SlideShare a Scribd company logo
1 of 7
CURRICULUM VITAE
Carrier Objective
Seeking a position to utilize my skills & abilities in the field of MEP Quantity Surveying by
working professionally in my functional areas and to elevate the value of the organization to a
higher notch.
Page 1 of 6
NAMMUNI ARACHCHIGE WIJITHA
4/86, Melfort Estate, 1st
Lane, Gemunupura,
Kaduwela, Sri Lanka
Tel : 0097 52 878 5871
e-mail : nawijitha7@yahoo.com
A. Middle East Experience (5 Years)
2. Trafalgar Technical Services Limited
Worked as MEP Quantity Surveyor from November 2012 to August 2014.
Key projects involved;
Post Contract:
Dubai World Central – Al Maktoum International Airport. Jabel Ali, Dubai, Phase 1.
 Passenger Terminal Building (PTB) – MEP and Finishes, Project value USD 205
Million.
Storm water Drainage and Sewerage System (Phase 1)-Remaining Areas, Project value
USD 200 Million
Pre Contract:
 Dubai International Airport Expansion (Phase II) – Concourse, Re-Measure contract.
 AX 124, Finishes for concourse 3, Project value USD 1.6 Billion.
 Residential City phase 1 – Irrigation pump station.
Job Responsibilities
Page 2 of 6
1. Emirates Trading Agency (ETA)
I have been working with Emirates Trading Agency (ETA) as a Sr. MEP Quantity Surveyor
since November 2014 to date in Damac Towers by Paramount Hotels & Resorts ongoing
construction Project.
Job Responsibilities
 Preparation/Certification/Monitoring/Agreements of Variation Claims, Variation Account,
Analyzing & Reviewing of Sub-contractors Variation Order Proposals related to Mechanical,
Electrical and Plumbing Works
Major Variations submitted
1. IFC changers.
2. Additional 4 floors.
3. Installation of Additional CCTV samaras.
 Reviewing Sub contractor payments Applications
 Negotiating, resolving the disputes arising with the Consultant during the agreement of
Variation Claims etc.
 Buildup of Star Rates for the new items and claiming for the abortive works, damage claims
Project status
Original Contract value of MEP Package : 225,000,000.00 AED
Variations : 45,000,000.00 AED
 Reporting to Team leader/ Commercial Manager.
 Preparation of Oder of Cost.
 Take off quantities for new projects. Take off quantities and preparation of Bill of
Quantities for several stages of project like preliminary, draft final , final design and
tender with studying and referring of MEP drawings, preambles, and technical
specifications.
 Pre tender estimations.
 Variation orders/ Site works instructions, Evaluation of Variations, Star Rate evaluation
for new items, Negotiation of disputed items
B. Sri Lanka Experience (14 Years)
1. Lanka Trading Construction Co. (Pvt.) Ltd.
I have worked in Lanka Trading Construction Co. (Pvt.) Ltd. as a MEP Quantity
Surveyor since January 2011 to August 2012 in various projects.
2. Japan Airport Consultants, Inc./Nippon Koei Co. Ltd.
I have worked in Japan Airport consultants, Inc./Nippon Koei Co. Ltd as a MEP
Quantity Surveyor since April 2004 to February 2007 in Bandaranaike International
Airport Development Project
Page 3 of 6
3. Juma Al Majid EST LLC.
I have worked with Juma Al Majid ETS LLC. as a MEP Quantity Surveyor since June
2007 to December 2010 in The Dubai Mall Project
Job Responsibilities
 Preparation/Certification/Monitoring/Agreements of Variation Claims, Variation Account,
Analyzing & Reviewing of Sub-contractors Variation Order Proposals related to
Mechanical, Electrical (Power and ELV) and Plumbing Works
Major Variations submitted
1. Main feeder and power wiring system, Power control panel board installation, Lighting
panel board installation, MATV system, CCTV camera system, Low and extra voltage system,
Public address system, Automatic fire alarm system, Lightning protection system, Generator
installation, 1600KVA Transformer installation, Installation of escalator.
2. Installation of HVAC system; Chilled water piping, ducting etc.
3. Water Supply and Drainage System.
 Reviewing Sub contractor payments Applications
 Negotiating, resolving the disputes arising with the Consultant during the agreement of
Variation Claims etc.
 Buildup of Star Rates for the new items and claiming for the abortive works, damage
claims
Project status
Original Contract value of MEP Package : 602,817,726.00 AED
