RAVI KUMAR.G
 Importance and Necessity of Protected
Water Supply Schemes
 Water Borne Diseases
 Flow chart of Public Water Supply System
 Role of Environmental Engineer
 Water Demand
 Per-capita Demand
 Types of Water Demands & Its
Variations
 Design Period
 Population Forecasting
The five essentials of human existence are:
i. Air
ii. Water
iii. Food
iv. Heat
v. Light
The contamination of these elements may
cause health hazards. Environmental
Engineering deals with all these elements.
Water is most important and essential. There
will no alternate to water.
Everywhere water is required for various
purposes, few of them are:
• For drinking and cooking
• For bathing and washing
• For watering of lawns and gardens
• For heating and air conditioning systems
• For growing of crops
 To supply safe and wholesome water to
consume
 To supply water in adequate quantity
 To make water easily available to consumers
so as to encourage personal and household
cleanliness
An wholesome water is usually one which is
unpolluted, free from toxic substances as well
as excessive amounts of mineral and organic
matter that may impair the quality of water.
 Whenever there is no water in our taps we
become helpless. Whenever no water in our
surroundings our survival become questionable.
Therefore, it is necessary that to have a water
supply scheme with sufficient quantity.
 From public health point view, the water should
be good in appearance, safe and clean. It means
that the water should be free from contaminants.
Therefore, the provision of such a scheme should
supply water with good quality.
 Such a scheme shall not only help in supply
of wholesome water for drinking, cooking,
bathing, washing, etc.
 Also, to keep the diseases away, and there by
promoting better health.
• development of industrialization
• pollution control
• maintenance of parks, gardens and fountains
• beautification of surroundings
• better sanitation maintenance
• economic development of the particular
community
• promoting welfare of the entire community
Such a scheme will also help in
The water borne diseases are diseases
which spread primarily through the
contaminated water.
When water contains harmful and diseases
producing matter, it lead to water borne
diseases on being consumed by healthy
persons.
The water borne diseases are may be caused
by the following factors:
 Presence of micro organism
 Presence of inorganic matter
 Presence of organic matter
Diseases caused by bacterial infections:
 Typhoid fever and paratyphoid fever (caused
by salmonella typhi bacteria)
 Cholera (caused by vibrio-cholera bacteria)
 Bacillary dysentery(caused by shiga bacillus
or flexner-bacillus, or sonne bacilus)
Diseases caused by viral infections:
 Infectious hepatitis or infectious jaundice
(caused by hepatitis virus)
 Poliomyelitis (caused by polio virus)
Diseases caused by protozoal infections:
 Amoebic dysentery (caused by entamoeba
hystolytic germ)
 Excess fluorides concentration causes
fluorosis
 Excessive amounts of sulphates causes
Diarrhea
 Less amounts of Iodide causes Goiter
 Excess of nitrates cause blue babies in
infants
 Excess of nitrates cause
methemoglobinemia
An excess of vegetable matter in water or the
entrance of sewage effluents into bodies of water
may lead to diarrhoea and other gastic
disturbances in the human body.
The complete control of water borne diseases involves
instituting an environmental health programme that
incorporates personnel and household hygiene practices,
control of fly species and other insects, scientific waste
disposal and water treatment to remove harmful
constituents.
