CONTROLLING MECHANICAL PROJECTS
• When handling mechanical projects , the following sequence of tasks are to
be embedded in delivering mechanical projects. Quality control/ assurance
processes or documentation are highlight as a sub items:
• General Processes/Activities:
• 1. Progress reviews weekly and/ or monthly by means of standardized
reports and software platforms.
• 2. Daily Toolbox talks
• 3. Contractor performance evaluation intervals and scope.
• 4. Baseline Risk Assessment and risk register,
• 5. Issue logs
• 6. Lessons learnt log.
• 7. Site Inspections
• b. Participate in Factory Acceptance
Tests (FAT) and sign-off relevant check
sheets. FAT reports to be compiled and
submitted to HOD
• c. Equipment and materials
receiving onsite. Agree on
documentation required for
equipment and materilas receiving.
• 5. Construction and Installations.
• a. Agree on works permit system.
(Work at heights, confined space, hot
work, and other construction permits)
• b. Review all works Method
Statement and QCPs.
• c. Review all works HIRA documents.

More Related Content

Similar to Mechanical Projects.pptx

Managing The Risk Of Financing Renewable Energy Projects
Managing The Risk Of Financing Renewable Energy ProjectsManaging The Risk Of Financing Renewable Energy Projects
Managing The Risk Of Financing Renewable Energy Projectsmtingle
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C
 
Test planning & estimation
Test planning & estimationTest planning & estimation
Test planning & estimationLeslie Smart
 
Warehouse Operations Redefining methodology
Warehouse Operations Redefining methodologyWarehouse Operations Redefining methodology
Warehouse Operations Redefining methodologyAkhilRanjanDubey
 
Functions of production planning and control
Functions of production planning and controlFunctions of production planning and control
Functions of production planning and controlVignesh Jayakumar
 
Functions of production planning and control 2
Functions of production planning and control 2Functions of production planning and control 2
Functions of production planning and control 2Vignesh Jayakumar
 
Construction submittals, their importance, and quick review steps.pdf
Construction submittals, their importance, and quick review steps.pdfConstruction submittals, their importance, and quick review steps.pdf
Construction submittals, their importance, and quick review steps.pdfiFieldsmart Technologies
 
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdf
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdfJamco_FAI_Training_Materials_AS9102_Rev_B.pdf
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdfFaizyNoh
 
Commissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover PhaseCommissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover PhaseOlivia Wilson
 
Quality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementQuality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementEdwinJacob5
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptxabdo badr
 
commissioning.pdf
commissioning.pdfcommissioning.pdf
commissioning.pdfharis348605
 

Similar to Mechanical Projects.pptx (20)

Managing The Risk Of Financing Renewable Energy Projects
Managing The Risk Of Financing Renewable Energy ProjectsManaging The Risk Of Financing Renewable Energy Projects
Managing The Risk Of Financing Renewable Energy Projects
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 
Test planning & estimation
Test planning & estimationTest planning & estimation
Test planning & estimation
 
CV
CVCV
CV
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
APQP
APQP APQP
APQP
 
Warehouse Operations Redefining methodology
Warehouse Operations Redefining methodologyWarehouse Operations Redefining methodology
Warehouse Operations Redefining methodology
 
Session 4 gdas pmp study group presentation
Session 4   gdas pmp study group presentationSession 4   gdas pmp study group presentation
Session 4 gdas pmp study group presentation
 
Functions of production planning and control
Functions of production planning and controlFunctions of production planning and control
Functions of production planning and control
 
Functions of production planning and control 2
Functions of production planning and control 2Functions of production planning and control 2
Functions of production planning and control 2
 
Construction submittals, their importance, and quick review steps.pdf
Construction submittals, their importance, and quick review steps.pdfConstruction submittals, their importance, and quick review steps.pdf
Construction submittals, their importance, and quick review steps.pdf
 
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdf
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdfJamco_FAI_Training_Materials_AS9102_Rev_B.pdf
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdf
 
Samaa CV
Samaa CVSamaa CV
Samaa CV
 
Muhammad Shamim up date
Muhammad Shamim up dateMuhammad Shamim up date
Muhammad Shamim up date
 
Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.
 
Commissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover PhaseCommissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover Phase
 
Quality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementQuality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract management
 
RESUME
RESUMERESUME
RESUME
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
commissioning.pdf
commissioning.pdfcommissioning.pdf
commissioning.pdf
 

Recently uploaded

electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.benjamincojr
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashidFaiyazSheikh
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualBalamuruganV28
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024EMMANUELLEFRANCEHELI
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxMustafa Ahmed
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksIJECEIAES
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdfKamal Acharya
 
1893-part-1-2016 for Earthquake load design
1893-part-1-2016 for Earthquake load design1893-part-1-2016 for Earthquake load design
1893-part-1-2016 for Earthquake load designAshishSingh1301
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxKarpagam Institute of Teechnology
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfJNTUA
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...IJECEIAES
 
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...Nitin Sonavane
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfragupathi90
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AISheetal Jain
 
Multivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxMultivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxalijaker017
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxCHAIRMAN M
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxRashidFaridChishti
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docxrahulmanepalli02
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...archanaece3
 

Recently uploaded (20)

electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdf
 
1893-part-1-2016 for Earthquake load design
1893-part-1-2016 for Earthquake load design1893-part-1-2016 for Earthquake load design
1893-part-1-2016 for Earthquake load design
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdf
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdf
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AI
 
Multivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxMultivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptx
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docx
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 

Mechanical Projects.pptx

  • 2. CONTROLLING MECHANICAL PROJECTS • When handling mechanical projects , the following sequence of tasks are to be embedded in delivering mechanical projects. Quality control/ assurance processes or documentation are highlight as a sub items: • General Processes/Activities: • 1. Progress reviews weekly and/ or monthly by means of standardized reports and software platforms. • 2. Daily Toolbox talks • 3. Contractor performance evaluation intervals and scope. • 4. Baseline Risk Assessment and risk register, • 5. Issue logs • 6. Lessons learnt log. • 7. Site Inspections
  • 3. • b. Participate in Factory Acceptance Tests (FAT) and sign-off relevant check sheets. FAT reports to be compiled and submitted to HOD • c. Equipment and materials receiving onsite. Agree on documentation required for equipment and materilas receiving. • 5. Construction and Installations. • a. Agree on works permit system. (Work at heights, confined space, hot work, and other construction permits) • b. Review all works Method Statement and QCPs. • c. Review all works HIRA documents.