SlideShare a Scribd company logo
1 of 8
Sheet 1 of 7
H.K.Mishra
E-042 GAUR GREEN CITY,
INDIRAPURAM,GHAZIABAD,U.P.
PIN-201014
Mob:09873509239
E-mail:hemant.hkm2009@gmail.com
Post applied for : Team Leader/Sr Quality cum Material Engineer/
Resident Engineer / Suitable Position
Name : Hemant Kumar Mishra
Date Of Birth : 01 June 1963
Nationality : Indian
Total Experience : More than 29 years
Educational Qualification : (i) Bachelor of Technology (Civil), G.B Pant University of
Agriculture &Technology PantNagar ,Nainital Uttar
Pradesh,1984 with first division.
(ii) Master Degree in Total Quality Management, Sikkim Manipal
University of Health, Medical and Technological Science, 2009
with first division.
Membership of Professional
Societies : Member, Indian Roads Congress(LM-28195)
Member , Institution of Engineers(M-1270898)
Member , Institution of Valuers(F-15763)
Detailed Main Tasks Assigned :
(1) Position: Acting Team Leader/Highway Engineer,
Project Name: Independent Consultancy Services for improvement of Gurgaon-Faridabad and
Ballabhgarh-Sohna Road on BOT Basis consultancy Package Number: HR/PWD/IC/BOT 4&5
From July 2010 to July 2014, India
(2) Position: Senior Pavement cum Material Engineer,
Project Name: Project Management consultancy for Construction of additional two lane for Ahmedabad-
Viramgam-Malia Road to make it four lane divided carriageway facility under viability gap funding
scheme of Govt. of India on (BOT) Build, operate & transfer basis under Gujrat state Road development
corporation Ltd. From Nov. 2009 - June 2010, India
(3) Position: Senior Pavement cum Material Engineer,
Project Name: Construction Supervision for West Bengal Corridor Development Project A.D.B. Funded
From April 2009- Oct 2009, India
(4) Position: Senior Pavement cum Material Engineer,
Project Name: Project Management Consultancy Services for Construction
Supervision, Quality Assurance and Quality Control for Yamuna Expressway, India BOT basis
From Oct. 2008-March 2009, India
(5)Position: Deputy Team Leader,
Project Name: Consultancy Services for Planning, Finalizing, Engineering and Design of Ganga Expressway,
Section 4 (278 km) and its Service Roads , India.
From April. 2008-Sept2008, India
CURRICULUM VITAE
Sheet 2 of 7
H.K.Mishra
E-042 GAUR GREEN CITY,
INDIRAPURAM,GHAZIABAD,U.P.
PIN-201014
Mob:09873509239
E-mail:hemant.hkm2009@gmail.com
(6) Position: Deputy Team Leader,
Project Name: Project Development works including Feasibility Study and Bid Process Management for 8
lane Access Controlled 1047 km long Ganga Expressway Project (Construction cost 30000 Crore), by forming
a Project Development Special Purpose Vehicle on PPP basis , India.
From Aug. 2007-March 2008, India
(7) Position: Material Engineer/Highway Engineer,
Project Name: Construction Supervision Consultancy of 4-laning & strengthening of the existing 2-lane
stretches from km 321.100 to km 393.00 on NH-2 (Contract Packages I-C ), Uttar Pradesh – Grand Trunk
Road (World Bank Funded)
From Aug.2002- July 2007, India
(8) Position: Assistant Resident Engineer,
Project Name: Construction Supervision of periodic maintenance Phase-I Contract Package under
Haryana Highways Upgrading Project Haryana .
From Sept 2000-July 2002, India
(9) Position : Senior Engineer
Project Name: Widening and Strengthening of Ghaziabad-Hapur Section (Length: 16 km) & Construction
of Hapur Bypass on NH-24, (OECF funded), Uttar Pradesh
. From Nov 1997-Aug 2000, India
(10) Position : Material Engineer,
Project Name: 4-laning and Strengthening of NH-1 (Delhi-Amristar) (Length: 40 km),
(Ambala to Sirhind), World Bank funded), Punjab
From Sept 1995-Oct 1997, India
(11) Position: Senior Engineer,
Project Name: Construction of Ahmedabad- Vadodara Expressway (length- 93 km), Gujarat
From Jan 1990-Aug1995, India.
(12) Position: Engineer
Project Name: Construction of building, Effluent & Waste Water Treatment Plants including Approach
Roads, Drainage System and Other Infrastructures, India
From Sept 1986- Nov1989 , India.
Key Qualifications:
Has 29 years of extensive experience in construction supervision & maintenance including
preparation of feasibility and detailed project reports of Highways projects for World Bank , ADB,
Government ,Concessionaire funded. Key qualification includes Project Co-ordination
,implementation and liaison, approve/suggest modifications in contractor’s work programme,
review of construction methods, , material testing, quality control works, Geosynthesis, soil and
material investigation, testing recommendation, characterization of pavement materials,
assessment of in-situ strength, geo-technical investigation of bridge sites, preparation and
implementation of quality assurance procedures/plans for all types of activities, operation &
maintenance manual review, approval of material sources, setting up of material testing laboratory,
design of various mixes for flexible and rigid pavements(PQC Works)and concrete works, review and
approve contractor’s working drawings, review of pavement design ,overlay design ,supervision of
construction works, ensure timely completion of the project, inspect Contractor’s establishment at
regular intervals, issue orders as required, conducting special tests of materials and completed
works, prepare Interim Payment Certificates, variation orders, drawings and quantities, prepare
CURRICULUM VITAE
Sheet 3 of 7
H.K.Mishra
E-042 GAUR GREEN CITY,
INDIRAPURAM,GHAZIABAD,U.P.
PIN-201014
Mob:09873509239
E-mail:hemant.hkm2009@gmail.com
progress reports (monthly, quarterly, annual, sectional completion Fully conversant with relevant
code of practice and guidelines of FIDIC/IRC/MOST/AASHTO specifications.
Education:
• Bachelor of Technology (Civil), G. B. Pant University of Agriculture and Technology, Pant Nagar,
Nainital, U.P., 1984.
• Master Degree in Total Quality Management, Sikkim Manipal University of Health, Medical and
Technological Science, 2009.
Employment Record:
Sept 2000 to 15 July 2015: JACOBS-CONSULTING ENGINEERING SERVICES (INDIA) PRIVATE
LIMITED, NEW DELHI
Chief General Manager/Genaral Manager/Project Manager/Deputy
Project Manager
Independent consultancy services for improvement of Gurgaon-Faridabad and Ballabhgarh -
Sohna Road on BOT Basis (4 Lane) consultancy Package Number: HR/PWD/IC/BOT 4&5, India,
July 2010 – July 2014
(Client: PWD, B&R Haryana) (Project cost: Rs1800 million approx.)
Worked as Acting Team Leader /Highway Engineer, responsible for review/ concurrence of
pavement design, Operation and Maintenance Manual review, finalization of horizontal alignment
and vertical profile drawing, guiding and supervising the Team member by prescribing the
construction methodology, control test specification by various IS & IRC codes and Ministry of
Surface Transport Specifications, review of Mix design /JMF of flexible & rigid pavement (PQC
works) & quality assurance manual , review of Extension of Time & claims of Concessionaire as per
Concession Agreement.
Also responsible for checking the laboratories and equipment for adequacy for the required
testing; reviewing the test results of bore hole, quarry and borrow area material to find out their
strength characteristics and suitability for using them in pavement construction ,testing &
supervision of PQC Works . Also responsible for quality assurance of the Construction work;
bituminous mixing plants to ensure that the specified requirements for such equipment are fully
met; issue Non Conformance Reports; undertaking visits to verify the compliance of defects noted
in earlier visits; recording observations about the quality and the standard of the works
completed; suitability of proposed construction methods, plant and equipment, sequence of
operations, proposed construction scheduling ; prescribing a quality control monitoring system to
ensure that the work carried is of the required quality; reviewing the various formats for tests of
asphaltic concrete, soil and other construction materials .
Project Management consultancy for Construction of additional two lane for Ahmedabad-
Viramgam-Malia Road to make it 4-lane divided carriageway facility under viability gap funding
scheme of Govt. of India on (BOT) Build, operate & transfer basis under Gujarat state Road
development corporation Ltd. (Length 183 km, 4-lane), India, November 2009 – June 2010