The water demanded by a people of
community for their daily uses, is
known a water demand for a water
supply scheme.
Engineer’s first duty of planning a water
supply scheme is to evaluate the amount
of water available and the amount of water
demanded by the public.
While planning a water
supply scheme, the
assessment of the
following are necessary
•Total annual volume of water demanded by
the public (in litres or million litres)
•Annual average rate of draft per day
•Annual average rate of draft per day per
person
•Average rate of draft in litres per day per
service
•Fluctuations in flows
1. Domestic water demand
2. Industrial water demand
3. Institution and commercial water
demand
4. Demand for public uses
5. Fire demand
6. Water required to compensate losses in
wastes and thefts
Types of water
demands
This includes the water requirement of people for drinking, cooking,
bathing, lawn sprinkling, gardening, sanitary purposes, etc.
The domestic consumption completely depends upon the economic
status of the people:
200 lit/head/day for rich living
135 lit/head/day for middle class living
•The total domestic demand is equal to 50-60% of the total water consumption.
Use Consumption in litres per
head per day
Drinking 5
Cooking 5
Bathing 75
Washing clothes 25
Washing of utensils 15
Washing and cleaning of houses
and residences
15
Lawn watering and gardening 15
Flushing of water closets, etc. 45
TOTAL 200
Use Consumption in litres per
head per day
Drinking 5
Cooking 5
Bathing 55
Washing clothes 20
Washing of utensils 10
Washing and cleaning of houses
and residences
10
Flushing of water closets, etc. 30
TOTAL 135
The quantity of industrial water demand will vary
with the type and number of industries.
In industrial cities the per capita water demand
computed as 450 l/h/day for high scale industrial
zones and as 50 l/h/day for small scale industrial
zones.
S. No. Name of industry
and product
Unit of production or
raw material used
Appropriate quantity of
water required per unit of
production or raw material
in kilo litres
1 Auto mobiles vehicle 40
2 Distillery (Alcohol) Kilo litre 122-170
3 Fertilizer Tonne 80-200
4 Leather (tanned) Tonne 40
5 Paper Tonne 200-400
6 Special quality paper Tonne 400-1000
7 Petroleum refinery Tonne 1-2
8 Steel Tonne 200-250
9 Sugar Tonne 1-2
10 Textile Tonne 80-140
The water requirements of institutions, hospitals, hotels,
restaurants, schools, offices, etc. come under this category.
The quantity will vary with the nature of the city and with the
number and type of commercial establishments.
On an average, a per capita demand of 20-50 l/h/day is
usually considered for such demand.
This includes the quantity
of water required for
public utility purposes,
such as
Watering of
public parks
Gardening
Washing and
sprinkling
on roads
Use in
public
fountains,
etc.
A figure of 10 l/h/day is
usually considered for this
demand.
In thickly populated and
industrial areas, fires
generally break out and
may lead to serious
damages, if not
controlled effectively.
There fore, a provision
should be made in
modern water supply
schemes for fighting
fires.
The quantity of water for
extinguishing fires,
should be easily
available and kept
always in storage
reservoirs.
Fire demand
 Kuichling’s formula:
Q = 3182 √𝑃
where, P = Population
Q = Quantity of water demand
 Freeman’s formula:
Q = 1136
𝑃
10
+ 10
where, P = Population
Q = Quantity of water demand
 National Board of Fire Under Writer’s formula
Population < 2,00,000
Q = 4637 sq.rt.(P)[1-0.01sq.rt.(p)]
Population > 2,00,000
Q = 54,600 l/min and more 9600 to
36400 l/min
Introduction, water demand

