SSI - Europe’s second largest
Blast Furnace
• Total site emits 7.1million tonnes of CO2 per
year
• After optioneering 3 concepts selected for
further study:
1. Post combustion capture on the flue gas from new
power station fueled by blast furnace gas – 1.6million
tonnes captured
2. Pre-combustion capture from entire blast furnace gas
– 2.1million tonnes captured
3. Pre-combustion capture from excess blast furnace
gas and BOS gas – carbon converted to H2 and CO2
in shift reaction – 2.2million tonnes captured
Comparison of options
Growhow – 35% of UK’s
fertilisers
• Produces CO2 as part of process, sells to
Greenhouses and Drinks industry
• Average of 375,000 tonnes of CO2 per year
• New 100barg compression plant required
(2 x 50tonne/hr compressors)
• Proven technology from existing suppliers
• No operation or integration issues identified
Compressor Compound
BOC Linde - UK’s largest Steam
Methane Reformer
• 305,000 tonnes of CO2 captured
• Conventional Amine Process on flue
gas from SMR
• No significant impact on the
hydrogen plant
• Significant power consumption –
5.9MW
ReformerCCP
Core
Plant
PSA
CCP Utilities
BOC Layout
Natural
Gas
Feed
SMR Shift PSA
Hydrogen
Export
Tail Gas
Flue
Gas
Steam
Export
HMU
Utilities
Existing
Hydrogen
Plant
CO2
Capture
Compression
&
Dehydration
CO2
Export
Vent Gas
CCP
Utilities
New CO2
Capture Plant
Lotte - Produces enough PET for
15billion drinks bottles every year
• 50,000 tonnes of CO2 captured
• Amine capture solution selected
• Pre-designed amine units
available – American – no
European pricing available
• 90% CO2 captured
New
Plant
Lotte Chemicals Layout
Onshore network
• 5 and 15million tonnes per year capacity pipe studied
• 100 barg from capture units with specified CO2, transport at dense phase
• Constraints identified to generate route:
– Environmental
– NG NTS Feeder
– Populations
– Access to suitable shore landing
– Rail and road crossings
Initial spine and extensions
Booster Station to Offshore Routes
Booster
Station
Booster
Station
Cleveland
Golf
Club
Cleveland
Golf
Club
SSI
CCS
SSI
CCS
Hot
Metal
Line
Hot
Metal
Line
Offshore network
• Two destinations:
• National Grid’s 5/42 / Bunter
– 154km
– 3 pipeline crossings, 3
communication crossings, 3
electrical transmission cable
crossings, submarine exercise area.
– 5mt/yr = 18in. 15mt/yr = 24in
• Captain
– 433km
– 4 pipeline crossings
– 5mt/yr = 20in. 15mt/yr = 30in
Thank you
Sarah Tennison
@Teescollective
www.teessidecollective.co.uk
info@teescollective.co.uk

More Related Content

What's hot

Biofuel Project: an anlysis to substitute 10% italian petrol by mean of non-f...
Biofuel Project: an anlysis to substitute 10% italian petrol by mean of non-f...Biofuel Project: an anlysis to substitute 10% italian petrol by mean of non-f...
Biofuel Project: an anlysis to substitute 10% italian petrol by mean of non-f...Stefano Maronese
 
Slideshare September 2010
Slideshare September 2010Slideshare September 2010
Slideshare September 2010Joel Johnson
 
Asia's biggest oil and gas pipelines
Asia's biggest oil and gas pipelinesAsia's biggest oil and gas pipelines
Asia's biggest oil and gas pipelinesNES Global Talent
 
Unlocking the Innovation Hidden within Today’s Variable-Speed Drives
Unlocking the Innovation Hidden within Today’s Variable-Speed DrivesUnlocking the Innovation Hidden within Today’s Variable-Speed Drives
Unlocking the Innovation Hidden within Today’s Variable-Speed DrivesEMEX
 
Bmw manufacturing chp-project_profile1
Bmw manufacturing chp-project_profile1Bmw manufacturing chp-project_profile1
Bmw manufacturing chp-project_profile1tejasp
 
Dqm scottish local authorities
Dqm scottish local authoritiesDqm scottish local authorities
Dqm scottish local authoritiesDQM Solutions Ltd
 
KEI Data Logger System
KEI Data Logger SystemKEI Data Logger System
KEI Data Logger SystemAlys Spillman
 
June 2015 ITM Power Company Presentation
June 2015 ITM Power Company PresentationJune 2015 ITM Power Company Presentation
June 2015 ITM Power Company PresentationRebecca Markillie
 
