Unit 1
Prof.Vaibhav D.Kamble
B.E.Civil, M.E.(Civil- Environmental Engineering)
Water Demand
IS 1172:1993( Reaffirmed in 2002) CODE OF BASIC
REQUIREMENTS FOR WATE R SUPPLY, DRAINAGE
AND SANITATION
Water Demand
Population
Source Availability
Amount of Water demanded by public and amount of
water available
 Estimation of Water Demand- key parameter –
planning of Water Supply Scheme
 Agriculture sector – more then 80% of total water
potential created in our country
 Remaining portion we have to utilize
Improvement in Life style & industrial development push
up the per capita of water
 Prediction of precise quantity- very difficult
 Certain Thumb Rules & Empirical Formulae
 Types of Water Demand-
1. Domestic Water Demand
2. Industrial Water Demand
3. Institutional and Commercial Water Demand
4. Demand for Public Uses
5. Fire Demand
6. Water Loss in Thefts and Wastes
 Vary according to the Living Conditions
 50 to 60% of Total Water Consumption
 IS code- limit on domestic water consumption
between 135 to 225 lpcd
 Minimum Water Demand- For a town with full
flushing system-200 lpcd
 Minimized up to 135 lpcd for EWS & LIG
Developed countries like USA –
usually high as 340 lpcd .
 Industries which are existing or likely to start in
future
 vary with the types & number of industries
present in the city
In Industrial Cities Per capita requirement
computed to be as high as 450l/h/d as
compared to the normal industrial requirement
of 50l/h/d
On an average per capita demand of 20
l/h/d is usually considered , this demand
may be as high as 50 l/h/d for highly
commercial cities
S.No Type of Building Avg.lpcd
1 Factories a) Where Bathrooms are required to be provided 45
b)Where no bathrooms are required 30
2 Hospitals (Including Laundry per Bed )
a) Number of Beds less than 100 340
b) Number of beds exceeding 100 450
3 Nurses Homes and Medical Quarters 150
4 Hostels 135
5 Hostels(per Bed) 180
6 Restaurants per Seat 70
7 Offices 45
8 Cinemas, Auditoriums and Theatres (per seat) 15
9 Schools a) Day Scholars 45
b) Residentials 135
 Water requirements for parks, gardening,
washing of roads etc
 Normally 5% of Total water Consumption
 Usual Range – 10 lpcd while computing total
water requirement
 1 lpcd – 50 Lac Population
 Establishment of Fire Hydrants in the City
 Following Requirements must be met for the
water demand
1) The minimum water pressure available at the Hydrant-
100-150 KN/m2( 10 to 15m of Water Head) & should be
maintained for 4 to 5 Hours of Use of Hydrant
2) Out of three jet stream – discharge from single stream-
1100l/m
 For cities having population exceeding 50,000 the water
required in kilolitres may be computed using the
relation=100√P where P= Population in Thousand
 Kuichling Formula- Q=3182 √P where P is population in
Thousand and Q is amount of water requires in
litres/minute
 Freemans Formula-1136[P/5 +10]
 National Boards of Fire Underwriters Formula- When
population is less than 2 Lakh, Q=4637√p[1-0.01√p]
 Bustons Formula- It states that, Q=5663√P
All the above formulas suffer from the drawback that they are
not related to the type of district served and gives equal
results for Industral and Non. Industrial Aress
 Water lost in leakage due to bad plumbing or damaged
meters, stolen water due to unauthorized water
connections
 These losses should be taken into account while
estimating the total requirement
 May be as high as 15% of the Total Consumption –
nearly equal to 55lpcd
Total Maximum Water Demand = Sum of Six Water
Demands
(Domestic Water Demand) +
(Industrial Water Demand)+
(Institutional and Commercial Water Demand)+
(Demand for Public Uses)+
(Fire Demand) +
(Water Loss in Thefts and Wastes)
Per capita demand = Total Yearly water
requirement of the city in litres
(i.e.V)/365* Population
Use Demand in l/h/d
1) Domestic Use 200
2) Industrial Use 50
3) Commercial Use 20