(Client:L&T,IDPL,Ahemdabad) (Projectcost:Rs10153millionapprox)
Worked as Sr. Pavement-cum-Material Engineer, Checking & approval of embankment, subgrade,
CURRICULUM VITAE
Sheet 4 of 7
H.K.Mishra
E-042 GAUR GREEN CITY,
INDIRAPURAM,GHAZIABAD,U.P.
PIN-201014
Mob:09873509239
E-mail:hemant.hkm2009@gmail.com
GSB, WMM, DBM, BC etc. approval of borrow areas, JMF finalization of GSB, WMM, DBM, BC,
Concrete mix design, preparation of quality assurance manual, setting out of four field laboratory
& monitoring, checking of method statement, making correspondence to client/contractor as per
contract agreement.
Also responsible for carry out Constructions Supervision , assess and monitor the tests being carried
out by staff of the Contractors and undertake additional tests as necessary to assess the quality of
works, day to day supervision of earthwork, sub-grade/sub-base/base and laying bituminous works
for DBM with all modern machineries, maintenance of road during construction period, keeping
records of contractor’s work programme ,deployed resources, preparation of monthly progress
report and several times performed duty of Resident Engineer in his absence .
Construction Supervision for West Bengal Corridor Development Project India, A.D.B. Funded
April 2009-Oct.2009
(Client: PWRD-Govt. of West Bengal) (Project cost: Rs 5000 million approx)
Worked as Sr. Pavement cum Material Engineer , responsible for monitoring supervision as per
MORT&H specification for final checkup of embankment , subgrade preparation, GSB, WMM, DBM,
BC,JMF for GSB,WMM,DBM,BC& concrete mix design, road marking etc. and review of
Contractor’s , equipment and construction method statements. Responsibility also includes guiding
field inspector for proper
checking and assist the Team Leader for each and every details of the project, preparing report,
checking statement, making correspondence to the Client/Contractor as per Contract agreement,
suggest Client/Consultant to change in design/drawing as per site condition, preparation and
checking measurement of executed works, preparation and checking of IPC including escalation,
mobilization, & machinery advance , making correspondence to client / contractor as per contract
agreement and several times performed duty of Resident Engineer in his absence .
.
Consultancy Services for Construction Supervision, Quality Assurance and Quality Control
(Project Management Consultancy) for 6/8 lane Tolled Yamuna Expressway (6/8-lane, 166 km),
India, Oct. 2008- March 2009
(Client: Jaiprakash Associates Limited.) (Project Cost: Rs 6750 million)
Worked as Sr. Pavement-cum-Material Engineer ,responsible for planning & monitoring detailed
subsoil exploration, Review of the test results of bore holes, quarry and borrow area material,
interpretation of laboratory & field test, conducting plate load and pile test, guiding and supervising
the Resident Engineer by prescribing the construction methodology , control test specification to
ensure high quality pavement construction and maintenance of roads. Deal with different Mix
design/JMF of flexible & PQC works, laying procedures, slump control specifications, prepared
quality assurance manual, monthly progress report, construction supervision manual, monitored
progress , making correspondence to client / contractor as per contract agreement and other
related services for the project and several times performed duty of Resident Engineer in his
absence .
.
Consultancy Services for Planning, Finalizing, Engineering and Design of Ganga Expressway,
CURRICULUM VITAE
Sheet 5 of 7
H.K.Mishra
E-042 GAUR GREEN CITY,
INDIRAPURAM,GHAZIABAD,U.P.
PIN-201014
Mob:09873509239
E-mail:hemant.hkm2009@gmail.com
Section 4 (278 km) and its Service Roads ,India .April 2008 –Sept 2008.
(Client: Jaypee Ganga Infrastructure Company Limited )
Government of Uttar Pradesh proposed to develop 8-lane access controlled expressway
including link roads connecting major cities of U.P. from Greater Noida to Ballia via 16 districts of
U.P. The scope of the works was to prepare detailed project report for 8 lane accesse controlled
expressway cum flood protection embankment for 278 km long section 4 of the expressway.
Worked As Deputy Team Leader, responsible for organizing all DPR activities including alignment
finalization, selection of location of interchanges / ROBs, Structures, topographic, material and
other
surveys, geometric design of Expressway and Service Roads, material investigation and pavement
design, rate analysis, cost estimate and preparation of detailed project report.
Project Development works including Feasibility Study and Bid Process Management for 8 lane
Access Controlled 1047 km long Ganga Expressway project by forming a Project Development
Special Purpose Vehicle on PPP basis, August 2007-March 2008.
(Client: U.P. Expressway Industrial Development Authority)
The Government of Uttar Pradesh proposed to construct an 8 lane access controlled expressway over
the marginal flood protection bund proposed by UP Irrigation department. The expressway was
proposed to be constructed on PPP format by appointing a PDSPV where 50% share would be PDCP.
The project has 1047 km length, 8 Mega bridges including 5 over river Ganga, 25 Interchanges, 320
Underpasses , 25 Road Over Bridges. The embankment height varies from 5 to 10m.
Worked as Deputy Team Leader , responsible to co-ordinate preliminarily preparation of RFQ and
RFP documents for engagement of Developers, then simultaneously carried out pre-feasibility
study and engineering design, involving inter alia, site verification of alignment, preliminary
topographicsurvey, soil and material survey, geotechnical survey, preparation of base map using
satellite imageries , preparation of GAD of major and minor bridges, type
design of culverts, geometric and pavement design of expressway, etc
Construction Supervision Consultancy of 4-laning & strengthening of the existing 2-lane
stretches from km 321.100 to km 393.00 (72.8 km) on NH-2 (Contract Packages I-C), Uttar
Pradesh – Grand Trunk Road (World Bank Funded), India, Aug 2002-July 2007.
(Client: National Highway Authority of India) (Project Cost: Rs 3230 million)
Worked as Material Engineer/Highway Engineer is Coordinating in setting up field laboratory,
identification of borrow areas for granular sub-base Material, embankment fill, sub-grade, and quarry
sites for aggregates to be used in bituminous and WMM works, monitor various field and laboratory
tests on soil & material, documentation of test results and maintaining records. Responsibilities also
included maintaining quality control for the construction of different pavement works such as
earthwork, GSB, WMM and bituminous works, design of job mix formula for bituminous concrete,
DBM, bituminous macadam and concrete mix.Also responsible for the project execution and
ensuring compliance with drawings, technical specifications, safety and environmental
management plan approved by the World Bank for the project. Assistance to the Team Leader in
respect to the execution of construction work and any change required in respect of alignment,
levels or method of working. Coordination with the contractor to tackle all problems of utility
relocation and departmental follow-up. To scrutinize and certify the work measurement and
testing to ensure compliance of project requirement, certify daily records of all activities being
carried out, review programe & progress of the contractor, Coordination in releasing of
CURRICULUM VITAE
Sheet 6 of 7
H.K.Mishra
E-042 GAUR GREEN CITY,
INDIRAPURAM,GHAZIABAD,U.P.
PIN-201014
Mob:09873509239
E-mail:hemant.hkm2009@gmail.com
construction drawings in advance for the planned works and attending progress review meetings
with the clients and making correspondence to client / contractor as per contract agreement. In
addition to above also performed many times duty of Resident Engineer in his absence .
Construction Supervision of periodic maintenance Phase-I Contract Package under Haryana
Highways Upgrading Project (595 km) Haryana, India, Sept 2000-July 2002
(Client: P.W.D. Govt. of Haryana) (Project Cost: Rs 500 million approx.)
The PWD (B&R) Haryana intended to maintain 11 state highways comprising 595 km length
through overlay provision using part of HUDCO Loan. The periodic maintenance provided
