FINAL RESULTS PRESENTATION:
FOR THE YEAR ENDING APRIL 2014
30TH JULY 2014 | TAVISTOCK | FINSBURY PAVEMENT | LONDON
Contents:
• Introduction
• Power-to-Gas Energy Storage
• Power-to-Gas Projects
• Clean Fuel Projects
• Corporate Development
• Key Performance Indicators
• Results
• Summary
FINAL RESULTS PRESENTATION:
FOR THE YEAR ENDING APRIL 2014
30TH JULY 2014 | TAVISTOCK | FINSBURY PAVEMENT | LONDON
RAPID RESPONSE
HYDROGEN ENERGY SYSTEMS
RAPID RESPONSE ELECTROLYSER
ITM Electrolyser
Clean Fuel
Energy StorageWind Power
Grid
Scalable | Rapid Response | Self pressurising
HFUEL: REFUELLING STATIONS
HYDROGEN ENERGY SYSTEMS
RAPID RESPONSE ELECTROLYSER
Scalable | Rapid Response | Self pressurising
HGAS: POWER-TO-GAS
HYDROGEN ENERGY SYSTEMS
RAPID RESPONSE ELECTROLYSER
Scalable | Rapid Response | Self pressurising
REFERENCE PLANT
REFERENCE PLANT | GERMANY | UK | USA
A major barrier to entry has been overcome
• NRE has been invested
• Products have been standardised
• Compliance in UK | EU | USA
• Power-to-Gas and Refuelling Stations
HYDROGEN ENERGY SYSTEMS
REGULATIONS, CODES & STANDARDS
A leading role in shaping hydrogen deployment
• Secretary of BCGA Technical Steering Committee 9
• Secretary and UK Expert to ISO Technical Committee 197
• UK Expert to ISO working groups…
• …for electrolysers, dispensers & H2 quality
• Next Chair of BSI PVE/3/8
HYDROGEN ENERGY SYSTEMS
COMPLIANCE
Code of Practice 41: H2 Fuelling Stations
Design & Construction
Maintenance & Operation
ISO 19880-1: H2 Fuelling Stations
ISO 22734: Electrolyser
ISO 14687: H2Quality
BSI PVE/3/8: H2 Systems Standardisation
Production & Storage
Transport, Measurement & Use
P2G RATIONALE
P2G RATIONALE
MARKET SIZE
GROWING WIND GENERATION
ENERGY STORAGE: THE NEED
HYDROGEN ENERGY SYSTEMS
• Evidence of grid balancing problems
from Germany and Denmark
• Problems start at 20% capacity
• UK hit this threshold at the
end of 2013
• Energy Storage is a Market Pull
Source: ITM Power plc, data from BWEA
THE NEED: GRID BALANCING
BALANCING SUPPLY AND DEMAND:
• A total of £725m paid for balancing services in 2010–11
• Estimates in 2020 are: circa £1.9bn – £5.9bn pa
• Tariffs already operational in the UK: FCDM response sub 2 seconds
HYDROGEN ENERGY SYSTEMS
WHY POWER-TO-GAS?
POWER-TO-GAS RATIONALE
Electricity cannot be stored easily | Hydrogen can be stored easily in the gas grid
Source: ITM Power plc
HYDROGEN ENERGY SYSTEMS
ENERGY STORAGE TECHNOLOGIES
ENERGY STORAGE TECHNOLOGIES
Power-to-gas is efficient | long term | low energy cost
Source: ITM Power plc
HYDROGEN ENERGY SYSTEMS
0%
5%
10%
15%
20%
25%
30%
35%
0.0%
0.5%
1.0%
1.5%
2.0%
2.5%
3.0%
3.5%
0 2 4 6 8 10 12
Fractionwindoutputcurtailed
Hydrogenfraction(vol%)
Excess wind (TWh pa)
725 TWh p.a. natural gas consumption, 30 GW wind capacity (2020)
Hydrogen fraction
Curtailment
HYDROGEN FRACTION VS EXCESS WIND LEVELS
ENERGY STORAGE | CLEAN FUEL
• Capturing 2.8 TWh pa of excess wind (ie 4% of 2020 output)
• Requiring 978MW of electrolysis at 30% utilisation (£1.7bn market)
• Results in average national hydrogen content of 0.5%, reducing carbon footprint by 0.2%
Source: ITM Power plc
POWER-TO-GAS IN THE UK
P2G PROJECTS
THÜGA PROJECT
METHANATION
UREA
USA | CALIFORNIA
FIRST P2G SALE: THÜGA GROUP
Won competitive tender on performance and price
• One of the world’s largest utility groupings
• 18,200 employees
• 5.7m customers (electricity, 3.6m, gas 2.1m)
• Sales of €21.3bn
• Plant located at Mainova AG in Frankfurt
• A pipeline of potential customers
360KW POWER-TO-GAS MODULE
Source: Thüga-Gruppe
HYDROGEN ENERGY SYSTEMS
A challenging time frame
• Discussions April 2011
• Competitive tender process
• Order March 2013
• On site in September 2013
• CE marked in December 2013
• TÜV permit in December 2013
• Hydrogen injected in December 2013
THE SCHEDULE
THE SCHEDULE
HYDROGEN ENERGY SYSTEMS
A challenging time frame
• Discussions April 2011
• Competitive tender process
• Order March 2013
• On site in September 2013
• CE marked in December 2013
• TÜV permit in December 2013
• Hydrogen injected in December 2013
THE SCHEDULE
THE SCHEDULE
HYDROGEN ENERGY SYSTEMS
Build
•Procurement
•Manufacture
•Control system design
CE Mark
•PED
•EMC
•Machinery
•ATEX
Commission
•Loop checks
•Acceptance
•Performance
Permit
•Documentation
•Audit
•Certificate
P2G PLANT & VISITOR CENTRE
HYDROGEN ENERGY SYSTEMS
MIXING PLANT
HYDROGEN ENERGY SYSTEMS
Beyond the Thüga project
• Thüga II
• P2G in Germany, USA and UK