4) Civic or Public Use 10
5)Wastes and Thefts etc 55
6) Fire Demand Less than 1
Total=335 = per capita demand
Factors Affecting per
Capita Demand
1. Size of the City
2. Climatic Conditions
3. Types of Gentry & Habits of People
4. Industrial & Commercial Activities
5. Quality of Water Supplies
6. Pressure in the distribution system
7. Developments of Sewerage Facilities
8. System of Supply
9. Cost of Water
10. Policy of Metering & Method of Charging
1. Water tight joints
2. Pressure in the Distribution System
3. System of Supply
4. Metering
5. Unauthorized Connections
Calculation of Water
Demand and
Population
Forecasting
 Smaller the town more variable is the demand
1) Maximum Daily Demand= 1.8 ×Average Daily Demand(q)
2)Maximum Hourly Demand
= 1.5 ×Average Hourly Demand of Maximum Daily Demand
=1.5 × (Maximum Daily Demand/24)
=1.5 ×(1.8 × q/24)
=2.7 ×(q/24)
=2.7 × Average Annual Hourly Demand
3)Maximum Weekly Demand=1.48 × Average Weekly Demand
4)Maximum Monthly Demand= 1.28 × Average Monthly Demand
 The GOI manual on water supply has recommended the
following values of peak factor, depending upon the
population
Sr.No
.
Population Peak Factor
1 Up to 50,000 3
50,001 – 2,00,000 2.5
Above 2 Lakh 2
2 For Rural Water Supply Scheme,
where supply is effected through
stand post for only 6 Hours
3
Design Period of Water
Supply Unit
 In Order to avoid future complications of Expansion
 Design period should neither be too long nor should it be
too short & should not exceed useful life of the structure
The future period or the number of years for which provision is
made in designing the capacities of various components of the
Water supply scheme is known as the Design Period.
Water supply projects under normal circumstances, may
be designed for a design period of 30 years excluding
completion time of 2 years.
S.No
.
Units Design
Discharge
Design
Period
1 Water Treatment Units Maximum Daily
Demand
15 Years
2 Main Supply Pipes(
Water Mains)
Maximum Daily
Demand
30 Years
3 Wells and Tube Wells Maximum Daily
Demand
30-50 Years
4 Demand Reservoir Average Annual
Demand
50 Years
5 Distribution System Maximum Hourly
Demand
30 Years
Population Forecasting
& Methods of
Population
Forecasting
1. Arithmetic Increase Method
2. Geometric Increase Method
3. Incremental Increase Method
4. Decreasing Growth Rate Method
5. Extension Curve Method
6. Comparative Graphical Method
7. Master Plan or Zoning Method
8. Ratio Method
9. Logistic Curve Method
 Based upon the assumption that the population
increases at a constant rate i.e. The rate of
change of population with time is constant
 Where
 Pn=Perspective or forecasted population after n
decades from the present(i.e. last Known
census)
 Po=Population at present(Last Known Census)
 n= number of decade between now & future
 X= Average( arithmetic mean) of population
increase in the known decades
Pn = Po + nx
This method is of limited application, mostly used in
large and established towns where future growth has
been controlled
 The basic difference between arithmetic & geometric
method is that in Arithmetic method no compounding is
done and in Geometric Method Compounding id done
every decade
 In this method a constant value of percentage growth
rate per decade is calculated
 Where Pn= Population after n decades
 Po= Initial Known Population
 r= √r1.r2.r3…….rm ( Average percentage growth rate per
decade)
Pn = Po (1+ r/100)n
This method is applicable to the cities with unlimited
scope for future expansion and where a constant rate of
growth is anticipated
 According to this method population after n
decade is given by
 Where x and y are average incremental increase
of population per decade and average
incremental increase resp.
 x=average increase of population per decade
= x1+x2+…..+xp/p
 y= Average of Incremental Increase
 =y1+y2+…..+yp/p
Pn = Po + nx +n(n+1)/2*y