More Related Content

What's hot

Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer AppurtenancesShahid Arshad
 
Quality and quantity of water m1
Quality and quantity of water m1Quality and quantity of water m1
Quality and quantity of water m1Bibhabasu Mohanty
 
Water demand and factor affecting water demand
Water demand and factor affecting water demandWater demand and factor affecting water demand
Water demand and factor affecting water demandAnkit Gola
 
P.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish PandeyP.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish PandeyManish Pandey
 
Water resources planning and development m5
Water resources planning and development m5Water resources planning and development m5
Water resources planning and development m5Bibhabasu Mohanty
 
Water demand
Water demandWater demand
Water demandMood Naik
 
Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1Mujeeb Muji
 
Chapter 7 conveyance of water
Chapter 7 conveyance of waterChapter 7 conveyance of water
Chapter 7 conveyance of waterGokul Saud
 
Lift irrigation
Lift irrigationLift irrigation
Lift irrigationSk Rabial
 
Design period
Design periodDesign period
Design periodjagadish108
 
05 water supply system
05 water supply system05 water supply system
05 water supply systemAkepati S. Reddy
 
House connection from mains, laying and joints in pipes
House connection from mains, laying and joints in pipesHouse connection from mains, laying and joints in pipes
House connection from mains, laying and joints in pipeskrishnacp
 
Collection and estimation of sewage
Collection and estimation of sewageCollection and estimation of sewage
Collection and estimation of sewageBibhabasu Mohanty
 
Conveyance of-water
Conveyance of-water Conveyance of-water
Conveyance of-water Yogesh SN
 
Design of sewerage system
Design of sewerage systemDesign of sewerage system
Design of sewerage systemManoj Mota
 
Water demand and Population forecasting
Water demand and Population forecastingWater demand and Population forecasting
Water demand and Population forecastingShivangi Somvanshi
 

What's hot (20)

Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
Quality and quantity of water m1
Quality and quantity of water m1Quality and quantity of water m1
Quality and quantity of water m1
 
Water demand and factor affecting water demand
Water demand and factor affecting water demandWater demand and factor affecting water demand
Water demand and factor affecting water demand
 
P.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish PandeyP.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish Pandey
 
Water resources planning and development m5
Water resources planning and development m5Water resources planning and development m5
Water resources planning and development m5
 
Water demand
Water demandWater demand
Water demand
 
Canal Irrigation
Canal IrrigationCanal Irrigation
Canal Irrigation
 
SEWER DESIGN:
SEWER DESIGN:SEWER DESIGN:
SEWER DESIGN:
 
Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1
 
Chapter 7 conveyance of water
Chapter 7 conveyance of waterChapter 7 conveyance of water
Chapter 7 conveyance of water
 
Lift irrigation
Lift irrigationLift irrigation
Lift irrigation
 
Design period
Design periodDesign period
Design period
 
05 water supply system
05 water supply system05 water supply system
05 water supply system
 
House connection from mains, laying and joints in pipes
House connection from mains, laying and joints in pipesHouse connection from mains, laying and joints in pipes
House connection from mains, laying and joints in pipes
 
Collection and estimation of sewage
Collection and estimation of sewageCollection and estimation of sewage
Collection and estimation of sewage
 
Canal
CanalCanal
Canal
 
Conveyance of-water
Conveyance of-water Conveyance of-water
Conveyance of-water
 
L 3 and l-4 water demand
L 3  and l-4 water demandL 3  and l-4 water demand
L 3 and l-4 water demand
 
Design of sewerage system
Design of sewerage systemDesign of sewerage system
Design of sewerage system
 
Water demand and Population forecasting
Water demand and Population forecastingWater demand and Population forecasting
Water demand and Population forecasting
 

Similar to Introduction, water demand

Types of water demand
Types of water demandTypes of water demand
Types of water demandKoi Bdk Pahang
 
module I.docx
module I.docxmodule I.docx
module I.docxshobha816444
 
Lec 2.pptx
Lec 2.pptxLec 2.pptx
Lec 2.pptxmrunmayee20
 
Water resource treatment
Water resource treatmentWater resource treatment
Water resource treatmentAishwaryap32
 
Environmental health course.pptx
Environmental health course.pptxEnvironmental health course.pptx
Environmental health course.pptxBatMan752678
 
Water pollution in pakistan
Water pollution in pakistanWater pollution in pakistan
Water pollution in pakistanshifa-aisha
 
Water supply and treatment Engineering notes 18 cv46
Water supply and treatment Engineering notes 18 cv46Water supply and treatment Engineering notes 18 cv46
Water supply and treatment Engineering notes 18 cv46RamyaNarasimhan5
 
Water Pollution in Lahore, Pakistan
Water Pollution in Lahore, Pakistan Water Pollution in Lahore, Pakistan
Water Pollution in Lahore, Pakistan UsamaAhmad69
 