Long-term energy system modelling with improved resolution to address short-t...
Long-term energy system modelling with improved resolution to address short-t...Long-term energy system modelling with improved resolution to address short-t...
Long-term energy system modelling with improved resolution to address short-t...IEA-ETSAP
 
Scenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy systemScenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy systemIEA-ETSAP
 
Spatial flexibility in redispatch: Supporting low carbon energy systems with ...
Spatial flexibility in redispatch: Supporting low carbon energy systems with ...Spatial flexibility in redispatch: Supporting low carbon energy systems with ...
Spatial flexibility in redispatch: Supporting low carbon energy systems with ...IEA-ETSAP
 
District heating potential in the Italian NECP: assessment through a new resi...
District heating potential in the Italian NECP: assessment through a new resi...District heating potential in the Italian NECP: assessment through a new resi...
District heating potential in the Italian NECP: assessment through a new resi...IEA-ETSAP
 
Impacts of green hydrogen on the Italian power system by 2030
Impacts of green hydrogen on the Italian power system by 2030Impacts of green hydrogen on the Italian power system by 2030
Impacts of green hydrogen on the Italian power system by 2030IEA-ETSAP
 
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...IEA-ETSAP
 
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage ProjectPaul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage ProjectGlobal CCS Institute
 
Modelling the low-carbon energy transition of the territories: a TIMES-SUD PA...
Modelling the low-carbon energy transition of the territories: a TIMES-SUD PA...Modelling the low-carbon energy transition of the territories: a TIMES-SUD PA...
Modelling the low-carbon energy transition of the territories: a TIMES-SUD PA...IEA-ETSAP
 
Underground coal gasification
Underground coal gasificationUnderground coal gasification
Underground coal gasificationdevmehta10
 
Gary Anderson, ARIPPA, Ebensburg Power, "23 Years of Abandoned Mine Reclamation"
Gary Anderson, ARIPPA, Ebensburg Power, "23 Years of Abandoned Mine Reclamation"Gary Anderson, ARIPPA, Ebensburg Power, "23 Years of Abandoned Mine Reclamation"
Gary Anderson, ARIPPA, Ebensburg Power, "23 Years of Abandoned Mine Reclamation"Michael Hewitt, GISP
 
Analysis of distribution grid tariffs in the Norwegian energy system
Analysis of distribution grid tariffs in the Norwegian energy systemAnalysis of distribution grid tariffs in the Norwegian energy system
Analysis of distribution grid tariffs in the Norwegian energy systemIEA-ETSAP
 

What's hot (20)

Biofuel Project: an anlysis to substitute 10% italian petrol by mean of non-f...
Biofuel Project: an anlysis to substitute 10% italian petrol by mean of non-f...Biofuel Project: an anlysis to substitute 10% italian petrol by mean of non-f...
Biofuel Project: an anlysis to substitute 10% italian petrol by mean of non-f...
 
Slideshare September 2010
Slideshare September 2010Slideshare September 2010
Slideshare September 2010
 
Asia's biggest oil and gas pipelines
Asia's biggest oil and gas pipelinesAsia's biggest oil and gas pipelines
Asia's biggest oil and gas pipelines
 
Unlocking the Innovation Hidden within Today’s Variable-Speed Drives
Unlocking the Innovation Hidden within Today’s Variable-Speed DrivesUnlocking the Innovation Hidden within Today’s Variable-Speed Drives
Unlocking the Innovation Hidden within Today’s Variable-Speed Drives
 
Bmw manufacturing chp-project_profile1
Bmw manufacturing chp-project_profile1Bmw manufacturing chp-project_profile1
Bmw manufacturing chp-project_profile1
 
Dqm scottish local authorities
Dqm scottish local authoritiesDqm scottish local authorities
Dqm scottish local authorities
 
KEI Data Logger System
KEI Data Logger SystemKEI Data Logger System
KEI Data Logger System
 
June 2015 ITM Power Company Presentation
June 2015 ITM Power Company PresentationJune 2015 ITM Power Company Presentation
June 2015 ITM Power Company Presentation
 
Long-term energy system modelling with improved resolution to address short-t...
Long-term energy system modelling with improved resolution to address short-t...Long-term energy system modelling with improved resolution to address short-t...
Long-term energy system modelling with improved resolution to address short-t...
 
Scenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy systemScenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy system
 
Spatial flexibility in redispatch: Supporting low carbon energy systems with ...
Spatial flexibility in redispatch: Supporting low carbon energy systems with ...Spatial flexibility in redispatch: Supporting low carbon energy systems with ...
Spatial flexibility in redispatch: Supporting low carbon energy systems with ...
 
Steam Engine Revolution presentation
Steam Engine Revolution presentationSteam Engine Revolution presentation
Steam Engine Revolution presentation
 
District heating potential in the Italian NECP: assessment through a new resi...
District heating potential in the Italian NECP: assessment through a new resi...District heating potential in the Italian NECP: assessment through a new resi...
District heating potential in the Italian NECP: assessment through a new resi...
 
Impacts of green hydrogen on the Italian power system by 2030
Impacts of green hydrogen on the Italian power system by 2030Impacts of green hydrogen on the Italian power system by 2030
Impacts of green hydrogen on the Italian power system by 2030
 
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
 
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage ProjectPaul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
 
Modelling the low-carbon energy transition of the territories: a TIMES-SUD PA...
Modelling the low-carbon energy transition of the territories: a TIMES-SUD PA...Modelling the low-carbon energy transition of the territories: a TIMES-SUD PA...
Modelling the low-carbon energy transition of the territories: a TIMES-SUD PA...
 
Underground coal gasification
Underground coal gasificationUnderground coal gasification
Underground coal gasification
 
Gary Anderson, ARIPPA, Ebensburg Power, "23 Years of Abandoned Mine Reclamation"
Gary Anderson, ARIPPA, Ebensburg Power, "23 Years of Abandoned Mine Reclamation"Gary Anderson, ARIPPA, Ebensburg Power, "23 Years of Abandoned Mine Reclamation"
Gary Anderson, ARIPPA, Ebensburg Power, "23 Years of Abandoned Mine Reclamation"
 
Analysis of distribution grid tariffs in the Norwegian energy system
Analysis of distribution grid tariffs in the Norwegian energy systemAnalysis of distribution grid tariffs in the Norwegian energy system
Analysis of distribution grid tariffs in the Norwegian energy system
 

Similar to Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual 21-22 April 2015

Overview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&DOverview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&DGlobal CCS Institute
 
GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013Sean Chen, PMP, MBA
 
OLADE-Slide-Deck-compressed para ver.pdf
OLADE-Slide-Deck-compressed para ver.pdfOLADE-Slide-Deck-compressed para ver.pdf
OLADE-Slide-Deck-compressed para ver.pdfHenryApaza12
 
Ccsstatusandopportunitiesdohanov12 121202220106-phpapp01
Ccsstatusandopportunitiesdohanov12 121202220106-phpapp01Ccsstatusandopportunitiesdohanov12 121202220106-phpapp01
Ccsstatusandopportunitiesdohanov12 121202220106-phpapp01Sarim Dastgir
 
Technologies for Carbon Capture in Oil Refineries
Technologies for Carbon Capture in Oil RefineriesTechnologies for Carbon Capture in Oil Refineries
Technologies for Carbon Capture in Oil Refineriescanaleenergia
 
Carbon capture and storage
Carbon capture and storage Carbon capture and storage
Carbon capture and storage Yahia Mahmoud
 
Combined Heat and Power as a Boiler MACT Compliance Strategy (Slides only)
 Combined Heat and Power as a Boiler MACT Compliance Strategy (Slides only) Combined Heat and Power as a Boiler MACT Compliance Strategy (Slides only)
Combined Heat and Power as a Boiler MACT Compliance Strategy (Slides only)Midwest Energy Efficiency Alliance
 
Business case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
Business case of CCUS, Sasha Mackler, SUMMIT Carbon CaptureBusiness case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
Business case of CCUS, Sasha Mackler, SUMMIT Carbon CaptureGlobal CCS Institute
 
Apec workshop 2 presentation 6 1 compression and transport apec
Apec workshop 2 presentation 6 1  compression and transport apecApec workshop 2 presentation 6 1  compression and transport apec
Apec workshop 2 presentation 6 1 compression and transport apecGlobal CCS Institute
 
AN INVESTOR VIEW OF POST-COMBUSTION CO₂ CAPTURE
AN INVESTOR VIEW OF POST-COMBUSTION CO₂ CAPTUREAN INVESTOR VIEW OF POST-COMBUSTION CO₂ CAPTURE
AN INVESTOR VIEW OF POST-COMBUSTION CO₂ CAPTUREiQHub
 
Carbon Accounting Buildings | Sue Roaf
Carbon Accounting Buildings | Sue Roaf Carbon Accounting Buildings | Sue Roaf
Carbon Accounting Buildings | Sue Roaf icarb
 
