Gas CCS in China
Dr Jia Li
Lecturer in Carbon Capture and Storage
2014 Jun 25, University of Sussex
Gas CCS meeting
Content
• Update on CCS in China
• Background on Chinese Natural Gas Industry
• Post-combustion Capture Studies in CCGT Power Plant
- Datang Study
- Huaneng Pilot
• SNG
CCS R&D Activities and Scoping Projects
• National 973 Projects (two led by Petro China)
• National 863 Projects (incl. IGCC, Algae, Oxyfuel, EOR)
• National Key Technology Program (CO2 storage, capture from blast furnace
iron making)
• EU-UK-China NZEC / COACH /STRACO2
• UK-China Chinese Advanced Power Plants Carbon Capture Options
• US-China Clean Energy Research Centre
• Australia – China CO2 Geologic Storage Cooperation Project
• Italy – China CCS Cooperation
• Guangdong CCS Readiness Project
• A number of studies by Asian Development Bank and the World Bank
• Participation in ISO standard design
CCS Pilot Projects in China
• Petro China Jilin Oilfield, EOR, 100,000 t/a (2007- )
• CAS – Jinlong CO2 Chemical Utilization, 10,000 t/a (2007- )
• Huaneng Gaobeidian post-combustion capture, 3000 t/a (2008 -)
• CNOOC biodegradable plastic CO2 utilisation, 2100 t/a (2009- )
• Huaneng Shidongkou post-combustion capture, 120,000 t/a (2009- )
• Chongqing Shuanghuai post-combustion capture, 10,000 t/a (2010- )
• SINOPEC Shengli Oil Field post-combustion and EOR, 40,000 t/a (2010 - )
• Lianyuan Gang Clean Coal Energy System pre-combustion, 30,000t/a (2011- )
• Shenhua CTL capture and saline aquifer storage, 100,000 t/a (2011 - )
• ENN Microalgae Bio-fuel Demonstration, 20,000 t/a (TBC)
• Huaneng Green-gen IGCC CCS Pilot, up to 100,000t/a capture (TBC)
• Hubei Yingcheng Oxy-combustion R&D, 50,000 t/a capture (TBC)
• Guangdong 1 million ton post-combustion (Pre-M) (2014- )
Gas Production and Consumption in China
0.0
20.0
40.0
60.0
80.0
100.0
120.0
140.0
160.0
billioncubicmetre(bcm)
Year
Total Consumption Total Production
Source: BP, 2012; NDRC, 2013
Compounded growth rate (2003-2012):
Consumption: 15.8%
Production: 11.9%
Gas Net Import Ratio in China
0%
5%
10%
15%
20%
25%
30%
2007 2008 2009 2010 2011 2012
GsaNetImportRatio
Year
Source: BP, 2012; NDRC, 2013
The dependency ratio of
crude oil is 56% in 2012
Conventional
Gas
51%
Coal SNG
6%
CBM
6%Shale Gas
2%
Import Gas
35%
Estimated Gas Sources in 2015
• Total domestic production:
176 bcm
• Conventional gas: 138.5 bcm
• Coal Synthetic Natural Gas:
15 to 18 bcm
• Coal bed methane: 16 bcm
• Shale Gas: 6.5 bcm (with 200
bcm potential)
• Import LNG and pipeline
gas: 93.5 bcm
Source: NEA, 2012
http://zfxxgk.nea.gov.cn/auto86/201212/W0
20121203312244945303.pdf
Natural Gas in China
• The share of natural gas in the energy mix will increase from 4%
in 2010 to 10% in 2020
• The government is reforming the gas market, current regulated
“city-gate gas prices” are around 3 to 3.3 per cm in the east of
China
• Natural gas will be applied for generating electricity in major
cities with tight “environment capacity”, such as Beijing,
Shenzhen, Shanghai, Guangzhou
• The CCGT capacity is estimated to increase from 20GW in 2010
to 60GW in 2015 and 110GW in 2020
• Some pioneer projects are studying CCS in gas-fired power plants
in China
Datang Gas CCS Study
ADB TA‐8001 (PRC): Study on Carbon Capture and Storage in Natural Gas-Based
Power Plants
Information provided by Dr Andrew Minchener (Project Lead)
Project Objectives
• Develop a CCS roadmap for natural gas-based CHP
plants;
• Carry out a techno-economic feasibility analysis for a CCS
pilot scale demonstration on the Gaojing CHP plant;
• Formulate a CCS-readiness plan for natural gas-based
CHP plants;
• Establish a capacity strengthening programme for
various stakeholder groups concerned with the
application of CCS for gas fired CHP systems.
Source: Minchener, 2013
Steam turbine hall and HRSG
Source: Minchener, 2013
Steam turbine hall
Source: Minchener, 2013
Datang Gas CCS Plan
• A CCS pilot scale demonstration for Gaojing natural gas
power plant through post-combustion chemical
scrubbing (3 tonne per day)
• Establish CCS-readiness guidelines to meet new and
future CCS retrofitting requirements for applications to
all natural gas power plants within PRC
• ADB TA provides an important assessment of strategic
and technical options and impact on economic
competitiveness (draft report by July 2013; followed by
stakeholder workshops in Sep and Oct)
Source: Minchener, 2013
Huaneng Gas CCS Pilot
Information provided by Mr Lianbo Liu (Project Manager)
CCM Verification Project
CCM燃气碳捕集验证项目
 First CO2 capture pilot plant for natural gas based
power station in China, built by CERI in 2012 (1000
tons CO2 per year)
 CERI建造的中国首套燃气电厂二氧化碳捕集测试
系统(规模1000吨CO2/年)
 This plant (named CCM Verification Plant here) is
also served as a verification plant for Norway CO2
Capture Mongstad (CCM) project
 挪威CCM碳捕集工程的验证项目,第一阶段
 CCM Project is executed by Statoil to build a full-
scale post combustion capture of CO2 from a
combined heat and power station at Mongstad
 CCM项目将对Mongstad热电厂烟道气进行CO2全
捕集,工程建设由挪威国家石油公司负责
 CCM Verification plant has been running stably for
3000 hours with capture efficiency >85%
(85%~92%)
 在保证84%捕集率的条件下,CCM验证项目已连
续稳定运行2000小时(捕集率84%~92%)
Features of CCM Verification Plant
CCM工程项目特征
 Absorber with Intercooling System
吸收塔伴中间冷却
 Novel Regeneration System, Reducing 20% Energy Cost
Compared with Traditional Stripper
新型再生系统,相对传统再生方式可减少20%能耗
 Natural Gas Boiler to Provide Flue Gas and Steam
天然气锅炉提供烟道气和再生用蒸汽、烟气循环
 Solvent Reclaim System
溶液回收再生装置
 Two Independent Online Lab Analysis Systems to Ensure
Accurate Experimental Data
两套独立的实验室在线分析系统,确保数据相符和准确
 PLC with UPS for Pilot Plant
PLC自动控制,备有UPS不间歇电源
 Data Collection and Online Share with Norway
数据采集和在线共享
19
Online Database Files
在线数据文件
 Automatic Data Collection Every 5 Seconds, and Generating Performance Curves
 现场数据采集,每5秒存储形成数据库文件,通过数据分析,形成小时统计数据及性能曲线
烟气成分实时数据 Daily Analyzer CalibrationFlue gas content analysis
real-time data
Solvent ph level
and density
Clean coal and CCS in China and the developing economies of Asia, Dr Andrew J Minchener,
http://www.ukccsrc.ac.uk/7-february-future-uk-coal-ccs-options-workshop
Approved SNG projects by government in China
Gasification Process
Gasification
Large scale gasifiers in China
Gasification
Gasifier
Final Remark
• Gas fired power plants will increase rapidly though it is
still a small proportion of total generation capacity
• CCGT power plants are likely first deployed in large cities
and developed regions, with limit land resource and high
population density, therefore CCS Ready is very
important to avoid the carbon lock-in effect
• Datang and Huaneng are developing pilot CO2 capture
projects in gas-fired power plants
• SNG and gas processing will provide low-cost
opportunities for CCS in the gas industry