Water pollution ppt
Water pollution pptWater pollution ppt
Water pollution pptVaidikpatel22
 
WATER QUALITY.docx
WATER QUALITY.docxWATER QUALITY.docx
WATER QUALITY.docxmuhmmadsameer
 
SUSTAINABLE STRATEGIES IN WATER SUPPLY & SANITATION
SUSTAINABLE  STRATEGIES IN WATER SUPPLY & SANITATIONSUSTAINABLE  STRATEGIES IN WATER SUPPLY & SANITATION
SUSTAINABLE STRATEGIES IN WATER SUPPLY & SANITATIONRAMSIDDARTHAN .
 
lec 1.pptx
lec 1.pptxlec 1.pptx
lec 1.pptxmrunmayee20
 
WATER QUALITY IN INDIA
WATER QUALITY IN INDIAWATER QUALITY IN INDIA
WATER QUALITY IN INDIANEERAJ RANI
 

Similar to Introduction, water demand (20)

UNIT-I & II.pdf
UNIT-I & II.pdfUNIT-I & II.pdf
UNIT-I & II.pdf
 
Types of water demand
Types of water demandTypes of water demand
Types of water demand
 
module I.docx
module I.docxmodule I.docx
module I.docx
 
Lec 2.pptx
Lec 2.pptxLec 2.pptx
Lec 2.pptx
 
Water resource treatment
Water resource treatmentWater resource treatment
Water resource treatment
 
unit 1 EEppc
unit 1 EEppc unit 1 EEppc
unit 1 EEppc
 
Environmental health course.pptx
Environmental health course.pptxEnvironmental health course.pptx
Environmental health course.pptx
 
Water pollution in pakistan
Water pollution in pakistanWater pollution in pakistan
Water pollution in pakistan
 
Water supply and treatment Engineering notes 18 cv46
Water supply and treatment Engineering notes 18 cv46Water supply and treatment Engineering notes 18 cv46
Water supply and treatment Engineering notes 18 cv46
 
Hi5Engineers
Hi5EngineersHi5Engineers
Hi5Engineers
 
Water Treatment Plant
Water Treatment PlantWater Treatment Plant
Water Treatment Plant
 
EE MODULE 1.pdf
EE MODULE 1.pdfEE MODULE 1.pdf
EE MODULE 1.pdf
 
Water Pollution in Lahore, Pakistan
Water Pollution in Lahore, Pakistan Water Pollution in Lahore, Pakistan
Water Pollution in Lahore, Pakistan
 
Water .pptx
Water .pptxWater .pptx
Water .pptx
 
Water pollution ppt
Water pollution pptWater pollution ppt
Water pollution ppt
 
WATER QUALITY.docx
WATER QUALITY.docxWATER QUALITY.docx
WATER QUALITY.docx
 
SUSTAINABLE STRATEGIES IN WATER SUPPLY & SANITATION
SUSTAINABLE  STRATEGIES IN WATER SUPPLY & SANITATIONSUSTAINABLE  STRATEGIES IN WATER SUPPLY & SANITATION
SUSTAINABLE STRATEGIES IN WATER SUPPLY & SANITATION
 
lec 1.pptx
lec 1.pptxlec 1.pptx
lec 1.pptx
 
WATER QUALITY IN INDIA
WATER QUALITY IN INDIAWATER QUALITY IN INDIA
WATER QUALITY IN INDIA
 
Bo dand sewage
Bo dand sewageBo dand sewage
Bo dand sewage
 

More from GARRE RAVI KUMAR

Eia for railway project
Eia for railway projectEia for railway project
Eia for railway projectGARRE RAVI KUMAR
 
Introduction, alignment &amp; surveys
Introduction, alignment &amp; surveysIntroduction, alignment &amp; surveys
Introduction, alignment &amp; surveysGARRE RAVI KUMAR
 
