1. MD TABREZ ALAM – QA/QC S.R Electrical Engineer
Diploma in Electrical Engineering)
Permanent Address: Vill Bukar P.S Kaw akol Dist. Naw adah State Bihar India,
Pin-805106
Contact : +966 534801531
E-Mail : md.tabrez_kwt@yahoo.com.com & md.tamrez.kwt@gmail.com
ASSIGNMENTS ARE OF QUALITY CONTROL AND ASSURANCE ENGINEERING WITH A LEADING ORGANISATION IN MIDDLE EAST
Middle level position in Electro-Mechanical & Instrumentation / Construction Project Management with leading
Organizations
Professional Profile
A result oriented professional with about 14 years of (8+ years of experience in overseas experience in Quality Control &
Assurance of EPC (Engineering, Procurement & Construction) Industry. (Power/Energy/Oil/Gas/M ineral/Chemical/
Infrastructure) Company.
Most recent project w as associated w ith LTSA (Larsen & Toubro Saudi Arabia), LLC - KSA as a Sr. Electrical QA/QC. Engineer
Expertise in handling static and rotating equipment such as generators, motors, gas & steam turbines, transformers, sw itchboards,
sw itchgears, battery systems and its related Electrical, Electronics and Instrument packages.
OBJECT: To seek a result driven career position with dynamic growth oriented organization, which could facilitate
application of my Technical & Management Skills to provide the organization with strategic edge over its competitors.
.
CAREER EXPERIENCES
1. from Jul’2014 to Present: Larsen & Toubro Saudi Arabia LLC
- This project execution consist of Engineering, Procurement, Construction and Commissioning as follow:- Electrical part
execution for 230/115 KV GIS, 250 M VA POWER TRANSFORM ER, GIB, SHUNT REACTOR, 230 & 115 KV OHTL, 115 KV
UG CABLES HVAC, Fire-fighting system, Telecom & instrumentation system Utility packages such as lighting, welding
receptacles and its cable tray, LV, M V, HV and fiber optic Cabling and termination. Civil execution consists of building
for the Sub-station, road works, oil collection pits. And, M echanical part consists of the execution of structural works for
Transformer shelter, Capacitor bank shelter and piping for Fire protection system.
- M y responsibilities as follows: Preparing M S, ITP, all Quality related documents such as Project quality plan, Plant
readiness program, etc. related to the above mentioned works and to strictly ensure those throughout the project
- Conducting auditing, management review meeting, Technical meeting, M OM , KOM in order to achieve the Project mile
stone through the path of Quality. M aking and submitting the Weekly, M onthly Quality Report to HO and Owner of the
with Client and Third party for all long lead
equipment for the procurement with respect to the M anufacturing ITP. Finalizing equipment checks according to the
project requirements and standards prior to the shipment.
- Assisting procurement team to ensure the procurement of all materials in line with specification, project standard
requirement and International standards such as NEC, IEC, IEEE, BS, SAES, SAM SS, TIA, EIA, BICSI etc.
- Dealing subcontractors and their workmanship with respect to project requi rements in line with the EPC contract.
- M onitoring Construction, pre-commissioning (Site Acceptance Test (SAT)) and commissioning activities in line with the
Quality requirements and International standards.
- M onitoring Request for Inspection (RFI) of the inspectors and keeping M aster punch list, NCR, Site surveillance report
Data base and clearing them in order to fulfill the customer requirements in before handing over of the project.
PROJECT : 115 KV GIS, 250 MVA POWER TRANSFORMERS, GIB, SHUNT
REACTOR, 230 & 115 KV OHTL, 115 KV UG CABLES, TELECOM.
FIRE FIGHTING, HVAC & INSZTRUMENTATION SYSTEM NEW
SUB-STATION BUILDING Replace power generation system –
Marjan Gosps (ARAMCO)
CONTRACTOR : L&T Saudi Arabia LLC.
CLIENT : SAUDI ARAMCO
Position : QA/QC S.R ELECTRICAL ENGINEER
2. from Jul’2014 to Present: Larsen & Toubro Saudi Arabia LLC
- This project execution consist of Engineering, Procurement, Construction and Commissioning as follow:- Electrical part
execution for 34.5/13.8 kV GIS, 13.8 kV AIS, 1500 KVAR Capacitor bank, 30/40/50 M VA Oil immersed Power Transformers,
2. HVAC, Fire-fighting system, Utility packages such as lighting, welding receptacl es and its cable tray, LV, M V, HV and
fiber optic Cabling and termination. Civil execution consists of building expansion for the Sub-station, road works, oil
collection pits. And, M echanical part consists of the execution of structural works for Transformer shelter, Capacitor
bank shelter and piping for Fire protection system.
