SlideShare a Scribd company logo
1 of 3
RESUME
Sunil Kumar
GSM:- 9891767597 Email: sunilkumarjoy@gmail.com
RZF-1/118,Flat No-103,Street No-1
Mahavir Enclave, Newdelhi-45
Executive Summary
B. Tech in Electrical engineering having 13.5 Years of Experience in Project &
Maintenance for internal/external electrification & MEP services of large offices/ IT
Park/ Hospital/ Industrial/ commercial /residential & High-rise building and Airport
projects also.
Work Experience  Currently I am working as a Project Manager MEP in Turner project management (I)
Pvt. Ltd, for C-17 Beddown Infrastructure Facilities (INDIAN AIR FORCE,
Airport) Project in Ghaziabad.
 Worked with C.P Kukreja Associates, as Project Manager (MEP) since Nov.2011 to
October 2014.
 Worked as a Project Manager in BPTP LTD from 20th
July 2010 to 30th
Nov2011.
 Worked with CP Kukreja Associates, as an Asst. Project Manager from 20th
july2007 to 19th
july2010.
 Worked with Sudhir Engg. Pvt. Ltd. from May 2005 to 20th
July 2007 as a Sr.
Engineer.
 Worked as a GET in COCA-COLA from Dec.2002 to Feb2005.
Professional/
Educational
Qualification
 Executive MBA in Project Management in 2014.
 B. Tech. (Electrical) from BIT Sindri in 2002 with good academic record.
 Passed 10+2 (Science) from BIEC Patna.
 Passed 10th
(Science) from BSEB Patna.
Turner project management (I) Pvt. Ltd
Company Profile: -Turner is US based international construction management company. Turner entered in the Indian market
since 2007, to provide program management services management service. (www.turnerconstruction.com)
Job Profile:-
 Responsible for follow-up and coordination of MEP services with client (USACE & IAF) and contractor (L&T) for C-
17 Bed down Infrastructure Facilities for INDIAN AIR FORCE, Airport) Project in Ghaziabad.
 33KV Electrical Substation, 11KV DG Sets, NGR Panels, HVAC, plumbing, Fire Fighting, Fire Alarm, PA, CATV,
CCTV, BMS, IDS system.
 Review of designs submitted by and involvement in the process of finalize basic and detailed engineering designs
suggesting modifications in design response to unplanned exigencies during execution phase.
 Preparation of Erection & commissioning related documentation at different stages of project such as SHOP drawing,
GA drawing, ‘RED line’ drawing, checklist, extra item rate analysis..
 Involvement in the process of finalization of equipment as per tender specification and approved make.
 To discuss & resolve matters of work procedures complaints & construction problem.
 Sending daily/weekly reports to project head.
Page 1 of 3
CP Kukreja Associates
Company Profile: -C.P. Kukreja Associates is one of top 100 architectural firms in the world based on
Delhi since1969. (www.cpkukreja.com).
Job Profile:-
 Responsible for follow-up and coordination of MEP services with client, consultant, subcontractor (Electrical-
Transformer, DG Sets, LT Panels, DB, cabling, Earthing, conduting & wiring, HVAC, plumbing, Fire Fighting, Fire
Alarm, PA, CCTV, BMS, CPMS, Elevators, Medical Gas System, Nurse calling system, Modular OT’s, CSSD & Laundry)
to ensure timely delivery of equipment & installation as per schedule.
 Proper planning, scheduling, Monitoring & Review Project schedules to ensure execution of projects in adherence to
quality and safety guidelines within the budgeted time and cost. Maintaining and controlling of all project records.
 Review of designs submitted by design consultants and involvement in the process of finalize basic and detailed
engineering designs suggesting modifications in design response to unplanned exigencies during execution phase.
 Preparation of Erection & commissioning related documentation at different stages of project such as SHOP drawing,
GA drawing, ‘As Built’ drawing, earthing report, megger report, checklist, extra item rate analysis & processing of
contractors RAR bills.
 Involvement in the process of finalization of equipment as per tender specification and approved make.
 To discuss & resolve matters of work procedures complaints & construction problem.