through the overlay (50 to 75 mm Bituminous Macadam + 20 mm Mix Seal surfacing) over the
existing intermediate/double lane roads, which were in extremely deteriorated condition. In
addition to the overlay, the shoulder reconstruction by GSB and WMM also formed part of this
project.
Worked as Assistant Resident Engineer, responsible for Construction Supervision and Quality
Assurance of the project. Responsibility includes final check up of embankment, subgrade, GSB,
WMM, BM, MSS, etc. and review of contractors programme, equipment & construction method. His
responsibilities also included setting of laboratory, identification of source of material and approval
of the same for earthwork, GSB, WMM, bituminous works and job mix formula for different
pavement layers. He has been involved in monitoring and preparation of quality assurance manual,
day to day testing of different pavement layers and making of monthly reports and keeping the
record for various approved materials including review of material report carried out by the
Consultants and, issued correspondence letters to client / contractor as per Contract Agreement .
Nov 1997-Aug 2000: NAGARJUNA CONSTRUCTION COMPANY LIMITED, HYDERABAD.
SENIOR ENGINEER
Widening and Strengthening of Ghaziabad-Hapur Section (4-lane, 16 km) & Construction of
Hapur Bypass on NH-24, (OECF funded), Uttar Pradesh, India, Nov 1997-Aug 2000
(Client: National Highways Authority of India) (Project Cost:Rs.1200 million approx)
The existing stretch is a 2-lane one and carrying heavy traffic day in and day out. The capacity of
the road section is falling inadequate to bear the load of present traffic. NHAI has therefore
taken up section of NH-24 from Km 27.0 to Km 48.0 for 4-laning and strengthening and also the
construction of Hapur bypass.
Worked as Senior Engineer, main responsibility was the execution of road as per MOST
Specification for strengthening and construction of Hapur Bypass, which includes construction of
earthwork, GSB, WMM, DBM, BC, etc. Responsibility also includes execution of survey work,
preparation of construction programme, material statement, material selection, bar bending
schedule preparation, man machine and material handling as per requirement, preparation of
Variation and claims form work and reinforcement checking maintaining quality control at
constructions site, progress report, preparation of measurement sheet and quantity survey.
Was also responsible for setting up of material testing laboratory, Quality Control of works,
preparation of quality assurance manual, identification of borrow areas for embankment and sub-
grade construction, organized relevant tests by taking sample from the borrow areas, preparation of
CURRICULUM VITAE
Sheet 7 of 7
H.K.Mishra
E-042 GAUR GREEN CITY,
INDIRAPURAM,GHAZIABAD,U.P.
PIN-201014
Mob:09873509239
E-mail:hemant.hkm2009@gmail.com
job mix formula for different pavement layers. Was involved with scheduling and execution of
different pavement layers by
modern machineries like excavator, grader, vibratory roller, paver with sensor, tandem & pneumatic
rollers, monitoring daily/weekly/monthly progress ,liaison closely with client and consultants
ensuring that the executed works do conform to the standards and specifications prescribed in the
contract
Sept 1995-Oct 1997: STUP CONSULTANTS LIMITED (INDIA)
4-laning and Strengthening of NH-1 (Delhi-Amristar) (Length: 40 km), (Ambala to Sirhind),
(World Bank funded), Punjab, India,Sept 1995-Oct 1997
(Client: P.W.D. Govt. of Punjab, India) (Project Cost: Rs.800 million approx.)
Worked as Material Engineer, main responsibility was to carry out Constructions Supervision as per
MOST Specification. The item of work includes earthwork, GSB, WMM, DBM, BC etc., review of
work programme, preparation of monthly progress report, preparation of Variation Order etc., bill
preparation of Contractor’s payment, survey work, monitoring material testing (laboratory as well
field testing) related to the soil, GSB, WMM, aggregate, concrete etc. Also involved in system of
quality assurance, responsible for Quality Control of works, checking of earthwork in embankment,
sub-grade, GSB, WMM as per MOST specification. Assess and monitor the tests being carried out by
staff of the Contractors and undertake additional tests as necessary to assess the quality of works.
Was also responsible for day to day supervision of earthwork, sub-grade/sub-base/base and laying
bituminous works for DBM and AC with all modern machineries, keeping records of contractor’s
work programme and deployed resources, attended joint measurement of executed works,
prepared interim payment certificates and assisted the Resident Engineer in the preparation of
monthly progress report and project management services.
Jan 1990-Aug 1995: CONTINENTAL CONSTRUCTION LIMITED, NEW DELHI
Construction of Ahmedabad-Vadodara Expressway (4-lane, length- 93 km), Gujarat, India,
Jan1990-Aug 1995
(Client: P.W.D. Govt. of Gujarat India) (Project Cost: Rs.900 million Approx.)
Worked as Senior Engineer, responsibility is to monitor supervision as per MOST specification. It
includes final checking of embankment, subgrade preparation, GSB, CD Works etc. Also monitored
highly mechanized equipment like grader, dozer, excavator, loader, density checking of
embankment, subgrade etc. Final checking of level as per drawing and specification, preparation of
weekly and monthly progress report, daily record of plant, machinery, labours, preparation of work
programme, equipment and construction methods. Developed a system of quality assurance on the
works and produce to the Engineer’s representative for implementation. Developed standard forms
and procedures on recording of test results in laboratory and field. Set up site laboratory and
maintain equipments to ensure proper functioning. Carried out tests for different borrow area,
quarry materials including cement, brick, steel, aggregates including preparing proposals for cement
concrete mix design and bituminous mix design. Rendered assistance to Engineer’s representative on
technical supervision of the works to ensure quality and conformity with the standards and
specifications prescribed in the contract. Monitored work programme, progress of work and day-to-
day quality control of works at site and laboratory.
Sept 1986-Nov 1989: H R SURI, ARCHITECT AND TOWN PLANNER, GORAKHPUR,
CURRICULUM VITAE
Sheet 8 of 7
H.K.Mishra
E-042 GAUR GREEN CITY,
INDIRAPURAM,GHAZIABAD,U.P.
PIN-201014
Mob:09873509239
E-mail:hemant.hkm2009@gmail.com
Engineer
Construction of building , Effluent & Waste Water Treatment Plants including Approach Roads,
Drainage System and Other Infrastructures, India, Sept1986- Nov1989
(Client: Municipality of Gorakhpur)
Worked as Engineer responsible for overall In-Charge of of all activities – Civil work – building
including all finishing, sewerage work, landscaping, electrical, roads including Quality control,
concrete mix design, day to day supervision , monitoring progress & construction schedule,
certification of contractors bill as per contract agreement.
Also responsible for design and construction of effluent and waste water treatment including
approach road also responsible for soil & material investigation, subsoil investigation, insitu,
laboratory testing of soil & material sampling from site & borrow area. Also supervised testing of
construction material, compilation, preparation of soil & material reports.
Feb 1985-Jan 1986: PROVINCIAL DIVISION, PWD, GORAKHPUR, U.P, INDIA
Assistant Engineer (Apprentice)
Maintenance & Strengthening of state building & road under Gorakhpur Division, U.P, India. (Feb
1985-Jan 1986)
(Client: P.W.D, Govt. Of U.P.)
Worked as Assistant Engineer (Apprentice) responsible for maintenance & strengthening of state
building & road under P.W.D, Gorakhpur. Also involved in investigation, soil sample collection,
auger boring, insitu & laboratory testing, CBR checking and supervision of other geo-technical &
subsoil investigation and preparation of soil & geo-technical reports.
Languages: Language Writing Speaking Reading
English Excellent Excellent Excellent
Hindi Excellent Excellent Excellent
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, these data correctly
describes me, my qualifications and my experience.
Signature of Staff Member Day/Month/Year
CURRICULUM VITAE