UBC Steam to Hot Water IDEA Main conference June 2016
UBC Steam to Hot Water IDEA Main conference June 2016UBC Steam to Hot Water IDEA Main conference June 2016
UBC Steam to Hot Water IDEA Main conference June 2016Paul Holt
 

Similar to Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual 21-22 April 2015 (20)

Blueprint for Industrial CCS in the UK, Mark Lewis, Tees Valley Unlimited - U...
Blueprint for Industrial CCS in the UK, Mark Lewis, Tees Valley Unlimited - U...Blueprint for Industrial CCS in the UK, Mark Lewis, Tees Valley Unlimited - U...
Blueprint for Industrial CCS in the UK, Mark Lewis, Tees Valley Unlimited - U...
 
Gas CCS in the UK - Tom Snow at the UKCCSRC Gas CCS Meeting, University of Su...
Gas CCS in the UK - Tom Snow at the UKCCSRC Gas CCS Meeting, University of Su...Gas CCS in the UK - Tom Snow at the UKCCSRC Gas CCS Meeting, University of Su...
Gas CCS in the UK - Tom Snow at the UKCCSRC Gas CCS Meeting, University of Su...
 
CO2 Capture - Jon Gibbins, UKCCSRC, at the UKCCSRC ECR Winter School 2015
CO2 Capture - Jon Gibbins, UKCCSRC, at the UKCCSRC ECR Winter School 2015CO2 Capture - Jon Gibbins, UKCCSRC, at the UKCCSRC ECR Winter School 2015
CO2 Capture - Jon Gibbins, UKCCSRC, at the UKCCSRC ECR Winter School 2015
 
Overview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&DOverview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&D
 
GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013
 
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
 
UKCCSRC PACT Test Facilities and UK Research on Biomass and Gas CCS, Mohamed ...
UKCCSRC PACT Test Facilities and UK Research on Biomass and Gas CCS, Mohamed ...UKCCSRC PACT Test Facilities and UK Research on Biomass and Gas CCS, Mohamed ...
UKCCSRC PACT Test Facilities and UK Research on Biomass and Gas CCS, Mohamed ...
 
OLADE-Slide-Deck-compressed para ver.pdf
OLADE-Slide-Deck-compressed para ver.pdfOLADE-Slide-Deck-compressed para ver.pdf
OLADE-Slide-Deck-compressed para ver.pdf
 
Overview on capture technologies
Overview on capture technologiesOverview on capture technologies
Overview on capture technologies
 
Ccsstatusandopportunitiesdohanov12 121202220106-phpapp01
Ccsstatusandopportunitiesdohanov12 121202220106-phpapp01Ccsstatusandopportunitiesdohanov12 121202220106-phpapp01
Ccsstatusandopportunitiesdohanov12 121202220106-phpapp01
 
Technologies for Carbon Capture in Oil Refineries
Technologies for Carbon Capture in Oil RefineriesTechnologies for Carbon Capture in Oil Refineries
Technologies for Carbon Capture in Oil Refineries
 
Carbon capture and storage
Carbon capture and storage Carbon capture and storage
Carbon capture and storage
 
Combined Heat and Power as a Boiler MACT Compliance Strategy (Slides only)
 Combined Heat and Power as a Boiler MACT Compliance Strategy (Slides only) Combined Heat and Power as a Boiler MACT Compliance Strategy (Slides only)
Combined Heat and Power as a Boiler MACT Compliance Strategy (Slides only)
 
Business case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
Business case of CCUS, Sasha Mackler, SUMMIT Carbon CaptureBusiness case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
Business case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
 
Apec workshop 2 presentation 6 1 compression and transport apec
Apec workshop 2 presentation 6 1  compression and transport apecApec workshop 2 presentation 6 1  compression and transport apec
Apec workshop 2 presentation 6 1 compression and transport apec
 
AN INVESTOR VIEW OF POST-COMBUSTION CO₂ CAPTURE
AN INVESTOR VIEW OF POST-COMBUSTION CO₂ CAPTUREAN INVESTOR VIEW OF POST-COMBUSTION CO₂ CAPTURE
AN INVESTOR VIEW OF POST-COMBUSTION CO₂ CAPTURE
 
Carbon Accounting Buildings | Sue Roaf
Carbon Accounting Buildings | Sue Roaf Carbon Accounting Buildings | Sue Roaf
Carbon Accounting Buildings | Sue Roaf
 
SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...
SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...
SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...
 
