WHAT IS SINGLE PHASE? WHAT IS 3- PHASE?
Alternating current electric power
using a system in which all the
voltages of the supply vary in
unison
Common method of alternating
current electric power generation,
transmission and distribution
CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G
SINGLE PHASE 3- PHASE
• Used when loads are mostly
lighting and heating
• Power large motors and other
heavy loadsUSAGE
POWER
FACTO
R
• Instantaneous power
pulsating hence change over
the cycle
• Instantaneous power is
always constant over the
cycle
• Has only one sine wave
voltage
• Peaks in voltage at 90 and
270 degree with a complete
cycle at 360 degree
• Uses three, separate sine
wave that are offset 120
degree from each other
VOLTAGES
CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G
SINGLE PHASE 3- PHASE
• Only need 2 wires to
complete the circuit
• Need at least 3 wires
• One for each phase
• Simple • Complicated
• Established much before • Established later
COMPLICATI
ON
ESTABLISHM
ENT OF
SYSTEM
WIRES
NEEDED
CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G
SINGLE PHASE 3- PHASE
• Increase the conductor
needed by 50%
• Increase the power
delivered by about 73%
• Homes • Industries
• Costlier in long term • Economical in long term
INCREMENT
OF SYSTEM
PREFERENCE
S OF USAGE
COST
CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G
SINGLE PHASE 3- PHASE
• May not perform
better in motors
• Perform better in
motors
• One neutral wire and one
power wire with current
flowing between them and
power flows between them
• No neutral wire is being
used in delta configuration
• Neutral and ground wire is
being used in wye
configuration
QUALITY OF
PERFORMANCE
TYPES OF
WIRES USED
CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G
ADVANTAGES DISADVANTAGES
Lightweig
ht
Experiences more interruptions in
electrical flows
•High voltage of transmission, lesser
current going through the line.
•Due to low current, the size of
conductor is less so, weight of
conductor is also lesser.
•Thus, the supporting tower becomes
lighter.
Efficient Transmission
•Reduction of power losses due to
low current.
•Efficiency of the transmission
increases, the unit operates at its
optimum.
Not Uniform Torque
•Produces current unbalance and
voltage unbalance or power system.
•Torque obtained is not uniform
•Due to presence of frequency which
affects the operation quality.
CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G
ADVANTAGES DISADVANTAGES
Less Substation Required
•Voltage reduction, distance between
2 substation can be increased
•Fewer substation is required.
•Substations can be placed at the
high voltage grid to reduces the initial
cost
of transmission.
•Cannot handle much
overload compared to DC
models.
Cannot Handle Overload
High Insulation Cost
• Caused by high system voltage.
•Insulation depends on voltage.
•Size of wire depends on current.
Shorter lifespan
More prone to vibration
• Power transferred in motors is a
function of the instantaneous
current which is constantly varying.
CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G
ADVANTAGES DISADVANTAGES
Steady source of
power
Increased cost and
inconvenience of repairs•Power transferred is uniform
throughout the cycle, therefore the
vibrations are greatly reduced
•2 overhead wires are required. So
cost increases
Safety
•It is safer to use around combustible
materials since there is no sparking
when they start
High
efficiency•150 % more efficient than single
phase in the same power range
Defectiveness of one unit
•In three phase transformer, a
common core is shared for all three
units
• If one unit is defective, the core of
the defective unit would immediately
saturate because of the absence of
opposing magnetic field
• It must be shut down if any one
phase is defective
CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G
ADVANTAGES DISADVANTAGES
Can handle heavy load Greater cost of standby Units
•Takes more load than single phase
Available in larger horsepower
size•Three-phase motors are available in
larger horsepower sizes than single-
phase motors.
Less expensive in long term
•Less expensive and usually lighter
and smaller than single phase at the
same horsepower rating
Have uniform torque
•3 phase motor have uniform torque
CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G
ADVANTAGES DISADVANTAGES
Self starting
•produce a rotating magnetic field
• eliminates the needs for a separate
starting winding, centrifugal switch,
starting capacitor, or a system of
brushes
High power to weight ratio
•Power to weight ratio of 3-phase
transformer is high
•Means for same amount of Electric
Power, the size of 3-phase
transformer is small
•The overall cost of transformer is
reduced.
•Due to reduction in weight:-
•transportation and installation
of transformer become
convenient
•less space is required to
accommodate the transformer.
CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G
MOULDED CASE CIRCUIT
BREAKER• control electric energy in
distribution
• offer short circuit and over current
protection for circuits ranges from
63 Amps-3000 Amps.
• give a means to manually open a
circuit/automatically open a circuit
SINGLE PHASE ENERGY
METER• watt-hour meter
• monitoring the
consumption of
electrical energy
MINIATURE CIRCUIT BREAKER
• Guards an electrical circuit
from an over current and
overheating
• Rated current is not more
than 100 amperes
NEUTRAL LINK
• accessories in MCB
• isolation of electric
equipment & clearing faulty
downstream
• protecting electric circuit
from damage caused by
overload
COPPER BUS BAR
• A conductor
• Collect electric power from
the incoming feeders and
distributes them to the
outgoing feeders at one
location
CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G
MCCB
Connect to each MCB
from
energy meter
CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G
WHY 3-PHASE IS USUALLY USE COMPARED TO SINGLE PHASE
Constant power delivered
• In single phase circuit the power delivered is pulsating and objectionable
for many applications
High Rating
• Output of a three-phase machine is narly 1.5 times the rating of a single
phase machine
Size and Weight of
Alternator• Small in size and light weight for 3- phase machine
Long-term maintenance
• Lower long-term maintenance for 3-phase machine
CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G
WHY 3-PHASE IS USUALLY USE COMPARED TO SINGLE PHASE
Requirement of Copper and
Aluminium• 3-phased system requires less copper and aluminium for transmission
system
Frequency of Vibration
• Frequency of vibration in 3-phased is lower than single- phased
Torque
• Uniform and constant torque in 3-phased system
Self Starting
• 3-phased system are self-starting whereas single-phase motor is not self-
starting
CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G
z
QUESTION: OPINION AS A QS IN TERM OF COSTING APPROACH?
Low Installation Cost
• Aluminum, Copper
Around 25% Less Conductor
Materials
Low Labor Handling Cost
Economical in Operation
• Efficient to run and have longer lifespan
• Require conductors with smaller cross-sectional area, saving copper = less
installation cost
CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G

