Executive Summary
B. Tech in Electrical engineering having 13.5 Years of Experience in Project &
Maintenance for internal/external electrification & MEP services of large offices/ IT
Park/ Hospital/ Industrial/ commercial /residential & High-rise building and Airport
projects also.
Work Experience  Currently I am working as a Project Manager MEP in Turner project management (I)
Pvt. Ltd, for C-17 Beddown Infrastructure Facilities (INDIAN AIR FORCE,
Airport) Project in Ghaziabad.
 Worked with C.P Kukreja Associates, as Project Manager (MEP) since Nov.2011 to
October 2014.
 Worked as a Project Manager in BPTP LTD from 20th
July 2010 to 30th
Nov2011.
 Worked with CP Kukreja Associates, as an Asst. Project Manager from 20th
july2007 to 19th
july2010.
 Worked with Sudhir Engg. Pvt. Ltd. from May 2005 to 20th
July 2007 as a Sr.
Engineer.
 Worked as a GET in COCA-COLA from Dec.2002 to Feb2005.
Professional/
Educational
Qualification
 Executive MBA in Project Management in 2014.
 B. Tech. (Electrical) from BIT Sindri in 2002 with good academic record.
 Passed 10+2 (Science) from BIEC Patna.
 Passed 10th
(Science) from BSEB Patna.
Turner project management (I) Pvt. Ltd
Company Profile: -Turner is US based international construction management company. Turner entered in the Indian market
since 2007, to provide program management services management service. (www.turnerconstruction.com)
Job Profile:-
 Responsible for follow-up and coordination of MEP services with client (USACE & IAF) and contractor (L&T) for C-
17 Bed down Infrastructure Facilities for INDIAN AIR FORCE, Airport) Project in Ghaziabad.
 33KV Electrical Substation, 11KV DG Sets, NGR Panels, HVAC, plumbing, Fire Fighting, Fire Alarm, PA, CATV,
CCTV, BMS, IDS system.
 Review of designs submitted by and involvement in the process of finalize basic and detailed engineering designs
suggesting modifications in design response to unplanned exigencies during execution phase.
 Preparation of Erection & commissioning related documentation at different stages of project such as SHOP drawing,
GA drawing, ‘RED line’ drawing, checklist, extra item rate analysis..
 Involvement in the process of finalization of equipment as per tender specification and approved make.
 To discuss & resolve matters of work procedures complaints & construction problem.
 Sending daily/weekly reports to project head.
Page 1 of 3
CP Kukreja Associates
Company Profile: -C.P. Kukreja Associates is one of top 100 architectural firms in the world based on
Delhi since1969. (www.cpkukreja.com).
Job Profile:-
 Responsible for follow-up and coordination of MEP services with client, consultant, subcontractor (Electrical-
Transformer, DG Sets, LT Panels, DB, cabling, Earthing, conduting & wiring, HVAC, plumbing, Fire Fighting, Fire
Alarm, PA, CCTV, BMS, CPMS, Elevators, Medical Gas System, Nurse calling system, Modular OT’s, CSSD & Laundry)
to ensure timely delivery of equipment & installation as per schedule.
 Proper planning, scheduling, Monitoring & Review Project schedules to ensure execution of projects in adherence to
quality and safety guidelines within the budgeted time and cost. Maintaining and controlling of all project records.
 Review of designs submitted by design consultants and involvement in the process of finalize basic and detailed
engineering designs suggesting modifications in design response to unplanned exigencies during execution phase.
 Preparation of Erection & commissioning related documentation at different stages of project such as SHOP drawing,
GA drawing, ‘As Built’ drawing, earthing report, megger report, checklist, extra item rate analysis & processing of
contractors RAR bills.
 Involvement in the process of finalization of equipment as per tender specification and approved make.
 To discuss & resolve matters of work procedures complaints & construction problem.
 Inviting tenders from all venders for the supply of Plant & Machinery, services etc.
 Evaluation of bids and preparation of comparative statement & finalize the tender.
 Monitoring safety norms & implements project safety plan.