Railway engineering part3
Railway engineering part3Railway engineering part3
Railway engineering part3GARRE RAVI KUMAR
 
Railway engineering part2
Railway engineering part2Railway engineering part2
Railway engineering part2GARRE RAVI KUMAR
 
Railway engineering part1
Railway engineering part1Railway engineering part1
Railway engineering part1GARRE RAVI KUMAR
 
Introduction to particulate matter
Introduction to particulate matterIntroduction to particulate matter
Introduction to particulate matterGARRE RAVI KUMAR
 
Air pollution introduction
Air pollution introductionAir pollution introduction
Air pollution introductionGARRE RAVI KUMAR
 
Kinetics and thermodynamics of air pollutants
Kinetics and thermodynamics of air pollutantsKinetics and thermodynamics of air pollutants
Kinetics and thermodynamics of air pollutantsGARRE RAVI KUMAR
 
Monitoring of Particulate matter
Monitoring of Particulate matterMonitoring of Particulate matter
Monitoring of Particulate matterGARRE RAVI KUMAR
 
Monitoring of gaseous pollutants
Monitoring of gaseous pollutantsMonitoring of gaseous pollutants
Monitoring of gaseous pollutantsGARRE RAVI KUMAR
 
Methods to control s ox emissions
Methods to control s ox emissionsMethods to control s ox emissions
Methods to control s ox emissionsGARRE RAVI KUMAR
 
Ozone layer depletion
Ozone layer depletionOzone layer depletion
Ozone layer depletionGARRE RAVI KUMAR
 
Greenhouse effect and global warming
Greenhouse effect and global warmingGreenhouse effect and global warming
Greenhouse effect and global warmingGARRE RAVI KUMAR
 
Effects of air pollutants on plants
Effects of air pollutants on plantsEffects of air pollutants on plants
Effects of air pollutants on plantsGARRE RAVI KUMAR
 
Effects of air pollutants on materials
Effects of air pollutants on materialsEffects of air pollutants on materials
Effects of air pollutants on materialsGARRE RAVI KUMAR
 
Effects of air pollutants on human
Effects of air pollutants on humanEffects of air pollutants on human
Effects of air pollutants on humanGARRE RAVI KUMAR
 
Episoeds of air pollution
Episoeds of air pollutionEpisoeds of air pollution
Episoeds of air pollutionGARRE RAVI KUMAR
 
General methods to control gaseous pollutants
General methods to control gaseous pollutantsGeneral methods to control gaseous pollutants
General methods to control gaseous pollutantsGARRE RAVI KUMAR
 

More from GARRE RAVI KUMAR (20)

Eia for railway project
Eia for railway projectEia for railway project
Eia for railway project
 
Introduction, alignment &amp; surveys
Introduction, alignment &amp; surveysIntroduction, alignment &amp; surveys
Introduction, alignment &amp; surveys
 
Railway engineering part3
Railway engineering part3Railway engineering part3
Railway engineering part3
 
Railway engineering part2
Railway engineering part2Railway engineering part2
Railway engineering part2
 
Railway engineering part1
Railway engineering part1Railway engineering part1
Railway engineering part1
 
Introduction to particulate matter
Introduction to particulate matterIntroduction to particulate matter
Introduction to particulate matter
 
Air pollution introduction
Air pollution introductionAir pollution introduction
Air pollution introduction
 
Kinetics and thermodynamics of air pollutants
Kinetics and thermodynamics of air pollutantsKinetics and thermodynamics of air pollutants
Kinetics and thermodynamics of air pollutants
 
Monitoring of Particulate matter
Monitoring of Particulate matterMonitoring of Particulate matter
Monitoring of Particulate matter
 
Monitoring of gaseous pollutants
Monitoring of gaseous pollutantsMonitoring of gaseous pollutants
Monitoring of gaseous pollutants
 
Methods to control s ox emissions
Methods to control s ox emissionsMethods to control s ox emissions
Methods to control s ox emissions
 