More Related Content

What's hot

Introduction to switchgear
Introduction to switchgearIntroduction to switchgear
Introduction to switchgearAdnan Sayed
 
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)Hazem El-Henawy
 
Circuit Breakers for Low Voltage Applications
Circuit Breakers for Low Voltage ApplicationsCircuit Breakers for Low Voltage Applications
Circuit Breakers for Low Voltage ApplicationsIsham Rashik
 
Electrical Systems in a Building
Electrical Systems in a BuildingElectrical Systems in a Building
Electrical Systems in a BuildingGAURAV. H .TANDON
 
Selection Of Circuit Breaker
Selection Of Circuit BreakerSelection Of Circuit Breaker
Selection Of Circuit BreakerRaviraj solanki
 
SWITCH GEAR & PROTECTIVE DEVICE (EEN-437)
SWITCH GEAR & PROTECTIVE DEVICE (EEN-437)SWITCH GEAR & PROTECTIVE DEVICE (EEN-437)
SWITCH GEAR & PROTECTIVE DEVICE (EEN-437)foyez ahammad
 
X ray generators and its type
X ray generators and its typeX ray generators and its type
X ray generators and its typeDeepaknegi09
 
Switchgear and protection lecture 1
Switchgear and protection lecture 1Switchgear and protection lecture 1
Switchgear and protection lecture 1anuphowlader1
 
High Speed Schematic Design
High Speed Schematic DesignHigh Speed Schematic Design
High Speed Schematic DesignPankaj Khodifad
 
Surge Arresters construction and working
Surge Arresters construction and workingSurge Arresters construction and working
Surge Arresters construction and workingMuhammad Faisal Ikram
 