 Sending daily/weekly reports to project head.
 Responsible for Billing and Qty. Estimation.
Project completed:-
1.QRG Medicare Ltd. (400Beded Super specialty Hospital )- Total Project Cost Rs 350 Crores.
2.JCB India Ltd at Jaipur
3.Krrish Provence (24th
floor group housing) at Gwal pahri gurgaon.
4.Halla lighting (I) ltd - industrial project)- Total Project Cost Rs 150 Crores.
5.Havells (I) Ltd. Corporate office)- Total Project Cost Rs 100 Crores.
6.Army college of medical science- Medical college & Group Housing)- Total Project Cost Rs 250 Crores.
7.Havells Warehouse in 10 Acres)- Total Project Cost Rs 200 Crores.
8.Multi Level Under Ground Car Parking)- Total Project Cost Rs 100 Crores.
BPTP LTD.
Company Profile: -BPTP Limited, a real estate development company in India, is undertaking a wide-range of projects
including integrated townships, residential & commercial complexes, retail spaces, IT parks and SEZs.(www.bptpltd.com).
 Involvement in the process of finalization of equipment as per tender specification and approved make.
 To discuss & resolve matters of work procedures complaints & construction problem.
 Inviting tenders from all venders for the supply of Plant & Machinery, services etc.
 Evaluation of bids and preparation of comparative statement & finalize the tender.
 Monitoring safety norms & implements project safety plan.
 Sending daily/weekly reports to GM project head.
 Responsible for Billing and Qty. Estimation.
Project Handled:- 1700 Acres Residential (High Rise, Low rise, Villa) & commercial Project at Faridabad.
Sudhir Engg Co.
Job Profile- Supervision of Electrical commissioning activities like substation, electrical distribution, communication, fire
alarm system, lighting, cabling. Mobilizing resources/equipments, Labour handling on site, material at local level of facilitate
&End to End Responsibility. Preparation 'As Built' documentation of total execution of project. Co-ordination with Architects,
projects Management Team, Clients, Consultants, & sub-contractor., implementation of Manpower plans. Billing and Follow
up. Ensure strict compliance to all safety norms & implements project safety plan.
Project Handled:-
(1) IT Park- HCL Commnet sector-125, Noida
Page 2 of 3
(2) Motherson-Sumi sector-62, Noida
Coca-Cola
Under my supervision Erection &Commissioning of following machinery have done, along with its maintenance
DG Sets: - 750KVA, 500KVA, 250KVA and 62.5KVA. LT & HT Panels, Control panels, Transformer, Cabling, Lighting.
Boiler:-1.5 & 2 ton, Chilling Unit, Air Compressor, LT Panel, etc.
Filler –600BPM, Bottle-washer-40Wide, Caser-Uncaser, Paramix,
 I have done Six-month project work along with KHS machinery pvt. Ltd
College Training Program
Power Plant of Barauni Thermal Power Station.
Goal of Training: - Over view of flow diagram of Plant, Specifically Boiler, Coal Treatment Plant & Water
Treatment Plant.
Project Undertaken: - Study of 132KV Patherdih grid.
Goal of Project: - Study of sub-station & distribution network, study of different types of Circuit Breaker.
Key Skills
• To achieve timely completion of project.
• Good communication & coordination skills,
• Time and man power management skills.
• Have good analytical and practical approach to problem solving.
• Preparation of reports on site status on daily basis.
• Hardworking, Energetic, Enthusiastic, work at any wide environment.
Computer Knowledge
Operating System Windows,
Package AutoCAD, MS-Office, MS-Project, Internet
Personal Details
Date: -
Place: - Signature
Page 3 of 3
Date of Birth 05-Dec-1978
Sex Male
Nationality Indian
Marital Status Married
Permanent Address S/o Sri Gayanand Prasad, Vill- Anantpur, Post – Amarpura, Dist. – Patna, (Bihar)
Passport No N9366752
Valid up to 25/04/2026
Place of issue Patna
Skype ID sunilkumar_joy

Resume (Sunil Kumar)

  • 1.
