SlideShare a Scribd company logo
1 of 15
ENVIRONMENTAL
ENGINEERING-II
SEWER DESIGN
SUBMITTED TO :
SIR UMAIR
SUBMITTED BY :
ARSLAN NAWAZISH
15-CLT-07
CIVIL ENGINEERING
DEPARTMENT
NFC IE&FR FAISALABAD
Table of Contents
Topic___________________________________________Page no.
Introduction 03
Sources of wastewater 03
Types of sewer 03
Types of sewerage systems 04
Steps of design 04
Preliminary investigation 05
Design criteria consideration 06
Actual design of sewer 08
Preparation of drawing & BOQs 09
P a g e 2 | 14
Related Theory:
Sewage:
It is the liquid waste of wastewater produced as a result of water use.
Sewer:
It is a pipe or conduit for carrying sewage. It is generally closed and
flow tables place under gravity.
Sewerage:
It is a comprehensive term. This term is applied to the art of the
collection of wastewater and conveying it to the point of final disposalwith
or without treatment.
Sources of wastewater:
1. Domestic:
It is waste water from residential buildings, offices, other buildings and
institutions etc.
2. Industrial:
It is liquid waste from industrial processeslike dying, paper
making, fertilizers, chemicals, leather etc.
3. Storm water:
It include surface run off generated by rainfalls and street wash.
Types of sewers:
1. Sanitary sewer:
Sewer which carries sanitary sewage i.e., wastewater originating from
municipality including domestic and industrial wastewater.
2. Storm sewer:
It carries storm sewage including surface run off and street washes.
P a g e 3 | 14
3. Combined sewer:
It carries domestic, industrial and storm sewage.
4. House sewer:
Pipe conveying sewage, industrial and storm sewage.
5. Lateral sewer:
It receives discharge from house sewer.
6. Sub main sewer:
It receives discharge from one or more laterals.
7. Main / Trunk sewer:
Receives discharge from two or more sub mains.
8. Outfall sewer:
Receives discharge from all collecting system and convey it to the point of
final disposal(e.g., a water bodyetc.)
Types of sewage system:
1. Separate System:
If storm water is carried separately from domestic and industrial waste, the
system is called separate system.
When favored:
(i) There is an immediate need for collection of sanitary sewage but not
for storm sewage.
(ii) Where sanitary sewage need treatment but storm water does not.
P a g e 4 | 14
2. Combined System:
A system in which sewer carries both sanitary as well as storm sewage.
When favored:
(i) When combined sewage can be disposed off without treatment.
(ii) When both need treatment.
(iii) When streets are narrow and two separate sewers cannot be laid.
3. Partially Combined:
If some portion of storm or surface run off (from roads, open spaces etc.) is
allowed to be carried along with sanitary sewage, the system is known as
partially combined system.
Steps for designof sewer:
1) Preliminary investigation
2) Design consideration / Formulation of design criteria
3) Actual design
4) Preparation of drawings and BOQ
5) Subsequent modifications
1. Preliminary
Investigation:
It includes:
- If map of the area is not already available, the step is to carry out
survey to draw a map of the project area.
Different details are marked out on the map like:
*Streets
*Railway lines
*Streams
Location of underground utilities like gas, water mains etc.
P a g e 5 | 14
- Establish bench marks throughout the area and make
contour profiles
- Soil conditions should be investigated for the type of
structure, location of water table, presenceof any
underground rock etc.
- Collection of rainfall and run off data
- Study of natural slopes of the area and selection of a
suitable disposalpoint
2. Designconsideration/ Formulation of designcriteria:
(i) DesignFlow:
(a) Sanitary sewer = Peak sewage flow + Infiltration +
Industrial flow
(b) Partially combined = 2 * Peak sewage flow + Infiltration
+ Industrial flow
(WASA criteria)
(ii) DesignEquation:
Sewers are designed on the basis of open channel flow not at
under pressure
V = 1/n * R^2/3 * S^1/2 (Manning’s formula)
Where:
V =velocity, m/sec
R = hydraulic mean depth = Area / wetted perimeter
S = D/4, when pipe is flowing full or ½ full
N = Co-efficient of roughness for pipe (0.012 for R.C.C pipe)
(iii) Minimum Velocity:
P a g e 6 | 14
Min. velocity also called as self-cleaning velocities must be