Revised Contract value after Variations : 901,861,583.00 AED
This project involves construction of two story new cargo building, Terminal building
(Renovation), two story Pier building with Boarding bridge, Two story new departure building,
two story new Arrival building, water supply system, Water treatment plant and Sewage
treatment plant. Estimated cost is 12 billion.
Job Responsibilities
1. I have gained experience in following works.
 Verification of joint measurements. Taking of quantity from shop drawing for
Interim valuation and Final Account Statements
 Reviewing and verification of interim valuation for interim Payment Certificates.
 Evaluation of varied work
2. I have prepared measurements for following systems.
 Main feeder and power wiring system, Power control panel board installation,
Lighting panel board installation, Clock system, MATV system, CCTV camera
system, Low and extra voltage system, Public address system, Flight information
display system, Automatic fire alarm system, Lightning protection system,
Generator installation, 1600KVA Transformer installation, Installation of
escalator.
 Installation of air conditioning system which are chillers, cooling towers, piping,
ducting etc.
 Pipe laying works for sewerage treatment systems. Pipe laying works for water
treatment plant. Pipe laying works for plumbing system.
3. State Engineering Corporation Of Sri Lanka
I have worked in state Engineering Corporation of Sri Lanka as a MEP Quantity
Surveyor since March 1995 to April 2004.
Key projects involved;
1. Manning Town Housing Project ( 95.03.27 – 96.08.20 )
This project involves construction and completion of 27 luxury apartments and a shopping
complex provided with all the modern day facilities.
2. Head Office ( 96.08.21 – 96.10.02 )
Electrical accessories evaluation for all construction sites and site inspection.
3. University of Rajarata Project ( 96.10.03 – 96.12.14 )
This project involves construction and completion of Vice Chancellor and Dean Quarters
and Lecture Halls.
4. Air Force Head Quarters Project ( 96.12.15 – 2001.07.31 ).
This project involves construction and completion of 14 stories and a helipad area for
helicopter landing.
5. De Soyza Hospital Project (2001.08.01 – 2002.01.21).
Construction and completion of 3 story building provided with labour room , operation
theatres and children words.
6. Printing Press Government project (2002.01.22 – 03.04.24)
Construction and completion of 3 story building.
7. National Hospital Project (2003.04.25 – 2004 .04 09 )
Construction and completion of 5 story building provided with words and intensive care
units.
Page 4 of 6
Educational Qualification
1
.
Successfully completed National Diploma in Technology (NDT) in field
of Electrical Engineering conducted by the University of Moratuwa,Sri Lanka (92-94)
2
.
BSc Degree, obtained from Faculty of Science, University of Kelaniya, Sri Lanka.
3
.
Successfully completed the Sound Contract Administration CPD course (10 courses)
conducted by Prof. Indrawansa Samaratunga
4
.
Having excellent knowledge in following method of measurements and contractual
procedures.
 FIDIC Conditions  SMM 7
 ICTAD Conditions  POMI/CESMM3
Page 5 of 6
Computer Literacy
 Microsoft Office package (Including 2007,2010 version) and other related Application
software
 Knowledge of Auto CAD, Internet and E-mail Applications
 Programming Language: Visual Basic 6
Personal Details
Name in full : Nammuni Arachchige Wijitha
Date Of Birth : 14th
Septemebr 1967
Civil Status : Married
Sex : Male
Nationality : Sri Lankan
I hereby certify that the above particular data furnished by me are true and correct to the best of
my knowledge.
N.A. Wijitha Date
Page 6 of 6
Computer Literacy
 Microsoft Office package (Including 2007,2010 version) and other related Application
software
 Knowledge of Auto CAD, Internet and E-mail Applications
 Programming Language: Visual Basic 6
Personal Details
Name in full : Nammuni Arachchige Wijitha
Date Of Birth : 14th
Septemebr 1967
Civil Status : Married
Sex : Male
Nationality : Sri Lankan
I hereby certify that the above particular data furnished by me are true and correct to the best of
my knowledge.
N.A. Wijitha Date
Page 6 of 6