• Methanation | BioGas upgrading
• Ammonia | Urea (2% of global energy)
POWER-TO-GAS PROJECTS PIPELINE
POWER-TO-GAS PROJECTS PIPELINE
HYDROGEN ENERGY SYSTEMS
CPUC Sets the energy storage mandate for the power sector
• Energy storage target of 1,325 megawatts
• 3 major CA utilities by 2020
• Optimization of the grid, including peak reduction
• Integration of renewable energy
• Reduction of GHG emissions to 80% below 1990 levels by 2050
“This decision represents an important first step in encouraging
the storage market and supporting grid reliability,”
Commissioner Carla J. Peterman, the lead Commissioner for this proceeding.
CALIFORNIA ENERGY STORAGE
1.3GW ENERGY STORAGE MANDATE IN CALIFORNIA
HYDROGEN ENERGY SYSTEMS
CLEAN FUEL
WHAT IS A FCEV
OEM ALLIANCES
THE CARS
FUEL CELL CARS
WHAT IS A FUEL CELL CAR?
An EV drive train that’s refuelled rather than recharged
• Refuel in 3 minutes
• Range 400 miles
• Managed export of
energy from the grid
HYDROGEN ENERGY SYSTEMS
FCEV ALLIANCES
2013 | FCEV ALLIANCES
Four fuel cell manufacturers have
emerged; with 8 OEM’s rolling out cars
• Hyundai
• Nissan: Ford | Daimler
• Toyota: BMW
• Honda: GM
HYDROGEN ENERGY SYSTEMS
HYUNDAI IX35 FCEV
Launched in 2013
California, Germany and UK
Lease $499/month
HYDROGEN ENERGY SYSTEMS
TOYOTA FCEV
Launch in 2015
California, Germany and UK
Sale $70k
HYDROGEN ENERGY SYSTEMS
ISLAND HYDROGEN
UKH2MOBILITY
HYFIVE
CHINO CA
RIVERSIDE CA
CLEAN FUEL
PROJECTS
Hydrogen Energy Storage Smart Grid
• £2.4m TSB consortium grant
• Installation of 80kg/day and 15kg/day refuellers at 350bar
• Fleet of 20 vehicles (HICE and FC)
• Hydrogen energy storage system
• Balancing supply and demand
ISLAND HYDROGEN
HYDROGEN ENERGY SYSTEMS
ISLAND HYDROGEN
HYDROGEN ENERGY SYSTEMS
UK REFUELLING STATIONS
UK REFUELLING STATIONS
EcoIsland (TSB)
1x80kg | 1x15kg
£1.5m
HyFive (EU)
3x80kg
€3.0m
OLEV £10m Call
6x80kg
Tender
H2Mobility
65x80kg
Tender
H2Mobility
1,000 Stations
Tender
Development of a UK Infrastructure Business
• Grant funded Capex and Opex
• Maintenance contract with each award
• OLEV £10m call in Sept | OLEV £60m call in early 2015
• OLEV have indicated £100m allocated for hydrogen (un-announced)
HYDROGEN ENERGY SYSTEMS
Selected by the LHP as the 2013 HRS partner
• LHP Funded the ITM Power 2013 JTI submission
• 100 Fuel Cell Electric Vehicles from 5 OEMs
• ITM to build 3 refuelling stations in London
• Backing from the Mayor’s office
• €18m total EU (JTI) funding
• £2.8m to ITM Power
LONDON HYDROGEN PARTNERSHIP
HYDROGEN ENERGY SYSTEMS
WWW.HYFIVE.EU
HYDROGEN ENERGY SYSTEMS
FCH JU 2: 2014
FCH JU 2: 2014
HYDROGEN ENERGY SYSTEMS
FCH budget €1.4bn, managed by the New Energy World
• Development: 100% of the total eligible cost
• Demonstrations: 70% maximum will apply for profit making entities
Pillar 1: FCH technologies for Transportation Systems
• Road transport
• FCEV
• HRS infrastructure
Pillar 2: FCH Technologies for Energy Systems
• Hydrogen as a flexible link between renewable energy both mobile and stationary systems.
• Storage of renewable electricity and grid balancing, including hydrogen blending in the natural gas grid
• Fuel cells in power
• Power systems for domestic, commercial, municipal and industrial applications
CALIFORNIA REFUELLING STATIONS
CALIFORNIA REFUELLING STATIONS
2013 PON
Hyundai Chino
Won $1.3m
2014 PON
Riverside
Won $2.1m Bid
2015 PON
10x100kg
Tender
8 More PON’s
80x100kg
Annual Tender
California Hydrogen Infrastructure Deployment
• Fund of $200m for 100 hydrogen stations with up to $20m a year for 10yrs
• 2012: ITM Power Inc. established in California
• 2013: ITM Power Inc. wins H2 station award with 2 North American partners at Hyundai, Chino
• 2014: ITM Power Inc. wins H2 station award with 2 North American partners at the City of Riverside
HYDROGEN ENERGY SYSTEMS
BOARD
AWARENESS
KPI’S
CORPORATE
THE BOARD
HYDROGEN ENERGY SYSTEMS
THE BOARD
AWARENESS
AWARENESS
HYDROGEN ENERGY SYSTEMS
Source: Thuega
National and International Coverage
• Radio 4: Costing the Earth
• Guardian: Power-to-Gas energy storage
• Royal Academy of Engineering presentation
• Platts on Power-to-Gas energy storage
KEY PERFORMANCE INDICATORS
KEY PERFORMANCE INDICATORS
Clear measures of business performance
•Technology
•Cumulative test hoursKPI 1
•Technology
•Cumulative installed capacityKPI 2
•Commercial
•Product salesKPI 3
•Commercial
•Project incomeKPI 4
•Commercial
•Projects under contractKPI 5