maintained in sewers to avoid deposition of suspended solids
and sub sequent choking of sewers.
Sanitary sewers = 0.6 m/sec (2ft/sec) {organic particles sp.qs =
1.61}
Storm sewer = 1 m/sec {inorganic particle sp.qs =
2.65} Partially combined = 0.7 m/sec
The slopes with which will give the velocity in pipe 0.6
m/s when flowing full when n = 0.013
A cleaning velocity will achieve only when pipe flow full or
78% full
(iv) Maximum Velocities:
Should not be greater than 2.4 m/sec
A limit on higher velocity is imposed due to abrasive character
of solids in wastewater.
Scraping or wearing away
(v) Min. sewersize:
225 mm is taken as min sewer size {WASA}
(vi) Min Cover:
1 m is taken as min cover over sewers to avoid damage from
live loads coming on sewers.
(vii) Manholes:
Purpose:
1. Cleaning
2. Inspection
3. House connection
When provided:
1. At every change in direction
2. Where two different dia pipes are to be connected
P a g e 7 | 14
Spacing:
225 mm - 350 mm spacing not greater than 100 m
460 mm – 760 mm spacing not greater than 120 m
{WASA}
>760 mm spacing not greater than 150 m
For plots, one manhole be provided for 2 plots
(viii) Qd / Qt Ratios:
WASA recommends the Qd/Qt ratios in order to provide air
space in the upper portion of sewer for ventilation purpose.
Qd represent design flow and Qt is flow when flow sewer is
flowing full.
Sewer size Ratio (Qd/Qt)
225-380 mm 0.7
460 – 1220 mm 0.75
1370 mm and larger 0.8
3. Designof sewer:
By design of sewer, we mean the following two things:
(i) To find the size of sewer Q
= AV is used to find size
(ii) To find required slope to maintain a min. velocity
in sewers
P a g e 8 | 14
V = 1/n * R^2/3 * S^1/2 is used to find slope.
4. Preparationof drawings and
BOQ:Typical drawings includes:
- Sewer joints
- Manholes
- Disposal station
- Sewer profiles or L-sections
5. Subsequent Modifications:
Mostly done due to some unforeseen incidents, to
accommodatesome additional demand / requirement
of the client etc. There may be several other reasons.
P a g e 9 | 14
Project
Sewerage system for housing society (through gravity flow).
Location:
Jhelum road, Bank of upper Chenab canal, Jhelum.
Projectdescription:
No. of plots 281
No. of apartments 3
No. of flats 3
No. of dispensary 1
No. of parks 2
No. of graveyards 1
No. of school 1
Design period 20 years
.
Distribution system:
Grid system
Population forecast:
Geometric method
Pipe material:
Concrete pipes
P a g e 10 | 14
DESIGN CALCULATIONS
POPULATION FORCASTING:
Population Present Future
(2017) (2037)
Persons/plot 7 11
Persons/app 400 618
Persons/flat 200 309
Pop. of school 300 464
Park 200 309
Graveyard 50 77
Dispensary 150 232
Presentpopulation:
(No. of plots * no. of persons per plot) + other population
Design future population:
Pi + [1+ % rate of growth]
Here n = no. of years for design
Per capita waterconsumption:
400 lpcd
Avg. daily flow:
(Population*per capita consumption*factor)/1000
Here, Factor= 0.8 to 0.9
Peak factor:
1+ (14/4+P.05
)
Here, P = in thousands
P a g e 11 | 14
Peak flow:
Peak factor* Avg. daily flow
Slope of sewer:
S =
((V*n)/R2/3
)2
Here, n=0.013
R=D/4
Min. velocity:
0.7m/s
Min. sewersize:
225mm
Cycle time:
20 minutes
Depth of wetwell:
2m
Infiltration:
10% of Qavg
Minimum cover:
1m
Sewageflow:
90% of Qavg
P a g e 12 | 14
Calculations:
Manhole-1 to manhole-2
Total no. of plots = 29
Other population = 0
Initial population = 7*29+0
=203 persons
Future population = 203*(1+2.3%) ^20
=319 persons
Average daily flow = (0.9*319*400)/1000
=115 m3
d-1
Peak factor = 1+ (14/4+P0.5
)
=4.066
Peak sewage flow = 4.066*115
=467.05 m3
d-1
Storm sewage flow = 467.05 m3
d-1
Infiltration = 0.1*319*0.4
= 12.76 m3
d-1
Total sewage flow = 946.86 m3
d-1
=0.011 m3
s-1
Min. velocity = 0.7 ms-1
Area of sewer = Q/V =0.016 m2
Dia. of sewer = ((0.016*4)/3.14)0.5
=142 mm
Adopted dia. = 225mm
Thickness = 42 mm
Slope of sewer= ((0.7*0.012)/
(0.225/4)2/3
)2
=0.0033
QFull = (0.7*3.14*0.2252
)/4
=0.0278 m3
d-1
Q/QFull = 0.40
d/D = 0.49 (From graph)
d = 0.49*225
=110 mm
V/VFull = 0.79 (From graph)
V = 0.553 ms-1
P a g e 13 | 14
Length of pipe = 79 m (Map scale: 1cm=10m)
Ground level upper = 101.5 m
Ground level lower = 100.5 m
Invert level upper = 101.5-1-42-0.225
=100.233 m
Invert level lower = 100.5-1-42-0.225
=99.23 m
Height of manhole = 101.5-100.23
=1.267 m
P a g e 14 | 14