More Related Content

What's hot

Use of Wind Tunnel Refinements in the Dispersion Modeling Analysis of the Ala...
Use of Wind Tunnel Refinements in the Dispersion Modeling Analysis of the Ala...Use of Wind Tunnel Refinements in the Dispersion Modeling Analysis of the Ala...
Use of Wind Tunnel Refinements in the Dispersion Modeling Analysis of the Ala...Sergio A. Guerra
 
Life cycle analysis for PEMEX EOR CO2-CCS project in southern mexico
Life cycle analysis for PEMEX EOR CO2-CCS project in southern mexicoLife cycle analysis for PEMEX EOR CO2-CCS project in southern mexico
Life cycle analysis for PEMEX EOR CO2-CCS project in southern mexicoGlobal CCS Institute
 
Apec workshop 2 presentation 12 lh ci cinco presidentes-pemex-apec workshop 2
Apec workshop 2 presentation 12 lh ci cinco presidentes-pemex-apec workshop 2Apec workshop 2 presentation 12 lh ci cinco presidentes-pemex-apec workshop 2
Apec workshop 2 presentation 12 lh ci cinco presidentes-pemex-apec workshop 2Global CCS Institute
 
APM Subcommmittee Update on PRIME2 Research Study
APM Subcommmittee Update on PRIME2 Research StudyAPM Subcommmittee Update on PRIME2 Research Study
APM Subcommmittee Update on PRIME2 Research StudySergio A. Guerra
 
SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCH
SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCHSCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCH
SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCHJohn Glenning
 
Data Analytics in Carbon Capture and Storage
Data Analytics in Carbon Capture and StorageData Analytics in Carbon Capture and Storage
Data Analytics in Carbon Capture and StorageYohanes Nuwara
 
ZhangZhao-resume
ZhangZhao-resumeZhangZhao-resume
ZhangZhao-resumeZhao Zhang
 
2014 krishnamurthy ai_ch_ej_pilotplant
2014 krishnamurthy ai_ch_ej_pilotplant2014 krishnamurthy ai_ch_ej_pilotplant
2014 krishnamurthy ai_ch_ej_pilotplantkyrilluskameel
 

What's hot (20)

OCTAVIUS - Optimisation of CO2 capture technology allowing verification and i...
OCTAVIUS - Optimisation of CO2 capture technology allowing verification and i...OCTAVIUS - Optimisation of CO2 capture technology allowing verification and i...
OCTAVIUS - Optimisation of CO2 capture technology allowing verification and i...
 