This method is adopted for cities which are likely to grow
progressively of increasing or decreasing rate rather
than a constant rate
 In this method average decrease in the % increase is
calculated and then subtracted from the last % increase
computations made for each increased year
 Calculate the % increase in population in each decade
and work out the decrease in percentage increase in
each decade and find average percentage decrease say
‘r’. The population of upcoming decade from the previous
known decade is given as
 Where
 Po=Population of the last known decade
 ro = Growth Rate of last decade
 r’= Average decrease in growth rate
P1=Po+(ro-r’/100)*Po
If Population is reaching towards saturation and growth
rate is decreasing, then this method is suitable.
This method is suitable when past record is available for
long duration and extension is required for small
duration
 Big and Metropolitan Cities are not allowed to
develop in haphazard & natural ways, but are
allowed to develop only in planned ways
 The expansion of such cities are regulated by
various by laws of the corporations and other
local bodies
 Only those expansions are allowed which are
permitted / proposed in the master plan of the
city.
This method can give us when and where the given
number of houses, industries and commercial
establishments would be developed
This method is valid for those
whose growths are parallel to
national growth
Unit 1
Sources of Water
Surface Sources
Sub-Surface
Sources
Pond and Lakes
Streams and Rivers
Storage Reservoirs
Ocean
Springs
Infiltration Galleries
Infiltration Wells
Wells and Tube Wells
 Are sometimes called as Horizontal Wells
Infiltration Galleries
 Are the shallow wells constructed in series along the banks of
the river in order to collect the river water seeping through their
bottom.
Infiltration Wells
 The natural outflow of ground water at the earths
surface is said to form a spring.
 Springs are usually formed under three general
conditions of geological formation
1. Gravity Spring
2. Surface Spring
3. Artesian Spring
Springs
Gravity Spring
Surface Spring
Artesian Spring
Wells
Open Wells Tube Wells
Shallow Wells
Deep Wells
Strainer Type
Cavity Type
Gravel Pack
Type
Intake Structure
Collection of Surface Water
Generally- Masonry/Concrete Structure to provide –
relatively clear water free from Pollution @ source
Site Should be Selected such that
Admit water even under worst condition of the flow in the river
As near as possible to the treatment works
At a place protected from rapid currents
It is free from pollution
It should not interfere with river traffic
Good Foundation Conditions are available & scouring will be less
Further Expansion is possible
 Intakes are classified under Three Heads
Intakes
Submerged
Intake
Exposed
Intake
Wet Intake
Dry Intake
River Intake
Reservoir
Intake
Lake Intake
Canal Intake
Wet type Intake Well founded near river bed
River Intake is located at the Upstream side of the City
They are mostly located sufficiently inside the river
Where the River Bed is soft and unstable
The Intake Tower founded slightly away from River Bed
The Intake is kept submerged under lower water level of river
When the flow in the river is not guaranteed throughout the year –
dam is constructed
The Reservoir Intake – Practically Similar to River Intake except
these are located at maximum depth of water
Design depends – Type of Dam
When the flow in the river is not guaranteed throughtout the year
– dam is constructed
The Reservoir Intake – Practically Similar to River Intake except
these are located at maximum depth of water
Design depends – Type of Dam
Sometimes- source- irrigation canal passing through the town
Does not cause appreciable resistance to the canal flow
Otherwise- located inside the canal bank and Canal bank is lined
  Sources, intake structures and water demand in Water Supply Schemes