More Related Content

What's hot

Design Of Belt Conveyor to Prevent the failure and many other drawbacks from ...
Design Of Belt Conveyor to Prevent the failure and many other drawbacks from ...Design Of Belt Conveyor to Prevent the failure and many other drawbacks from ...
Design Of Belt Conveyor to Prevent the failure and many other drawbacks from ...Vishal Patel
 
N.Prasanth CV - Charted Geotechnical Engineer 2021
N.Prasanth CV - Charted Geotechnical Engineer 2021N.Prasanth CV - Charted Geotechnical Engineer 2021
N.Prasanth CV - Charted Geotechnical Engineer 2021N Prasanth
 
training report
training reporttraining report
training reportLilonheart
 
RETIRED--CV-RESUME OF Self - Copy
RETIRED--CV-RESUME OF Self - CopyRETIRED--CV-RESUME OF Self - Copy
RETIRED--CV-RESUME OF Self - Copysubodh kumar jain
 
NP Geotechnical Engineer
NP Geotechnical EngineerNP Geotechnical Engineer
NP Geotechnical EngineerN Prasanth
 
final year civil engineering training report
final year civil engineering training report final year civil engineering training report
final year civil engineering training report Poojan Patel
 
CV - B.SRIKANTH
CV - B.SRIKANTH CV - B.SRIKANTH
CV - B.SRIKANTH b_kanthi1
 
Civil engineering internship report
Civil engineering internship reportCivil engineering internship report
Civil engineering internship reportMd Mohsin Mohsin
 
Summer Internship Report Civil Engineering
Summer Internship Report Civil EngineeringSummer Internship Report Civil Engineering
Summer Internship Report Civil EngineeringZakaria Yahya
 
Cv mallikarjuna rao venkata bhadriraju 1 july 2019 consolidated
Cv mallikarjuna rao venkata  bhadriraju 1 july 2019 consolidatedCv mallikarjuna rao venkata  bhadriraju 1 july 2019 consolidated
Cv mallikarjuna rao venkata bhadriraju 1 july 2019 consolidatedMallikarjunaRaoBhadr
 
summer Internship report L&T_ Bihar museum_Patna
summer Internship report L&T_ Bihar museum_Patnasummer Internship report L&T_ Bihar museum_Patna
summer Internship report L&T_ Bihar museum_Patnakishore1192
 

What's hot (19)

Design Of Belt Conveyor to Prevent the failure and many other drawbacks from ...
Design Of Belt Conveyor to Prevent the failure and many other drawbacks from ...Design Of Belt Conveyor to Prevent the failure and many other drawbacks from ...
Design Of Belt Conveyor to Prevent the failure and many other drawbacks from ...
 
HEAMNT_GURAV
HEAMNT_GURAVHEAMNT_GURAV
HEAMNT_GURAV
 
N.Prasanth CV - Charted Geotechnical Engineer 2021
N.Prasanth CV - Charted Geotechnical Engineer 2021N.Prasanth CV - Charted Geotechnical Engineer 2021
N.Prasanth CV - Charted Geotechnical Engineer 2021
 
training report
training reporttraining report
training report
 
RETIRED--CV-RESUME OF Self - Copy
RETIRED--CV-RESUME OF Self - CopyRETIRED--CV-RESUME OF Self - Copy
RETIRED--CV-RESUME OF Self - Copy
 
NP Geotechnical Engineer
NP Geotechnical EngineerNP Geotechnical Engineer
NP Geotechnical Engineer
 
final year civil engineering training report
final year civil engineering training report final year civil engineering training report
final year civil engineering training report
 
Anant Gupta CV
Anant Gupta CVAnant Gupta CV
Anant Gupta CV
 
---Ajinkya-- Resume
---Ajinkya-- Resume---Ajinkya-- Resume
---Ajinkya-- Resume
 
Farooqh pasha_CV
Farooqh pasha_CVFarooqh pasha_CV
Farooqh pasha_CV
 
Farooqh pasha_CV
Farooqh pasha_CVFarooqh pasha_CV
Farooqh pasha_CV
 
CV - B.SRIKANTH
CV - B.SRIKANTH CV - B.SRIKANTH
CV - B.SRIKANTH
 
Civil engineering internship report
Civil engineering internship reportCivil engineering internship report
Civil engineering internship report
 
Rajeev Bhargava_Resume'
Rajeev Bhargava_Resume'Rajeev Bhargava_Resume'
Rajeev Bhargava_Resume'
 
Summer Internship Report Civil Engineering
Summer Internship Report Civil EngineeringSummer Internship Report Civil Engineering
Summer Internship Report Civil Engineering
 
C.V.
C.V.C.V.
C.V.
 