Ben Anthony (Cranfield University) - The Future of Calcium Looping Technology...
Ben Anthony (Cranfield University) - The Future of Calcium Looping Technology...Ben Anthony (Cranfield University) - The Future of Calcium Looping Technology...
Ben Anthony (Cranfield University) - The Future of Calcium Looping Technology...
 
Oxyfuel Power Plant with Novel CO2 Separation and Compression Technology - Dr...
Oxyfuel Power Plant with Novel CO2 Separation and Compression Technology - Dr...Oxyfuel Power Plant with Novel CO2 Separation and Compression Technology - Dr...
Oxyfuel Power Plant with Novel CO2 Separation and Compression Technology - Dr...
 
Gas-FACTS Project Overview
Gas-FACTS Project OverviewGas-FACTS Project Overview
Gas-FACTS Project Overview
 
Gas-FACTS - Future Advanced Capture Technology Systems - Jon Gibbins at the U...
Gas-FACTS - Future Advanced Capture Technology Systems - Jon Gibbins at the U...Gas-FACTS - Future Advanced Capture Technology Systems - Jon Gibbins at the U...
Gas-FACTS - Future Advanced Capture Technology Systems - Jon Gibbins at the U...
 
Callide oxyfuel project update
Callide oxyfuel project updateCallide oxyfuel project update
Callide oxyfuel project update
 
Use of Wind Tunnel Refinements in the Dispersion Modeling Analysis of the Ala...
Use of Wind Tunnel Refinements in the Dispersion Modeling Analysis of the Ala...Use of Wind Tunnel Refinements in the Dispersion Modeling Analysis of the Ala...
Use of Wind Tunnel Refinements in the Dispersion Modeling Analysis of the Ala...
 
Life cycle analysis for PEMEX EOR CO2-CCS project in southern mexico
Life cycle analysis for PEMEX EOR CO2-CCS project in southern mexicoLife cycle analysis for PEMEX EOR CO2-CCS project in southern mexico
Life cycle analysis for PEMEX EOR CO2-CCS project in southern mexico
 
Apec workshop 2 presentation 12 lh ci cinco presidentes-pemex-apec workshop 2
Apec workshop 2 presentation 12 lh ci cinco presidentes-pemex-apec workshop 2Apec workshop 2 presentation 12 lh ci cinco presidentes-pemex-apec workshop 2
Apec workshop 2 presentation 12 lh ci cinco presidentes-pemex-apec workshop 2
 
Elbashir AIChE 2012 - Visulaization
Elbashir AIChE 2012 - VisulaizationElbashir AIChE 2012 - Visulaization
Elbashir AIChE 2012 - Visulaization
 
Wood Workshop on Modelling and Simulation of Coal-fired Power Generation and ...
Wood Workshop on Modelling and Simulation of Coal-fired Power Generation and ...Wood Workshop on Modelling and Simulation of Coal-fired Power Generation and ...
Wood Workshop on Modelling and Simulation of Coal-fired Power Generation and ...
 
APM Subcommmittee Update on PRIME2 Research Study
APM Subcommmittee Update on PRIME2 Research StudyAPM Subcommmittee Update on PRIME2 Research Study
APM Subcommmittee Update on PRIME2 Research Study
 
Global CCS Institute Presentation
Global CCS Institute PresentationGlobal CCS Institute Presentation
Global CCS Institute Presentation
 
SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCH
SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCHSCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCH
SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCH
 
Data Analytics in Carbon Capture and Storage
Data Analytics in Carbon Capture and StorageData Analytics in Carbon Capture and Storage
Data Analytics in Carbon Capture and Storage
 
ZhangZhao-resume
ZhangZhao-resumeZhangZhao-resume
ZhangZhao-resume
 
Peter Styring (University of Sheffield) presenting 'Carbon Dioxide Utilisatio...
Peter Styring (University of Sheffield) presenting 'Carbon Dioxide Utilisatio...Peter Styring (University of Sheffield) presenting 'Carbon Dioxide Utilisatio...
Peter Styring (University of Sheffield) presenting 'Carbon Dioxide Utilisatio...
 
ION Engineering Presentation
ION Engineering PresentationION Engineering Presentation
ION Engineering Presentation
 
Capturing CO2 from air: Research at the University of Edinburgh - Dr Maria Ch...
Capturing CO2 from air: Research at the University of Edinburgh - Dr Maria Ch...Capturing CO2 from air: Research at the University of Edinburgh - Dr Maria Ch...
Capturing CO2 from air: Research at the University of Edinburgh - Dr Maria Ch...
 