More Related Content

What's hot

Chapter 7 conveyance of water
Chapter 7 conveyance of waterChapter 7 conveyance of water
Chapter 7 conveyance of water
Gokul Saud
 

What's hot (20)

Sewer appurtenances
Sewer appurtenancesSewer appurtenances
Sewer appurtenances
 
Chapter 7 conveyance of water
Chapter 7 conveyance of waterChapter 7 conveyance of water
Chapter 7 conveyance of water
 
Water requirements
Water requirementsWater requirements
Water requirements
 
SEWERAGE SYSTEMS ppt by mayank oza
SEWERAGE SYSTEMS ppt by mayank ozaSEWERAGE SYSTEMS ppt by mayank oza
SEWERAGE SYSTEMS ppt by mayank oza
 
Design of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningDesign of Lined Canal and Canal Lining
Design of Lined Canal and Canal Lining
 
L 3 and l-4 water demand
L 3  and l-4 water demandL 3  and l-4 water demand
L 3 and l-4 water demand
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
Design of sewers
Design of sewersDesign of sewers
Design of sewers
 
Canal Fall
Canal FallCanal Fall
Canal Fall
 
Canal
CanalCanal
Canal
 
Water demand
Water demandWater demand
Water demand
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 
design of weirs
design of weirsdesign of weirs
design of weirs
 
SEWER DESIGN:
SEWER DESIGN:SEWER DESIGN:
SEWER DESIGN:
 
Design period
Design periodDesign period
Design period
 
Water distribution System In Water Supply Schemes
Water distribution System In Water Supply Schemes Water distribution System In Water Supply Schemes
Water distribution System In Water Supply Schemes
 
Intake structures
Intake structures Intake structures
Intake structures
 
Intake structures-Introduction
Intake structures-IntroductionIntake structures-Introduction
Intake structures-Introduction
 
Collection of sewage & estimation of its discharge
Collection of sewage & estimation of its dischargeCollection of sewage & estimation of its discharge
Collection of sewage & estimation of its discharge
 
Intake structures in wwwe
Intake structures in wwweIntake structures in wwwe
Intake structures in wwwe
 

Similar to Sources, intake structures and water demand in Water Supply Schemes

sewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenancesewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenance
Manish Goyal
 
Environmental engineering
Environmental engineeringEnvironmental engineering
Environmental engineering
shaymaa17
 

Similar to Sources, intake structures and water demand in Water Supply Schemes (20)

Quality and quantity of water m1
Quality and quantity of water m1Quality and quantity of water m1
Quality and quantity of water m1
 
Chapter 1..Water Demand (1) examples.pptx
Chapter 1..Water Demand (1) examples.pptxChapter 1..Water Demand (1) examples.pptx
Chapter 1..Water Demand (1) examples.pptx
 
Water requirements
Water requirementsWater requirements
Water requirements
 
Quantity of Water.pptx
Quantity of Water.pptxQuantity of Water.pptx
Quantity of Water.pptx
 
L1 - Introduction.ppt
L1 - Introduction.pptL1 - Introduction.ppt
L1 - Introduction.ppt
 
Ce 401 introduction to environmental engineering
Ce 401 introduction to environmental engineeringCe 401 introduction to environmental engineering
Ce 401 introduction to environmental engineering
 
Lec 2.pptx
Lec 2.pptxLec 2.pptx
Lec 2.pptx
 
water supply and Treatment (2).pptx
water supply and Treatment (2).pptxwater supply and Treatment (2).pptx
water supply and Treatment (2).pptx
 
Water demand/Waterrequirements
Water demand/Waterrequirements Water demand/Waterrequirements
Water demand/Waterrequirements
 
sewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenancesewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenance
 
Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1
 
Quality & quantity of water
Quality & quantity of waterQuality & quantity of water
Quality & quantity of water
 
Water resource treatment
Water resource treatmentWater resource treatment
Water resource treatment
 
UNIT -I Introduction to water supply scheme.ppt
UNIT -I Introduction to water supply scheme.pptUNIT -I Introduction to water supply scheme.ppt
UNIT -I Introduction to water supply scheme.ppt
 
L 4 wastewater flow rates
L 4 wastewater flow ratesL 4 wastewater flow rates
L 4 wastewater flow rates
 
Kebutuhan Air
Kebutuhan AirKebutuhan Air
Kebutuhan Air
 
EE.pdf
EE.pdfEE.pdf
EE.pdf
 
Environmental engineering
Environmental engineeringEnvironmental engineering
Environmental engineering
 
quantity of water
quantity of waterquantity of water
quantity of water
 
Water Requirements
Water RequirementsWater Requirements
Water Requirements
 

More from Vaibhav Kambale

More from Vaibhav Kambale (9)

Thermal Processing of Solid Waste
Thermal Processing of Solid WasteThermal Processing of Solid Waste
Thermal Processing of Solid Waste
 
Processing of Solid Waste
Processing of Solid Waste Processing of Solid Waste
Processing of Solid Waste
 
Treatment of Water and Design Example on Sedimentation Tank
Treatment of Water and Design Example on Sedimentation TankTreatment of Water and Design Example on Sedimentation Tank
Treatment of Water and Design Example on Sedimentation Tank
 