 Inviting tenders from all venders for the supply of Plant & Machinery, services etc.
 Evaluation of bids and preparation of comparative statement & finalize the tender.
 Monitoring safety norms & implements project safety plan.
 Sending daily/weekly reports to project head.
 Responsible for Billing and Qty. Estimation.
Project completed:-
1.QRG Medicare Ltd. (400Beded Super specialty Hospital )- Total Project Cost Rs 350 Crores.
2.JCB India Ltd at Jaipur
3.Krrish Provence (24th
floor group housing) at Gwal pahri gurgaon.
4.Halla lighting (I) ltd - industrial project)- Total Project Cost Rs 150 Crores.
5.Havells (I) Ltd. Corporate office)- Total Project Cost Rs 100 Crores.
6.Army college of medical science- Medical college & Group Housing)- Total Project Cost Rs 250 Crores.
7.Havells Warehouse in 10 Acres)- Total Project Cost Rs 200 Crores.
8.Multi Level Under Ground Car Parking)- Total Project Cost Rs 100 Crores.
BPTP LTD.
Company Profile: -BPTP Limited, a real estate development company in India, is undertaking a wide-range of projects
including integrated townships, residential & commercial complexes, retail spaces, IT parks and SEZs.(www.bptpltd.com).
 Involvement in the process of finalization of equipment as per tender specification and approved make.
 To discuss & resolve matters of work procedures complaints & construction problem.
 Inviting tenders from all venders for the supply of Plant & Machinery, services etc.
 Evaluation of bids and preparation of comparative statement & finalize the tender.
 Monitoring safety norms & implements project safety plan.
 Sending daily/weekly reports to GM project head.
 Responsible for Billing and Qty. Estimation.
Project Handled:- 1700 Acres Residential (High Rise, Low rise, Villa) & commercial Project at Faridabad.
Sudhir Engg Co.
Job Profile- Supervision of Electrical commissioning activities like substation, electrical distribution, communication, fire
alarm system, lighting, cabling. Mobilizing resources/equipments, Labour handling on site, material at local level of facilitate
&End to End Responsibility. Preparation 'As Built' documentation of total execution of project. Co-ordination with Architects,
projects Management Team, Clients, Consultants, & sub-contractor., implementation of Manpower plans. Billing and Follow
up. Ensure strict compliance to all safety norms & implements project safety plan.
Project Handled:-
(1) IT Park- HCL Commnet sector-125, Noida
Page 2 of 3
(2) Motherson-Sumi sector-62, Noida
Coca-Cola
Under my supervision Erection &Commissioning of following machinery have done, along with its maintenance
DG Sets: - 750KVA, 500KVA, 250KVA and 62.5KVA. LT & HT Panels, Control panels, Transformer, Cabling, Lighting.
Boiler:-1.5 & 2 ton, Chilling Unit, Air Compressor, LT Panel, etc.
Filler –600BPM, Bottle-washer-40Wide, Caser-Uncaser, Paramix,
 I have done Six-month project work along with KHS machinery pvt. Ltd
College Training Program
Power Plant of Barauni Thermal Power Station.
Goal of Training: - Over view of flow diagram of Plant, Specifically Boiler, Coal Treatment Plant & Water
Treatment Plant.
Project Undertaken: - Study of 132KV Patherdih grid.
Goal of Project: - Study of sub-station & distribution network, study of different types of Circuit Breaker.
Key Skills
• To achieve timely completion of project.
• Good communication & coordination skills,
• Time and man power management skills.
• Have good analytical and practical approach to problem solving.
• Preparation of reports on site status on daily basis.
• Hardworking, Energetic, Enthusiastic, work at any wide environment.
Computer Knowledge
Operating System Windows,
Package AutoCAD, MS-Office, MS-Project, Internet
Personal Details
Date: -
Place: - Signature
Page 3 of 3
Date of Birth 05-Dec-1978
Sex Male
Nationality Indian
Marital Status Married
Permanent Address S/o Sri Gayanand Prasad, Vill- Anantpur, Post – Amarpura, Dist. – Patna, (Bihar)
Passport No N9366752
Valid up to 25/04/2026
Place of issue Patna
Skype ID sunilkumar_joy