•Financial
•Headcount and staff costsKPI 6
HYDROGEN ENERGY SYSTEMS
KPI 1: CUMULATIVE TEST HOURS
ENERGY STORAGE | CLEAN FUEL
KPI 1: CUMULATIVE TEST HOURS
Cumulative test hours
• Test stands fully automated & data logged
• Qualifying performance of key cell & stack components
• Developing predictive tools
KPI 2: INSTALLED CAPACITY
KPI 2: INSTALLED CAPACITY
Cumulative capacity
• Tracks the technology deployment
• Tracks available reference plant
• Installed capacity is a key metric in tender documents
HYDROGEN ENERGY SYSTEMS
KPI 3: PRODUCT SALES & PROJECT INCOME
KPI 3: PRODUCT SALES & PROJECT INCOME
Customers are often confidential; we announce when
possible. Order book needs strong balance sheet
For year ending April 30th 2012
• £1.46m total inflow
• £0.48m product sales
• £0.98m grant funding
For year ending April 30th 2013
• £1.45m total inflow
• £0.09m product sales
• £1.36m grant funding
For year ending April 30th 2014
• £3.08m total inflow
• £1.13m product sales
• £1.96m project funding £0
£500,000
£1,000,000
£1,500,000
£2,000,000
£2,500,000
£3,000,000
£3,500,000
2010 2011 2012 2013 2014
Sales Revenue
Project Income
HYDROGEN ENERGY SYSTEMS
KPI 4: PROJECT INCOME
KPI 4: PROJECT INCOME
Customers are often confidential; we announce when
possible. Order book needs strong balance sheet
For year ending April 30th 2012
• £1.46m total inflow
• £0.48m product sales
• £0.98m grant funding
For year ending April 30th 2013
• £1.45m total inflow
• £0.09m product sales
• £1.36m grant funding
For year ending April 30th 2014
• £3.08m total inflow
• £1.13m product sales
• £1.96m project funding £0
£500,000
£1,000,000
£1,500,000
£2,000,000
£2,500,000
£3,000,000
£3,500,000
£4,000,000
2010 2011 2012 2013 2014 2015 2016 2017
Collaborative Project Funding
Applied For
Negotiation
Secured
Paid
HYDROGEN ENERGY SYSTEMS
KPI 5: PROJECTS UNDER CONTRACT
KPI 5: PROJECTS UNDER CONTRACT
Contract Project To be paid Project Type User
EcoIsland 360kW £760k £1.5m Grant SSE
Chino I 360kW £621k £773k Sale Hyundai
Phaedrus 120kW £536k £731k Grant Shell/Diamler
Common E 120kW £260k £279k Grant ITM
HyFive 3x 360kW £2.75m £2.75m Grant GLA
DECC 100kW £78k £325k Grant ITM
HMGS Hpac40+ £100k £100k Sale HMGS
HMGS II Hpac40+ £74k £74k Sales HMGS
Riverside 60kW+ £1,265k £1,265k Grant CoR
Other Smaller £105k Sales -
Total £6,550k
Pipeline of projects is rapidly growing
• £9.56m of projects under contract or in the final stages of negotiation
• £6.55m of projects under contract
• £3.01m of contracts in final negotiation
• Rapidly growing pipeline
HYDROGEN ENERGY SYSTEMS
KPI 6: HEAD COUNT | STAFF COSTS
KPI 6: HEAD COUNT | STAFF COSTS
Staff and Country Reps | £4m pa
• Headcount has only increased by <10% despite a 100% increased grant take and revenue
• £1.2m of costs (labour and overhead) funded by grants
• Increase in staff in production and field engineer teams – service delivery
£0
£50,000
£100,000
£150,000
£200,000
£250,000
£300,000
£350,000
£400,000
May13
June13
July13
Aug13
Sep-13
Oct-13
Nov-13
Dec-13
Jan-14
Feb-14
Mar-14
Apr-14
Staff costs per month
Reps
and BD
Staff
Costs
-
10
20
30
40
50
60
70
80
90
May-13
Jun-13
Jul-13
Aug-13
Sep-13
Oct-13
Nov-13
Dec-13
Jan-14
Feb-14
Mar-14
Apr-14
Staff Numbers per month
Reps
and BD
Staff
HYDROGEN ENERGY SYSTEMS
Key Financial Results for the year ended 30 April 2014:
 Total Income incorporating sales revenue and projects income £3.077m (2013: £1.44m) up 114%
 Sales Revenue £1.127 (2013: £0.087m) up £1.040m
 Collaborative projects income £1.370m (2013: £1.35m)
 Additional capitalised project income £0.58m (2013: £nil)
 Increase in fixed assets to £1.755m from £1.463m, up 20%
 Loss from operations £7.978m (2013: £6.518)
 Cash burn £7.568m (2013: £6.1m)
 Cash balance £9.763m (2013: £5.94m)
 Two placings creating proceeds of £12.0m before expenses
FINAL RESULTS PRESENTATION:
FOR THE YEAR ENDING APRIL 2014
30TH JULY 2014 | TAVISTOCK | FINSBURY PAVEMENT | LONDON
Commercial progress to date:
 A Total of £9.56m of projects under contract or in the final stages of negotiation
 £6.55m of projects under contract
 £3.01m of contracts in the final stages of negotiation
 Strongly developing pipeline of commercial sales and funded projects
FINAL RESULTS PRESENTATION:
FOR THE YEAR ENDING APRIL 2014
30TH JULY 2014 | TAVISTOCK | FINSBURY PAVEMENT | LONDON
FINAL RESULTS PRESENTATION:
FOR THE YEAR ENDING APRIL 2014
30TH JULY 2014 | TAVISTOCK | FINSBURY PAVEMENT | LONDON