Quality and Characteristics of Water
Quality and Characteristics of Water Quality and Characteristics of Water
Quality and Characteristics of Water
 
Characteristics of solid waste 3
Characteristics of solid waste 3Characteristics of solid waste 3
Characteristics of solid waste 3
 
Composition of solid waste management 2
Composition of solid waste management 2Composition of solid waste management 2
Composition of solid waste management 2
 
Introduction to solid waste management1
Introduction to solid waste management1Introduction to solid waste management1
Introduction to solid waste management1
 
Introduction to Envronmental Engineering I or water supply engineering
 Introduction to Envronmental Engineering I or  water supply engineering Introduction to Envronmental Engineering I or  water supply engineering
Introduction to Envronmental Engineering I or water supply engineering
 
Biological Treatment of Wastewater by Activated Sludge Process
Biological Treatment of Wastewater by Activated Sludge Process Biological Treatment of Wastewater by Activated Sludge Process
Biological Treatment of Wastewater by Activated Sludge Process
 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Recently uploaded (20)

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 

Sources, intake structures and water demand in Water Supply Schemes

  • 1. Unit 1 Prof.Vaibhav D.Kamble B.E.Civil, M.E.(Civil- Environmental Engineering)
  • 2. Water Demand IS 1172:1993( Reaffirmed in 2002) CODE OF BASIC REQUIREMENTS FOR WATE R SUPPLY, DRAINAGE AND SANITATION
  • 3. Water Demand Population Source Availability Amount of Water demanded by public and amount of water available
  • 4.  Estimation of Water Demand- key parameter – planning of Water Supply Scheme  Agriculture sector – more then 80% of total water potential created in our country  Remaining portion we have to utilize Improvement in Life style & industrial development push up the per capita of water
  • 5.  Prediction of precise quantity- very difficult  Certain Thumb Rules & Empirical Formulae  Types of Water Demand- 1. Domestic Water Demand 2. Industrial Water Demand 3. Institutional and Commercial Water Demand 4. Demand for Public Uses 5. Fire Demand 6. Water Loss in Thefts and Wastes
  • 6.  Vary according to the Living Conditions  50 to 60% of Total Water Consumption  IS code- limit on domestic water consumption between 135 to 225 lpcd  Minimum Water Demand- For a town with full flushing system-200 lpcd  Minimized up to 135 lpcd for EWS & LIG Developed countries like USA – usually high as 340 lpcd .
  • 7.  Industries which are existing or likely to start in future  vary with the types & number of industries present in the city In Industrial Cities Per capita requirement computed to be as high as 450l/h/d as compared to the normal industrial requirement of 50l/h/d
  • 8. On an average per capita demand of 20 l/h/d is usually considered , this demand may be as high as 50 l/h/d for highly commercial cities
  • 9. S.No Type of Building Avg.lpcd 1 Factories a) Where Bathrooms are required to be provided 45 b)Where no bathrooms are required 30 2 Hospitals (Including Laundry per Bed ) a) Number of Beds less than 100 340 b) Number of beds exceeding 100 450 3 Nurses Homes and Medical Quarters 150 4 Hostels 135 5 Hostels(per Bed) 180 6 Restaurants per Seat 70 7 Offices 45 8 Cinemas, Auditoriums and Theatres (per seat) 15 9 Schools a) Day Scholars 45 b) Residentials 135
  • 10.  Water requirements for parks, gardening, washing of roads etc  Normally 5% of Total water Consumption  Usual Range – 10 lpcd while computing total water requirement
  • 11.  1 lpcd – 50 Lac Population  Establishment of Fire Hydrants in the City  Following Requirements must be met for the water demand 1) The minimum water pressure available at the Hydrant- 100-150 KN/m2( 10 to 15m of Water Head) & should be maintained for 4 to 5 Hours of Use of Hydrant 2) Out of three jet stream – discharge from single stream- 1100l/m
  • 12.  For cities having population exceeding 50,000 the water required in kilolitres may be computed using the relation=100√P where P= Population in Thousand  Kuichling Formula- Q=3182 √P where P is population in Thousand and Q is amount of water requires in litres/minute  Freemans Formula-1136[P/5 +10]  National Boards of Fire Underwriters Formula- When population is less than 2 Lakh, Q=4637√p[1-0.01√p]  Bustons Formula- It states that, Q=5663√P All the above formulas suffer from the drawback that they are not related to the type of district served and gives equal results for Industral and Non. Industrial Aress