More Related Content

What's hot

CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 
Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Singh
 
MEP Engineer with Revit Certification
MEP Engineer with Revit CertificationMEP Engineer with Revit Certification
MEP Engineer with Revit CertificationVishnuprasad P
 
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad
 
S.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopyS.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopySharvan kumar
 
Resume - Shabbir Ahmed 1
Resume - Shabbir Ahmed  1Resume - Shabbir Ahmed  1
Resume - Shabbir Ahmed 1Ahmed Shabbir
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineernomanqudrat
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalSAYANTAN GHOSH
 
Richard Heggen - 1 Page CV
Richard Heggen - 1 Page CVRichard Heggen - 1 Page CV
Richard Heggen - 1 Page CVRichard Heggen
 
Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJSiva Kumar
 
Director Power Projects Resume
Director Power Projects ResumeDirector Power Projects Resume
Director Power Projects Resumeprasunkishoreroy
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEankush kumar
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANSUDARSANAN NANU
 

What's hot (20)

CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project Manager
 
MEP Engineer with Revit Certification
MEP Engineer with Revit CertificationMEP Engineer with Revit Certification
MEP Engineer with Revit Certification
 
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CV
 
Resume
ResumeResume
Resume
 
RESUME - AMB- N
RESUME - AMB- NRESUME - AMB- N
RESUME - AMB- N
 
S.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopyS.Kumar CV - Piping - Copy
S.Kumar CV - Piping - Copy
 
Resume - Shabbir Ahmed 1
Resume - Shabbir Ahmed  1Resume - Shabbir Ahmed  1
Resume - Shabbir Ahmed 1
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 
Resume
ResumeResume
Resume
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_Electrical
 
Richard Heggen - 1 Page CV
Richard Heggen - 1 Page CVRichard Heggen - 1 Page CV
Richard Heggen - 1 Page CV
 
Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJ
 
Director Power Projects Resume
Director Power Projects ResumeDirector Power Projects Resume
Director Power Projects Resume
 
HVAC Engineer Resume
HVAC Engineer ResumeHVAC Engineer Resume
HVAC Engineer Resume
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAE
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANAN
 
Syed C.V
Syed C.VSyed C.V
Syed C.V
 
Amitav Sahoo-CV
Amitav Sahoo-CVAmitav Sahoo-CV
Amitav Sahoo-CV
 
Resume
ResumeResume
Resume
 

Viewers also liked

若者の言葉ジェラルド ロブ24295698
若者の言葉ジェラルド ロブ24295698若者の言葉ジェラルド ロブ24295698
若者の言葉ジェラルド ロブ24295698Gerard ????? Robb???
 
9104 qanaah-dan-tasamuh
9104 qanaah-dan-tasamuh9104 qanaah-dan-tasamuh
9104 qanaah-dan-tasamuhsmkntegal
 
Resume_Subrata_Maji
Resume_Subrata_MajiResume_Subrata_Maji
Resume_Subrata_MajiSubrata Maji
 
RASE to Succeed by Vinod Balan M Pharm, Marketing Excecutive, SUN Pharma Oman
RASE to Succeed by Vinod Balan M Pharm, Marketing Excecutive, SUN Pharma OmanRASE to Succeed by Vinod Balan M Pharm, Marketing Excecutive, SUN Pharma Oman
RASE to Succeed by Vinod Balan M Pharm, Marketing Excecutive, SUN Pharma OmanVinod Balan
 
マラソンブーム発表ジェリーロブ
マラソンブーム発表ジェリーロブマラソンブーム発表ジェリーロブ
マラソンブーム発表ジェリーロブGerard ????? Robb???
 
Resume_Subrata_Maji
Resume_Subrata_MajiResume_Subrata_Maji
Resume_Subrata_MajiSubrata Maji
 
Presentacion de la gaceta completa
Presentacion de la gaceta completaPresentacion de la gaceta completa
Presentacion de la gaceta completaMontserrat Sanchez
 
Why are US and European government bond yields so low? Mete Feridun, Economist
Why are US and European government bond yields so low? Mete Feridun, EconomistWhy are US and European government bond yields so low? Mete Feridun, Economist
Why are US and European government bond yields so low? Mete Feridun, Economist123AEC
 
Hakikat sastra utawa objek formal
Hakikat sastra utawa objek formalHakikat sastra utawa objek formal
Hakikat sastra utawa objek formalsmkntegal
 
Heat Energy Transfer Booklet
Heat Energy Transfer BookletHeat Energy Transfer Booklet
Heat Energy Transfer BookletLauren W
 