Resume - Ganesh Ramakrishnan
Resume - Ganesh RamakrishnanResume - Ganesh Ramakrishnan
Resume - Ganesh Ramakrishnan
 
Cv mallikarjuna rao venkata bhadriraju 1 july 2019 consolidated
Cv mallikarjuna rao venkata  bhadriraju 1 july 2019 consolidatedCv mallikarjuna rao venkata  bhadriraju 1 july 2019 consolidated
Cv mallikarjuna rao venkata bhadriraju 1 july 2019 consolidated
 
summer Internship report L&T_ Bihar museum_Patna
summer Internship report L&T_ Bihar museum_Patnasummer Internship report L&T_ Bihar museum_Patna
summer Internship report L&T_ Bihar museum_Patna
 

Viewers also liked (20)

Plan de clase de ciencias naturales
Plan de clase de ciencias naturalesPlan de clase de ciencias naturales
Plan de clase de ciencias naturales
 
Malla curicular de ciencias naturales
Malla curicular de ciencias naturalesMalla curicular de ciencias naturales
Malla curicular de ciencias naturales
 
Malla curricular ingenieriaindustrial
Malla curricular ingenieriaindustrialMalla curricular ingenieriaindustrial
Malla curricular ingenieriaindustrial
 
Malla curricular ciencias periodo uno 2016
Malla  curricular ciencias periodo uno 2016Malla  curricular ciencias periodo uno 2016
Malla curricular ciencias periodo uno 2016
 
Malla curricular de ciencias naturales
Malla curricular de ciencias naturalesMalla curricular de ciencias naturales
Malla curricular de ciencias naturales
 
Malla curricular educacion fisica 2017
Malla curricular educacion fisica 2017Malla curricular educacion fisica 2017
Malla curricular educacion fisica 2017
 
CV
CVCV
CV
 
azhar_resume
azhar_resumeazhar_resume
azhar_resume
 
BLS CVs and Competencies Sep 2016
BLS CVs and Competencies Sep 2016BLS CVs and Competencies Sep 2016
BLS CVs and Competencies Sep 2016
 
Brandon Hughes CV
Brandon Hughes CVBrandon Hughes CV
Brandon Hughes CV
 
Curriculum Vitae-Zuber
Curriculum Vitae-ZuberCurriculum Vitae-Zuber
Curriculum Vitae-Zuber
 
Plan de clase agropecuaria roberto flores
Plan de clase   agropecuaria  roberto floresPlan de clase   agropecuaria  roberto flores
Plan de clase agropecuaria roberto flores
 
Dr John Mwai Mbugua CV July 2015 current
Dr John Mwai Mbugua CV July 2015 currentDr John Mwai Mbugua CV July 2015 current
Dr John Mwai Mbugua CV July 2015 current
 
Raymond cv
Raymond cvRaymond cv
Raymond cv
 
Hailay CV
Hailay CVHailay CV
Hailay CV
 
cv updated
cv updatedcv updated
cv updated
 
Samson Latest CV, 2016
Samson Latest CV, 2016Samson Latest CV, 2016
Samson Latest CV, 2016
 
ANOOP CV SITE ENGR
ANOOP CV SITE ENGRANOOP CV SITE ENGR
ANOOP CV SITE ENGR
 
Bruno VERRIER - CV
Bruno VERRIER - CVBruno VERRIER - CV
Bruno VERRIER - CV
 
CV Transport Expert_Vu Anh Tuan (2015)
CV Transport Expert_Vu Anh Tuan (2015)CV Transport Expert_Vu Anh Tuan (2015)
CV Transport Expert_Vu Anh Tuan (2015)
 

Similar to corrected Sept 30, C.V OF HK MISHRA- TL

Similar to corrected Sept 30, C.V OF HK MISHRA- TL (20)

CURRICULUM_VITAE__NHAI_latest
CURRICULUM_VITAE__NHAI_latestCURRICULUM_VITAE__NHAI_latest
CURRICULUM_VITAE__NHAI_latest
 
CV
CVCV
CV
 
Revised cv kk gupta
Revised cv kk guptaRevised cv kk gupta
Revised cv kk gupta
 
highway main
highway mainhighway main
highway main
 
USM-28-6-16
USM-28-6-16USM-28-6-16
USM-28-6-16
 
Biswajit Das_Resume
Biswajit Das_ResumeBiswajit Das_Resume
Biswajit Das_Resume
 
Jayasankar_CV_for QA Manager
Jayasankar_CV_for QA ManagerJayasankar_CV_for QA Manager
Jayasankar_CV_for QA Manager
 
JYOTI THAKURIA CV
JYOTI THAKURIA CVJYOTI THAKURIA CV
JYOTI THAKURIA CV
 
cv.dchand copy
cv.dchand copycv.dchand copy
cv.dchand copy
 
Cv shubham bhargava
Cv   shubham bhargavaCv   shubham bhargava
Cv shubham bhargava
 
Prashant - CV simple format
Prashant - CV  simple formatPrashant - CV  simple format
Prashant - CV simple format
 
Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016
 
Asstt Bridge Engineer - Bhupinder Singh
Asstt Bridge Engineer - Bhupinder SinghAsstt Bridge Engineer - Bhupinder Singh
Asstt Bridge Engineer - Bhupinder Singh
 
CV Shubham Bhargava
CV  Shubham BhargavaCV  Shubham Bhargava
CV Shubham Bhargava
 
CV Mr. Haribabu
CV Mr. HaribabuCV Mr. Haribabu
CV Mr. Haribabu
 
Chennakesavulu CV tendering format
Chennakesavulu CV tendering formatChennakesavulu CV tendering format
Chennakesavulu CV tendering format
 
Resume_Pramod Chaudhari
Resume_Pramod ChaudhariResume_Pramod Chaudhari
Resume_Pramod Chaudhari
 
CV Shubham Bhargava
CV Shubham BhargavaCV Shubham Bhargava
CV Shubham Bhargava
 
Rajinder kumar updated resume
Rajinder  kumar updated resumeRajinder  kumar updated resume
Rajinder kumar updated resume
 
Abhinandan K -Highway Engineer with 3 + yr Expr 2014
Abhinandan K -Highway Engineer with 3 + yr Expr 2014 Abhinandan K -Highway Engineer with 3 + yr Expr 2014
Abhinandan K -Highway Engineer with 3 + yr Expr 2014
 