More Related Content

What's hot

Mission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeMission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeGlobal CCS Institute
 
Company Update February 2017
Company Update February 2017Company Update February 2017
Company Update February 2017Rebecca Markillie
 
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Global CCS Institute
 
LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...
LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...
LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...Marcellus Drilling News
 
Natural gas and bio methane as fuel for transport r. strods
Natural gas and bio methane as fuel for transport   r. strodsNatural gas and bio methane as fuel for transport   r. strods
Natural gas and bio methane as fuel for transport r. strodsEuropean Commission
 
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage ProjectPaul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage ProjectGlobal CCS Institute
 
Unlocking the Innovation Hidden within Today’s Variable-Speed Drives
Unlocking the Innovation Hidden within Today’s Variable-Speed DrivesUnlocking the Innovation Hidden within Today’s Variable-Speed Drives
Unlocking the Innovation Hidden within Today’s Variable-Speed DrivesEMEX
 
Membrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationMembrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationGlobal CCS Institute
 
Modelling of offshore wind
Modelling of offshore windModelling of offshore wind
Modelling of offshore windIEA-ETSAP
 
Making the CNG Virtual Pipeline a Reality for Transportation Natural Gas (TNG)
Making the CNG Virtual Pipeline a Reality for Transportation Natural Gas (TNG)Making the CNG Virtual Pipeline a Reality for Transportation Natural Gas (TNG)
Making the CNG Virtual Pipeline a Reality for Transportation Natural Gas (TNG)Jolynn Kennedy, CIMS-GB
 
White Rose Carbon Capture and Storage Project
White Rose Carbon Capture and Storage ProjectWhite Rose Carbon Capture and Storage Project
White Rose Carbon Capture and Storage ProjectGlobal CCS Institute
 
Renewable Gas for the large industry sector - The road to Ireland's low carbo...
Renewable Gas for the large industry sector - The road to Ireland's low carbo...Renewable Gas for the large industry sector - The road to Ireland's low carbo...
Renewable Gas for the large industry sector - The road to Ireland's low carbo...Linda O'Brien
 
GE ADGT Application - Virtual Pipeline
GE ADGT Application - Virtual PipelineGE ADGT Application - Virtual Pipeline
GE ADGT Application - Virtual PipelineGE코리아
 
Climeworks - Capturing CO2 from air
Climeworks - Capturing CO2 from airClimeworks - Capturing CO2 from air
Climeworks - Capturing CO2 from airengineeringzhaw
 

What's hot (20)

Mission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeMission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation Challenge
 
Company Update February 2017
Company Update February 2017Company Update February 2017
Company Update February 2017
 
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
 
LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...
LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...
LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...
 
ION Engineering Presentation
ION Engineering PresentationION Engineering Presentation
ION Engineering Presentation
 
Natural gas and bio methane as fuel for transport r. strods
Natural gas and bio methane as fuel for transport   r. strodsNatural gas and bio methane as fuel for transport   r. strods
Natural gas and bio methane as fuel for transport r. strods
 
Update on CCS Activities in Canada and Possible Topics for European Collabora...
Update on CCS Activities in Canada and Possible Topics for European Collabora...Update on CCS Activities in Canada and Possible Topics for European Collabora...
Update on CCS Activities in Canada and Possible Topics for European Collabora...
 
Global CCS Institute Presentation
Global CCS Institute PresentationGlobal CCS Institute Presentation
Global CCS Institute Presentation
 
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage ProjectPaul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
 
Adnoc and masdar project may 2013
Adnoc and masdar project   may 2013Adnoc and masdar project   may 2013
Adnoc and masdar project may 2013
 
Unlocking the Innovation Hidden within Today’s Variable-Speed Drives
Unlocking the Innovation Hidden within Today’s Variable-Speed DrivesUnlocking the Innovation Hidden within Today’s Variable-Speed Drives
Unlocking the Innovation Hidden within Today’s Variable-Speed Drives
 
Membrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationMembrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) Presentation
 
Modelling of offshore wind
Modelling of offshore windModelling of offshore wind
Modelling of offshore wind
 
Making the CNG Virtual Pipeline a Reality for Transportation Natural Gas (TNG)
Making the CNG Virtual Pipeline a Reality for Transportation Natural Gas (TNG)Making the CNG Virtual Pipeline a Reality for Transportation Natural Gas (TNG)
Making the CNG Virtual Pipeline a Reality for Transportation Natural Gas (TNG)
 
White Rose Carbon Capture and Storage Project
White Rose Carbon Capture and Storage ProjectWhite Rose Carbon Capture and Storage Project
White Rose Carbon Capture and Storage Project
 
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
 
Renewable Gas for the large industry sector - The road to Ireland's low carbo...
Renewable Gas for the large industry sector - The road to Ireland's low carbo...Renewable Gas for the large industry sector - The road to Ireland's low carbo...
Renewable Gas for the large industry sector - The road to Ireland's low carbo...
 
GE ADGT Application - Virtual Pipeline
GE ADGT Application - Virtual PipelineGE ADGT Application - Virtual Pipeline
GE ADGT Application - Virtual Pipeline
 
Climeworks - Capturing CO2 from air
Climeworks - Capturing CO2 from airClimeworks - Capturing CO2 from air
Climeworks - Capturing CO2 from air
 
TCM presentation May 2013
TCM presentation May 2013TCM presentation May 2013
TCM presentation May 2013
 

Similar to ITM Power Results Presentation

Power-to-Gas Storing Renewable Energy in the Gas Grid
Power-to-Gas Storing Renewable Energy in the Gas GridPower-to-Gas Storing Renewable Energy in the Gas Grid
Power-to-Gas Storing Renewable Energy in the Gas GridITM Power
 
ITM Power Results Presentation July 2011
ITM Power Results Presentation July 2011ITM Power Results Presentation July 2011
ITM Power Results Presentation July 2011Rebecca Markillie
 
