SUNIL GOPINATH Page 1
CURRICULUM VITEA
Mr.Sunil Gopinath
Sriram
1/578A(PRA16)
Kundanur kara
Kakannad
Kochi-30,
Kerala
Mobile: 0091-9562998961
Email-gopinath.sunil@yahoo.com
Presently working in MEP Company as Manager Projects and having more
than twelve years experience in the industry.
I have diversified vast professional experience in the MEP construction industry mainly in HVAC. Have
managed and worked with complex competitive challenge projects and have implemented them
successfully with efficiency and quality. Have expertise in project scheduling in MS Project
OBJECTIVE:
Seeking a Management position in competitive construction projects where I could prove my expertise
and vast experience gained in this area.
EDUCATIONALQUALIFICATION:
Bachelor of Technology – Mechanical
Kannur University,
ORGANIZATIONAL EXPERIENCE:
M/s ETA engineering pvt ltd January 2012 to till present
Desig n a t i o n: Manager-Projects
Responsibilities:
1. Overall project execution as per the tender specification, relevant standards, approved shop drawing
and as per the client requirements.
2. Interact with client and consultants for the various project requirements.
3. To ensure submission of the material submittal and drawing on time.
4. Finalization of sub-contractor for the project.
5. To ensure the material delivery in timely manner in coordination procurement team.
6. To monitor and completion of work as per the project schedule to meet the timeline as per the work
order.
7. To ensure billing as per the billing cycle and payment collection from the Client.
8. To monitor and control the project cost.
SUNIL GOPINATH Page 2
9. To ensure project related variation of items are properly highlighted and approved by the client.
Project details:-
Project: Centre S quare Mall
Position: Project Manager
Total contract value:15 crore
Brief description of project:-
The project which was executed, commissioned and handed over to client with total contract value of
more than 14crore. Project consisted of services HVAC, fire fighting and HT,LT electrical works.
Project: Q1 Mall
Position: Project M anager
Total contract value:12 cr.
Brief description of project:-
The one of the on-going projects which consists of all services HVAC, fire fighting, plumbing, drainage
and electrical works.
Project: Lenarth shopping Mall
Position: Project Manager
Total contract value:6 crore
Brief description of project:
The one of the on-going projects which consists of all services HVAC, fire fighting, plumbing, drainage
works.
Project: Infra Futura Position:
Project manager
Total contract value:2 cr.
Brief description of project:
The one of the on-going projects which consist of HVAC works.
M/s Al Tamez Middle East WLL- Qatar September 2010 to Jan2012
Desig n a t i o n: Mechanical coordinator -projects
Responsibilities:
1. Overall project execution as per the tender specification, relevant standards, approved shop drawing
and as per the client requirements.
2. Interact with client and consultants for the various project requirements.
SUNIL GOPINATH Page 3
3. To ensure submission of the material submittal and drawing on time.
4. Finalization of sub-contractor for the project.
5. To ensure the material delivery in timely manner in coordination procurement team.
6. To monitor and completion of work as per the project schedule to meet the timeline as per the w ork
order.
7. To ensure billing as per the billing cycle and payment collection from the Client.
8. To monitor and control the project cost.
9. To ensure project related variation of items are properly highlighted and approved by the client.
Project: Extension of existing documentary channel, Al Jazzerra
Total Contract value : Qr 1.5million
Brief description of project:
The project was a building extension project of existing documentary channel of Al Jazeera TV station.
Our company bagged the whole MEP portion were M/s Galfar Al misnad were our main civil contractor
and I was in charge of the Mechanical part of the project. Air conditioning unit were packaged air
conditioning unit with humidity control system for the server room. Firefighting system was connected to