  • 13.  Water lost in leakage due to bad plumbing or damaged meters, stolen water due to unauthorized water connections  These losses should be taken into account while estimating the total requirement  May be as high as 15% of the Total Consumption – nearly equal to 55lpcd
  • 14. Total Maximum Water Demand = Sum of Six Water Demands (Domestic Water Demand) + (Industrial Water Demand)+ (Institutional and Commercial Water Demand)+ (Demand for Public Uses)+ (Fire Demand) + (Water Loss in Thefts and Wastes) Per capita demand = Total Yearly water requirement of the city in litres (i.e.V)/365* Population
  • 15. Use Demand in l/h/d 1) Domestic Use 200 2) Industrial Use 50 3) Commercial Use 20 4) Civic or Public Use 10 5)Wastes and Thefts etc 55 6) Fire Demand Less than 1 Total=335 = per capita demand
  • 17. 1. Size of the City 2. Climatic Conditions 3. Types of Gentry & Habits of People 4. Industrial & Commercial Activities 5. Quality of Water Supplies 6. Pressure in the distribution system 7. Developments of Sewerage Facilities 8. System of Supply 9. Cost of Water 10. Policy of Metering & Method of Charging
  • 18. 1. Water tight joints 2. Pressure in the Distribution System 3. System of Supply 4. Metering 5. Unauthorized Connections
  • 19. Calculation of Water Demand and Population Forecasting
  • 20.  Smaller the town more variable is the demand 1) Maximum Daily Demand= 1.8 ×Average Daily Demand(q) 2)Maximum Hourly Demand = 1.5 ×Average Hourly Demand of Maximum Daily Demand =1.5 × (Maximum Daily Demand/24) =1.5 ×(1.8 × q/24) =2.7 ×(q/24) =2.7 × Average Annual Hourly Demand 3)Maximum Weekly Demand=1.48 × Average Weekly Demand 4)Maximum Monthly Demand= 1.28 × Average Monthly Demand
  • 21.  The GOI manual on water supply has recommended the following values of peak factor, depending upon the population Sr.No . Population Peak Factor 1 Up to 50,000 3 50,001 – 2,00,000 2.5 Above 2 Lakh 2 2 For Rural Water Supply Scheme, where supply is effected through stand post for only 6 Hours 3
  • 22. Design Period of Water Supply Unit
  • 23.  In Order to avoid future complications of Expansion  Design period should neither be too long nor should it be too short & should not exceed useful life of the structure The future period or the number of years for which provision is made in designing the capacities of various components of the Water supply scheme is known as the Design Period. Water supply projects under normal circumstances, may be designed for a design period of 30 years excluding completion time of 2 years.
  • 24. S.No . Units Design Discharge Design Period 1 Water Treatment Units Maximum Daily Demand 15 Years 2 Main Supply Pipes( Water Mains) Maximum Daily Demand 30 Years 3 Wells and Tube Wells Maximum Daily Demand 30-50 Years 4 Demand Reservoir Average Annual Demand 50 Years 5 Distribution System Maximum Hourly Demand 30 Years
  • 25. Population Forecasting & Methods of Population Forecasting
  • 26. 1. Arithmetic Increase Method 2. Geometric Increase Method 3. Incremental Increase Method 4. Decreasing Growth Rate Method 5. Extension Curve Method 6. Comparative Graphical Method 7. Master Plan or Zoning Method 8. Ratio Method 9. Logistic Curve Method
  • 27.  Based upon the assumption that the population increases at a constant rate i.e. The rate of change of population with time is constant  Where  Pn=Perspective or forecasted population after n decades from the present(i.e. last Known census)  Po=Population at present(Last Known Census)  n= number of decade between now & future  X= Average( arithmetic mean) of population increase in the known decades Pn = Po + nx This method is of limited application, mostly used in large and established towns where future growth has been controlled
  • 28.  The basic difference between arithmetic & geometric method is that in Arithmetic method no compounding is done and in Geometric Method Compounding id done every decade  In this method a constant value of percentage growth rate per decade is calculated  Where Pn= Population after n decades  Po= Initial Known Population  r= √r1.r2.r3…….rm ( Average percentage growth rate per decade) Pn = Po (1+ r/100)n This method is applicable to the cities with unlimited scope for future expansion and where a constant rate of growth is anticipated