- M y responsibilities as follows: Preparing M S, ITP, all Quality related documents such as Project quality plan, Plant
readiness program, etc. related to the above mentioned works and to strictly ensure those throughout the project
- Conducting auditing, management review meeting, Technical meeting, M OM , KOM in order to achieve the Project mile
stone through the path of Quality. M aking and submitting the Weekly, M onthly Quality Report to HO and Owner of the
equipment for the procurement with respect to the M anufacturing ITP. Finalizing equipment checks according to the
project requirements and standards prior to the shipment.
- Assisting procurement team to ensure the procurement of all materials in line with specification, project standard
requirement and International standards such as NEC, IEC, IEEE, BS, NFPA, SM ACNA, IBC, DIN, etc.
- Dealing subcontractors and their workmanship with respect to project requirements in line with the EPC contract.
- M onitoring Construction, pre-commissioning (Site Acceptance Test (SAT)) and commissioning activities in line with the
Quality requirements and International standards.
- M onitoring Request for Inspection (RFI) of the inspectors and keeping M aster punch list, NCR, Site surveillance report
Data base and clearing them in order to fulfill the customer requirements in before handing over of the project.
PROJECT : 34.5/13.8 kv gis sub-station expansion – al-bayroni
powerdownstream enhancement project
CONTRACTOR : L&T Saudi Arabia LLC.
CLIENT : SABIC (Saudi Arabia Basic Industries Corporation)
Position : QA/QC S.R ELECTRICAL ENGINEER
3. from March’2011 to June’2014: NESMA & PARTNERS CO. LTD. - KSA
Key Responsibilities:
- Performing asa QA/QC Engineer and inspecting erection and pre-commissioning activitiesin, Switchgear, Transformer,
bus duct, capacitor bank, M CC, DCS, AC/DC motors, VFD, PLC, generators, AC/DC distribution boards, battery systems,
utility stations, electrical panel boards, lighting, CCTV, HVAC, field instruments and related piping works & calibration,
valves, cable trays, conduits, earthling, fire-fighting M V & LV, control, Instrument, optical cable laying, testing &
terminations, etc.
- Implementing QM S at Site as per approved Quality Plan
- Identify and develop M S, ITP, RFI, Checklist, TQ, CAR, NCR, Work Procedure and all Quality record/ report/ formats
according to Project Quality M anagement Systems and compliance with ISO 9001. And strictly following International
standards (such as NEC, IEEE, IEC, BS, NEM A, NFPA & etc.).KSA standard SAES,SAM SS,TM SS, TCS, TES, SES,etc.
- Co-ordinate with client to conduct inspection at site and witnessing all testing and commissioning activitiesof the plant
according to the checklist and requirements. And conducting weekly and monthly internal and external audits for all
construction records, FAT (Factory Acceptance Reports), testing equipment calibration certificate and testing reports.
- Organize/Conduct training to Staff, Supervisors & Workmen on work procedures
- Promote awareness among all Staff; Supervisors & Subcontractorsabout site Quality requirements.
Liaise with Clients for quality related issues
- Conduct QA/QC tests on materials/inspection as per ITP
- Identify & conduct M ock-up at site for critical activity’s
- M onitor Calibration of all testing & measuring equipment and Conduct Product Quality Assessment as per plan
- Coordinating for early disposal of non-conformance (NCR).
- Develop & implement Corrective Action and Preventive Action Plans
- Organizing and conducting Quality auditswith the co-ordination of all concerned
Identify & implement best industry practice and Prepare methodology statement for QA/QC work
- To co-ordinate QA/QC team for implementing quality control measures and Quality Assurance Systems at sites
To Ensure Periodic site visits for reviewing quality of work and material
To provide technical support and co-ordination to QA/QC team for providing solution related to QA/QC.
- To guide QA/QC team in setting up and maintaining material testing laboratory, calibration of laboratory equipment and
other measuring equipment at site
Witness the tests of all construction activitiesat site and maintain the proper documentation Responsible for Site,
Quality control and Quality Assurance of the Site work.
- Hands on experience in implementing the QA/QC plans and prepara tion of QA/QC inspection reports.
- Preparation of quality assurance plan matching with BOQ and technical specification.
Quality inspection for finishing items
- Ensuring contractor is following all specifications and methodologies as per project quality plan.
3. PROJECT : Sadara & Jabal Umar Project
CONTRACTOR : Nesma & Partners Co. Ltd.
CLIENT : Sadara & Jabal Umar Project
DESIGNATION : ELECTRICAL ENGINEER (QA/QC)
4. From Jul’2008 to March’2010,SK ENGINEERING & CONSTRUCTION CO. LTD KUWAIT
Key Responsibilities:
- Responsible for Quality control and Quality Assurance of the Site work.