the existing project with some of the rooms being protected by FM 200 fire suppression system. Plumbing
and drainage were connected to the existing building.
M/s Voltas –Pune March 08 to August 10
Desig n a t i o n: Area Manager- Projects
Responsibilities:
1. Overall project execution as per the tender specification, relevant standards, approved shop drawing
and as per the client requirements.
2. Interact with client and consultants for the various project requirements.
3. To ensure submission of the material submittal and drawing on time.
4. To ensure the material delivery in timely manner in coordination procurement team.
5. To monitor and completion of work as per the project schedule to meet the timeline as per the work
order.
6. To ensure billing as per the billing cycle and payment collection from the Client.
7. To monitor and control the project cost.
8. To ensure project related variation of items are properly highlighted and approved by the client.
SUNIL GOPINATH Page 4
Project:Empire Mall
Position: Project Manager
Total contract value: 16 crore
Brief description of project:
The project was mall construction project were Voltas bagged the Mechanical (firefighting and plumbing)
and electrical (LT and HT).The project was two basement and two floor project. The fire fighting system
consist of sprinkler and hydrant network in the both the basement and corridor of the main shopping
floor and pump for the system in the basement. The building had external fire fighting hydrant system.
Plumbing with GI piping, installation of plumbing pumps and sanitary fixture were in plumbing scope of
work. Drainage part consists of UPVC drainage pipe from sanitary fixture to the external drainage system.
Electrical part of the system consists of LT work from the transformer to the building and HT work from
the substation to the transformer. Total load of the electrical system were 7.7 MVA.
Project: Hotel Westin
Position: Project Manager
Total contract value: 11crore
Brief description of project:
The project was five star hotel project in Koregoan park,Pune. The project was 352 hotel room project
and the M/s Spectral Delhi were the consultant for the project. Our scope of work consist only HVAC
service. The whole capacity of the project was of 1500 TR with 2 No. of centrifugal chiller, 367
No.FCUs,67 No. AHUs and Ventilation consist of 42 No. toilet exhaust fans, smoke exhaust fans,
pressurization fans. Kitchen scrubber units 8No.
Project: Hotel Radisson Position:
Project Manager
Total contract value: 3 crore
Brief description of project:
The project was three star hotel project in Pune.The project was 150 hotel room project with HVAC
service. The project had HVAC load of 300 TR with 2 No. of screw chiller, 154 No.FCUs, 15No.AHUs.
Ventilation consists of 13No.toilet exhaust fans, smoke exhaust fans.
M/s ETA -EMIRATESTECHNICALASSOCIATES, AUGUST 2006 to February 08
ABU DHABI, UAE
Desig n a t i o n: Mechanical engineer
PROJECT: Between two bridges, ABU DHABI.
RESPONSIBILITIES:
Coordinating with Civil Contractors for the MEP provisions in Civil works.
Furnishing the inputs to create the Builders work drawings.
Testing and commissioning of HVAC equipment.
SUNIL GOPINATH Page 5
PROJECT: ABUDHABI NATIONAL EXHIBITION CENTER, ABU DHABI
RESPONSIBILITIES:
Testing and commissioning of HVAC equipment.
M/sHADENINTERNATIONALLIMITED, MARCH 2004 TO April 2006
BANGLORE, INDIA
Worked as a JUNIOR ENGINEER
PROJECT: INTEL INDIA PRIVATE LTD
RESPONSIBILITIES:
Operation and maintenance of chiller plant consisting of water and air cooled chiller.
Maintenance of diesel generator, sewage treatment plant and water treatment plant
Overall maintenance of building Air conditioning equipments like precision air conditioning unit,
split unit, air handling units ,cooling towers.
Computerproficiency: Knowledge of MS project and other office programs.
PASSPORTDETAILS:
Passport No : M 6 5 6 7 3 6 9
Date of issue : 24/02/15
Date of Expiry : 23/02/25
Issued place : Regional Passport, Trivandrum
PERSONNELDETAILS:
Date Of Birth : 25-04-1980
Nationality : Indian
Languages Known : English, Hindi, and Malayalam.

