Mr. Sunil Gopinath is a Manager of Projects with over 12 years of experience in the MEP construction industry, specializing in HVAC. He is currently working for ETA Engineering Pvt Ltd in Kochi, Kerala, India and is seeking a management position where he can utilize his expertise. He has managed multiple commercial construction projects with contract values between Rs. 2-15 crores. His responsibilities have included overall project execution, interacting with clients, scheduling, cost control, and ensuring timely completion.
1. SUNIL GOPINATH Page 1
CURRICULUM VITEA
Mr.Sunil Gopinath
Sriram
1/578A(PRA16)
Kundanur kara
Kakannad
Kochi-30,
Kerala
Mobile: 0091-9562998961
Email-gopinath.sunil@yahoo.com
Presently working in MEP Company as Manager Projects and having more
than twelve years experience in the industry.
I have diversified vast professional experience in the MEP construction industry mainly in HVAC. Have
managed and worked with complex competitive challenge projects and have implemented them
successfully with efficiency and quality. Have expertise in project scheduling in MS Project
OBJECTIVE:
Seeking a Management position in competitive construction projects where I could prove my expertise
and vast experience gained in this area.
EDUCATIONALQUALIFICATION:
Bachelor of Technology – Mechanical
Kannur University,
ORGANIZATIONAL EXPERIENCE:
M/s ETA engineering pvt ltd January 2012 to till present
Desig n a t i o n: Manager-Projects
Responsibilities:
1. Overall project execution as per the tender specification, relevant standards, approved shop drawing
and as per the client requirements.
2. Interact with client and consultants for the various project requirements.
3. To ensure submission of the material submittal and drawing on time.
4. Finalization of sub-contractor for the project.
5. To ensure the material delivery in timely manner in coordination procurement team.
6. To monitor and completion of work as per the project schedule to meet the timeline as per the work
order.
7. To ensure billing as per the billing cycle and payment collection from the Client.
8. To monitor and control the project cost.
2. SUNIL GOPINATH Page 2
9. To ensure project related variation of items are properly highlighted and approved by the client.
Project details:-
Project: Centre S quare Mall
Position: Project Manager
Total contract value:15 crore
Brief description of project:-
The project which was executed, commissioned and handed over to client with total contract value of
more than 14crore. Project consisted of services HVAC, fire fighting and HT,LT electrical works.
Project: Q1 Mall
Position: Project M anager
Total contract value:12 cr.
Brief description of project:-
The one of the on-going projects which consists of all services HVAC, fire fighting, plumbing, drainage
and electrical works.
Project: Lenarth shopping Mall
Position: Project Manager
Total contract value:6 crore
Brief description of project:
The one of the on-going projects which consists of all services HVAC, fire fighting, plumbing, drainage
works.
Project: Infra Futura Position:
Project manager
Total contract value:2 cr.
Brief description of project:
The one of the on-going projects which consist of HVAC works.
M/s Al Tamez Middle East WLL- Qatar September 2010 to Jan2012
Desig n a t i o n: Mechanical coordinator -projects
Responsibilities:
1. Overall project execution as per the tender specification, relevant standards, approved shop drawing
and as per the client requirements.
2. Interact with client and consultants for the various project requirements.
3. SUNIL GOPINATH Page 3
3. To ensure submission of the material submittal and drawing on time.
4. Finalization of sub-contractor for the project.
5. To ensure the material delivery in timely manner in coordination procurement team.
6. To monitor and completion of work as per the project schedule to meet the timeline as per the w ork
order.
7. To ensure billing as per the billing cycle and payment collection from the Client.
8. To monitor and control the project cost.
9. To ensure project related variation of items are properly highlighted and approved by the client.
Project: Extension of existing documentary channel, Al Jazzerra
Total Contract value : Qr 1.5million
Brief description of project:
The project was a building extension project of existing documentary channel of Al Jazeera TV station.
Our company bagged the whole MEP portion were M/s Galfar Al misnad were our main civil contractor
and I was in charge of the Mechanical part of the project. Air conditioning unit were packaged air
conditioning unit with humidity control system for the server room. Firefighting system was connected to
the existing project with some of the rooms being protected by FM 200 fire suppression system. Plumbing
and drainage were connected to the existing building.