Presentation_ICOE_2016_Perez_Ortiz_Alberto_On the tidal resource of the Rathl...
Presentation_ICOE_2016_Perez_Ortiz_Alberto_On the tidal resource of the Rathl...Presentation_ICOE_2016_Perez_Ortiz_Alberto_On the tidal resource of the Rathl...
Presentation_ICOE_2016_Perez_Ortiz_Alberto_On the tidal resource of the Rathl...Alberto P
 
Global Traffic Ads
Global Traffic AdsGlobal Traffic Ads
Global Traffic AdsEarly Alerts
 

Viewers also liked (20)

Understanding DWI penalties in Texas
Understanding DWI penalties in TexasUnderstanding DWI penalties in Texas
Understanding DWI penalties in Texas
 
若者の言葉ジェラルド ロブ24295698
若者の言葉ジェラルド ロブ24295698若者の言葉ジェラルド ロブ24295698
若者の言葉ジェラルド ロブ24295698
 
9104 qanaah-dan-tasamuh
9104 qanaah-dan-tasamuh9104 qanaah-dan-tasamuh
9104 qanaah-dan-tasamuh
 
Why Do You Need SEO_
Why Do You Need SEO_Why Do You Need SEO_
Why Do You Need SEO_
 
Resume_Subrata_Maji
Resume_Subrata_MajiResume_Subrata_Maji
Resume_Subrata_Maji
 
cv anoop
cv anoopcv anoop
cv anoop
 
RASE to Succeed by Vinod Balan M Pharm, Marketing Excecutive, SUN Pharma Oman
RASE to Succeed by Vinod Balan M Pharm, Marketing Excecutive, SUN Pharma OmanRASE to Succeed by Vinod Balan M Pharm, Marketing Excecutive, SUN Pharma Oman
RASE to Succeed by Vinod Balan M Pharm, Marketing Excecutive, SUN Pharma Oman
 
日本人らしさ口頭発表
日本人らしさ口頭発表日本人らしさ口頭発表
日本人らしさ口頭発表
 
Premier league..
Premier league..Premier league..
Premier league..
 
Сталл 2015
Сталл 2015Сталл 2015
Сталл 2015
 
マラソンブーム発表ジェリーロブ
マラソンブーム発表ジェリーロブマラソンブーム発表ジェリーロブ
マラソンブーム発表ジェリーロブ
 
面子演讲
面子演讲面子演讲
面子演讲
 
Resume_Subrata_Maji
Resume_Subrata_MajiResume_Subrata_Maji
Resume_Subrata_Maji
 
Presentacion de la gaceta completa
Presentacion de la gaceta completaPresentacion de la gaceta completa
Presentacion de la gaceta completa
 
Why are US and European government bond yields so low? Mete Feridun, Economist
Why are US and European government bond yields so low? Mete Feridun, EconomistWhy are US and European government bond yields so low? Mete Feridun, Economist
Why are US and European government bond yields so low? Mete Feridun, Economist
 
Hakikat sastra utawa objek formal
Hakikat sastra utawa objek formalHakikat sastra utawa objek formal
Hakikat sastra utawa objek formal
 
Heat Energy Transfer Booklet
Heat Energy Transfer BookletHeat Energy Transfer Booklet
Heat Energy Transfer Booklet
 
Flexible Rice 168
Flexible Rice 168Flexible Rice 168
Flexible Rice 168
 
Presentation_ICOE_2016_Perez_Ortiz_Alberto_On the tidal resource of the Rathl...
Presentation_ICOE_2016_Perez_Ortiz_Alberto_On the tidal resource of the Rathl...Presentation_ICOE_2016_Perez_Ortiz_Alberto_On the tidal resource of the Rathl...
Presentation_ICOE_2016_Perez_Ortiz_Alberto_On the tidal resource of the Rathl...
 
Global Traffic Ads
Global Traffic AdsGlobal Traffic Ads
Global Traffic Ads
 

Similar to Resume (Sunil Kumar)

Similar to Resume (Sunil Kumar) (20)

Resume
ResumeResume
Resume
 
Farookh Engr
Farookh EngrFarookh Engr
Farookh Engr
 
CURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPCURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEP
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
NIZAM UDDIN UPDATED CV
NIZAM UDDIN UPDATED CVNIZAM UDDIN UPDATED CV
NIZAM UDDIN UPDATED CV
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
Asim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedAsim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updated
 
Resume-up-Aug-16
Resume-up-Aug-16Resume-up-Aug-16
Resume-up-Aug-16
 
CV-VA- March2016
CV-VA- March2016CV-VA- March2016
CV-VA- March2016
 
Nitin_Technical
Nitin_TechnicalNitin_Technical
Nitin_Technical
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
CV
CVCV
CV
 
MANZAR_CVH
MANZAR_CVHMANZAR_CVH
MANZAR_CVH
 
Ravi Ranjan_CV
Ravi Ranjan_CVRavi Ranjan_CV
Ravi Ranjan_CV
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation Engineer
 
nabi
nabinabi
nabi
 
social profile.
social profile.social profile.
social profile.
 