More Related Content

What's hot

Water demand forecasting
Water demand forecastingWater demand forecasting
Water demand forecastingMohsin Siddique
 
sewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenancesewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenanceManish Goyal
 
Estimating sewage discharge and peak drainage discharge
Estimating sewage discharge and peak drainage dischargeEstimating sewage discharge and peak drainage discharge
Estimating sewage discharge and peak drainage dischargeAnkit Gola
 
Design and construction of sewer
Design and construction of sewer Design and construction of sewer
Design and construction of sewer SitalParajuli
 
Collection of sewage & estimation of its discharge
Collection of sewage & estimation of its dischargeCollection of sewage & estimation of its discharge
Collection of sewage & estimation of its dischargeRajdip Bhdaraka
 
Storage and distribution reservoirs
Storage and distribution reservoirsStorage and distribution reservoirs
Storage and distribution reservoirsfarooq husain
 
Water and Waste Water Engineering
Water and Waste Water EngineeringWater and Waste Water Engineering
Water and Waste Water EngineeringAditya Mistry
 
Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesTulsiram Bhattarai
 
Design of sewerage collection system and cost estimation
Design of sewerage collection system and cost estimationDesign of sewerage collection system and cost estimation
Design of sewerage collection system and cost estimationVijay Kumar
 
Reservoir capacity
Reservoir capacityReservoir capacity
Reservoir capacityonyx3
 
Introduction to water supply engg. by Prof. D S.Shah
Introduction to water supply engg. by Prof. D S.ShahIntroduction to water supply engg. by Prof. D S.Shah
Introduction to water supply engg. by Prof. D S.Shahdhavalsshah
 
design and analysis of water distribution System
design and analysis of water distribution Systemdesign and analysis of water distribution System
design and analysis of water distribution SystemMian Umair Afzal
 
Collection of sewage, Types,Components & Layout
Collection of sewage, Types,Components & LayoutCollection of sewage, Types,Components & Layout
Collection of sewage, Types,Components & LayoutRAMPRASAD KUMAWAT
 
Estimation of storm sewage
Estimation of storm sewageEstimation of storm sewage
Estimation of storm sewagesidrarashiddar
 
Sewage Conveyance and Pumping
Sewage Conveyance and PumpingSewage Conveyance and Pumping
Sewage Conveyance and PumpingGAURAV. H .TANDON
 

What's hot (20)

Water demand forecasting
Water demand forecastingWater demand forecasting
Water demand forecasting
 
sewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenancesewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenance
 
Estimating sewage discharge and peak drainage discharge
Estimating sewage discharge and peak drainage dischargeEstimating sewage discharge and peak drainage discharge
Estimating sewage discharge and peak drainage discharge
 