2014 krishnamurthy ai_ch_ej_pilotplant
2014 krishnamurthy ai_ch_ej_pilotplant2014 krishnamurthy ai_ch_ej_pilotplant
2014 krishnamurthy ai_ch_ej_pilotplant
 

Viewers also liked

Carbon Capture and Storage
Carbon Capture and StorageCarbon Capture and Storage
Carbon Capture and Storageravi8492
 
Biotechflow Martin Hofmann 22SEP2015 Berlin plus installed 600
Biotechflow Martin Hofmann 22SEP2015 Berlin plus installed 600Biotechflow Martin Hofmann 22SEP2015 Berlin plus installed 600
Biotechflow Martin Hofmann 22SEP2015 Berlin plus installed 600Martin Hofmann
 
Carbon Capture And Storage
Carbon Capture And StorageCarbon Capture And Storage
Carbon Capture And StorageHector Rodriguez
 
Meteor MBBR - Complete treatment of wastewater with a very compact footprint
Meteor MBBR - Complete treatment of wastewater with a very compact footprintMeteor MBBR - Complete treatment of wastewater with a very compact footprint
Meteor MBBR - Complete treatment of wastewater with a very compact footprintDegrémont
 
Packed Bed Reactor Lumped
Packed Bed Reactor LumpedPacked Bed Reactor Lumped
Packed Bed Reactor Lumpedgauravkakran
 
introduction and advancement Electro fenton processes for waste water treatment
introduction and advancement Electro fenton processes for waste water treatmentintroduction and advancement Electro fenton processes for waste water treatment
introduction and advancement Electro fenton processes for waste water treatmentKathiresan Nadar
 
Biotechnological applications for environmental waste management
Biotechnological applications for environmental waste managementBiotechnological applications for environmental waste management
Biotechnological applications for environmental waste managementUtkarsh Verma
 
Biofiltration nitrification design overview
Biofiltration nitrification design overviewBiofiltration nitrification design overview
Biofiltration nitrification design overviewYounes Seven
 
Introduction to Carbon Capture and Storage
Introduction to Carbon Capture and Storage Introduction to Carbon Capture and Storage
Introduction to Carbon Capture and Storage The Climate Institute
 
Biofilters for control of air pollution
Biofilters for control of air pollutionBiofilters for control of air pollution
Biofilters for control of air pollutionAshish kumar Yadav
 
Biofilter presentation (2)
Biofilter presentation (2)Biofilter presentation (2)
Biofilter presentation (2)Rajendra Shah
 
Water Pollution and its control through biotechnology
Water Pollution and its control through biotechnologyWater Pollution and its control through biotechnology
Water Pollution and its control through biotechnologyRachana Tiwari
 

Viewers also liked (20)

Jonathan Lee (Newcastle University) - Intensification of Solvent Based Carbon...
Jonathan Lee (Newcastle University) - Intensification of Solvent Based Carbon...Jonathan Lee (Newcastle University) - Intensification of Solvent Based Carbon...
Jonathan Lee (Newcastle University) - Intensification of Solvent Based Carbon...
 
Carbon Capture and Storage
Carbon Capture and StorageCarbon Capture and Storage
Carbon Capture and Storage
 
Biotechflow Martin Hofmann 22SEP2015 Berlin plus installed 600
Biotechflow Martin Hofmann 22SEP2015 Berlin plus installed 600Biotechflow Martin Hofmann 22SEP2015 Berlin plus installed 600
Biotechflow Martin Hofmann 22SEP2015 Berlin plus installed 600
 
Study of process intensification of CO2 capture through modelling and simulat...
Study of process intensification of CO2 capture through modelling and simulat...Study of process intensification of CO2 capture through modelling and simulat...
Study of process intensification of CO2 capture through modelling and simulat...
 
Waste water treatment
Waste water treatmentWaste water treatment
Waste water treatment
 
carbon capture and storage
carbon capture and storagecarbon capture and storage
carbon capture and storage
 
Bioreactors ppt atun
Bioreactors ppt atunBioreactors ppt atun
Bioreactors ppt atun
 
Carbon Capture And Storage
Carbon Capture And StorageCarbon Capture And Storage
Carbon Capture And Storage
 
Meteor MBBR - Complete treatment of wastewater with a very compact footprint
Meteor MBBR - Complete treatment of wastewater with a very compact footprintMeteor MBBR - Complete treatment of wastewater with a very compact footprint
Meteor MBBR - Complete treatment of wastewater with a very compact footprint
 
Packed Bed Reactor Lumped
Packed Bed Reactor LumpedPacked Bed Reactor Lumped
Packed Bed Reactor Lumped
 
introduction and advancement Electro fenton processes for waste water treatment
introduction and advancement Electro fenton processes for waste water treatmentintroduction and advancement Electro fenton processes for waste water treatment
introduction and advancement Electro fenton processes for waste water treatment
 