Resume
Resume Resume
Resume
 
Manickam - CV
Manickam - CVManickam - CV
Manickam - CV
 

Resume (Sunil Kumar)

  • 1. RESUME Sunil Kumar GSM:- 9891767597 Email: sunilkumarjoy@gmail.com RZF-1/118,Flat No-103,Street No-1 Mahavir Enclave, Newdelhi-45 Executive Summary B. Tech in Electrical engineering having 13.5 Years of Experience in Project & Maintenance for internal/external electrification & MEP services of large offices/ IT Park/ Hospital/ Industrial/ commercial /residential & High-rise building and Airport projects also. Work Experience  Currently I am working as a Project Manager MEP in Turner project management (I) Pvt. Ltd, for C-17 Beddown Infrastructure Facilities (INDIAN AIR FORCE, Airport) Project in Ghaziabad.  Worked with C.P Kukreja Associates, as Project Manager (MEP) since Nov.2011 to October 2014.  Worked as a Project Manager in BPTP LTD from 20th July 2010 to 30th Nov2011.  Worked with CP Kukreja Associates, as an Asst. Project Manager from 20th july2007 to 19th july2010.  Worked with Sudhir Engg. Pvt. Ltd. from May 2005 to 20th July 2007 as a Sr. Engineer.  Worked as a GET in COCA-COLA from Dec.2002 to Feb2005. Professional/ Educational Qualification  Executive MBA in Project Management in 2014.  B. Tech. (Electrical) from BIT Sindri in 2002 with good academic record.  Passed 10+2 (Science) from BIEC Patna.  Passed 10th (Science) from BSEB Patna. Turner project management (I) Pvt. Ltd Company Profile: -Turner is US based international construction management company. Turner entered in the Indian market since 2007, to provide program management services management service. (www.turnerconstruction.com) Job Profile:-  Responsible for follow-up and coordination of MEP services with client (USACE & IAF) and contractor (L&T) for C- 17 Bed down Infrastructure Facilities for INDIAN AIR FORCE, Airport) Project in Ghaziabad.  33KV Electrical Substation, 11KV DG Sets, NGR Panels, HVAC, plumbing, Fire Fighting, Fire Alarm, PA, CATV, CCTV, BMS, IDS system.  Review of designs submitted by and involvement in the process of finalize basic and detailed engineering designs suggesting modifications in design response to unplanned exigencies during execution phase.  Preparation of Erection & commissioning related documentation at different stages of project such as SHOP drawing, GA drawing, ‘RED line’ drawing, checklist, extra item rate analysis..  Involvement in the process of finalization of equipment as per tender specification and approved make.  To discuss & resolve matters of work procedures complaints & construction problem.  Sending daily/weekly reports to project head. Page 1 of 3
  • 2. CP Kukreja Associates Company Profile: -C.P. Kukreja Associates is one of top 100 architectural firms in the world based on Delhi since1969. (www.cpkukreja.com). Job Profile:-  Responsible for follow-up and coordination of MEP services with client, consultant, subcontractor (Electrical- Transformer, DG Sets, LT Panels, DB, cabling, Earthing, conduting & wiring, HVAC, plumbing, Fire Fighting, Fire Alarm, PA, CCTV, BMS, CPMS, Elevators, Medical Gas System, Nurse calling system, Modular OT’s, CSSD & Laundry) to ensure timely delivery of equipment & installation as per schedule.  Proper planning, scheduling, Monitoring & Review Project schedules to ensure execution of projects in adherence to quality and safety guidelines within the budgeted time and cost. Maintaining and controlling of all project records.  Review of designs submitted by design consultants and involvement in the process of finalize basic and detailed engineering designs suggesting modifications in design response to unplanned exigencies during execution phase.  Preparation of Erection & commissioning related documentation at different stages of project such as SHOP drawing, GA drawing, ‘As Built’ drawing, earthing report, megger report, checklist, extra item rate analysis & processing of contractors RAR bills.  Involvement in the process of finalization of equipment as per tender specification and approved make.  