Urban heat islands
Urban heat islandsUrban heat islands
Urban heat islands
 
Ozone layer depletion
Ozone layer depletionOzone layer depletion
Ozone layer depletion
 
Greenhouse effect and global warming
Greenhouse effect and global warmingGreenhouse effect and global warming
Greenhouse effect and global warming
 
Effects of air pollutants on plants
Effects of air pollutants on plantsEffects of air pollutants on plants
Effects of air pollutants on plants
 
Effects of air pollutants on materials
Effects of air pollutants on materialsEffects of air pollutants on materials
Effects of air pollutants on materials
 
Effects of air pollutants on human
Effects of air pollutants on humanEffects of air pollutants on human
Effects of air pollutants on human
 
Acid rains
Acid rainsAcid rains
Acid rains
 
Episoeds of air pollution
Episoeds of air pollutionEpisoeds of air pollution
Episoeds of air pollution
 
General methods to control gaseous pollutants
General methods to control gaseous pollutantsGeneral methods to control gaseous pollutants
General methods to control gaseous pollutants
 

Recently uploaded

UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 

Recently uploaded (20)

UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 

Introduction, water demand

  • 2.  Importance and Necessity of Protected Water Supply Schemes  Water Borne Diseases  Flow chart of Public Water Supply System  Role of Environmental Engineer
  • 3.  Water Demand  Per-capita Demand  Types of Water Demands & Its Variations  Design Period  Population Forecasting
  • 4. The five essentials of human existence are: i. Air ii. Water iii. Food iv. Heat v. Light The contamination of these elements may cause health hazards. Environmental Engineering deals with all these elements.
  • 5. Water is most important and essential. There will no alternate to water. Everywhere water is required for various purposes, few of them are: • For drinking and cooking • For bathing and washing • For watering of lawns and gardens • For heating and air conditioning systems • For growing of crops
  • 6.  To supply safe and wholesome water to consume  To supply water in adequate quantity  To make water easily available to consumers so as to encourage personal and household cleanliness An wholesome water is usually one which is unpolluted, free from toxic substances as well as excessive amounts of mineral and organic matter that may impair the quality of water.
  • 7.  Whenever there is no water in our taps we become helpless. Whenever no water in our surroundings our survival become questionable. Therefore, it is necessary that to have a water supply scheme with sufficient quantity.  From public health point view, the water should be good in appearance, safe and clean. It means that the water should be free from contaminants. Therefore, the provision of such a scheme should supply water with good quality.
  • 8.  Such a scheme shall not only help in supply of wholesome water for drinking, cooking, bathing, washing, etc.  Also, to keep the diseases away, and there by promoting better health.
  • 9. • development of industrialization • pollution control • maintenance of parks, gardens and fountains • beautification of surroundings • better sanitation maintenance • economic development of the particular community • promoting welfare of the entire community Such a scheme will also help in
  • 10. The water borne diseases are diseases which spread primarily through the contaminated water. When water contains harmful and diseases producing matter, it lead to water borne diseases on being consumed by healthy persons.
  • 11. The water borne diseases are may be caused by the following factors:  Presence of micro organism  Presence of inorganic matter  Presence of organic matter
  • 12. Diseases caused by bacterial infections:  Typhoid fever and paratyphoid fever (caused by salmonella typhi bacteria)  Cholera (caused by vibrio-cholera bacteria)  Bacillary dysentery(caused by shiga bacillus or flexner-bacillus, or sonne bacilus) Diseases caused by viral infections:  Infectious hepatitis or infectious jaundice (caused by hepatitis virus)  Poliomyelitis (caused by polio virus) Diseases caused by protozoal infections:  Amoebic dysentery (caused by entamoeba hystolytic germ)