More Related Content

What's hot (20)

HASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMPHASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMP
 
CV OF MVV
CV OF MVVCV OF MVV
CV OF MVV
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
Sr[1].Mech. Eng. Ayad Anad CV 3
Sr[1].Mech. Eng. Ayad Anad CV 3Sr[1].Mech. Eng. Ayad Anad CV 3
Sr[1].Mech. Eng. Ayad Anad CV 3
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
KRT Resume 29th July 2015
KRT Resume 29th July 2015KRT Resume 29th July 2015
KRT Resume 29th July 2015
 
Ashraf Suleiman.
Ashraf Suleiman.Ashraf Suleiman.
Ashraf Suleiman.
 
Amulya Gupta CV
Amulya Gupta CVAmulya Gupta CV
Amulya Gupta CV
 
Engr._Fahad_CV[1]
Engr._Fahad_CV[1]Engr._Fahad_CV[1]
Engr._Fahad_CV[1]
 
Omni Job Openings Dec 2101
Omni Job Openings Dec 2101Omni Job Openings Dec 2101
Omni Job Openings Dec 2101
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CV
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
Krishna kumar cv
Krishna kumar cvKrishna kumar cv
Krishna kumar cv
 
1 Essam CV
1 Essam CV1 Essam CV
1 Essam CV
 
eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)
 
RANJI -CV
RANJI -CVRANJI -CV
RANJI -CV
 
JAY CV 2016
JAY CV 2016JAY CV 2016
JAY CV 2016
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
CV HASSAN SHARIF ARCHITECT DIYAR
CV HASSAN SHARIF ARCHITECT DIYARCV HASSAN SHARIF ARCHITECT DIYAR
CV HASSAN SHARIF ARCHITECT DIYAR
 
Ranjith_Kumar R - CV
Ranjith_Kumar R - CVRanjith_Kumar R - CV
Ranjith_Kumar R - CV
 

Viewers also liked (13)

Shaji_new
Shaji_newShaji_new
Shaji_new
 
BUSIA 1
BUSIA 1BUSIA 1
BUSIA 1
 
01.maquinas simples grado 8
01.maquinas simples grado 801.maquinas simples grado 8
01.maquinas simples grado 8
 
License
LicenseLicense
License
 
OkRu Mediakit
OkRu MediakitOkRu Mediakit
OkRu Mediakit
 
Ivan Chan I
Ivan Chan IIvan Chan I
Ivan Chan I
 
звіт дир. 2016р.
звіт дир. 2016р.звіт дир. 2016р.
звіт дир. 2016р.
 
PPL Profile
PPL ProfilePPL Profile
PPL Profile
 
Tejal_D
Tejal_DTejal_D
Tejal_D
 
bhargav resume[1]
bhargav resume[1]bhargav resume[1]
bhargav resume[1]
 
Presentation Zambia 27 Sep 2016
Presentation Zambia 27 Sep 2016Presentation Zambia 27 Sep 2016
Presentation Zambia 27 Sep 2016
 
CV_MILADA
CV_MILADACV_MILADA
CV_MILADA
 
Resume
ResumeResume
Resume
 

Similar to CURRICULUM VITAE-SUNIL GOPINATH (2)

Similar to CURRICULUM VITAE-SUNIL GOPINATH (2) (20)

NASEER CV JUNE 2015
NASEER CV JUNE 2015NASEER CV JUNE 2015
NASEER CV JUNE 2015
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
Anjum Mushtaque CV2- Intl
Anjum Mushtaque CV2- IntlAnjum Mushtaque CV2- Intl
Anjum Mushtaque CV2- Intl
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
Cv ahmad harith.
Cv   ahmad harith.Cv   ahmad harith.
Cv ahmad harith.
 