Biotechnological applications for environmental waste management
Biotechnological applications for environmental waste managementBiotechnological applications for environmental waste management
Biotechnological applications for environmental waste management
 
Biofiltration nitrification design overview
Biofiltration nitrification design overviewBiofiltration nitrification design overview
Biofiltration nitrification design overview
 
Bioreactor
BioreactorBioreactor
Bioreactor
 
Introduction to Carbon Capture and Storage
Introduction to Carbon Capture and Storage Introduction to Carbon Capture and Storage
Introduction to Carbon Capture and Storage
 
Biofilters for control of air pollution
Biofilters for control of air pollutionBiofilters for control of air pollution
Biofilters for control of air pollution
 
Mbbr
MbbrMbbr
Mbbr
 
Biofilter presentation (2)
Biofilter presentation (2)Biofilter presentation (2)
Biofilter presentation (2)
 
Packed tower
Packed towerPacked tower
Packed tower
 
Water Pollution and its control through biotechnology
Water Pollution and its control through biotechnologyWater Pollution and its control through biotechnology
Water Pollution and its control through biotechnology
 

Similar to Gas CCS in China - Jia Li at the UKCCSRC Gas CCS Meeting, University of Sussex, 25 June 2014

EDF Carbon Capture & Storage
EDF Carbon Capture & StorageEDF Carbon Capture & Storage
EDF Carbon Capture & Storagekene2008
 
Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRI
Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRIPanel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRI
Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRIGlobal CCS Institute
 
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014Global CCS Institute
 
Business case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
Business case of CCUS, Sasha Mackler, SUMMIT Carbon CaptureBusiness case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
Business case of CCUS, Sasha Mackler, SUMMIT Carbon CaptureGlobal CCS Institute
 
Waste Heat Recovery Power Plant - WHRPP Kalina Based Cycle.
Waste Heat Recovery Power Plant - WHRPP Kalina Based Cycle.Waste Heat Recovery Power Plant - WHRPP Kalina Based Cycle.
Waste Heat Recovery Power Plant - WHRPP Kalina Based Cycle.Muhammad Awais
 
Costs for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonald
Costs for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonaldCosts for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonald
Costs for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonaldGlobal CCS Institute
 
Trial lecture presentation_Bita Najmi
Trial lecture presentation_Bita NajmiTrial lecture presentation_Bita Najmi
Trial lecture presentation_Bita NajmiBita Najmi
 
CO2 capture and utilisation for industry
CO2 capture and utilisation for industryCO2 capture and utilisation for industry
CO2 capture and utilisation for industryDawid Hanak
 
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.pptAPP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.pptsomnathmahapatra6
 
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...Global CCS Institute
 
Status of US CCS projects and data available
Status of US CCS projects and data availableStatus of US CCS projects and data available
Status of US CCS projects and data availableIEA-ETSAP
 
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...Global CCS Institute
 
Apec workshop 2 presentation 8 3 vegar apec workshop 8 presentation v4 3.ppt...
Apec workshop 2 presentation 8 3 vegar apec workshop 8  presentation v4 3.ppt...Apec workshop 2 presentation 8 3 vegar apec workshop 8  presentation v4 3.ppt...
Apec workshop 2 presentation 8 3 vegar apec workshop 8 presentation v4 3.ppt...Global CCS Institute
 
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...atlanticcouncil
 
ITM Power Results Presentation
ITM Power Results PresentationITM Power Results Presentation
ITM Power Results PresentationITM Power
 

Similar to Gas CCS in China - Jia Li at the UKCCSRC Gas CCS Meeting, University of Sussex, 25 June 2014 (20)

EDF Carbon Capture & Storage
EDF Carbon Capture & StorageEDF Carbon Capture & Storage
EDF Carbon Capture & Storage
 
Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRI
Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRIPanel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRI
Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRI
 
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014
 
Business case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
Business case of CCUS, Sasha Mackler, SUMMIT Carbon CaptureBusiness case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
Business case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
 
Waste Heat Recovery Power Plant - WHRPP Kalina Based Cycle.
Waste Heat Recovery Power Plant - WHRPP Kalina Based Cycle.Waste Heat Recovery Power Plant - WHRPP Kalina Based Cycle.
Waste Heat Recovery Power Plant - WHRPP Kalina Based Cycle.
 
H Liu Sinopec CCS
H Liu Sinopec CCSH Liu Sinopec CCS
H Liu Sinopec CCS
 
Techno-economic assessment and global sensitivity analysis for biomass-based ...
Techno-economic assessment and global sensitivity analysis for biomass-based ...Techno-economic assessment and global sensitivity analysis for biomass-based ...
Techno-economic assessment and global sensitivity analysis for biomass-based ...
 
