Executive Summary
B. Tech in Electrical engineering having 13.5 Years of Experience in Project &
Maintenance for internal/external electrification & MEP services of large offices/ IT
Park/ Hospital/ Industrial/ commercial /residential & High-rise building and Airport
projects also.
Work Experience Currently I am working as a Project Manager MEP in Turner project management (I)
Pvt. Ltd, for C-17 Beddown Infrastructure Facilities (INDIAN AIR FORCE,
Airport) Project in Ghaziabad.
Worked with C.P Kukreja Associates, as Project Manager (MEP) since Nov.2011 to
October 2014.
Worked as a Project Manager in BPTP LTD from 20th
July 2010 to 30th
Nov2011.
Worked with CP Kukreja Associates, as an Asst. Project Manager from 20th
july2007 to 19th
july2010.
Worked with Sudhir Engg. Pvt. Ltd. from May 2005 to 20th
July 2007 as a Sr.
Engineer.
Worked as a GET in COCA-COLA from Dec.2002 to Feb2005.
Professional/
Educational
Qualification
Executive MBA in Project Management in 2014.
B. Tech. (Electrical) from BIT Sindri in 2002 with good academic record.
Passed 10+2 (Science) from BIEC Patna.
Passed 10th
(Science) from BSEB Patna.
Turner project management (I) Pvt. Ltd
Company Profile: -Turner is US based international construction management company. Turner entered in the Indian market
since 2007, to provide program management services management service. (www.turnerconstruction.com)
Job Profile:-
Responsible for follow-up and coordination of MEP services with client (USACE & IAF) and contractor (L&T) for C-
17 Bed down Infrastructure Facilities for INDIAN AIR FORCE, Airport) Project in Ghaziabad.
33KV Electrical Substation, 11KV DG Sets, NGR Panels, HVAC, plumbing, Fire Fighting, Fire Alarm, PA, CATV,
CCTV, BMS, IDS system.
Review of designs submitted by and involvement in the process of finalize basic and detailed engineering designs
suggesting modifications in design response to unplanned exigencies during execution phase.
Preparation of Erection & commissioning related documentation at different stages of project such as SHOP drawing,
GA drawing, ‘RED line’ drawing, checklist, extra item rate analysis..
Involvement in the process of finalization of equipment as per tender specification and approved make.
To discuss & resolve matters of work procedures complaints & construction problem.
Sending daily/weekly reports to project head.
Page 1 of 3
2. CP Kukreja Associates
Company Profile: -C.P. Kukreja Associates is one of top 100 architectural firms in the world based on
Delhi since1969. (www.cpkukreja.com).
Job Profile:-
Responsible for follow-up and coordination of MEP services with client, consultant, subcontractor (Electrical-
Transformer, DG Sets, LT Panels, DB, cabling, Earthing, conduting & wiring, HVAC, plumbing, Fire Fighting, Fire
Alarm, PA, CCTV, BMS, CPMS, Elevators, Medical Gas System, Nurse calling system, Modular OT’s, CSSD & Laundry)
to ensure timely delivery of equipment & installation as per schedule.
Proper planning, scheduling, Monitoring & Review Project schedules to ensure execution of projects in adherence to
quality and safety guidelines within the budgeted time and cost. Maintaining and controlling of all project records.
Review of designs submitted by design consultants and involvement in the process of finalize basic and detailed
engineering designs suggesting modifications in design response to unplanned exigencies during execution phase.
Preparation of Erection & commissioning related documentation at different stages of project such as SHOP drawing,
GA drawing, ‘As Built’ drawing, earthing report, megger report, checklist, extra item rate analysis & processing of
contractors RAR bills.
Involvement in the process of finalization of equipment as per tender specification and approved make.
To discuss & resolve matters of work procedures complaints & construction problem.
Inviting tenders from all venders for the supply of Plant & Machinery, services etc.
Evaluation of bids and preparation of comparative statement & finalize the tender.
Monitoring safety norms & implements project safety plan.