CV- Project Control Manager PMP
CV- Project Control Manager PMPCV- Project Control Manager PMP
CV- Project Control Manager PMP
 
RESUME - AMB- N
RESUME - AMB- NRESUME - AMB- N
RESUME - AMB- N
 
new 5 tanmay_CV
new 5 tanmay_CV new 5 tanmay_CV
new 5 tanmay_CV
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)
 
Resume (Sunil Kumar)
Resume (Sunil Kumar)Resume (Sunil Kumar)
Resume (Sunil Kumar)
 
Annexure - Projects
Annexure - ProjectsAnnexure - Projects
Annexure - Projects
 
Tony_Van_Grembergen
Tony_Van_GrembergenTony_Van_Grembergen
Tony_Van_Grembergen
 
zk resume
zk resumezk resume
zk resume
 
cv amr
cv amrcv amr
cv amr
 
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATIONGRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
 
CV
CVCV
CV
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
Resume_Anjanna
Resume_AnjannaResume_Anjanna
Resume_Anjanna
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 

CURRICULUM VITAE-SUNIL GOPINATH (2)

  • 1. SUNIL GOPINATH Page 1 CURRICULUM VITEA Mr.Sunil Gopinath Sriram 1/578A(PRA16) Kundanur kara Kakannad Kochi-30, Kerala Mobile: 0091-9562998961 Email-gopinath.sunil@yahoo.com Presently working in MEP Company as Manager Projects and having more than twelve years experience in the industry. I have diversified vast professional experience in the MEP construction industry mainly in HVAC. Have managed and worked with complex competitive challenge projects and have implemented them successfully with efficiency and quality. Have expertise in project scheduling in MS Project OBJECTIVE: Seeking a Management position in competitive construction projects where I could prove my expertise and vast experience gained in this area. EDUCATIONALQUALIFICATION: Bachelor of Technology – Mechanical Kannur University, ORGANIZATIONAL EXPERIENCE: M/s ETA engineering pvt ltd January 2012 to till present Desig n a t i o n: Manager-Projects Responsibilities: 1. Overall project execution as per the tender specification, relevant standards, approved shop drawing and as per the client requirements. 2. Interact with client and consultants for the various project requirements. 3. To ensure submission of the material submittal and drawing on time. 4. Finalization of sub-contractor for the project. 5. To ensure the material delivery in timely manner in coordination procurement team. 6. To monitor and completion of work as per the project schedule to meet the timeline as per the work order. 7. To ensure billing as per the billing cycle and payment collection from the Client. 8. To monitor and control the project cost.
  • 2. SUNIL GOPINATH Page 2 9. To ensure project related variation of items are properly highlighted and approved by the client. Project details:- Project: Centre S quare Mall Position: Project Manager Total contract value:15 crore Brief description of project:- The project which was executed, commissioned and handed over to client with total contract value of more than 14crore. Project consisted of services HVAC, fire fighting and HT,LT electrical works. Project: Q1 Mall Position: Project M anager Total contract value:12 cr. Brief description of project:- The one of the on-going projects which consists of all services HVAC, fire fighting, plumbing, drainage and electrical works. Project: Lenarth shopping Mall Position: Project Manager Total contract value:6 crore Brief description of project: The one of the on-going projects which consists of all services HVAC, fire fighting, plumbing, drainage works. Project: Infra Futura Position: Project manager Total contract value:2 cr. Brief description of project: The one of the on-going projects which consist of HVAC works. M/s Al Tamez Middle East WLL- Qatar September 2010 to Jan2012 Desig n a t i o n: Mechanical coordinator -projects Responsibilities: 1. Overall project execution as per the tender specification, relevant standards, approved shop drawing and as per the client requirements. 2. Interact with client and consultants for the various project requirements.