Vacuum circuit breaker
Vacuum circuit breakerVacuum circuit breaker
Vacuum circuit breakeropjit88
 
Application Considerations for Power System Grounding
Application Considerations for Power System GroundingApplication Considerations for Power System Grounding
Application Considerations for Power System Groundingmichaeljmack
 
transient performance improvement of MG by resistive superconducting Fault cu...
transient performance improvement of MG by resistive superconducting Fault cu...transient performance improvement of MG by resistive superconducting Fault cu...
transient performance improvement of MG by resistive superconducting Fault cu...Rohan Jain
 

What's hot (20)

Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 
Introduction to switchgear
Introduction to switchgearIntroduction to switchgear
Introduction to switchgear
 
Circuit breakers
Circuit breakersCircuit breakers
Circuit breakers
 
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
 
Circuit Breakers for Low Voltage Applications
Circuit Breakers for Low Voltage ApplicationsCircuit Breakers for Low Voltage Applications
Circuit Breakers for Low Voltage Applications
 
Electrical Systems in a Building
Electrical Systems in a BuildingElectrical Systems in a Building
Electrical Systems in a Building
 
Ac.generators
Ac.generatorsAc.generators
Ac.generators
 
Selection Of Circuit Breaker
Selection Of Circuit BreakerSelection Of Circuit Breaker
Selection Of Circuit Breaker
 
SWITCH GEAR & PROTECTIVE DEVICE (EEN-437)
SWITCH GEAR & PROTECTIVE DEVICE (EEN-437)SWITCH GEAR & PROTECTIVE DEVICE (EEN-437)
SWITCH GEAR & PROTECTIVE DEVICE (EEN-437)
 
X ray generators and its type
X ray generators and its typeX ray generators and its type
X ray generators and its type
 
switchboards
switchboardsswitchboards
switchboards
 
Switchgear and protection lecture 1
Switchgear and protection lecture 1Switchgear and protection lecture 1
Switchgear and protection lecture 1
 
High Speed Schematic Design
High Speed Schematic DesignHigh Speed Schematic Design
High Speed Schematic Design
 
Surge Arresters construction and working
Surge Arresters construction and workingSurge Arresters construction and working
Surge Arresters construction and working
 
Vacuum circuit breaker
Vacuum circuit breakerVacuum circuit breaker
Vacuum circuit breaker
 
Application Considerations for Power System Grounding
Application Considerations for Power System GroundingApplication Considerations for Power System Grounding
Application Considerations for Power System Grounding
 
havells ppt
havells ppthavells ppt
havells ppt
 
circuit breaker
circuit breakercircuit breaker
circuit breaker
 
transient performance improvement of MG by resistive superconducting Fault cu...
transient performance improvement of MG by resistive superconducting Fault cu...transient performance improvement of MG by resistive superconducting Fault cu...
transient performance improvement of MG by resistive superconducting Fault cu...
 
surge arrester
surge arrestersurge arrester
surge arrester
 

Similar to BS 2 PRESENTATION

Difference between single phase wiring and three phase wiring
Difference between single phase wiring and three phase wiring Difference between single phase wiring and three phase wiring
Difference between single phase wiring and three phase wiring Sow Wei Henn
 
Difference between single phase wiring and three phase (latest)
Difference between single phase wiring and three phase (latest)Difference between single phase wiring and three phase (latest)
Difference between single phase wiring and three phase (latest)shensin1015
 
ALBA MANUFACTURING OF TRANSFORMERS.pptx
ALBA MANUFACTURING OF TRANSFORMERS.pptxALBA MANUFACTURING OF TRANSFORMERS.pptx
ALBA MANUFACTURING OF TRANSFORMERS.pptxsfQyoom
 
Electrical supply & distribution
Electrical supply & distributionElectrical supply & distribution
Electrical supply & distributionYingHongKang
 
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptxBASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptxVenkataLokeshMamidis
 
Electrical Machine II by Jibesh Sir
Electrical Machine II by Jibesh SirElectrical Machine II by Jibesh Sir
Electrical Machine II by Jibesh SirMuntasir Mahdi
 