    RESUME Sunil Kumar GSM:- 9891767597Email: sunilkumarjoy@gmail.com RZF-1/118,Flat No-103,Street No-1 Mahavir Enclave, Newdelhi-45 Executive Summary B. Tech in Electrical engineering having 13.5 Years of Experience in Project & Maintenance for internal/external electrification & MEP services of large offices/ IT Park/ Hospital/ Industrial/ commercial /residential & High-rise building and Airport projects also. Work Experience  Currently I am working as a Project Manager MEP in Turner project management (I) Pvt. Ltd, for C-17 Beddown Infrastructure Facilities (INDIAN AIR FORCE, Airport) Project in Ghaziabad.  Worked with C.P Kukreja Associates, as Project Manager (MEP) since Nov.2011 to October 2014.  Worked as a Project Manager in BPTP LTD from 20th July 2010 to 30th Nov2011.  Worked with CP Kukreja Associates, as an Asst. Project Manager from 20th july2007 to 19th july2010.  Worked with Sudhir Engg. Pvt. Ltd. from May 2005 to 20th July 2007 as a Sr. Engineer.  Worked as a GET in COCA-COLA from Dec.2002 to Feb2005. Professional/ Educational Qualification  Executive MBA in Project Management in 2014.  B. Tech. (Electrical) from BIT Sindri in 2002 with good academic record.  Passed 10+2 (Science) from BIEC Patna.  Passed 10th (Science) from BSEB Patna. Turner project management (I) Pvt. Ltd Company Profile: -Turner is US based international construction management company. Turner entered in the Indian market since 2007, to provide program management services management service. (www.turnerconstruction.com) Job Profile:-  Responsible for follow-up and coordination of MEP services with client (USACE & IAF) and contractor (L&T) for C- 17 Bed down Infrastructure Facilities for INDIAN AIR FORCE, Airport) Project in Ghaziabad.  33KV Electrical Substation, 11KV DG Sets, NGR Panels, HVAC, plumbing, Fire Fighting, Fire Alarm, PA, CATV, CCTV, BMS, IDS system.  Review of designs submitted by and involvement in the process of finalize basic and detailed engineering designs suggesting modifications in design response to unplanned exigencies during execution phase.  Preparation of Erection & commissioning related documentation at different stages of project such as SHOP drawing, GA drawing, ‘RED line’ drawing, checklist, extra item rate analysis..  Involvement in the process of finalization of equipment as per tender specification and approved make.  To discuss & resolve matters of work procedures complaints & construction problem.  Sending daily/weekly reports to project head. Page 1 of 3
  • 2.
    CP Kukreja Associates CompanyProfile: -C.P. Kukreja Associates is one of top 100 architectural firms in the world based on Delhi since1969. (www.cpkukreja.com). Job Profile:-  Responsible for follow-up and coordination of MEP services with client, consultant, subcontractor (Electrical- Transformer, DG Sets, LT Panels, DB, cabling, Earthing, conduting & wiring, HVAC, plumbing, Fire Fighting, Fire Alarm, PA, CCTV, BMS, CPMS, Elevators, Medical Gas System, Nurse calling system, Modular OT’s, CSSD & Laundry) to ensure timely delivery of equipment & installation as per schedule.  Proper planning, scheduling, Monitoring & Review Project schedules to ensure execution of projects in adherence to quality and safety guidelines within the budgeted time and cost. Maintaining and controlling of all project records.  Review of designs submitted by design consultants and involvement in the process of finalize basic and detailed engineering designs suggesting modifications in design response to unplanned exigencies during execution phase.  Preparation of Erection & commissioning related documentation at different stages of project such as SHOP drawing, GA drawing, ‘As Built’ drawing, earthing report, megger report, checklist, extra item rate analysis & processing of contractors RAR bills.  Involvement in the process of finalization of equipment as per tender specification and approved make.  To discuss & resolve matters of work procedures complaints & construction problem.  