M/s Voltas –Pune March 08 to August 10
Desig n a t i o n: Area Manager- Projects
Responsibilities:
1. Overall project execution as per the tender specification, relevant standards, approved shop drawing
and as per the client requirements.
2. Interact with client and consultants for the various project requirements.
3. To ensure submission of the material submittal and drawing on time.
4. To ensure the material delivery in timely manner in coordination procurement team.
5. To monitor and completion of work as per the project schedule to meet the timeline as per the work
order.
6. To ensure billing as per the billing cycle and payment collection from the Client.
7. To monitor and control the project cost.
8. To ensure project related variation of items are properly highlighted and approved by the client.
4. SUNIL GOPINATH Page 4
Project:Empire Mall
Position: Project Manager
Total contract value: 16 crore
Brief description of project:
The project was mall construction project were Voltas bagged the Mechanical (firefighting and plumbing)
and electrical (LT and HT).The project was two basement and two floor project. The fire fighting system
consist of sprinkler and hydrant network in the both the basement and corridor of the main shopping
floor and pump for the system in the basement. The building had external fire fighting hydrant system.
Plumbing with GI piping, installation of plumbing pumps and sanitary fixture were in plumbing scope of
work. Drainage part consists of UPVC drainage pipe from sanitary fixture to the external drainage system.
Electrical part of the system consists of LT work from the transformer to the building and HT work from
the substation to the transformer. Total load of the electrical system were 7.7 MVA.
Project: Hotel Westin
Position: Project Manager
Total contract value: 11crore
Brief description of project:
The project was five star hotel project in Koregoan park,Pune. The project was 352 hotel room project
and the M/s Spectral Delhi were the consultant for the project. Our scope of work consist only HVAC
service. The whole capacity of the project was of 1500 TR with 2 No. of centrifugal chiller, 367
No.FCUs,67 No. AHUs and Ventilation consist of 42 No. toilet exhaust fans, smoke exhaust fans,
pressurization fans. Kitchen scrubber units 8No.
Project: Hotel Radisson Position:
Project Manager
Total contract value: 3 crore
Brief description of project:
The project was three star hotel project in Pune.The project was 150 hotel room project with HVAC
service. The project had HVAC load of 300 TR with 2 No. of screw chiller, 154 No.FCUs, 15No.AHUs.
Ventilation consists of 13No.toilet exhaust fans, smoke exhaust fans.
M/s ETA -EMIRATESTECHNICALASSOCIATES, AUGUST 2006 to February 08
ABU DHABI, UAE
Desig n a t i o n: Mechanical engineer
PROJECT: Between two bridges, ABU DHABI.
RESPONSIBILITIES:
Coordinating with Civil Contractors for the MEP provisions in Civil works.
Furnishing the inputs to create the Builders work drawings.
Testing and commissioning of HVAC equipment.
5. SUNIL GOPINATH Page 5
PROJECT: ABUDHABI NATIONAL EXHIBITION CENTER, ABU DHABI
RESPONSIBILITIES:
Testing and commissioning of HVAC equipment.
M/sHADENINTERNATIONALLIMITED, MARCH 2004 TO April 2006
BANGLORE, INDIA
Worked as a JUNIOR ENGINEER
PROJECT: INTEL INDIA PRIVATE LTD
RESPONSIBILITIES:
Operation and maintenance of chiller plant consisting of water and air cooled chiller.
Maintenance of diesel generator, sewage treatment plant and water treatment plant
Overall maintenance of building Air conditioning equipments like precision air conditioning unit,
split unit, air handling units ,cooling towers.
Computerproficiency: Knowledge of MS project and other office programs.
PASSPORTDETAILS:
Passport No : M 6 5 6 7 3 6 9
Date of issue : 24/02/15
Date of Expiry : 23/02/25
Issued place : Regional Passport, Trivandrum
PERSONNELDETAILS:
Date Of Birth : 25-04-1980
Nationality : Indian
Languages Known : English, Hindi, and Malayalam.