Design and construction of sewer
Design and construction of sewer Design and construction of sewer
Design and construction of sewer
 
Collection of sewage & estimation of its discharge
Collection of sewage & estimation of its dischargeCollection of sewage & estimation of its discharge
Collection of sewage & estimation of its discharge
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
L 2 sources and water supply schemes
L 2 sources and water supply schemesL 2 sources and water supply schemes
L 2 sources and water supply schemes
 
Storage and distribution reservoirs
Storage and distribution reservoirsStorage and distribution reservoirs
Storage and distribution reservoirs
 
02 water demand
02 water demand02 water demand
02 water demand
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
Sewerage design
Sewerage designSewerage design
Sewerage design
 
Water and Waste Water Engineering
Water and Waste Water EngineeringWater and Waste Water Engineering
Water and Waste Water Engineering
 
Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer Appurtenances
 
Design of sewerage collection system and cost estimation
Design of sewerage collection system and cost estimationDesign of sewerage collection system and cost estimation
Design of sewerage collection system and cost estimation
 
Reservoir capacity
Reservoir capacityReservoir capacity
Reservoir capacity
 
Introduction to water supply engg. by Prof. D S.Shah
Introduction to water supply engg. by Prof. D S.ShahIntroduction to water supply engg. by Prof. D S.Shah
Introduction to water supply engg. by Prof. D S.Shah
 
design and analysis of water distribution System
design and analysis of water distribution Systemdesign and analysis of water distribution System
design and analysis of water distribution System
 
Collection of sewage, Types,Components & Layout
Collection of sewage, Types,Components & LayoutCollection of sewage, Types,Components & Layout
Collection of sewage, Types,Components & Layout
 
Estimation of storm sewage
Estimation of storm sewageEstimation of storm sewage
Estimation of storm sewage
 
Sewage Conveyance and Pumping
Sewage Conveyance and PumpingSewage Conveyance and Pumping
Sewage Conveyance and Pumping
 

Similar to SEWER DESIGN:

Ee ii ce(pc)505- module 1_2_3
Ee ii ce(pc)505- module 1_2_3Ee ii ce(pc)505- module 1_2_3
Ee ii ce(pc)505- module 1_2_3SamirDas66
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxAsnelTiffa
 
Water distribution system design report
Water distribution system design reportWater distribution system design report
Water distribution system design reportMuhammad Magsi
 
IRJET - Application of Water Conservation Technique to Low Income Group H...
IRJET -  	  Application of Water Conservation Technique to Low Income Group H...IRJET -  	  Application of Water Conservation Technique to Low Income Group H...
IRJET - Application of Water Conservation Technique to Low Income Group H...IRJET Journal
 
final year Project (civil)
final year Project (civil)final year Project (civil)
final year Project (civil)Alankar jaiswal
 
Water Supply Compilation of Reports
Water Supply Compilation of ReportsWater Supply Compilation of Reports
Water Supply Compilation of ReportsJahh Lavz
 
IRJET-Design and Fabrication Of Gutters
IRJET-Design and Fabrication Of GuttersIRJET-Design and Fabrication Of Gutters
IRJET-Design and Fabrication Of GuttersIRJET Journal
 
Lec 1 (wastewater collection system)
Lec 1 (wastewater collection system)Lec 1 (wastewater collection system)
Lec 1 (wastewater collection system)5032683
 
Wastewater and Solid waste management.pdf
Wastewater and Solid waste management.pdfWastewater and Solid waste management.pdf
Wastewater and Solid waste management.pdfAmdework Belay
 
Wasa guidelines for design and construction -boett-2003
Wasa guidelines for design and construction -boett-2003Wasa guidelines for design and construction -boett-2003
Wasa guidelines for design and construction -boett-2003Jeffrey James
 
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptxNEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptxASHISHGOUTAM6
 
Sewage treatment plant design calculation
Sewage treatment plant design calculationSewage treatment plant design calculation
Sewage treatment plant design calculationSharifah Ain
 
Sewage, Sewer system, and elevations Module
Sewage, Sewer system, and elevations ModuleSewage, Sewer system, and elevations Module
Sewage, Sewer system, and elevations ModuleBahzad5
 