Inviting tenders from all venders for the supply of Plant & Machinery, services etc.  Evaluation of bids and preparation of comparative statement & finalize the tender.  Monitoring safety norms & implements project safety plan.  Sending daily/weekly reports to project head.  Responsible for Billing and Qty. Estimation. Project completed:- 1.QRG Medicare Ltd. (400Beded Super specialty Hospital )- Total Project Cost Rs 350 Crores. 2.JCB India Ltd at Jaipur 3.Krrish Provence (24th floor group housing) at Gwal pahri gurgaon. 4.Halla lighting (I) ltd - industrial project)- Total Project Cost Rs 150 Crores. 5.Havells (I) Ltd. Corporate office)- Total Project Cost Rs 100 Crores. 6.Army college of medical science- Medical college & Group Housing)- Total Project Cost Rs 250 Crores. 7.Havells Warehouse in 10 Acres)- Total Project Cost Rs 200 Crores. 8.Multi Level Under Ground Car Parking)- Total Project Cost Rs 100 Crores. BPTP LTD. Company Profile: -BPTP Limited, a real estate development company in India, is undertaking a wide-range of projects including integrated townships, residential & commercial complexes, retail spaces, IT parks and SEZs.(www.bptpltd.com).  Involvement in the process of finalization of equipment as per tender specification and approved make.  To discuss & resolve matters of work procedures complaints & construction problem.  Inviting tenders from all venders for the supply of Plant & Machinery, services etc.  Evaluation of bids and preparation of comparative statement & finalize the tender.  Monitoring safety norms & implements project safety plan.  Sending daily/weekly reports to GM project head.  Responsible for Billing and Qty. Estimation. Project Handled:- 1700 Acres Residential (High Rise, Low rise, Villa) & commercial Project at Faridabad. Sudhir Engg Co. Job Profile- Supervision of Electrical commissioning activities like substation, electrical distribution, communication, fire alarm system, lighting, cabling. Mobilizing resources/equipments, Labour handling on site, material at local level of facilitate &End to End Responsibility. Preparation 'As Built' documentation of total execution of project. Co-ordination with Architects, projects Management Team, Clients, Consultants, & sub-contractor., implementation of Manpower plans. Billing and Follow up. Ensure strict compliance to all safety norms & implements project safety plan. Project Handled:- (1) IT Park- HCL Commnet sector-125, Noida Page 2 of 3
  • 3.
    (2) Motherson-Sumi sector-62,Noida Coca-Cola Under my supervision Erection &Commissioning of following machinery have done, along with its maintenance DG Sets: - 750KVA, 500KVA, 250KVA and 62.5KVA. LT & HT Panels, Control panels, Transformer, Cabling, Lighting. Boiler:-1.5 & 2 ton, Chilling Unit, Air Compressor, LT Panel, etc. Filler –600BPM, Bottle-washer-40Wide, Caser-Uncaser, Paramix,  I have done Six-month project work along with KHS machinery pvt. Ltd College Training Program Power Plant of Barauni Thermal Power Station. Goal of Training: - Over view of flow diagram of Plant, Specifically Boiler, Coal Treatment Plant & Water Treatment Plant. Project Undertaken: - Study of 132KV Patherdih grid. Goal of Project: - Study of sub-station & distribution network, study of different types of Circuit Breaker. Key Skills • To achieve timely completion of project. • Good communication & coordination skills, • Time and man power management skills. • Have good analytical and practical approach to problem solving. • Preparation of reports on site status on daily basis. • Hardworking, Energetic, Enthusiastic, work at any wide environment. Computer Knowledge Operating System Windows, Package AutoCAD, MS-Office, MS-Project, Internet Personal Details Date: - Place: - Signature Page 3 of 3 Date of Birth 05-Dec-1978 Sex Male Nationality Indian Marital Status Married Permanent Address S/o Sri Gayanand Prasad, Vill- Anantpur, Post – Amarpura, Dist. – Patna, (Bihar) Passport No N9366752 Valid up to 25/04/2026 Place of issue Patna Skype ID sunilkumar_joy