Costs for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonald
Costs for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonaldCosts for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonald
Costs for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonald
 
Trial lecture presentation_Bita Najmi
Trial lecture presentation_Bita NajmiTrial lecture presentation_Bita Najmi
Trial lecture presentation_Bita Najmi
 
UK CCS Programme
UK CCS ProgrammeUK CCS Programme
UK CCS Programme
 
CO2 capture and utilisation for industry
CO2 capture and utilisation for industryCO2 capture and utilisation for industry
CO2 capture and utilisation for industry
 
Capstone Final
Capstone FinalCapstone Final
Capstone Final
 
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.pptAPP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
 
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
 
Status of US CCS projects and data available
Status of US CCS projects and data availableStatus of US CCS projects and data available
Status of US CCS projects and data available
 
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
 
Apec workshop 2 presentation 8 3 vegar apec workshop 8 presentation v4 3.ppt...
Apec workshop 2 presentation 8 3 vegar apec workshop 8  presentation v4 3.ppt...Apec workshop 2 presentation 8 3 vegar apec workshop 8  presentation v4 3.ppt...
Apec workshop 2 presentation 8 3 vegar apec workshop 8 presentation v4 3.ppt...
 
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...
 
ITM Power Results Presentation
ITM Power Results PresentationITM Power Results Presentation
ITM Power Results Presentation
 
Update on CCS Activities in Canada and Possible Topics for European Collabora...
Update on CCS Activities in Canada and Possible Topics for European Collabora...Update on CCS Activities in Canada and Possible Topics for European Collabora...
Update on CCS Activities in Canada and Possible Topics for European Collabora...
 

More from UK Carbon Capture and Storage Research Centre

More from UK Carbon Capture and Storage Research Centre (20)

CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...
CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...
CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...
 
Advances in Rock Physics Modelling and Improved Estimation of CO2 Saturation,...
Advances in Rock Physics Modelling and Improved Estimation of CO2 Saturation,...Advances in Rock Physics Modelling and Improved Estimation of CO2 Saturation,...
Advances in Rock Physics Modelling and Improved Estimation of CO2 Saturation,...
 
Numerical Modelling of Fracture Growth and Caprock Integrity During CO2 Injec...
Numerical Modelling of Fracture Growth and Caprock Integrity During CO2 Injec...Numerical Modelling of Fracture Growth and Caprock Integrity During CO2 Injec...
Numerical Modelling of Fracture Growth and Caprock Integrity During CO2 Injec...
 
Assessing Uncertainty of Time Lapse Seismic Response Due to Geomechanical Def...
Assessing Uncertainty of Time Lapse Seismic Response Due to Geomechanical Def...Assessing Uncertainty of Time Lapse Seismic Response Due to Geomechanical Def...
Assessing Uncertainty of Time Lapse Seismic Response Due to Geomechanical Def...
 
20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...
20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...
20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...
 
Modelling Fault Reactivation, Induced Seismicity, and Leakage During Undergro...
Modelling Fault Reactivation, Induced Seismicity, and Leakage During Undergro...Modelling Fault Reactivation, Induced Seismicity, and Leakage During Undergro...
Modelling Fault Reactivation, Induced Seismicity, and Leakage During Undergro...
 
Pore scale dynamics and the interpretation of flow processes - Martin Blunt, ...
Pore scale dynamics and the interpretation of flow processes - Martin Blunt, ...Pore scale dynamics and the interpretation of flow processes - Martin Blunt, ...
Pore scale dynamics and the interpretation of flow processes - Martin Blunt, ...
 
Passive seismic monitoring for CO2 storage sites - Anna Stork, University of ...
Passive seismic monitoring for CO2 storage sites - Anna Stork, University of ...Passive seismic monitoring for CO2 storage sites - Anna Stork, University of ...
Passive seismic monitoring for CO2 storage sites - Anna Stork, University of ...
 
Multiphase flow modelling of calcite dissolution patterns from core scale to ...
Multiphase flow modelling of calcite dissolution patterns from core scale to ...Multiphase flow modelling of calcite dissolution patterns from core scale to ...
Multiphase flow modelling of calcite dissolution patterns from core scale to ...
 
Long term safety of geological co2 storage: lessons from Bravo Dome Natural C...
Long term safety of geological co2 storage: lessons from Bravo Dome Natural C...Long term safety of geological co2 storage: lessons from Bravo Dome Natural C...
Long term safety of geological co2 storage: lessons from Bravo Dome Natural C...
 
Challenges in the chemical industry, jay brookes (boc) industry ccs worksho...
Challenges in the chemical industry, jay brookes (boc)   industry ccs worksho...Challenges in the chemical industry, jay brookes (boc)   industry ccs worksho...
Challenges in the chemical industry, jay brookes (boc) industry ccs worksho...
 
Overall Network Issues, Tim Dumenil (Pale Blue Dot) - Industry CCS Workshop, ...
Overall Network Issues, Tim Dumenil (Pale Blue Dot) - Industry CCS Workshop, ...Overall Network Issues, Tim Dumenil (Pale Blue Dot) - Industry CCS Workshop, ...
Overall Network Issues, Tim Dumenil (Pale Blue Dot) - Industry CCS Workshop, ...
 