Capture from Cement and UK Calcium Looping Research, Paul Fennell (Imperial C...
Capture from Cement and UK Calcium Looping Research, Paul Fennell (Imperial C...Capture from Cement and UK Calcium Looping Research, Paul Fennell (Imperial C...
Capture from Cement and UK Calcium Looping Research, Paul Fennell (Imperial C...
 
UBC Steam to Hot Water IDEA Main conference June 2016
UBC Steam to Hot Water IDEA Main conference June 2016UBC Steam to Hot Water IDEA Main conference June 2016
UBC Steam to Hot Water IDEA Main conference June 2016
 

More from UK Carbon Capture and Storage Research Centre

More from UK Carbon Capture and Storage Research Centre (20)

CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...
CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...
CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...
 
Advances in Rock Physics Modelling and Improved Estimation of CO2 Saturation,...
Advances in Rock Physics Modelling and Improved Estimation of CO2 Saturation,...Advances in Rock Physics Modelling and Improved Estimation of CO2 Saturation,...
Advances in Rock Physics Modelling and Improved Estimation of CO2 Saturation,...
 
Numerical Modelling of Fracture Growth and Caprock Integrity During CO2 Injec...
Numerical Modelling of Fracture Growth and Caprock Integrity During CO2 Injec...Numerical Modelling of Fracture Growth and Caprock Integrity During CO2 Injec...
Numerical Modelling of Fracture Growth and Caprock Integrity During CO2 Injec...
 
Assessing Uncertainty of Time Lapse Seismic Response Due to Geomechanical Def...
Assessing Uncertainty of Time Lapse Seismic Response Due to Geomechanical Def...Assessing Uncertainty of Time Lapse Seismic Response Due to Geomechanical Def...
Assessing Uncertainty of Time Lapse Seismic Response Due to Geomechanical Def...
 
20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...
20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...
20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...
 
Modelling Fault Reactivation, Induced Seismicity, and Leakage During Undergro...
Modelling Fault Reactivation, Induced Seismicity, and Leakage During Undergro...Modelling Fault Reactivation, Induced Seismicity, and Leakage During Undergro...
Modelling Fault Reactivation, Induced Seismicity, and Leakage During Undergro...
 
Pore scale dynamics and the interpretation of flow processes - Martin Blunt, ...
Pore scale dynamics and the interpretation of flow processes - Martin Blunt, ...Pore scale dynamics and the interpretation of flow processes - Martin Blunt, ...
Pore scale dynamics and the interpretation of flow processes - Martin Blunt, ...
 
Passive seismic monitoring for CO2 storage sites - Anna Stork, University of ...
Passive seismic monitoring for CO2 storage sites - Anna Stork, University of ...Passive seismic monitoring for CO2 storage sites - Anna Stork, University of ...
Passive seismic monitoring for CO2 storage sites - Anna Stork, University of ...
 
Multiphase flow modelling of calcite dissolution patterns from core scale to ...
Multiphase flow modelling of calcite dissolution patterns from core scale to ...Multiphase flow modelling of calcite dissolution patterns from core scale to ...
Multiphase flow modelling of calcite dissolution patterns from core scale to ...
 
Long term safety of geological co2 storage: lessons from Bravo Dome Natural C...
Long term safety of geological co2 storage: lessons from Bravo Dome Natural C...Long term safety of geological co2 storage: lessons from Bravo Dome Natural C...
Long term safety of geological co2 storage: lessons from Bravo Dome Natural C...
 
Challenges in the chemical industry, jay brookes (boc) industry ccs worksho...
Challenges in the chemical industry, jay brookes (boc)   industry ccs worksho...Challenges in the chemical industry, jay brookes (boc)   industry ccs worksho...
Challenges in the chemical industry, jay brookes (boc) industry ccs worksho...
 
Overall Network Issues, Tim Dumenil (Pale Blue Dot) - Industry CCS Workshop, ...
Overall Network Issues, Tim Dumenil (Pale Blue Dot) - Industry CCS Workshop, ...Overall Network Issues, Tim Dumenil (Pale Blue Dot) - Industry CCS Workshop, ...
Overall Network Issues, Tim Dumenil (Pale Blue Dot) - Industry CCS Workshop, ...
 
Challenges in the Steel Industry and the Network, James Watt (Amec) - Industr...
Challenges in the Steel Industry and the Network, James Watt (Amec) - Industr...Challenges in the Steel Industry and the Network, James Watt (Amec) - Industr...
Challenges in the Steel Industry and the Network, James Watt (Amec) - Industr...
 
Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...
Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...
Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...
 
Guangdong Offshore CCUS Project (GOCCUS) - Xi Liang, University of Edinburgh ...
Guangdong Offshore CCUS Project (GOCCUS) - Xi Liang, University of Edinburgh ...Guangdong Offshore CCUS Project (GOCCUS) - Xi Liang, University of Edinburgh ...
Guangdong Offshore CCUS Project (GOCCUS) - Xi Liang, University of Edinburgh ...
 
Changes in the Dutch CCS Landscape - Jan Brouwer, CATO - UKCCSRC Strathclyde ...
Changes in the Dutch CCS Landscape - Jan Brouwer, CATO - UKCCSRC Strathclyde ...Changes in the Dutch CCS Landscape - Jan Brouwer, CATO - UKCCSRC Strathclyde ...
Changes in the Dutch CCS Landscape - Jan Brouwer, CATO - UKCCSRC Strathclyde ...
 
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
 
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
 
Computational Modelling and Optimisation of Carbon Capture Reactors, Daniel S...
Computational Modelling and Optimisation of Carbon Capture Reactors, Daniel S...Computational Modelling and Optimisation of Carbon Capture Reactors, Daniel S...
Computational Modelling and Optimisation of Carbon Capture Reactors, Daniel S...
 
Effective Adsorbents for Establishing Solids Looping as a Next Generation NG ...
Effective Adsorbents for Establishing Solids Looping as a Next Generation NG ...Effective Adsorbents for Establishing Solids Looping as a Next Generation NG ...
Effective Adsorbents for Establishing Solids Looping as a Next Generation NG ...
 

Recently uploaded

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 

Recently uploaded (20)

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 

Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual 21-22 April 2015

  • 1. Engineering outputs of an industrial CCS network in Teesside Sarah Tennison @Teescollective www.teessidecollective.co.uk info@teescollective.co.uk
  • 2.
  • 3. SSI - Europe’s second largest Blast Furnace • Total site emits 7.1million tonnes of CO2 per year • After optioneering 3 concepts selected for further study: 1. Post combustion capture on the flue gas from new power station fueled by blast furnace gas – 1.6million tonnes captured 2. Pre-combustion capture from entire blast furnace gas – 2.1million tonnes captured 3. Pre-combustion capture from excess blast furnace gas and BOS gas – carbon converted to H2 and CO2 in shift reaction – 2.2million tonnes captured
  • 5. Growhow – 35% of UK’s fertilisers • Produces CO2 as part of process, sells to Greenhouses and Drinks industry • Average of 375,000 tonnes of CO2 per year • New 100barg compression plant required (2 x 50tonne/hr compressors) • Proven technology from existing suppliers • No operation or integration issues identified
  • 7. BOC Linde - UK’s largest Steam Methane Reformer • 305,000 tonnes of CO2 captured • Conventional Amine Process on flue gas from SMR • No significant impact on the hydrogen plant • Significant power consumption – 5.9MW ReformerCCP Core Plant PSA CCP Utilities
  • 8. BOC Layout Natural Gas Feed SMR Shift PSA Hydrogen Export Tail Gas Flue Gas Steam Export HMU Utilities Existing Hydrogen Plant CO2 Capture Compression & Dehydration CO2 Export Vent Gas CCP Utilities New CO2 Capture Plant
  • 9. Lotte - Produces enough PET for 15billion drinks bottles every year • 50,000 tonnes of CO2 captured • Amine capture solution selected • Pre-designed amine units available – American – no European pricing available • 90% CO2 captured New Plant
  • 11. Onshore network • 5 and 15million tonnes per year capacity pipe studied • 100 barg from capture units with specified CO2, transport at dense phase • Constraints identified to generate route: – Environmental – NG NTS Feeder – Populations – Access to suitable shore landing – Rail and road crossings
  • 12. Initial spine and extensions
  • 13. Booster Station to Offshore Routes Booster Station Booster Station Cleveland Golf Club Cleveland Golf Club SSI CCS SSI CCS Hot Metal Line Hot Metal Line
  • 14. Offshore network • Two destinations: • National Grid’s 5/42 / Bunter – 154km – 3 pipeline crossings, 3 communication crossings, 3 electrical transmission cable crossings, submarine exercise area. – 5mt/yr = 18in. 15mt/yr = 24in • Captain – 433km – 4 pipeline crossings – 5mt/yr = 20in. 15mt/yr = 30in