corrected Sept 30, C.V OF HK MISHRA- TL

  • 1. Sheet 1 of 7 H.K.Mishra E-042 GAUR GREEN CITY, INDIRAPURAM,GHAZIABAD,U.P. PIN-201014 Mob:09873509239 E-mail:hemant.hkm2009@gmail.com Post applied for : Team Leader/Sr Quality cum Material Engineer/ Resident Engineer / Suitable Position Name : Hemant Kumar Mishra Date Of Birth : 01 June 1963 Nationality : Indian Total Experience : More than 29 years Educational Qualification : (i) Bachelor of Technology (Civil), G.B Pant University of Agriculture &Technology PantNagar ,Nainital Uttar Pradesh,1984 with first division. (ii) Master Degree in Total Quality Management, Sikkim Manipal University of Health, Medical and Technological Science, 2009 with first division. Membership of Professional Societies : Member, Indian Roads Congress(LM-28195) Member , Institution of Engineers(M-1270898) Member , Institution of Valuers(F-15763) Detailed Main Tasks Assigned : (1) Position: Acting Team Leader/Highway Engineer, Project Name: Independent Consultancy Services for improvement of Gurgaon-Faridabad and Ballabhgarh-Sohna Road on BOT Basis consultancy Package Number: HR/PWD/IC/BOT 4&5 From July 2010 to July 2014, India (2) Position: Senior Pavement cum Material Engineer, Project Name: Project Management consultancy for Construction of additional two lane for Ahmedabad- Viramgam-Malia Road to make it four lane divided carriageway facility under viability gap funding scheme of Govt. of India on (BOT) Build, operate & transfer basis under Gujrat state Road development corporation Ltd. From Nov. 2009 - June 2010, India (3) Position: Senior Pavement cum Material Engineer, Project Name: Construction Supervision for West Bengal Corridor Development Project A.D.B. Funded From April 2009- Oct 2009, India (4) Position: Senior Pavement cum Material Engineer, Project Name: Project Management Consultancy Services for Construction Supervision, Quality Assurance and Quality Control for Yamuna Expressway, India BOT basis From Oct. 2008-March 2009, India (5)Position: Deputy Team Leader, Project Name: Consultancy Services for Planning, Finalizing, Engineering and Design of Ganga Expressway, Section 4 (278 km) and its Service Roads , India. From April. 2008-Sept2008, India CURRICULUM VITAE
  • 2. Sheet 2 of 7 H.K.Mishra E-042 GAUR GREEN CITY, INDIRAPURAM,GHAZIABAD,U.P. PIN-201014 Mob:09873509239 E-mail:hemant.hkm2009@gmail.com (6) Position: Deputy Team Leader, Project Name: Project Development works including Feasibility Study and Bid Process Management for 8 lane Access Controlled 1047 km long Ganga Expressway Project (Construction cost 30000 Crore), by forming a Project Development Special Purpose Vehicle on PPP basis , India. From Aug. 2007-March 2008, India (7) Position: Material Engineer/Highway Engineer, Project Name: Construction Supervision Consultancy of 4-laning & strengthening of the existing 2-lane stretches from km 321.100 to km 393.00 on NH-2 (Contract Packages I-C ), Uttar Pradesh – Grand Trunk Road (World Bank Funded) From Aug.2002- July 2007, India (8) Position: Assistant Resident Engineer, Project Name: Construction Supervision of periodic maintenance Phase-I Contract Package under Haryana Highways Upgrading Project Haryana . From Sept 2000-July 2002, India (9) Position : Senior Engineer Project Name: Widening and Strengthening of Ghaziabad-Hapur Section (Length: 16 km) & Construction of Hapur Bypass on NH-24, (OECF funded), Uttar Pradesh . From Nov 1997-Aug 2000, India (10) Position : Material Engineer, Project Name: 4-laning and Strengthening of NH-1 (Delhi-Amristar) (Length: 40 km), (Ambala to Sirhind), World Bank funded), Punjab From Sept 1995-Oct 1997, India (11) Position: Senior Engineer, Project Name: Construction of Ahmedabad- Vadodara Expressway (length- 93 km), Gujarat From Jan 1990-Aug1995, India. (12) Position: Engineer Project Name: Construction of building, Effluent & Waste Water Treatment Plants including Approach Roads, Drainage System and Other Infrastructures, India From Sept 1986- Nov1989 , India. Key Qualifications: Has 29 years of extensive experience in construction supervision & maintenance including preparation of feasibility and detailed project reports of Highways projects for World Bank , ADB, Government ,Concessionaire funded. Key qualification includes Project Co-ordination ,implementation and liaison, approve/suggest modifications in contractor’s work programme, review of construction methods, , material testing, quality control works, Geosynthesis, soil and material investigation, testing recommendation, characterization of pavement materials, assessment of in-situ strength, geo-technical investigation of bridge sites, preparation and implementation of quality assurance procedures/plans for all types of activities, operation & maintenance manual review, approval of material sources, setting up of material testing laboratory, design of various mixes for flexible and rigid pavements(PQC Works)and concrete works, review and approve contractor’s working drawings, review of pavement design ,overlay design ,supervision of construction works, ensure timely completion of the project, inspect Contractor’s establishment at regular intervals, issue orders as required, conducting special tests of materials and completed works, prepare Interim Payment Certificates, variation orders, drawings and quantities, prepare CURRICULUM VITAE
  • 3. Sheet 3 of 7 H.K.Mishra E-042 GAUR GREEN CITY, INDIRAPURAM,GHAZIABAD,U.P. PIN-201014 Mob:09873509239 E-mail:hemant.hkm2009@gmail.com progress reports (monthly, quarterly, annual, sectional completion Fully conversant with relevant code of practice and guidelines of FIDIC/IRC/MOST/AASHTO specifications. Education: • Bachelor of Technology (Civil), G. B. Pant University of Agriculture and Technology, Pant Nagar, Nainital, U.P., 1984. • Master Degree in Total Quality Management, Sikkim Manipal University of Health, Medical and Technological Science, 2009. Employment Record: Sept 2000 to 15 July 2015: JACOBS-CONSULTING ENGINEERING SERVICES (INDIA) PRIVATE LIMITED, NEW DELHI Chief General Manager/Genaral Manager/Project Manager/Deputy Project Manager Independent consultancy services for improvement of Gurgaon-Faridabad and Ballabhgarh - Sohna Road on BOT Basis (4 Lane) consultancy Package Number: HR/PWD/IC/BOT 4&5, India, July 2010 – July 2014 (Client: PWD, B&R Haryana) (Project cost: Rs1800 million approx.) Worked as Acting Team Leader /Highway Engineer, responsible for review/ concurrence of pavement design, Operation and Maintenance Manual review, finalization of horizontal alignment and vertical profile drawing, guiding and supervising the Team member by prescribing the construction methodology, control test specification by various IS & IRC codes and Ministry of Surface Transport Specifications, review of Mix design /JMF of flexible & rigid pavement (PQC works) & quality assurance manual , review of Extension of Time & claims of Concessionaire as per Concession Agreement. Also responsible for checking the laboratories and equipment for adequacy for the required testing; reviewing the test results of bore hole, quarry and borrow area material to find out their strength characteristics and suitability for using them in pavement construction ,testing & supervision of PQC Works . Also responsible for quality assurance of the Construction work; bituminous mixing plants to ensure that the specified requirements for such equipment are fully met; issue Non Conformance Reports; undertaking visits to verify the compliance of defects noted in earlier visits; recording observations about the quality and the standard of the works completed; suitability of proposed construction methods, plant and equipment, sequence of operations, proposed construction scheduling ; prescribing a quality control monitoring system to ensure that the work carried is of the required quality; reviewing the various formats for tests of asphaltic concrete, soil and other construction materials . Project Management consultancy for Construction of additional two lane for Ahmedabad- Viramgam-Malia Road to make it 4-lane divided carriageway facility under viability gap funding scheme of Govt. of India on (BOT) Build, operate & transfer basis under Gujarat state Road development corporation Ltd. (Length 183 km, 4-lane), India, November 2009 – June 2010 (Client:L&T,IDPL,Ahemdabad) (Projectcost:Rs10153millionapprox) Worked as Sr. Pavement-cum-Material Engineer, Checking & approval of embankment, subgrade, CURRICULUM VITAE