Предимствата на вакуумни канализационни системи
Предимствата на вакуумни канализационни системиПредимствата на вакуумни канализационни системи
Предимствата на вакуумни канализационни системиEmil Hristov
 
2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_project2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_projectSaddam Mussie
 

Similar to SEWER DESIGN: (20)

Sewerage System
Sewerage SystemSewerage System
Sewerage System
 
Ee ii ce(pc)505- module 1_2_3
Ee ii ce(pc)505- module 1_2_3Ee ii ce(pc)505- module 1_2_3
Ee ii ce(pc)505- module 1_2_3
 
bro.pptx
bro.pptxbro.pptx
bro.pptx
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
 
Water distribution system design report
Water distribution system design reportWater distribution system design report
Water distribution system design report
 
IRJET - Application of Water Conservation Technique to Low Income Group H...
IRJET -  	  Application of Water Conservation Technique to Low Income Group H...IRJET -  	  Application of Water Conservation Technique to Low Income Group H...
IRJET - Application of Water Conservation Technique to Low Income Group H...
 
final year Project (civil)
final year Project (civil)final year Project (civil)
final year Project (civil)
 
Water Supply Compilation of Reports
Water Supply Compilation of ReportsWater Supply Compilation of Reports
Water Supply Compilation of Reports
 
IRJET-Design and Fabrication Of Gutters
IRJET-Design and Fabrication Of GuttersIRJET-Design and Fabrication Of Gutters
IRJET-Design and Fabrication Of Gutters
 
Lec 1 (wastewater collection system)
Lec 1 (wastewater collection system)Lec 1 (wastewater collection system)
Lec 1 (wastewater collection system)
 
Wastewater and Solid waste management.pdf
Wastewater and Solid waste management.pdfWastewater and Solid waste management.pdf
Wastewater and Solid waste management.pdf
 
Sources of wastewater
Sources of wastewaterSources of wastewater
Sources of wastewater
 
Wasa guidelines for design and construction -boett-2003
Wasa guidelines for design and construction -boett-2003Wasa guidelines for design and construction -boett-2003
Wasa guidelines for design and construction -boett-2003
 
RP-BRIDGE HYDRAULICS.pptx
RP-BRIDGE HYDRAULICS.pptxRP-BRIDGE HYDRAULICS.pptx
RP-BRIDGE HYDRAULICS.pptx
 
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptxNEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
 
Sewage treatment plant design calculation
Sewage treatment plant design calculationSewage treatment plant design calculation
Sewage treatment plant design calculation
 
Sewage, Sewer system, and elevations Module
Sewage, Sewer system, and elevations ModuleSewage, Sewer system, and elevations Module
Sewage, Sewer system, and elevations Module
 
11wiik
11wiik11wiik
11wiik
 
Предимствата на вакуумни канализационни системи
Предимствата на вакуумни канализационни системиПредимствата на вакуумни канализационни системи
Предимствата на вакуумни канализационни системи
 
2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_project2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_project
 

Recently uploaded

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 

Recently uploaded (20)

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 

SEWER DESIGN:

  • 1. ENVIRONMENTAL ENGINEERING-II SEWER DESIGN SUBMITTED TO : SIR UMAIR SUBMITTED BY : ARSLAN NAWAZISH 15-CLT-07 CIVIL ENGINEERING DEPARTMENT NFC IE&FR FAISALABAD
  • 2.
  • 3. Table of Contents Topic___________________________________________Page no. Introduction 03 Sources of wastewater 03 Types of sewer 03 Types of sewerage systems 04 Steps of design 04 Preliminary investigation 05 Design criteria consideration 06 Actual design of sewer 08 Preparation of drawing & BOQs 09 P a g e 2 | 14
  • 4. Related Theory: Sewage: It is the liquid waste of wastewater produced as a result of water use. Sewer: It is a pipe or conduit for carrying sewage. It is generally closed and flow tables place under gravity. Sewerage: It is a comprehensive term. This term is applied to the art of the collection of wastewater and conveying it to the point of final disposalwith or without treatment. Sources of wastewater: 1. Domestic: It is waste water from residential buildings, offices, other buildings and institutions etc. 2. Industrial: It is liquid waste from industrial processeslike dying, paper making, fertilizers, chemicals, leather etc. 3. Storm water: It include surface run off generated by rainfalls and street wash. Types of sewers: 1. Sanitary sewer: Sewer which carries sanitary sewage i.e., wastewater originating from municipality including domestic and industrial wastewater. 2. Storm sewer: It carries storm sewage including surface run off and street washes. P a g e 3 | 14
  • 5. 3. Combined sewer: It carries domestic, industrial and storm sewage. 4. House sewer: Pipe conveying sewage, industrial and storm sewage. 5. Lateral sewer: It receives discharge from house sewer. 6. Sub main sewer: It receives discharge from one or more laterals. 7. Main / Trunk sewer: Receives discharge from two or more sub mains. 8. Outfall sewer: Receives discharge from all collecting system and convey it to the point of final disposal(e.g., a water bodyetc.) Types of sewage system: 1. Separate System: If storm water is carried separately from domestic and industrial waste, the system is called separate system. When favored: (i) There is an immediate need for collection of sanitary sewage but not for storm sewage. (ii) Where sanitary sewage need treatment but storm water does not. P a g e 4 | 14
  • 6. 2. Combined System: A system in which sewer carries both sanitary as well as storm sewage. When favored: (i) When combined sewage can be disposed off without treatment. (ii) When both need treatment. (iii) When streets are narrow and two separate sewers cannot be laid. 3. Partially Combined: If some portion of storm or surface run off (from roads, open spaces etc.) is allowed to be carried along with sanitary sewage, the system is known as partially combined system. Steps for designof sewer: 1) Preliminary investigation 2) Design consideration / Formulation of design criteria 3) Actual design 4) Preparation of drawings and BOQ 5) Subsequent modifications 1. Preliminary Investigation: It includes: - If map of the area is not already available, the step is to carry out survey to draw a map of the project area. Different details are marked out on the map like: *Streets *Railway lines *Streams Location of underground utilities like gas, water mains etc. P a g e 5 | 14
  • 7. - Establish bench marks throughout the area and make contour profiles - Soil conditions should be investigated for the type of structure, location of water table, presenceof any underground rock etc. - Collection of rainfall and run off data - Study of natural slopes of the area and selection of a suitable disposalpoint 2. Designconsideration/ Formulation of designcriteria: (i) DesignFlow: (a) Sanitary sewer = Peak sewage flow + Infiltration + Industrial flow (b) Partially combined = 2 * Peak sewage flow + Infiltration + Industrial flow (WASA criteria) (ii) DesignEquation: Sewers are designed on the basis of open channel flow not at under pressure V = 1/n * R^2/3 * S^1/2 (Manning’s formula) Where: V =velocity, m/sec R = hydraulic mean depth = Area / wetted perimeter S = D/4, when pipe is flowing full or ½ full N = Co-efficient of roughness for pipe (0.012 for R.C.C pipe) (iii) Minimum Velocity: P a g e 6 | 14