Bs ii presentation slides
Bs ii presentation slidesBs ii presentation slides
Bs ii presentation slidesbee_by
 
power system 1 unit 5 contains for various faults & circuit breakers
power system 1 unit 5 contains for various faults & circuit breakerspower system 1 unit 5 contains for various faults & circuit breakers
power system 1 unit 5 contains for various faults & circuit breakersmonikavardia
 
Types of wires, three phase system earthing
Types of wires, three phase system earthing Types of wires, three phase system earthing
Types of wires, three phase system earthing wasim shaikh
 
Five Devices and Jobs related to Electrical and Electronics Engineering
Five Devices and Jobs related to Electrical and Electronics EngineeringFive Devices and Jobs related to Electrical and Electronics Engineering
Five Devices and Jobs related to Electrical and Electronics EngineeringAlekhayaDatta
 
Switchgear, protection and measurement
Switchgear, protection and measurementSwitchgear, protection and measurement
Switchgear, protection and measurementBishal Rimal
 
L6 Electrical Actuation system
L6 Electrical Actuation systemL6 Electrical Actuation system
L6 Electrical Actuation systemtaruian
 
actuation systems.pdf
actuation systems.pdfactuation systems.pdf
actuation systems.pdfJklMahanth
 
120A-WOBC H06 elo h
120A-WOBC H06 elo h120A-WOBC H06 elo h
120A-WOBC H06 elo hphase3-120A
 
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Rahul Prajapati
 
220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptxssuser1b3e431
 

Similar to BS 2 PRESENTATION (20)

99% complete (4)
99% complete (4)99% complete (4)
99% complete (4)
 
Difference between single phase wiring and three phase wiring
Difference between single phase wiring and three phase wiring Difference between single phase wiring and three phase wiring
Difference between single phase wiring and three phase wiring
 
Difference between single phase wiring and three phase (latest)
Difference between single phase wiring and three phase (latest)Difference between single phase wiring and three phase (latest)
Difference between single phase wiring and three phase (latest)
 
ALBA MANUFACTURING OF TRANSFORMERS.pptx
ALBA MANUFACTURING OF TRANSFORMERS.pptxALBA MANUFACTURING OF TRANSFORMERS.pptx
ALBA MANUFACTURING OF TRANSFORMERS.pptx
 
Electrical supply & distribution
Electrical supply & distributionElectrical supply & distribution
Electrical supply & distribution
 
Generators
GeneratorsGenerators
Generators
 
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptxBASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
 
Electrical Machine II by Jibesh Sir
Electrical Machine II by Jibesh SirElectrical Machine II by Jibesh Sir
Electrical Machine II by Jibesh Sir
 
Bs ii presentation slides
Bs ii presentation slidesBs ii presentation slides
Bs ii presentation slides
 
power system 1 unit 5 contains for various faults & circuit breakers
power system 1 unit 5 contains for various faults & circuit breakerspower system 1 unit 5 contains for various faults & circuit breakers
power system 1 unit 5 contains for various faults & circuit breakers
 
X-RAY GENERATORS(1).pdf
X-RAY GENERATORS(1).pdfX-RAY GENERATORS(1).pdf
X-RAY GENERATORS(1).pdf
 
Chapter 4 dc machine [autosaved]
Chapter 4   dc machine [autosaved]Chapter 4   dc machine [autosaved]
Chapter 4 dc machine [autosaved]
 
Types of wires, three phase system earthing
Types of wires, three phase system earthing Types of wires, three phase system earthing
Types of wires, three phase system earthing
 
Five Devices and Jobs related to Electrical and Electronics Engineering
Five Devices and Jobs related to Electrical and Electronics EngineeringFive Devices and Jobs related to Electrical and Electronics Engineering
Five Devices and Jobs related to Electrical and Electronics Engineering
 
Switchgear, protection and measurement
Switchgear, protection and measurementSwitchgear, protection and measurement
Switchgear, protection and measurement
 