  • 13.  Excess fluorides concentration causes fluorosis  Excessive amounts of sulphates causes Diarrhea  Less amounts of Iodide causes Goiter  Excess of nitrates cause blue babies in infants  Excess of nitrates cause methemoglobinemia
  • 14. An excess of vegetable matter in water or the entrance of sewage effluents into bodies of water may lead to diarrhoea and other gastic disturbances in the human body. The complete control of water borne diseases involves instituting an environmental health programme that incorporates personnel and household hygiene practices, control of fly species and other insects, scientific waste disposal and water treatment to remove harmful constituents.
  • 15. The water demanded by a people of community for their daily uses, is known a water demand for a water supply scheme. Engineer’s first duty of planning a water supply scheme is to evaluate the amount of water available and the amount of water demanded by the public.
  • 16. While planning a water supply scheme, the assessment of the following are necessary •Total annual volume of water demanded by the public (in litres or million litres) •Annual average rate of draft per day •Annual average rate of draft per day per person •Average rate of draft in litres per day per service •Fluctuations in flows
  • 17. 1. Domestic water demand 2. Industrial water demand 3. Institution and commercial water demand 4. Demand for public uses 5. Fire demand 6. Water required to compensate losses in wastes and thefts Types of water demands
  • 18. This includes the water requirement of people for drinking, cooking, bathing, lawn sprinkling, gardening, sanitary purposes, etc. The domestic consumption completely depends upon the economic status of the people: 200 lit/head/day for rich living 135 lit/head/day for middle class living •The total domestic demand is equal to 50-60% of the total water consumption.
  • 19. Use Consumption in litres per head per day Drinking 5 Cooking 5 Bathing 75 Washing clothes 25 Washing of utensils 15 Washing and cleaning of houses and residences 15 Lawn watering and gardening 15 Flushing of water closets, etc. 45 TOTAL 200
  • 20. Use Consumption in litres per head per day Drinking 5 Cooking 5 Bathing 55 Washing clothes 20 Washing of utensils 10 Washing and cleaning of houses and residences 10 Flushing of water closets, etc. 30 TOTAL 135
  • 21. The quantity of industrial water demand will vary with the type and number of industries. In industrial cities the per capita water demand computed as 450 l/h/day for high scale industrial zones and as 50 l/h/day for small scale industrial zones.
  • 22. S. No. Name of industry and product Unit of production or raw material used Appropriate quantity of water required per unit of production or raw material in kilo litres 1 Auto mobiles vehicle 40 2 Distillery (Alcohol) Kilo litre 122-170 3 Fertilizer Tonne 80-200 4 Leather (tanned) Tonne 40 5 Paper Tonne 200-400 6 Special quality paper Tonne 400-1000 7 Petroleum refinery Tonne 1-2 8 Steel Tonne 200-250 9 Sugar Tonne 1-2 10 Textile Tonne 80-140
  • 23. The water requirements of institutions, hospitals, hotels, restaurants, schools, offices, etc. come under this category. The quantity will vary with the nature of the city and with the number and type of commercial establishments. On an average, a per capita demand of 20-50 l/h/day is usually considered for such demand.
  • 24. This includes the quantity of water required for public utility purposes, such as Watering of public parks Gardening Washing and sprinkling on roads Use in public fountains, etc. A figure of 10 l/h/day is usually considered for this demand.
  • 25. In thickly populated and industrial areas, fires generally break out and may lead to serious damages, if not controlled effectively. There fore, a provision should be made in modern water supply schemes for fighting fires. The quantity of water for extinguishing fires, should be easily available and kept always in storage reservoirs. Fire demand
  • 26.  Kuichling’s formula: Q = 3182 √𝑃 where, P = Population Q = Quantity of water demand  Freeman’s formula: Q = 1136 𝑃 10 + 10 where, P = Population Q = Quantity of water demand
  • 27.  National Board of Fire Under Writer’s formula Population < 2,00,000 Q = 4637 sq.rt.(P)[1-0.01sq.rt.(p)] Population > 2,00,000 Q = 54,600 l/min and more 9600 to 36400 l/min