GRID BALANCING AND SUPPORT: POWER TO GAS ENERGY STORAGE
GRID BALANCING AND SUPPORT: POWER TO GAS ENERGY STORAGEGRID BALANCING AND SUPPORT: POWER TO GAS ENERGY STORAGE
GRID BALANCING AND SUPPORT: POWER TO GAS ENERGY STORAGEPower System Operation
 
Earth_Renewed_CNRGH2.1
Earth_Renewed_CNRGH2.1Earth_Renewed_CNRGH2.1
Earth_Renewed_CNRGH2.1dCORE
 
Developing district heating in ireland presentations
Developing district heating in ireland presentationsDeveloping district heating in ireland presentations
Developing district heating in ireland presentationsCodema
 
ITM Power: Solar Hydrogen Station
ITM Power: Solar Hydrogen StationITM Power: Solar Hydrogen Station
ITM Power: Solar Hydrogen StationRebecca Markillie
 
ITM Power: Solar Hydrogen Station
ITM Power: Solar Hydrogen StationITM Power: Solar Hydrogen Station
ITM Power: Solar Hydrogen StationRebecca Markillie
 
UK AD & BIogas 2016: Purple Seminar Room - 7 July
UK AD & BIogas 2016: Purple Seminar Room - 7 July  UK AD & BIogas 2016: Purple Seminar Room - 7 July
UK AD & BIogas 2016: Purple Seminar Room - 7 July UKADBiogas
 
El Hierro 100 % res island (EN)
El Hierro 100 % res island (EN)El Hierro 100 % res island (EN)
El Hierro 100 % res island (EN)UNDPhr
 
Circular Economy in Transformer Service.pptx
Circular Economy in Transformer Service.pptxCircular Economy in Transformer Service.pptx
Circular Economy in Transformer Service.pptxMircea Gingu
 
Building Energy Legislation - Liz Meddings, Arup
Building Energy Legislation - Liz Meddings, ArupBuilding Energy Legislation - Liz Meddings, Arup
Building Energy Legislation - Liz Meddings, ArupGo Green
 
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...ARC research group
 
Stewarts care dalkia armagh down district council presentaiton 27mar12
Stewarts care dalkia armagh  down district council presentaiton 27mar12Stewarts care dalkia armagh  down district council presentaiton 27mar12
Stewarts care dalkia armagh down district council presentaiton 27mar12John Harrington
 
ITM Power: Mobilité HYDROGÈNE France
ITM Power: Mobilité HYDROGÈNE FranceITM Power: Mobilité HYDROGÈNE France
ITM Power: Mobilité HYDROGÈNE FranceRebecca Markillie
 
DSR: Being Power Responsive, 18th June - Full Slidepack
DSR: Being Power Responsive, 18th June - Full SlidepackDSR: Being Power Responsive, 18th June - Full Slidepack
DSR: Being Power Responsive, 18th June - Full SlidepackPower Responsive
 

Similar to ITM Power Results Presentation (20)

Power-to-Gas Storing Renewable Energy in the Gas Grid
Power-to-Gas Storing Renewable Energy in the Gas GridPower-to-Gas Storing Renewable Energy in the Gas Grid
Power-to-Gas Storing Renewable Energy in the Gas Grid
 
ITM Power Results Presentation July 2011
ITM Power Results Presentation July 2011ITM Power Results Presentation July 2011
ITM Power Results Presentation July 2011
 
GRID BALANCING AND SUPPORT: POWER TO GAS ENERGY STORAGE
GRID BALANCING AND SUPPORT: POWER TO GAS ENERGY STORAGEGRID BALANCING AND SUPPORT: POWER TO GAS ENERGY STORAGE
GRID BALANCING AND SUPPORT: POWER TO GAS ENERGY STORAGE
 
Earth_Renewed_CNRGH2.1
Earth_Renewed_CNRGH2.1Earth_Renewed_CNRGH2.1
Earth_Renewed_CNRGH2.1
 
ITM Briefing 29-30.11.11
ITM Briefing 29-30.11.11ITM Briefing 29-30.11.11
ITM Briefing 29-30.11.11
 
Developing district heating in ireland presentations
Developing district heating in ireland presentationsDeveloping district heating in ireland presentations
Developing district heating in ireland presentations
 
ITM Power: Solar Hydrogen Station
ITM Power: Solar Hydrogen StationITM Power: Solar Hydrogen Station
ITM Power: Solar Hydrogen Station
 
ITM Power: Solar Hydrogen Station
ITM Power: Solar Hydrogen StationITM Power: Solar Hydrogen Station
ITM Power: Solar Hydrogen Station
 
UK AD & BIogas 2016: Purple Seminar Room - 7 July
UK AD & BIogas 2016: Purple Seminar Room - 7 July  UK AD & BIogas 2016: Purple Seminar Room - 7 July
UK AD & BIogas 2016: Purple Seminar Room - 7 July
 
NPL Opening 10th may
NPL Opening 10th mayNPL Opening 10th may
NPL Opening 10th may
 
El Hierro 100 % res island (EN)
El Hierro 100 % res island (EN)El Hierro 100 % res island (EN)
El Hierro 100 % res island (EN)
 
GenComm - Project
GenComm - ProjectGenComm - Project
GenComm - Project
 
Refit london Hadjidakis
Refit london HadjidakisRefit london Hadjidakis
Refit london Hadjidakis
 
Circular Economy in Transformer Service.pptx
Circular Economy in Transformer Service.pptxCircular Economy in Transformer Service.pptx
Circular Economy in Transformer Service.pptx
 
Building Energy Legislation - Liz Meddings, Arup
Building Energy Legislation - Liz Meddings, ArupBuilding Energy Legislation - Liz Meddings, Arup
Building Energy Legislation - Liz Meddings, Arup
 
An update on the UK Government's CCS policy, Brian Allison, DECC - UKCCSRC St...
An update on the UK Government's CCS policy, Brian Allison, DECC - UKCCSRC St...An update on the UK Government's CCS policy, Brian Allison, DECC - UKCCSRC St...
An update on the UK Government's CCS policy, Brian Allison, DECC - UKCCSRC St...
 