Challenges in the Steel Industry and the Network, James Watt (Amec) - Industr...
Challenges in the Steel Industry and the Network, James Watt (Amec) - Industr...Challenges in the Steel Industry and the Network, James Watt (Amec) - Industr...
Challenges in the Steel Industry and the Network, James Watt (Amec) - Industr...
 
Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...
Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...
Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...
 
Guangdong Offshore CCUS Project (GOCCUS) - Xi Liang, University of Edinburgh ...
Guangdong Offshore CCUS Project (GOCCUS) - Xi Liang, University of Edinburgh ...Guangdong Offshore CCUS Project (GOCCUS) - Xi Liang, University of Edinburgh ...
Guangdong Offshore CCUS Project (GOCCUS) - Xi Liang, University of Edinburgh ...
 
Changes in the Dutch CCS Landscape - Jan Brouwer, CATO - UKCCSRC Strathclyde ...
Changes in the Dutch CCS Landscape - Jan Brouwer, CATO - UKCCSRC Strathclyde ...Changes in the Dutch CCS Landscape - Jan Brouwer, CATO - UKCCSRC Strathclyde ...
Changes in the Dutch CCS Landscape - Jan Brouwer, CATO - UKCCSRC Strathclyde ...
 
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
 
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
 
Computational Modelling and Optimisation of Carbon Capture Reactors, Daniel S...
Computational Modelling and Optimisation of Carbon Capture Reactors, Daniel S...Computational Modelling and Optimisation of Carbon Capture Reactors, Daniel S...
Computational Modelling and Optimisation of Carbon Capture Reactors, Daniel S...
 
Effective Adsorbents for Establishing Solids Looping as a Next Generation NG ...
Effective Adsorbents for Establishing Solids Looping as a Next Generation NG ...Effective Adsorbents for Establishing Solids Looping as a Next Generation NG ...
Effective Adsorbents for Establishing Solids Looping as a Next Generation NG ...
 

Recently uploaded

Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Gas CCS in China - Jia Li at the UKCCSRC Gas CCS Meeting, University of Sussex, 25 June 2014