- This project execution, cable tray, cable laying, earthling, lighting, fire alarm, voice evacuation, cable termination,
testing, pre-commissioning and commissioning activities
- Auxiliary Boiler plant project execution consist of Instrument tubes, local instruments, solenoid valve, pressure control
valve, motorized valve, transmitters, Electric/Pneumatic equipment (control valve) and its junction boxes, cable tray
installation, earthling, cable laying, cable termination and its testing and commissioning activities.
- Witness all testing (such as winding insulation test, polarization index value test for motors & generators, Transformer
testing, motor solo run test, insulation & HV test for all types of cables, pneumatic and hydro pressure testing for the
instrument lines, calibration of electrical devices and instruments and etc.) for related construction work activities and
keeping all records as per QM P.
- prepares the M ethod statement (M S), Inspection test plan (ITP), and checklists for the site inspection of every sub -
system and systems. And strictly practicing ISO 9001 quality management system related procedures and
requirements.
- Conform to technical and quality standards by the regular inspections and monitors as per the project specifications
and requirements of all procured materials, vendor equipment and its third party inspection activities.
- Conduct follow-up and completion inspection for the successful construction completion parts and its final punch -lists
with respect to project specifications, requirements, and international standards (such as NEC, IEEE, IEC, BS, NEM A,
NFPA & etc.). If, work doesn’t meet the quality management plan (QM P) then will track the NCR log (Non-Conformance
Report) and verify until that the NCR has been corrected.
- Responsible for Internal and external audits to ensure compliance with company M anagement System procedures for
all construction records, FAT (Factory Acceptance Reports), testing equipment calibration certificate and testing
reports.
- Preparation of final red built drawing in accordance to actual field conditio n of construction then incorporate
construction management mark-up and issue the Final as-built to the company.
- Hands on experience in implementing the QA/QC plans and preparation of QA/QC inspection reports.
- Preparation of quality assurance plan matching with BOQ and technical specification. And quality inspection for
finishing items
- Preparation and M aintaining the document for Integrated M anagement system procedure as per specification of ISO -
9001, ISO-14001 and OHSAS-18001 related to the QA/QC department
- M aintaining Calibration of all lab Equipment.
- Preparing / maintaining the Project Quality Plan and managing the development and maintenance of any sub -project
Quality Plans.
- Producing Livening up Notice for the successful and tested completion parts of construction via sub-systems and
systems.
- Preparing and submitting the final turn over package (TOP) and certificates to the customer after the ultimate
completion of the project.
PROJECT : Gathering Center (GC-14)
CLIENT : KOC (KUWAIT OIL COMPANY)
CONTRACTOR : SK ENGINEERING & CONSTRUCTION CO LTD (KUWAIT)
DESIGNATION : E&I (QA/QC) INSPECTOR
5. From SEP’2006 to March’2008 : PETROFAC, OMAN
Key Responsibilities:
- Preparing the M S, ITP and JSA for the project. Keep on inspecting with respect to them and auditing all reports and
documents of construction and pre-commissioning activities with respect to M S and ITP.
- M ain responsibilitiesare co-ordinate with the client QA/QC representatives for do the inspections activities; work front
clearances and technical clarifications.
- Auditing all reports and documents in routine manner and take necessary steps to improve the quality of the project if
any irregularities found. Raising NCR to technical execution management if any malpracti ces or poor workmanship
found in the project execution.
4. - Checking and approving the equipment and materialsin accordance with in conformity to international standards and
specifications such as NEC, IEEE, IEC, BS, NEM A, NFPA & etc. Also strictly following the project specifications and
standard requirements in the project execution.
- Playing vital role in mechanical completion team of the project after the successful construction in every sub-system
and systems for the final dossier submission to the client.
- Hands on experience in implementing the QA/QC plans and preparation of QA/QC inspection r eports.
- Preparation of quality assurance plan matching with BOQ and technical specification.
Quality inspection for finishing items
- Preparation and M aintaining the document for Integrated M anagement system procedure as per specification of ISO -
9001,ISO-14001 and OHSAS-18001 related to the QA/QC department
- Preparing / maintaining the Project Quality Plan and managing the development and maintenance of any sub -project
Quality Plans.
- Responsible for Internal and external audits to ensure compliance with company M anagement System procedures.
- Serves as Quality Assurance Coordinator within the Project M anagement Team
PROJECT : HARWEEL PROJECT
CLIENT : PDO
CONTRACTOR : PETROFAC, OMAN
DESIGNATION : E&I (QA/QC)INSPECTOR
6. from May’2003 to June’2006 : BLUE STAR, INDIA
Key Deliverables:
- Actively participating in the pre-commissioning activitiesof the project and responsibilities include co-ordination with
the client QA/QC representative for inspection activities; work front clearance, technical clarification, and schedule
reviews for ensure the quality of the project.