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
 
Stewarts care dalkia armagh down district council presentaiton 27mar12
Stewarts care dalkia armagh  down district council presentaiton 27mar12Stewarts care dalkia armagh  down district council presentaiton 27mar12
Stewarts care dalkia armagh down district council presentaiton 27mar12
 
ITM Power: Mobilité HYDROGÈNE France
ITM Power: Mobilité HYDROGÈNE FranceITM Power: Mobilité HYDROGÈNE France
ITM Power: Mobilité HYDROGÈNE France
 
DSR: Being Power Responsive, 18th June - Full Slidepack
DSR: Being Power Responsive, 18th June - Full SlidepackDSR: Being Power Responsive, 18th June - Full Slidepack
DSR: Being Power Responsive, 18th June - Full Slidepack
 

Recently uploaded

GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 

Recently uploaded (20)

GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 

ITM Power Results Presentation

  • 1. FINAL RESULTS PRESENTATION: FOR THE YEAR ENDING APRIL 2014 30TH JULY 2014 | TAVISTOCK | FINSBURY PAVEMENT | LONDON
  • 2. Contents: • Introduction • Power-to-Gas Energy Storage • Power-to-Gas Projects • Clean Fuel Projects • Corporate Development • Key Performance Indicators • Results • Summary FINAL RESULTS PRESENTATION: FOR THE YEAR ENDING APRIL 2014 30TH JULY 2014 | TAVISTOCK | FINSBURY PAVEMENT | LONDON
  • 3. RAPID RESPONSE HYDROGEN ENERGY SYSTEMS RAPID RESPONSE ELECTROLYSER ITM Electrolyser Clean Fuel Energy StorageWind Power Grid Scalable | Rapid Response | Self pressurising
  • 4. HFUEL: REFUELLING STATIONS HYDROGEN ENERGY SYSTEMS RAPID RESPONSE ELECTROLYSER Scalable | Rapid Response | Self pressurising
  • 5. HGAS: POWER-TO-GAS HYDROGEN ENERGY SYSTEMS RAPID RESPONSE ELECTROLYSER Scalable | Rapid Response | Self pressurising
  • 6. REFERENCE PLANT REFERENCE PLANT | GERMANY | UK | USA A major barrier to entry has been overcome • NRE has been invested • Products have been standardised • Compliance in UK | EU | USA • Power-to-Gas and Refuelling Stations HYDROGEN ENERGY SYSTEMS
  • 7. REGULATIONS, CODES & STANDARDS A leading role in shaping hydrogen deployment • Secretary of BCGA Technical Steering Committee 9 • Secretary and UK Expert to ISO Technical Committee 197 • UK Expert to ISO working groups… • …for electrolysers, dispensers & H2 quality • Next Chair of BSI PVE/3/8 HYDROGEN ENERGY SYSTEMS COMPLIANCE Code of Practice 41: H2 Fuelling Stations Design & Construction Maintenance & Operation ISO 19880-1: H2 Fuelling Stations ISO 22734: Electrolyser ISO 14687: H2Quality BSI PVE/3/8: H2 Systems Standardisation Production & Storage Transport, Measurement & Use
  • 9. GROWING WIND GENERATION ENERGY STORAGE: THE NEED HYDROGEN ENERGY SYSTEMS • Evidence of grid balancing problems from Germany and Denmark • Problems start at 20% capacity • UK hit this threshold at the end of 2013 • Energy Storage is a Market Pull Source: ITM Power plc, data from BWEA
  • 10. THE NEED: GRID BALANCING BALANCING SUPPLY AND DEMAND: • A total of £725m paid for balancing services in 2010–11 • Estimates in 2020 are: circa £1.9bn – £5.9bn pa • Tariffs already operational in the UK: FCDM response sub 2 seconds HYDROGEN ENERGY SYSTEMS
  • 11. WHY POWER-TO-GAS? POWER-TO-GAS RATIONALE Electricity cannot be stored easily | Hydrogen can be stored easily in the gas grid Source: ITM Power plc HYDROGEN ENERGY SYSTEMS
  • 12. ENERGY STORAGE TECHNOLOGIES ENERGY STORAGE TECHNOLOGIES Power-to-gas is efficient | long term | low energy cost Source: ITM Power plc HYDROGEN ENERGY SYSTEMS
  • 13. 0% 5% 10% 15% 20% 25% 30% 35% 0.0% 0.5% 1.0% 1.5% 2.0% 2.5% 3.0% 3.5% 0 2 4 6 8 10 12 Fractionwindoutputcurtailed Hydrogenfraction(vol%) Excess wind (TWh pa) 725 TWh p.a. natural gas consumption, 30 GW wind capacity (2020) Hydrogen fraction Curtailment HYDROGEN FRACTION VS EXCESS WIND LEVELS ENERGY STORAGE | CLEAN FUEL • Capturing 2.8 TWh pa of excess wind (ie 4% of 2020 output) • Requiring 978MW of electrolysis at 30% utilisation (£1.7bn market) • Results in average national hydrogen content of 0.5%, reducing carbon footprint by 0.2% Source: ITM Power plc POWER-TO-GAS IN THE UK
  • 15. FIRST P2G SALE: THÜGA GROUP Won competitive tender on performance and price • One of the world’s largest utility groupings • 18,200 employees • 5.7m customers (electricity, 3.6m, gas 2.1m) • Sales of €21.3bn • Plant located at Mainova AG in Frankfurt • A pipeline of potential customers 360KW POWER-TO-GAS MODULE Source: Thüga-Gruppe HYDROGEN ENERGY SYSTEMS
  • 16. A challenging time frame • Discussions April 2011 • Competitive tender process • Order March 2013 • On site in September 2013 • CE marked in December 2013 • TÜV permit in December 2013 • Hydrogen injected in December 2013 THE SCHEDULE THE SCHEDULE HYDROGEN ENERGY SYSTEMS