  • 4. Sheet 4 of 7 H.K.Mishra E-042 GAUR GREEN CITY, INDIRAPURAM,GHAZIABAD,U.P. PIN-201014 Mob:09873509239 E-mail:hemant.hkm2009@gmail.com GSB, WMM, DBM, BC etc. approval of borrow areas, JMF finalization of GSB, WMM, DBM, BC, Concrete mix design, preparation of quality assurance manual, setting out of four field laboratory & monitoring, checking of method statement, making correspondence to client/contractor as per contract agreement. Also responsible for carry out Constructions Supervision , assess and monitor the tests being carried out by staff of the Contractors and undertake additional tests as necessary to assess the quality of works, day to day supervision of earthwork, sub-grade/sub-base/base and laying bituminous works for DBM with all modern machineries, maintenance of road during construction period, keeping records of contractor’s work programme ,deployed resources, preparation of monthly progress report and several times performed duty of Resident Engineer in his absence . Construction Supervision for West Bengal Corridor Development Project India, A.D.B. Funded April 2009-Oct.2009 (Client: PWRD-Govt. of West Bengal) (Project cost: Rs 5000 million approx) Worked as Sr. Pavement cum Material Engineer , responsible for monitoring supervision as per MORT&H specification for final checkup of embankment , subgrade preparation, GSB, WMM, DBM, BC,JMF for GSB,WMM,DBM,BC& concrete mix design, road marking etc. and review of Contractor’s , equipment and construction method statements. Responsibility also includes guiding field inspector for proper checking and assist the Team Leader for each and every details of the project, preparing report, checking statement, making correspondence to the Client/Contractor as per Contract agreement, suggest Client/Consultant to change in design/drawing as per site condition, preparation and checking measurement of executed works, preparation and checking of IPC including escalation, mobilization, & machinery advance , making correspondence to client / contractor as per contract agreement and several times performed duty of Resident Engineer in his absence . . Consultancy Services for Construction Supervision, Quality Assurance and Quality Control (Project Management Consultancy) for 6/8 lane Tolled Yamuna Expressway (6/8-lane, 166 km), India, Oct. 2008- March 2009 (Client: Jaiprakash Associates Limited.) (Project Cost: Rs 6750 million) Worked as Sr. Pavement-cum-Material Engineer ,responsible for planning & monitoring detailed subsoil exploration, Review of the test results of bore holes, quarry and borrow area material, interpretation of laboratory & field test, conducting plate load and pile test, guiding and supervising the Resident Engineer by prescribing the construction methodology , control test specification to ensure high quality pavement construction and maintenance of roads. Deal with different Mix design/JMF of flexible & PQC works, laying procedures, slump control specifications, prepared quality assurance manual, monthly progress report, construction supervision manual, monitored progress , making correspondence to client / contractor as per contract agreement and other related services for the project and several times performed duty of Resident Engineer in his absence . . Consultancy Services for Planning, Finalizing, Engineering and Design of Ganga Expressway, CURRICULUM VITAE
  • 5. Sheet 5 of 7 H.K.Mishra E-042 GAUR GREEN CITY, INDIRAPURAM,GHAZIABAD,U.P. PIN-201014 Mob:09873509239 E-mail:hemant.hkm2009@gmail.com Section 4 (278 km) and its Service Roads ,India .April 2008 –Sept 2008. (Client: Jaypee Ganga Infrastructure Company Limited ) Government of Uttar Pradesh proposed to develop 8-lane access controlled expressway including link roads connecting major cities of U.P. from Greater Noida to Ballia via 16 districts of U.P. The scope of the works was to prepare detailed project report for 8 lane accesse controlled expressway cum flood protection embankment for 278 km long section 4 of the expressway. Worked As Deputy Team Leader, responsible for organizing all DPR activities including alignment finalization, selection of location of interchanges / ROBs, Structures, topographic, material and other surveys, geometric design of Expressway and Service Roads, material investigation and pavement design, rate analysis, cost estimate and preparation of detailed project report. Project Development works including Feasibility Study and Bid Process Management for 8 lane Access Controlled 1047 km long Ganga Expressway project by forming a Project Development Special Purpose Vehicle on PPP basis, August 2007-March 2008. (Client: U.P. Expressway Industrial Development Authority) The Government of Uttar Pradesh proposed to construct an 8 lane access controlled expressway over the marginal flood protection bund proposed by UP Irrigation department. The expressway was proposed to be constructed on PPP format by appointing a PDSPV where 50% share would be PDCP. The project has 1047 km length, 8 Mega bridges including 5 over river Ganga, 25 Interchanges, 320 Underpasses , 25 Road Over Bridges. The embankment height varies from 5 to 10m. Worked as Deputy Team Leader , responsible to co-ordinate preliminarily preparation of RFQ and RFP documents for engagement of Developers, then simultaneously carried out pre-feasibility study and engineering design, involving inter alia, site verification of alignment, preliminary topographicsurvey, soil and material survey, geotechnical survey, preparation of base map using satellite imageries , preparation of GAD of major and minor bridges, type design of culverts, geometric and pavement design of expressway, etc Construction Supervision Consultancy of 4-laning & strengthening of the existing 2-lane stretches from km 321.100 to km 393.00 (72.8 km) on NH-2 (Contract Packages I-C), Uttar Pradesh – Grand Trunk Road (World Bank Funded), India, Aug 2002-July 2007. (Client: National Highway Authority of India) (Project Cost: Rs 3230 million) Worked as Material Engineer/Highway Engineer is Coordinating in setting up field laboratory, identification of borrow areas for granular sub-base Material, embankment fill, sub-grade, and quarry sites for aggregates to be used in bituminous and WMM works, monitor various field and laboratory tests on soil & material, documentation of test results and maintaining records. Responsibilities also included maintaining quality control for the construction of different pavement works such as earthwork, GSB, WMM and bituminous works, design of job mix formula for bituminous concrete, DBM, bituminous macadam and concrete mix.Also responsible for the project execution and ensuring compliance with drawings, technical specifications, safety and environmental management plan approved by the World Bank for the project. Assistance to the Team Leader in respect to the execution of construction work and any change required in respect of alignment, levels or method of working. Coordination with the contractor to tackle all problems of utility relocation and departmental follow-up. To scrutinize and certify the work measurement and testing to ensure compliance of project requirement, certify daily records of all activities being carried out, review programe & progress of the contractor, Coordination in releasing of CURRICULUM VITAE