L6 Electrical Actuation system
L6 Electrical Actuation systemL6 Electrical Actuation system
L6 Electrical Actuation system
 
actuation systems.pdf
actuation systems.pdfactuation systems.pdf
actuation systems.pdf
 
120A-WOBC H06 elo h
120A-WOBC H06 elo h120A-WOBC H06 elo h
120A-WOBC H06 elo h
 
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
 
220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx
 

More from Wan Nee

Presentation 7-pp-final
Presentation 7-pp-finalPresentation 7-pp-final
Presentation 7-pp-finalWan Nee
 
Professional practice-1-1-1-autosaved (1)
Professional practice-1-1-1-autosaved (1)Professional practice-1-1-1-autosaved (1)
Professional practice-1-1-1-autosaved (1)Wan Nee
 
Structures final 20th june
Structures final 20th juneStructures final 20th june
Structures final 20th juneWan Nee
 
Eca presentation slide (group a)
Eca presentation slide (group a)Eca presentation slide (group a)
Eca presentation slide (group a)Wan Nee
 
Estimating final
Estimating  final Estimating  final
Estimating final Wan Nee
 
Seminar question
Seminar questionSeminar question
Seminar questionWan Nee
 
Estimating presentation
Estimating presentation Estimating presentation
Estimating presentation Wan Nee
 
Evaluation brief qsb2134 tender (1)
Evaluation brief qsb2134 tender (1)Evaluation brief qsb2134 tender (1)
Evaluation brief qsb2134 tender (1)Wan Nee
 
Estimating Assignment Brief
Estimating Assignment BriefEstimating Assignment Brief
Estimating Assignment BriefWan Nee
 
Estimating Assignment
Estimating AssignmentEstimating Assignment
Estimating AssignmentWan Nee
 
Supply Chain
Supply Chain Supply Chain
Supply Chain Wan Nee
 
Supply chain
Supply chain  Supply chain
Supply chain Wan Nee
 
Supply chain
Supply chainSupply chain
Supply chainWan Nee
 
Management Science
Management Science Management Science
Management Science Wan Nee
 
Qsb 2413 group project august 2017
Qsb 2413 group project august 2017 Qsb 2413 group project august 2017
Qsb 2413 group project august 2017 Wan Nee
 
CT 3 Group Assignment Presentation Slide
CT 3 Group Assignment Presentation SlideCT 3 Group Assignment Presentation Slide
CT 3 Group Assignment Presentation SlideWan Nee
 
CT3 Group Assignment Report
CT3 Group Assignment ReportCT3 Group Assignment Report
CT3 Group Assignment ReportWan Nee
 
Ct2 latest1-1 (3)
Ct2 latest1-1 (3)Ct2 latest1-1 (3)
Ct2 latest1-1 (3)Wan Nee
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORTWan Nee
 
INTEGRATED ASSIGNMENT - CT BM M
INTEGRATED ASSIGNMENT - CT BM MINTEGRATED ASSIGNMENT - CT BM M
INTEGRATED ASSIGNMENT - CT BM MWan Nee
 

More from Wan Nee (20)

Presentation 7-pp-final
Presentation 7-pp-finalPresentation 7-pp-final
Presentation 7-pp-final
 
Professional practice-1-1-1-autosaved (1)
Professional practice-1-1-1-autosaved (1)Professional practice-1-1-1-autosaved (1)
Professional practice-1-1-1-autosaved (1)
 
Structures final 20th june
Structures final 20th juneStructures final 20th june
Structures final 20th june
 
Eca presentation slide (group a)
Eca presentation slide (group a)Eca presentation slide (group a)
Eca presentation slide (group a)
 
Estimating final
Estimating  final Estimating  final
Estimating final
 
Seminar question
Seminar questionSeminar question
Seminar question
 
Estimating presentation
Estimating presentation Estimating presentation
Estimating presentation
 
Evaluation brief qsb2134 tender (1)
Evaluation brief qsb2134 tender (1)Evaluation brief qsb2134 tender (1)
Evaluation brief qsb2134 tender (1)
 
Estimating Assignment Brief
Estimating Assignment BriefEstimating Assignment Brief
Estimating Assignment Brief
 