To discuss & resolve matters of work procedures complaints & construction problem.  Inviting tenders from all venders for the supply of Plant & Machinery, services etc.  Evaluation of bids and preparation of comparative statement & finalize the tender.  Monitoring safety norms & implements project safety plan.  Sending daily/weekly reports to project head.  Responsible for Billing and Qty. Estimation. Project completed:- 1.QRG Medicare Ltd. (400Beded Super specialty Hospital )- Total Project Cost Rs 350 Crores. 2.JCB India Ltd at Jaipur 3.Krrish Provence (24th floor group housing) at Gwal pahri gurgaon. 4.Halla lighting (I) ltd - industrial project)- Total Project Cost Rs 150 Crores. 5.Havells (I) Ltd. Corporate office)- Total Project Cost Rs 100 Crores. 6.Army college of medical science- Medical college & Group Housing)- Total Project Cost Rs 250 Crores. 7.Havells Warehouse in 10 Acres)- Total Project Cost Rs 200 Crores. 8.Multi Level Under Ground Car Parking)- Total Project Cost Rs 100 Crores. BPTP LTD. Company Profile: -BPTP Limited, a real estate development company in India, is undertaking a wide-range of projects including integrated townships, residential & commercial complexes, retail spaces, IT parks and SEZs.(www.bptpltd.com).  Involvement in the process of finalization of equipment as per tender specification and approved make.  To discuss & resolve matters of work procedures complaints & construction problem.  Inviting tenders from all venders for the supply of Plant & Machinery, services etc.  Evaluation of bids and preparation of comparative statement & finalize the tender.  Monitoring safety norms & implements project safety plan.  Sending daily/weekly reports to GM project head.  Responsible for Billing and Qty. Estimation. Project Handled:- 1700 Acres Residential (High Rise, Low rise, Villa) & commercial Project at Faridabad. Sudhir Engg Co. Job Profile- Supervision of Electrical commissioning activities like substation, electrical distribution, communication, fire alarm system, lighting, cabling. Mobilizing resources/equipments, Labour handling on site, material at local level of facilitate &End to End Responsibility. Preparation 'As Built' documentation of total execution of project. Co-ordination with Architects, projects Management Team, Clients, Consultants, & sub-contractor., implementation of Manpower plans. Billing and Follow up. Ensure strict compliance to all safety norms & implements project safety plan. Project Handled:- (1) IT Park- HCL Commnet sector-125, Noida Page 2 of 3
  • 3. (2) Motherson-Sumi sector-62, Noida Coca-Cola Under my supervision Erection &Commissioning of following machinery have done, along with its maintenance DG Sets: - 750KVA, 500KVA, 250KVA and 62.5KVA. LT & HT Panels, Control panels, Transformer, Cabling, Lighting. Boiler:-1.5 & 2 ton, Chilling Unit, Air Compressor, LT Panel, etc. Filler –600BPM, Bottle-washer-40Wide, Caser-Uncaser, Paramix,  I have done Six-month project work along with KHS machinery pvt. Ltd College Training Program Power Plant of Barauni Thermal Power Station. Goal of Training: - Over view of flow diagram of Plant, Specifically Boiler, Coal Treatment Plant & Water Treatment Plant. Project Undertaken: - Study of 132KV Patherdih grid. Goal of Project: - Study of sub-station & distribution network, study of different types of Circuit Breaker. Key Skills • To achieve timely completion of project. • Good communication & coordination skills, • Time and man power management skills. • Have good analytical and practical approach to problem solving. • Preparation of reports on site status on daily basis. • Hardworking, Energetic, Enthusiastic, work at any wide environment. Computer Knowledge Operating System Windows, Package AutoCAD, MS-Office, MS-Project, Internet Personal Details Date: - Place: - Signature Page 3 of 3 Date of Birth 05-Dec-1978 Sex Male Nationality Indian Marital Status Married Permanent Address S/o Sri Gayanand Prasad, Vill- Anantpur, Post – Amarpura, Dist. – Patna, (Bihar) Passport No N9366752 Valid up to 25/04/2026 Place of issue Patna Skype ID sunilkumar_joy