  • 6. Sheet 6 of 7 H.K.Mishra E-042 GAUR GREEN CITY, INDIRAPURAM,GHAZIABAD,U.P. PIN-201014 Mob:09873509239 E-mail:hemant.hkm2009@gmail.com construction drawings in advance for the planned works and attending progress review meetings with the clients and making correspondence to client / contractor as per contract agreement. In addition to above also performed many times duty of Resident Engineer in his absence . Construction Supervision of periodic maintenance Phase-I Contract Package under Haryana Highways Upgrading Project (595 km) Haryana, India, Sept 2000-July 2002 (Client: P.W.D. Govt. of Haryana) (Project Cost: Rs 500 million approx.) The PWD (B&R) Haryana intended to maintain 11 state highways comprising 595 km length through overlay provision using part of HUDCO Loan. The periodic maintenance provided through the overlay (50 to 75 mm Bituminous Macadam + 20 mm Mix Seal surfacing) over the existing intermediate/double lane roads, which were in extremely deteriorated condition. In addition to the overlay, the shoulder reconstruction by GSB and WMM also formed part of this project. Worked as Assistant Resident Engineer, responsible for Construction Supervision and Quality Assurance of the project. Responsibility includes final check up of embankment, subgrade, GSB, WMM, BM, MSS, etc. and review of contractors programme, equipment & construction method. His responsibilities also included setting of laboratory, identification of source of material and approval of the same for earthwork, GSB, WMM, bituminous works and job mix formula for different pavement layers. He has been involved in monitoring and preparation of quality assurance manual, day to day testing of different pavement layers and making of monthly reports and keeping the record for various approved materials including review of material report carried out by the Consultants and, issued correspondence letters to client / contractor as per Contract Agreement . Nov 1997-Aug 2000: NAGARJUNA CONSTRUCTION COMPANY LIMITED, HYDERABAD. SENIOR ENGINEER Widening and Strengthening of Ghaziabad-Hapur Section (4-lane, 16 km) & Construction of Hapur Bypass on NH-24, (OECF funded), Uttar Pradesh, India, Nov 1997-Aug 2000 (Client: National Highways Authority of India) (Project Cost:Rs.1200 million approx) The existing stretch is a 2-lane one and carrying heavy traffic day in and day out. The capacity of the road section is falling inadequate to bear the load of present traffic. NHAI has therefore taken up section of NH-24 from Km 27.0 to Km 48.0 for 4-laning and strengthening and also the construction of Hapur bypass. Worked as Senior Engineer, main responsibility was the execution of road as per MOST Specification for strengthening and construction of Hapur Bypass, which includes construction of earthwork, GSB, WMM, DBM, BC, etc. Responsibility also includes execution of survey work, preparation of construction programme, material statement, material selection, bar bending schedule preparation, man machine and material handling as per requirement, preparation of Variation and claims form work and reinforcement checking maintaining quality control at constructions site, progress report, preparation of measurement sheet and quantity survey. Was also responsible for setting up of material testing laboratory, Quality Control of works, preparation of quality assurance manual, identification of borrow areas for embankment and sub- grade construction, organized relevant tests by taking sample from the borrow areas, preparation of CURRICULUM VITAE
  • 7. Sheet 7 of 7 H.K.Mishra E-042 GAUR GREEN CITY, INDIRAPURAM,GHAZIABAD,U.P. PIN-201014 Mob:09873509239 E-mail:hemant.hkm2009@gmail.com job mix formula for different pavement layers. Was involved with scheduling and execution of different pavement layers by modern machineries like excavator, grader, vibratory roller, paver with sensor, tandem & pneumatic rollers, monitoring daily/weekly/monthly progress ,liaison closely with client and consultants ensuring that the executed works do conform to the standards and specifications prescribed in the contract Sept 1995-Oct 1997: STUP CONSULTANTS LIMITED (INDIA) 4-laning and Strengthening of NH-1 (Delhi-Amristar) (Length: 40 km), (Ambala to Sirhind), (World Bank funded), Punjab, India,Sept 1995-Oct 1997 (Client: P.W.D. Govt. of Punjab, India) (Project Cost: Rs.800 million approx.) Worked as Material Engineer, main responsibility was to carry out Constructions Supervision as per MOST Specification. The item of work includes earthwork, GSB, WMM, DBM, BC etc., review of work programme, preparation of monthly progress report, preparation of Variation Order etc., bill preparation of Contractor’s payment, survey work, monitoring material testing (laboratory as well field testing) related to the soil, GSB, WMM, aggregate, concrete etc. Also involved in system of quality assurance, responsible for Quality Control of works, checking of earthwork in embankment, sub-grade, GSB, WMM as per MOST specification. Assess and monitor the tests being carried out by staff of the Contractors and undertake additional tests as necessary to assess the quality of works. Was also responsible for day to day supervision of earthwork, sub-grade/sub-base/base and laying bituminous works for DBM and AC with all modern machineries, keeping records of contractor’s work programme and deployed resources, attended joint measurement of executed works, prepared interim payment certificates and assisted the Resident Engineer in the preparation of monthly progress report and project management services. Jan 1990-Aug 1995: CONTINENTAL CONSTRUCTION LIMITED, NEW DELHI Construction of Ahmedabad-Vadodara Expressway (4-lane, length- 93 km), Gujarat, India, Jan1990-Aug 1995 (Client: P.W.D. Govt. of Gujarat India) (Project Cost: Rs.900 million Approx.) Worked as Senior Engineer, responsibility is to monitor supervision as per MOST specification. It includes final checking of embankment, subgrade preparation, GSB, CD Works etc. Also monitored highly mechanized equipment like grader, dozer, excavator, loader, density checking of embankment, subgrade etc. Final checking of level as per drawing and specification, preparation of weekly and monthly progress report, daily record of plant, machinery, labours, preparation of work programme, equipment and construction methods. Developed a system of quality assurance on the works and produce to the Engineer’s representative for implementation. Developed standard forms and procedures on recording of test results in laboratory and field. Set up site laboratory and maintain equipments to ensure proper functioning. Carried out tests for different borrow area, quarry materials including cement, brick, steel, aggregates including preparing proposals for cement concrete mix design and bituminous mix design. Rendered assistance to Engineer’s representative on technical supervision of the works to ensure quality and conformity with the standards and specifications prescribed in the contract. Monitored work programme, progress of work and day-to- day quality control of works at site and laboratory. Sept 1986-Nov 1989: H R SURI, ARCHITECT AND TOWN PLANNER, GORAKHPUR, CURRICULUM VITAE
  • 8. Sheet 8 of 7 H.K.Mishra E-042 GAUR GREEN CITY, INDIRAPURAM,GHAZIABAD,U.P. PIN-201014 Mob:09873509239 E-mail:hemant.hkm2009@gmail.com Engineer Construction of building , Effluent & Waste Water Treatment Plants including Approach Roads, Drainage System and Other Infrastructures, India, Sept1986- Nov1989 (Client: Municipality of Gorakhpur) Worked as Engineer responsible for overall In-Charge of of all activities – Civil work – building including all finishing, sewerage work, landscaping, electrical, roads including Quality control, concrete mix design, day to day supervision , monitoring progress & construction schedule, certification of contractors bill as per contract agreement. Also responsible for design and construction of effluent and waste water treatment including approach road also responsible for soil & material investigation, subsoil investigation, insitu, laboratory testing of soil & material sampling from site & borrow area. Also supervised testing of construction material, compilation, preparation of soil & material reports. Feb 1985-Jan 1986: PROVINCIAL DIVISION, PWD, GORAKHPUR, U.P, INDIA Assistant Engineer (Apprentice) Maintenance & Strengthening of state building & road under Gorakhpur Division, U.P, India. (Feb 1985-Jan 1986) (Client: P.W.D, Govt. Of U.P.) Worked as Assistant Engineer (Apprentice) responsible for maintenance & strengthening of state building & road under P.W.D, Gorakhpur. Also involved in investigation, soil sample collection, auger boring, insitu & laboratory testing, CBR checking and supervision of other geo-technical & subsoil investigation and preparation of soil & geo-technical reports. Languages: Language Writing Speaking Reading English Excellent Excellent Excellent Hindi Excellent Excellent Excellent Certification: I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describes me, my qualifications and my experience. Signature of Staff Member Day/Month/Year CURRICULUM VITAE