  • 17. A challenging time frame • Discussions April 2011 • Competitive tender process • Order March 2013 • On site in September 2013 • CE marked in December 2013 • TÜV permit in December 2013 • Hydrogen injected in December 2013 THE SCHEDULE THE SCHEDULE HYDROGEN ENERGY SYSTEMS Build •Procurement •Manufacture •Control system design CE Mark •PED •EMC •Machinery •ATEX Commission •Loop checks •Acceptance •Performance Permit •Documentation •Audit •Certificate
  • 18. P2G PLANT & VISITOR CENTRE HYDROGEN ENERGY SYSTEMS
  • 20. Beyond the Thüga project • Thüga II • P2G in Germany, USA and UK • Methanation | BioGas upgrading • Ammonia | Urea (2% of global energy) POWER-TO-GAS PROJECTS PIPELINE POWER-TO-GAS PROJECTS PIPELINE HYDROGEN ENERGY SYSTEMS
  • 21. CPUC Sets the energy storage mandate for the power sector • Energy storage target of 1,325 megawatts • 3 major CA utilities by 2020 • Optimization of the grid, including peak reduction • Integration of renewable energy • Reduction of GHG emissions to 80% below 1990 levels by 2050 “This decision represents an important first step in encouraging the storage market and supporting grid reliability,” Commissioner Carla J. Peterman, the lead Commissioner for this proceeding. CALIFORNIA ENERGY STORAGE 1.3GW ENERGY STORAGE MANDATE IN CALIFORNIA HYDROGEN ENERGY SYSTEMS
  • 22. CLEAN FUEL WHAT IS A FCEV OEM ALLIANCES THE CARS
  • 23. FUEL CELL CARS WHAT IS A FUEL CELL CAR? An EV drive train that’s refuelled rather than recharged • Refuel in 3 minutes • Range 400 miles • Managed export of energy from the grid HYDROGEN ENERGY SYSTEMS
  • 24. FCEV ALLIANCES 2013 | FCEV ALLIANCES Four fuel cell manufacturers have emerged; with 8 OEM’s rolling out cars • Hyundai • Nissan: Ford | Daimler • Toyota: BMW • Honda: GM HYDROGEN ENERGY SYSTEMS
  • 25. HYUNDAI IX35 FCEV Launched in 2013 California, Germany and UK Lease $499/month HYDROGEN ENERGY SYSTEMS
  • 26. TOYOTA FCEV Launch in 2015 California, Germany and UK Sale $70k HYDROGEN ENERGY SYSTEMS
  • 28. Hydrogen Energy Storage Smart Grid • £2.4m TSB consortium grant • Installation of 80kg/day and 15kg/day refuellers at 350bar • Fleet of 20 vehicles (HICE and FC) • Hydrogen energy storage system • Balancing supply and demand ISLAND HYDROGEN HYDROGEN ENERGY SYSTEMS
  • 30. UK REFUELLING STATIONS UK REFUELLING STATIONS EcoIsland (TSB) 1x80kg | 1x15kg £1.5m HyFive (EU) 3x80kg €3.0m OLEV £10m Call 6x80kg Tender H2Mobility 65x80kg Tender H2Mobility 1,000 Stations Tender Development of a UK Infrastructure Business • Grant funded Capex and Opex • Maintenance contract with each award • OLEV £10m call in Sept | OLEV £60m call in early 2015 • OLEV have indicated £100m allocated for hydrogen (un-announced) HYDROGEN ENERGY SYSTEMS
  • 31. Selected by the LHP as the 2013 HRS partner • LHP Funded the ITM Power 2013 JTI submission • 100 Fuel Cell Electric Vehicles from 5 OEMs • ITM to build 3 refuelling stations in London • Backing from the Mayor’s office • €18m total EU (JTI) funding • £2.8m to ITM Power LONDON HYDROGEN PARTNERSHIP HYDROGEN ENERGY SYSTEMS
  • 33. FCH JU 2: 2014 FCH JU 2: 2014 HYDROGEN ENERGY SYSTEMS FCH budget €1.4bn, managed by the New Energy World • Development: 100% of the total eligible cost • Demonstrations: 70% maximum will apply for profit making entities Pillar 1: FCH technologies for Transportation Systems • Road transport • FCEV • HRS infrastructure Pillar 2: FCH Technologies for Energy Systems • Hydrogen as a flexible link between renewable energy both mobile and stationary systems. • Storage of renewable electricity and grid balancing, including hydrogen blending in the natural gas grid • Fuel cells in power • Power systems for domestic, commercial, municipal and industrial applications
  • 34. CALIFORNIA REFUELLING STATIONS CALIFORNIA REFUELLING STATIONS 2013 PON Hyundai Chino Won $1.3m 2014 PON Riverside Won $2.1m Bid 2015 PON 10x100kg Tender 8 More PON’s 80x100kg Annual Tender California Hydrogen Infrastructure Deployment • Fund of $200m for 100 hydrogen stations with up to $20m a year for 10yrs • 2012: ITM Power Inc. established in California • 2013: ITM Power Inc. wins H2 station award with 2 North American partners at Hyundai, Chino • 2014: ITM Power Inc. wins H2 station award with 2 North American partners at the City of Riverside HYDROGEN ENERGY SYSTEMS
  • 36. THE BOARD HYDROGEN ENERGY SYSTEMS THE BOARD
  • 37. AWARENESS AWARENESS HYDROGEN ENERGY SYSTEMS Source: Thuega National and International Coverage • Radio 4: Costing the Earth • Guardian: Power-to-Gas energy storage • Royal Academy of Engineering presentation • Platts on Power-to-Gas energy storage