  • 3. SUNIL GOPINATH Page 3 3. To ensure submission of the material submittal and drawing on time. 4. Finalization of sub-contractor for the project. 5. To ensure the material delivery in timely manner in coordination procurement team. 6. To monitor and completion of work as per the project schedule to meet the timeline as per the w ork order. 7. To ensure billing as per the billing cycle and payment collection from the Client. 8. To monitor and control the project cost. 9. To ensure project related variation of items are properly highlighted and approved by the client. Project: Extension of existing documentary channel, Al Jazzerra Total Contract value : Qr 1.5million Brief description of project: The project was a building extension project of existing documentary channel of Al Jazeera TV station. Our company bagged the whole MEP portion were M/s Galfar Al misnad were our main civil contractor and I was in charge of the Mechanical part of the project. Air conditioning unit were packaged air conditioning unit with humidity control system for the server room. Firefighting system was connected to the existing project with some of the rooms being protected by FM 200 fire suppression system. Plumbing and drainage were connected to the existing building. M/s Voltas –Pune March 08 to August 10 Desig n a t i o n: Area Manager- Projects Responsibilities: 1. Overall project execution as per the tender specification, relevant standards, approved shop drawing and as per the client requirements. 2. Interact with client and consultants for the various project requirements. 3. To ensure submission of the material submittal and drawing on time. 4. To ensure the material delivery in timely manner in coordination procurement team. 5. To monitor and completion of work as per the project schedule to meet the timeline as per the work order. 6. To ensure billing as per the billing cycle and payment collection from the Client. 7. To monitor and control the project cost. 8. To ensure project related variation of items are properly highlighted and approved by the client.
  • 4. SUNIL GOPINATH Page 4 Project:Empire Mall Position: Project Manager Total contract value: 16 crore Brief description of project: The project was mall construction project were Voltas bagged the Mechanical (firefighting and plumbing) and electrical (LT and HT).The project was two basement and two floor project. The fire fighting system consist of sprinkler and hydrant network in the both the basement and corridor of the main shopping floor and pump for the system in the basement. The building had external fire fighting hydrant system. Plumbing with GI piping, installation of plumbing pumps and sanitary fixture were in plumbing scope of work. Drainage part consists of UPVC drainage pipe from sanitary fixture to the external drainage system. Electrical part of the system consists of LT work from the transformer to the building and HT work from the substation to the transformer. Total load of the electrical system were 7.7 MVA. Project: Hotel Westin Position: Project Manager Total contract value: 11crore Brief description of project: The project was five star hotel project in Koregoan park,Pune. The project was 352 hotel room project and the M/s Spectral Delhi were the consultant for the project. Our scope of work consist only HVAC service. The whole capacity of the project was of 1500 TR with 2 No. of centrifugal chiller, 367 No.FCUs,67 No. AHUs and Ventilation consist of 42 No. toilet exhaust fans, smoke exhaust fans, pressurization fans. Kitchen scrubber units 8No. Project: Hotel Radisson Position: Project Manager Total contract value: 3 crore Brief description of project: The project was three star hotel project in Pune.The project was 150 hotel room project with HVAC service. The project had HVAC load of 300 TR with 2 No. of screw chiller, 154 No.FCUs, 15No.AHUs. Ventilation consists of 13No.toilet exhaust fans, smoke exhaust fans. M/s ETA -EMIRATESTECHNICALASSOCIATES, AUGUST 2006 to February 08 ABU DHABI, UAE Desig n a t i o n: Mechanical engineer PROJECT: Between two bridges, ABU DHABI. RESPONSIBILITIES: Coordinating with Civil Contractors for the MEP provisions in Civil works. Furnishing the inputs to create the Builders work drawings. Testing and commissioning of HVAC equipment.
  • 5. SUNIL GOPINATH Page 5 PROJECT: ABUDHABI NATIONAL EXHIBITION CENTER, ABU DHABI RESPONSIBILITIES: Testing and commissioning of HVAC equipment. M/sHADENINTERNATIONALLIMITED, MARCH 2004 TO April 2006 BANGLORE, INDIA Worked as a JUNIOR ENGINEER PROJECT: INTEL INDIA PRIVATE LTD RESPONSIBILITIES: Operation and maintenance of chiller plant consisting of water and air cooled chiller. Maintenance of diesel generator, sewage treatment plant and water treatment plant Overall maintenance of building Air conditioning equipments like precision air conditioning unit, split unit, air handling units ,cooling towers. Computerproficiency: Knowledge of MS project and other office programs. PASSPORTDETAILS: Passport No : M 6 5 6 7 3 6 9 Date of issue : 24/02/15 Date of Expiry : 23/02/25 Issued place : Regional Passport, Trivandrum PERSONNELDETAILS: Date Of Birth : 25-04-1980 Nationality : Indian Languages Known : English, Hindi, and Malayalam.