  • 1. 1 Gas CCS in China Dr Jia Li Lecturer in Carbon Capture and Storage 2014 Jun 25, University of Sussex Gas CCS meeting
  • 2. Content • Update on CCS in China • Background on Chinese Natural Gas Industry • Post-combustion Capture Studies in CCGT Power Plant - Datang Study - Huaneng Pilot • SNG
  • 3. CCS R&D Activities and Scoping Projects • National 973 Projects (two led by Petro China) • National 863 Projects (incl. IGCC, Algae, Oxyfuel, EOR) • National Key Technology Program (CO2 storage, capture from blast furnace iron making) • EU-UK-China NZEC / COACH /STRACO2 • UK-China Chinese Advanced Power Plants Carbon Capture Options • US-China Clean Energy Research Centre • Australia – China CO2 Geologic Storage Cooperation Project • Italy – China CCS Cooperation • Guangdong CCS Readiness Project • A number of studies by Asian Development Bank and the World Bank • Participation in ISO standard design
  • 4. CCS Pilot Projects in China • Petro China Jilin Oilfield, EOR, 100,000 t/a (2007- ) • CAS – Jinlong CO2 Chemical Utilization, 10,000 t/a (2007- ) • Huaneng Gaobeidian post-combustion capture, 3000 t/a (2008 -) • CNOOC biodegradable plastic CO2 utilisation, 2100 t/a (2009- ) • Huaneng Shidongkou post-combustion capture, 120,000 t/a (2009- ) • Chongqing Shuanghuai post-combustion capture, 10,000 t/a (2010- ) • SINOPEC Shengli Oil Field post-combustion and EOR, 40,000 t/a (2010 - ) • Lianyuan Gang Clean Coal Energy System pre-combustion, 30,000t/a (2011- ) • Shenhua CTL capture and saline aquifer storage, 100,000 t/a (2011 - ) • ENN Microalgae Bio-fuel Demonstration, 20,000 t/a (TBC) • Huaneng Green-gen IGCC CCS Pilot, up to 100,000t/a capture (TBC) • Hubei Yingcheng Oxy-combustion R&D, 50,000 t/a capture (TBC) • Guangdong 1 million ton post-combustion (Pre-M) (2014- )
  • 5.
  • 6.
  • 7. Gas Production and Consumption in China 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 billioncubicmetre(bcm) Year Total Consumption Total Production Source: BP, 2012; NDRC, 2013 Compounded growth rate (2003-2012): Consumption: 15.8% Production: 11.9%
  • 8. Gas Net Import Ratio in China 0% 5% 10% 15% 20% 25% 30% 2007 2008 2009 2010 2011 2012 GsaNetImportRatio Year Source: BP, 2012; NDRC, 2013 The dependency ratio of crude oil is 56% in 2012
  • 9. Conventional Gas 51% Coal SNG 6% CBM 6%Shale Gas 2% Import Gas 35% Estimated Gas Sources in 2015 • Total domestic production: 176 bcm • Conventional gas: 138.5 bcm • Coal Synthetic Natural Gas: 15 to 18 bcm • Coal bed methane: 16 bcm • Shale Gas: 6.5 bcm (with 200 bcm potential) • Import LNG and pipeline gas: 93.5 bcm Source: NEA, 2012 http://zfxxgk.nea.gov.cn/auto86/201212/W0 20121203312244945303.pdf
  • 10. Natural Gas in China • The share of natural gas in the energy mix will increase from 4% in 2010 to 10% in 2020 • The government is reforming the gas market, current regulated “city-gate gas prices” are around 3 to 3.3 per cm in the east of China • Natural gas will be applied for generating electricity in major cities with tight “environment capacity”, such as Beijing, Shenzhen, Shanghai, Guangzhou • The CCGT capacity is estimated to increase from 20GW in 2010 to 60GW in 2015 and 110GW in 2020 • Some pioneer projects are studying CCS in gas-fired power plants in China
  • 11. Datang Gas CCS Study ADB TA‐8001 (PRC): Study on Carbon Capture and Storage in Natural Gas-Based Power Plants Information provided by Dr Andrew Minchener (Project Lead)
  • 12. Project Objectives • Develop a CCS roadmap for natural gas-based CHP plants; • Carry out a techno-economic feasibility analysis for a CCS pilot scale demonstration on the Gaojing CHP plant; • Formulate a CCS-readiness plan for natural gas-based CHP plants; • Establish a capacity strengthening programme for various stakeholder groups concerned with the application of CCS for gas fired CHP systems. Source: Minchener, 2013
  • 13. Steam turbine hall and HRSG Source: Minchener, 2013
  • 14. Steam turbine hall Source: Minchener, 2013
  • 15. Datang Gas CCS Plan • A CCS pilot scale demonstration for Gaojing natural gas power plant through post-combustion chemical scrubbing (3 tonne per day) • Establish CCS-readiness guidelines to meet new and future CCS retrofitting requirements for applications to all natural gas power plants within PRC • ADB TA provides an important assessment of strategic and technical options and impact on economic competitiveness (draft report by July 2013; followed by stakeholder workshops in Sep and Oct) Source: Minchener, 2013
  • 16. Huaneng Gas CCS Pilot Information provided by Mr Lianbo Liu (Project Manager)
  • 17. CCM Verification Project CCM燃气碳捕集验证项目  First CO2 capture pilot plant for natural gas based power station in China, built by CERI in 2012 (1000 tons CO2 per year)  CERI建造的中国首套燃气电厂二氧化碳捕集测试 系统(规模1000吨CO2/年)  This plant (named CCM Verification Plant here) is also served as a verification plant for Norway CO2 Capture Mongstad (CCM) project  挪威CCM碳捕集工程的验证项目,第一阶段  CCM Project is executed by Statoil to build a full- scale post combustion capture of CO2 from a combined heat and power station at Mongstad  CCM项目将对Mongstad热电厂烟道气进行CO2全 捕集,工程建设由挪威国家石油公司负责  CCM Verification plant has been running stably for 3000 hours with capture efficiency >85% (85%~92%)  在保证84%捕集率的条件下,CCM验证项目已连 续稳定运行2000小时(捕集率84%~92%)
  • 18. Features of CCM Verification Plant CCM工程项目特征  Absorber with Intercooling System 吸收塔伴中间冷却  Novel Regeneration System, Reducing 20% Energy Cost Compared with Traditional Stripper 新型再生系统,相对传统再生方式可减少20%能耗  Natural Gas Boiler to Provide Flue Gas and Steam 天然气锅炉提供烟道气和再生用蒸汽、烟气循环  Solvent Reclaim System 溶液回收再生装置  Two Independent Online Lab Analysis Systems to Ensure Accurate Experimental Data 两套独立的实验室在线分析系统,确保数据相符和准确  PLC with UPS for Pilot Plant PLC自动控制,备有UPS不间歇电源  Data Collection and Online Share with Norway 数据采集和在线共享
  • 19. 19 Online Database Files 在线数据文件  Automatic Data Collection Every 5 Seconds, and Generating Performance Curves  现场数据采集,每5秒存储形成数据库文件,通过数据分析,形成小时统计数据及性能曲线 烟气成分实时数据 Daily Analyzer CalibrationFlue gas content analysis real-time data Solvent ph level and density
  • 20. Clean coal and CCS in China and the developing economies of Asia, Dr Andrew J Minchener, http://www.ukccsrc.ac.uk/7-february-future-uk-coal-ccs-options-workshop Approved SNG projects by government in China
  • 22. Large scale gasifiers in China Gasification
  • 24.
  • 25. Final Remark • Gas fired power plants will increase rapidly though it is still a small proportion of total generation capacity • CCGT power plants are likely first deployed in large cities and developed regions, with limit land resource and high population density, therefore CCS Ready is very important to avoid the carbon lock-in effect • Datang and Huaneng are developing pilot CO2 capture projects in gas-fired power plants • SNG and gas processing will provide low-cost opportunities for CCS in the gas industry