- Approving the equipment and materialsfor the construction in accordance with the standards and specifications (such
as NEC, IEEE, IEC, BS, NEM A, NFPA & etc.) of the company and client.
- Raising NCR to the client and sub-contractors regarding quality issues if any while the project execution at the field
and after takes necessary steps to accomplish the quality standard of the project in according to the company and
client standard specifications and requirements.
- Providing sufficient feedback to company and client representatives regarding the work progress, manpower and
material deployments.
- Also raising the issues regarding the information from project execution team and responding through technical
queries on discussion with client.
- Updating and reviewing the daily, weekly meeting outcomes and ensuring the project execution path as per the pre-
planned schedule.
Company : Blue Star Limited
Duration : May 2003 to June 2006
Position Held : E&I Site Engineer
Location : Bombay, India
7. from March’2000 to May’2003 : L&T, INDIA
Responsibility Involves:
- Assisting the project execution team in material identification, fabrication and erection of
- Preparing the M S, ITP and JSA for the project. Keep on inspecting with respect to them and auditing all reports and
documents of construction and pre-commissioning activities with respect to M S and ITP.
- Coordinating with the client and customer on clarifications of technical queries, solution proposals and variations.
- M ain responsibilities are includes approving the equipment and materials with respect to International standards and
specifications (follows the codes of NEC, IEEE, IEC, BS, NEM A, NFPA & etc.). And doing daily routine inspections and
final walk-down with the client and company.
- Preparing the work plan, execution schedule and work progress reports i n daily as well as monthly basis are
some of the main responsibilities.
- M onitoring and reporting work progress against scheduled tasks and driving the workforce to achieve the mile stones
as per schedule.
- Preparing man power reports, schedule reports, minutes of meeting reports, rigging plans, method statements on
needful basis.
5. Company : Larsen & Toubro Limited Engineers – ECC Construction Group
Duration : March 2000 to May 2003
Position Held : E&I Supervisor
Location : Jamshedpur, India
- EDUCATION & PROFESSIONAL AFFILIATIONS
Degree : Diploma in Electrical Engineering)
College : Alkabeer Polytechnic
Period : 1996 - 1999
TECHNICAL SKILLS
PROFICIENCY FORTE
Quality Control & Assurance
Ensuring adherence to quality standards and maintaining all related documents. Identify areas of quality failures and take
steps to rectify the system.
Practicing quality standards with key emphasis on improving quality.
Assisting execution representative during walk downs and inspection with customer.
Site & Construction M anagement
Supervise all construction activities including providing technical inputs for methodologies of construction & co -ordination
with site management activities.
Identify & develop vendor source for achieving cost effective purchase of equipment, accessories, & timely delivery so as
to minimize project cost.
Ensure that equipment/materials received are in accordance with the quantity & quality.
Implement QA / QC procedures, Total Quality Management principles, and checks. Conduct Audits to ensure adherence to
Quality and Safety norms across the entire course of project execution.
Co-ordination
Network with architects/ consultants to ascertain technical specifications, construction related essentials, based on the
prevalent rules.
Relationship management with statutory authorities for availing mandatory sanctions.
Installation, Commissioning & Handing Over
Supervise installation and commissioning of Equipment, followed by trial runs.
Identify project bottlenecks and undertaking corrective measures.
Ensure effective site management and discipline to ensure safe & timely execution of the projects.
Installation and commission of equipment, followed by plant trial runs meeting targeted performance/ quality & quantity
parameters and thereafter handing over of the plant.
COMPUTER PROFICIENCY
MS Office - Good Level
AutoCAD - fair Level
PROFESSIONAL SKILLs
1. Possess the ability to work with new technologies and apply them to specific contexts.
2. Maintenance of good relationship with superiors and subordinates.
3. Ability to learn and adapt to any situation and keep a positive outlook.
4. I believe in continuous hardworking, learning and adapting myself to the evolving external environment.
5. Follow a disciplined and time-managed approach for any activity.
PERSONAL DOSSIER
AREA OF INTEREST:
To work in Mega structures and Challenging projects With Big and Reputed Organizations.
PERSONAL DETAILS
Father’s Name : Md Mahboob Alam
Date of Birth : 25.11.1981
Gender : Male
Permanent Address : Bukar Nawadah Bihar India.
6. Linguistic Abilities : English, Hindi, Arbic
Passport Details : M2077950
Marital Status : Single
Strength : Positive attitude, confidence, hard work and etc.
Hobbies : Listening to music, Sports, Photography etc.
Nationality : Indian
Driving License : Authorized in INDIA
Mobility : Anywhere
DECLARATION
I hereby state that the above mentioned details are true to the best of my knowledge.
Yours Truly
Place: Jubail, KSA
Date: FEB/2016 Md Tabrez ALAM