  • 38. KEY PERFORMANCE INDICATORS KEY PERFORMANCE INDICATORS Clear measures of business performance •Technology •Cumulative test hoursKPI 1 •Technology •Cumulative installed capacityKPI 2 •Commercial •Product salesKPI 3 •Commercial •Project incomeKPI 4 •Commercial •Projects under contractKPI 5 •Financial •Headcount and staff costsKPI 6 HYDROGEN ENERGY SYSTEMS
  • 39. KPI 1: CUMULATIVE TEST HOURS ENERGY STORAGE | CLEAN FUEL KPI 1: CUMULATIVE TEST HOURS Cumulative test hours • Test stands fully automated & data logged • Qualifying performance of key cell & stack components • Developing predictive tools
  • 40. KPI 2: INSTALLED CAPACITY KPI 2: INSTALLED CAPACITY Cumulative capacity • Tracks the technology deployment • Tracks available reference plant • Installed capacity is a key metric in tender documents HYDROGEN ENERGY SYSTEMS
  • 41. KPI 3: PRODUCT SALES & PROJECT INCOME KPI 3: PRODUCT SALES & PROJECT INCOME Customers are often confidential; we announce when possible. Order book needs strong balance sheet For year ending April 30th 2012 • £1.46m total inflow • £0.48m product sales • £0.98m grant funding For year ending April 30th 2013 • £1.45m total inflow • £0.09m product sales • £1.36m grant funding For year ending April 30th 2014 • £3.08m total inflow • £1.13m product sales • £1.96m project funding £0 £500,000 £1,000,000 £1,500,000 £2,000,000 £2,500,000 £3,000,000 £3,500,000 2010 2011 2012 2013 2014 Sales Revenue Project Income HYDROGEN ENERGY SYSTEMS
  • 42. KPI 4: PROJECT INCOME KPI 4: PROJECT INCOME Customers are often confidential; we announce when possible. Order book needs strong balance sheet For year ending April 30th 2012 • £1.46m total inflow • £0.48m product sales • £0.98m grant funding For year ending April 30th 2013 • £1.45m total inflow • £0.09m product sales • £1.36m grant funding For year ending April 30th 2014 • £3.08m total inflow • £1.13m product sales • £1.96m project funding £0 £500,000 £1,000,000 £1,500,000 £2,000,000 £2,500,000 £3,000,000 £3,500,000 £4,000,000 2010 2011 2012 2013 2014 2015 2016 2017 Collaborative Project Funding Applied For Negotiation Secured Paid HYDROGEN ENERGY SYSTEMS
  • 43. KPI 5: PROJECTS UNDER CONTRACT KPI 5: PROJECTS UNDER CONTRACT Contract Project To be paid Project Type User EcoIsland 360kW £760k £1.5m Grant SSE Chino I 360kW £621k £773k Sale Hyundai Phaedrus 120kW £536k £731k Grant Shell/Diamler Common E 120kW £260k £279k Grant ITM HyFive 3x 360kW £2.75m £2.75m Grant GLA DECC 100kW £78k £325k Grant ITM HMGS Hpac40+ £100k £100k Sale HMGS HMGS II Hpac40+ £74k £74k Sales HMGS Riverside 60kW+ £1,265k £1,265k Grant CoR Other Smaller £105k Sales - Total £6,550k Pipeline of projects is rapidly growing • £9.56m of projects under contract or in the final stages of negotiation • £6.55m of projects under contract • £3.01m of contracts in final negotiation • Rapidly growing pipeline HYDROGEN ENERGY SYSTEMS
  • 44. KPI 6: HEAD COUNT | STAFF COSTS KPI 6: HEAD COUNT | STAFF COSTS Staff and Country Reps | £4m pa • Headcount has only increased by <10% despite a 100% increased grant take and revenue • £1.2m of costs (labour and overhead) funded by grants • Increase in staff in production and field engineer teams – service delivery £0 £50,000 £100,000 £150,000 £200,000 £250,000 £300,000 £350,000 £400,000 May13 June13 July13 Aug13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 Staff costs per month Reps and BD Staff Costs - 10 20 30 40 50 60 70 80 90 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 Staff Numbers per month Reps and BD Staff HYDROGEN ENERGY SYSTEMS
  • 45. Key Financial Results for the year ended 30 April 2014:  Total Income incorporating sales revenue and projects income £3.077m (2013: £1.44m) up 114%  Sales Revenue £1.127 (2013: £0.087m) up £1.040m  Collaborative projects income £1.370m (2013: £1.35m)  Additional capitalised project income £0.58m (2013: £nil)  Increase in fixed assets to £1.755m from £1.463m, up 20%  Loss from operations £7.978m (2013: £6.518)  Cash burn £7.568m (2013: £6.1m)  Cash balance £9.763m (2013: £5.94m)  Two placings creating proceeds of £12.0m before expenses FINAL RESULTS PRESENTATION: FOR THE YEAR ENDING APRIL 2014 30TH JULY 2014 | TAVISTOCK | FINSBURY PAVEMENT | LONDON
  • 46. Commercial progress to date:  A Total of £9.56m of projects under contract or in the final stages of negotiation  £6.55m of projects under contract  £3.01m of contracts in the final stages of negotiation  Strongly developing pipeline of commercial sales and funded projects FINAL RESULTS PRESENTATION: FOR THE YEAR ENDING APRIL 2014 30TH JULY 2014 | TAVISTOCK | FINSBURY PAVEMENT | LONDON
  • 47. FINAL RESULTS PRESENTATION: FOR THE YEAR ENDING APRIL 2014 30TH JULY 2014 | TAVISTOCK | FINSBURY PAVEMENT | LONDON