Estimating Assignment
Estimating AssignmentEstimating Assignment
Estimating Assignment
 
Supply Chain
Supply Chain Supply Chain
Supply Chain
 
Supply chain
Supply chain  Supply chain
Supply chain
 
Supply chain
Supply chainSupply chain
Supply chain
 
Management Science
Management Science Management Science
Management Science
 
Qsb 2413 group project august 2017
Qsb 2413 group project august 2017 Qsb 2413 group project august 2017
Qsb 2413 group project august 2017
 
CT 3 Group Assignment Presentation Slide
CT 3 Group Assignment Presentation SlideCT 3 Group Assignment Presentation Slide
CT 3 Group Assignment Presentation Slide
 
CT3 Group Assignment Report
CT3 Group Assignment ReportCT3 Group Assignment Report
CT3 Group Assignment Report
 
Ct2 latest1-1 (3)
Ct2 latest1-1 (3)Ct2 latest1-1 (3)
Ct2 latest1-1 (3)
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORT
 
INTEGRATED ASSIGNMENT - CT BM M
INTEGRATED ASSIGNMENT - CT BM MINTEGRATED ASSIGNMENT - CT BM M
INTEGRATED ASSIGNMENT - CT BM M
 

Recently uploaded

Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 

Recently uploaded (20)

Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 

BS 2 PRESENTATION

  • 1. CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G
  • 2. CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G WHAT IS SINGLE PHASE? WHAT IS 3- PHASE? Alternating current electric power using a system in which all the voltages of the supply vary in unison Common method of alternating current electric power generation, transmission and distribution
  • 3. CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G SINGLE PHASE 3- PHASE • Used when loads are mostly lighting and heating • Power large motors and other heavy loadsUSAGE POWER FACTO R • Instantaneous power pulsating hence change over the cycle • Instantaneous power is always constant over the cycle • Has only one sine wave voltage • Peaks in voltage at 90 and 270 degree with a complete cycle at 360 degree • Uses three, separate sine wave that are offset 120 degree from each other VOLTAGES
  • 4. CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G SINGLE PHASE 3- PHASE • Only need 2 wires to complete the circuit • Need at least 3 wires • One for each phase • Simple • Complicated • Established much before • Established later COMPLICATI ON ESTABLISHM ENT OF SYSTEM WIRES NEEDED
  • 5. CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G SINGLE PHASE 3- PHASE • Increase the conductor needed by 50% • Increase the power delivered by about 73% • Homes • Industries • Costlier in long term • Economical in long term INCREMENT OF SYSTEM PREFERENCE S OF USAGE COST
  • 6. CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G SINGLE PHASE 3- PHASE • May not perform better in motors • Perform better in motors • One neutral wire and one power wire with current flowing between them and power flows between them • No neutral wire is being used in delta configuration • Neutral and ground wire is being used in wye configuration QUALITY OF PERFORMANCE TYPES OF WIRES USED
  • 7. CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G ADVANTAGES DISADVANTAGES Lightweig ht Experiences more interruptions in electrical flows •High voltage of transmission, lesser current going through the line. •Due to low current, the size of conductor is less so, weight of conductor is also lesser. •Thus, the supporting tower becomes lighter. Efficient Transmission •Reduction of power losses due to low current. •Efficiency of the transmission increases, the unit operates at its optimum. Not Uniform Torque •Produces current unbalance and voltage unbalance or power system. •Torque obtained is not uniform •Due to presence of frequency which affects the operation quality.
  • 8. CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G ADVANTAGES DISADVANTAGES Less Substation Required •Voltage reduction, distance between 2 substation can be increased •Fewer substation is required. •Substations can be placed at the high voltage grid to reduces the initial cost of transmission. •Cannot handle much overload compared to DC models. Cannot Handle Overload High Insulation Cost • Caused by high system voltage. •Insulation depends on voltage. •Size of wire depends on current. Shorter lifespan More prone to vibration • Power transferred in motors is a function of the instantaneous current which is constantly varying.
  • 9. CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G ADVANTAGES DISADVANTAGES Steady source of power Increased cost and inconvenience of repairs•Power transferred is uniform throughout the cycle, therefore the vibrations are greatly reduced •2 overhead wires are required. So cost increases Safety •It is safer to use around combustible materials since there is no sparking when they start High efficiency•150 % more efficient than single phase in the same power range Defectiveness of one unit •In three phase transformer, a common core is shared for all three units • If one unit is defective, the core of the defective unit would immediately saturate because of the absence of opposing magnetic field • It must be shut down if any one phase is defective
  • 10. CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G ADVANTAGES DISADVANTAGES Can handle heavy load Greater cost of standby Units •Takes more load than single phase Available in larger horsepower size•Three-phase motors are available in larger horsepower sizes than single- phase motors. Less expensive in long term •Less expensive and usually lighter and smaller than single phase at the same horsepower rating Have uniform torque •3 phase motor have uniform torque
  • 11. CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G ADVANTAGES DISADVANTAGES Self starting •produce a rotating magnetic field • eliminates the needs for a separate starting winding, centrifugal switch, starting capacitor, or a system of brushes High power to weight ratio •Power to weight ratio of 3-phase transformer is high •Means for same amount of Electric Power, the size of 3-phase transformer is small •The overall cost of transformer is reduced. •Due to reduction in weight:- •transportation and installation of transformer become convenient •less space is required to accommodate the transformer.
  • 12. CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G MOULDED CASE CIRCUIT BREAKER• control electric energy in distribution • offer short circuit and over current protection for circuits ranges from 63 Amps-3000 Amps. • give a means to manually open a circuit/automatically open a circuit SINGLE PHASE ENERGY METER• watt-hour meter • monitoring the consumption of electrical energy MINIATURE CIRCUIT BREAKER • Guards an electrical circuit from an over current and overheating • Rated current is not more than 100 amperes NEUTRAL LINK • accessories in MCB • isolation of electric equipment & clearing faulty downstream • protecting electric circuit from damage caused by overload COPPER BUS BAR • A conductor • Collect electric power from the incoming feeders and distributes them to the outgoing feeders at one location
  • 13. CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G MCCB Connect to each MCB from energy meter
  • 14. CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G WHY 3-PHASE IS USUALLY USE COMPARED TO SINGLE PHASE Constant power delivered • In single phase circuit the power delivered is pulsating and objectionable for many applications High Rating • Output of a three-phase machine is narly 1.5 times the rating of a single phase machine Size and Weight of Alternator• Small in size and light weight for 3- phase machine Long-term maintenance • Lower long-term maintenance for 3-phase machine
  • 15. CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G WHY 3-PHASE IS USUALLY USE COMPARED TO SINGLE PHASE Requirement of Copper and Aluminium• 3-phased system requires less copper and aluminium for transmission system Frequency of Vibration • Frequency of vibration in 3-phased is lower than single- phased Torque • Uniform and constant torque in 3-phased system Self Starting • 3-phased system are self-starting whereas single-phase motor is not self- starting
  • 16. CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G z QUESTION: OPINION AS A QS IN TERM OF COSTING APPROACH? Low Installation Cost • Aluminum, Copper Around 25% Less Conductor Materials Low Labor Handling Cost Economical in Operation • Efficient to run and have longer lifespan • Require conductors with smaller cross-sectional area, saving copper = less installation cost
  • 17. CHAI JIA ERN 0324653 l CHEAH MAN YEE 0324743 l TAN KAI XUAN 0325066 l TEE WAN NEE 0325074 l NA YONG YI 0324458 l G

Editor's Notes

  1. For transmitting the same amount of power at the same voltage, a three phase transmission line requires less conductor material than a single phase line. The  three phase transmission system is so cheaper. For a given amount of power transmitted through a system, the three phase system requires conductors with a smaller cross-sectional area.  This means a saving of copper and thus the original installation costs are less. Three phase induction motors are self-starting whereas the single phase induction motor is not self-starting. This means the 1 –phase motor has no starting torque and hence it needs some auxiliary means to start at the initial stage.