  • 8. Min. velocity also called as self-cleaning velocities must be maintained in sewers to avoid deposition of suspended solids and sub sequent choking of sewers. Sanitary sewers = 0.6 m/sec (2ft/sec) {organic particles sp.qs = 1.61} Storm sewer = 1 m/sec {inorganic particle sp.qs = 2.65} Partially combined = 0.7 m/sec The slopes with which will give the velocity in pipe 0.6 m/s when flowing full when n = 0.013 A cleaning velocity will achieve only when pipe flow full or 78% full (iv) Maximum Velocities: Should not be greater than 2.4 m/sec A limit on higher velocity is imposed due to abrasive character of solids in wastewater. Scraping or wearing away (v) Min. sewersize: 225 mm is taken as min sewer size {WASA} (vi) Min Cover: 1 m is taken as min cover over sewers to avoid damage from live loads coming on sewers. (vii) Manholes: Purpose: 1. Cleaning 2. Inspection 3. House connection When provided: 1. At every change in direction 2. Where two different dia pipes are to be connected P a g e 7 | 14
  • 9. Spacing: 225 mm - 350 mm spacing not greater than 100 m 460 mm – 760 mm spacing not greater than 120 m {WASA} >760 mm spacing not greater than 150 m For plots, one manhole be provided for 2 plots (viii) Qd / Qt Ratios: WASA recommends the Qd/Qt ratios in order to provide air space in the upper portion of sewer for ventilation purpose. Qd represent design flow and Qt is flow when flow sewer is flowing full. Sewer size Ratio (Qd/Qt) 225-380 mm 0.7 460 – 1220 mm 0.75 1370 mm and larger 0.8 3. Designof sewer: By design of sewer, we mean the following two things: (i) To find the size of sewer Q = AV is used to find size (ii) To find required slope to maintain a min. velocity in sewers P a g e 8 | 14
  • 10. V = 1/n * R^2/3 * S^1/2 is used to find slope. 4. Preparationof drawings and BOQ:Typical drawings includes: - Sewer joints - Manholes - Disposal station - Sewer profiles or L-sections 5. Subsequent Modifications: Mostly done due to some unforeseen incidents, to accommodatesome additional demand / requirement of the client etc. There may be several other reasons. P a g e 9 | 14
  • 11. Project Sewerage system for housing society (through gravity flow). Location: Jhelum road, Bank of upper Chenab canal, Jhelum. Projectdescription: No. of plots 281 No. of apartments 3 No. of flats 3 No. of dispensary 1 No. of parks 2 No. of graveyards 1 No. of school 1 Design period 20 years . Distribution system: Grid system Population forecast: Geometric method Pipe material: Concrete pipes P a g e 10 | 14
  • 12. DESIGN CALCULATIONS POPULATION FORCASTING: Population Present Future (2017) (2037) Persons/plot 7 11 Persons/app 400 618 Persons/flat 200 309 Pop. of school 300 464 Park 200 309 Graveyard 50 77 Dispensary 150 232 Presentpopulation: (No. of plots * no. of persons per plot) + other population Design future population: Pi + [1+ % rate of growth] Here n = no. of years for design Per capita waterconsumption: 400 lpcd Avg. daily flow: (Population*per capita consumption*factor)/1000 Here, Factor= 0.8 to 0.9 Peak factor: 1+ (14/4+P.05 ) Here, P = in thousands P a g e 11 | 14
  • 13. Peak flow: Peak factor* Avg. daily flow Slope of sewer: S = ((V*n)/R2/3 )2 Here, n=0.013 R=D/4 Min. velocity: 0.7m/s Min. sewersize: 225mm Cycle time: 20 minutes Depth of wetwell: 2m Infiltration: 10% of Qavg Minimum cover: 1m Sewageflow: 90% of Qavg P a g e 12 | 14
  • 14. Calculations: Manhole-1 to manhole-2 Total no. of plots = 29 Other population = 0 Initial population = 7*29+0 =203 persons Future population = 203*(1+2.3%) ^20 =319 persons Average daily flow = (0.9*319*400)/1000 =115 m3 d-1 Peak factor = 1+ (14/4+P0.5 ) =4.066 Peak sewage flow = 4.066*115 =467.05 m3 d-1 Storm sewage flow = 467.05 m3 d-1 Infiltration = 0.1*319*0.4 = 12.76 m3 d-1 Total sewage flow = 946.86 m3 d-1 =0.011 m3 s-1 Min. velocity = 0.7 ms-1 Area of sewer = Q/V =0.016 m2 Dia. of sewer = ((0.016*4)/3.14)0.5 =142 mm Adopted dia. = 225mm Thickness = 42 mm Slope of sewer= ((0.7*0.012)/ (0.225/4)2/3 )2 =0.0033 QFull = (0.7*3.14*0.2252 )/4 =0.0278 m3 d-1 Q/QFull = 0.40 d/D = 0.49 (From graph) d = 0.49*225 =110 mm V/VFull = 0.79 (From graph) V = 0.553 ms-1 P a g e 13 | 14
  • 15. Length of pipe = 79 m (Map scale: 1cm=10m) Ground level upper = 101.5 m Ground level lower = 100.5 m Invert level upper = 101.5-1-42-0.225 =100.233 m Invert level lower = 100.5-1-42-0.225 =99.23 m Height of manhole = 101.5-100.23 =1.267 m P a g e 14 | 14