  • 29.  According to this method population after n decade is given by  Where x and y are average incremental increase of population per decade and average incremental increase resp.  x=average increase of population per decade = x1+x2+…..+xp/p  y= Average of Incremental Increase  =y1+y2+…..+yp/p Pn = Po + nx +n(n+1)/2*y This method is adopted for cities which are likely to grow progressively of increasing or decreasing rate rather than a constant rate
  • 30.  In this method average decrease in the % increase is calculated and then subtracted from the last % increase computations made for each increased year  Calculate the % increase in population in each decade and work out the decrease in percentage increase in each decade and find average percentage decrease say ‘r’. The population of upcoming decade from the previous known decade is given as  Where  Po=Population of the last known decade  ro = Growth Rate of last decade  r’= Average decrease in growth rate P1=Po+(ro-r’/100)*Po If Population is reaching towards saturation and growth rate is decreasing, then this method is suitable.
  • 31. This method is suitable when past record is available for long duration and extension is required for small duration
  • 32.
  • 33.  Big and Metropolitan Cities are not allowed to develop in haphazard & natural ways, but are allowed to develop only in planned ways  The expansion of such cities are regulated by various by laws of the corporations and other local bodies  Only those expansions are allowed which are permitted / proposed in the master plan of the city. This method can give us when and where the given number of houses, industries and commercial establishments would be developed
  • 34. This method is valid for those whose growths are parallel to national growth
  • 36. Sources of Water Surface Sources Sub-Surface Sources Pond and Lakes Streams and Rivers Storage Reservoirs Ocean Springs Infiltration Galleries Infiltration Wells Wells and Tube Wells
  • 37.  Are sometimes called as Horizontal Wells Infiltration Galleries
  • 38.
  • 39.  Are the shallow wells constructed in series along the banks of the river in order to collect the river water seeping through their bottom. Infiltration Wells
  • 40.
  • 41.
  • 42.  The natural outflow of ground water at the earths surface is said to form a spring.  Springs are usually formed under three general conditions of geological formation 1. Gravity Spring 2. Surface Spring 3. Artesian Spring Springs
  • 44.
  • 45.
  • 46.
  • 47. Wells Open Wells Tube Wells Shallow Wells Deep Wells Strainer Type Cavity Type Gravel Pack Type
  • 49. Generally- Masonry/Concrete Structure to provide – relatively clear water free from Pollution @ source
  • 50. Site Should be Selected such that Admit water even under worst condition of the flow in the river As near as possible to the treatment works At a place protected from rapid currents It is free from pollution It should not interfere with river traffic Good Foundation Conditions are available & scouring will be less Further Expansion is possible
  • 51.  Intakes are classified under Three Heads Intakes Submerged Intake Exposed Intake Wet Intake Dry Intake River Intake Reservoir Intake Lake Intake Canal Intake
  • 52. Wet type Intake Well founded near river bed River Intake is located at the Upstream side of the City They are mostly located sufficiently inside the river
  • 53. Where the River Bed is soft and unstable The Intake Tower founded slightly away from River Bed The Intake is kept submerged under lower water level of river
  • 54.
  • 55.
  • 56.
  • 57. When the flow in the river is not guaranteed throughout the year – dam is constructed The Reservoir Intake – Practically Similar to River Intake except these are located at maximum depth of water Design depends – Type of Dam
  • 58. When the flow in the river is not guaranteed throughtout the year – dam is constructed The Reservoir Intake – Practically Similar to River Intake except these are located at maximum depth of water Design depends – Type of Dam
  • 59.
  • 60.
  • 61.
  • 62.
  • 63. Sometimes- source- irrigation canal passing through the town Does not cause appreciable resistance to the canal flow Otherwise- located inside the canal bank and Canal bank is lined