Sending daily/weekly reports to project head.
Responsible for Billing and Qty. Estimation.
Project completed:-
1.QRG Medicare Ltd. (400Beded Super specialty Hospital )- Total Project Cost Rs 350 Crores.
2.JCB India Ltd at Jaipur
3.Krrish Provence (24th
floor group housing) at Gwal pahri gurgaon.
4.Halla lighting (I) ltd - industrial project)- Total Project Cost Rs 150 Crores.
5.Havells (I) Ltd. Corporate office)- Total Project Cost Rs 100 Crores.
6.Army college of medical science- Medical college & Group Housing)- Total Project Cost Rs 250 Crores.
7.Havells Warehouse in 10 Acres)- Total Project Cost Rs 200 Crores.
8.Multi Level Under Ground Car Parking)- Total Project Cost Rs 100 Crores.
BPTP LTD.
Company Profile: -BPTP Limited, a real estate development company in India, is undertaking a wide-range of projects
including integrated townships, residential & commercial complexes, retail spaces, IT parks and SEZs.(www.bptpltd.com).
Involvement in the process of finalization of equipment as per tender specification and approved make.
To discuss & resolve matters of work procedures complaints & construction problem.
Inviting tenders from all venders for the supply of Plant & Machinery, services etc.
Evaluation of bids and preparation of comparative statement & finalize the tender.
Monitoring safety norms & implements project safety plan.
Sending daily/weekly reports to GM project head.
Responsible for Billing and Qty. Estimation.
Project Handled:- 1700 Acres Residential (High Rise, Low rise, Villa) & commercial Project at Faridabad.
Sudhir Engg Co.
Job Profile- Supervision of Electrical commissioning activities like substation, electrical distribution, communication, fire
alarm system, lighting, cabling. Mobilizing resources/equipments, Labour handling on site, material at local level of facilitate
&End to End Responsibility. Preparation 'As Built' documentation of total execution of project. Co-ordination with Architects,
projects Management Team, Clients, Consultants, & sub-contractor., implementation of Manpower plans. Billing and Follow
up. Ensure strict compliance to all safety norms & implements project safety plan.
Project Handled:-
(1) IT Park- HCL Commnet sector-125, Noida
Page 2 of 3
3. (2) Motherson-Sumi sector-62, Noida
Coca-Cola
Under my supervision Erection &Commissioning of following machinery have done, along with its maintenance
DG Sets: - 750KVA, 500KVA, 250KVA and 62.5KVA. LT & HT Panels, Control panels, Transformer, Cabling, Lighting.
Boiler:-1.5 & 2 ton, Chilling Unit, Air Compressor, LT Panel, etc.
Filler –600BPM, Bottle-washer-40Wide, Caser-Uncaser, Paramix,
I have done Six-month project work along with KHS machinery pvt. Ltd
College Training Program
Power Plant of Barauni Thermal Power Station.
Goal of Training: - Over view of flow diagram of Plant, Specifically Boiler, Coal Treatment Plant & Water
Treatment Plant.
Project Undertaken: - Study of 132KV Patherdih grid.
Goal of Project: - Study of sub-station & distribution network, study of different types of Circuit Breaker.
Key Skills
• To achieve timely completion of project.
• Good communication & coordination skills,
• Time and man power management skills.
• Have good analytical and practical approach to problem solving.
• Preparation of reports on site status on daily basis.
• Hardworking, Energetic, Enthusiastic, work at any wide environment.
Computer Knowledge
Operating System Windows,
Package AutoCAD, MS-Office, MS-Project, Internet
Personal Details
Date: -
Place: - Signature
Page 3 of 3
Date of Birth 05-Dec-1978
Sex Male
Nationality Indian
Marital Status Married
Permanent Address S/o Sri Gayanand Prasad, Vill- Anantpur, Post – Amarpura, Dist. – Patna, (Bihar)
Passport No N9366752
Valid up to 25/04/2026
Place of issue Patna
Skype ID sunilkumar_joy