More Related Content

What's hot

consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11Ali Elamin
 
Naser odwan CV-Mechanical Engineer
Naser odwan CV-Mechanical EngineerNaser odwan CV-Mechanical Engineer
Naser odwan CV-Mechanical EngineerNaser Odwan
 
Cv electrical engr. fathi
Cv electrical engr. fathiCv electrical engr. fathi
Cv electrical engr. fathiFathi Alsunni
 
Sally CV 15 Aprl2012(Docx) Brief
Sally CV 15 Aprl2012(Docx)   BriefSally CV 15 Aprl2012(Docx)   Brief
Sally CV 15 Aprl2012(Docx) BriefSally Al-Gazzar
 
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab
 
Kiran -cv
Kiran -cvKiran -cv
Kiran -cvkkirruu
 
Ahmed nasr cv 2016
Ahmed nasr cv 2016Ahmed nasr cv 2016
Ahmed nasr cv 2016ahmed nasr
 
SADIQ CV NEW 14 09 2014 dubai
SADIQ CV NEW 14 09 2014 dubaiSADIQ CV NEW 14 09 2014 dubai
SADIQ CV NEW 14 09 2014 dubaisadiq rizan
 
CV-Electrical Engineer (1)
CV-Electrical Engineer (1)CV-Electrical Engineer (1)
CV-Electrical Engineer (1)Mohamed Fadol
 
Michael E. Cruz - C.V.
Michael E. Cruz - C.V.Michael E. Cruz - C.V.
Michael E. Cruz - C.V.Michael Cruz
 
Electronic& Electrical Engineer, LUAY's PROFESSIONAL RESUME in English .
Electronic& Electrical Engineer, LUAY's PROFESSIONAL RESUME in English .Electronic& Electrical Engineer, LUAY's PROFESSIONAL RESUME in English .
Electronic& Electrical Engineer, LUAY's PROFESSIONAL RESUME in English .Luay Philip
 
Hani Shaker mep
Hani Shaker mepHani Shaker mep
Hani Shaker mephani ayyad
 
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...Mohammad Arfin Alam
 
Ahmed nasr - low current systems design engineer
Ahmed nasr - low current systems design engineerAhmed nasr - low current systems design engineer
Ahmed nasr - low current systems design engineerahmed nasr
 
Sadiq new Resume
Sadiq new ResumeSadiq new Resume
Sadiq new Resumesadiq rizan
 

What's hot (20)

consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11
 
Krishna resume (1)
Krishna resume (1)Krishna resume (1)
Krishna resume (1)
 
Naser odwan CV-Mechanical Engineer
Naser odwan CV-Mechanical EngineerNaser odwan CV-Mechanical Engineer
Naser odwan CV-Mechanical Engineer
 
abdallah_ghonaimat_CV
abdallah_ghonaimat_CVabdallah_ghonaimat_CV
abdallah_ghonaimat_CV
 
Cv electrical engr. fathi
Cv electrical engr. fathiCv electrical engr. fathi
Cv electrical engr. fathi
 
Sally CV 15 Aprl2012(Docx) Brief
Sally CV 15 Aprl2012(Docx)   BriefSally CV 15 Aprl2012(Docx)   Brief
Sally CV 15 Aprl2012(Docx) Brief
 
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CV
 
Kiran -cv
Kiran -cvKiran -cv
Kiran -cv
 
Ahmed nasr cv 2016
Ahmed nasr cv 2016Ahmed nasr cv 2016
Ahmed nasr cv 2016
 
SADIQ CV NEW 14 09 2014 dubai
SADIQ CV NEW 14 09 2014 dubaiSADIQ CV NEW 14 09 2014 dubai
SADIQ CV NEW 14 09 2014 dubai
 
CV-Electrical Engineer (1)
CV-Electrical Engineer (1)CV-Electrical Engineer (1)
CV-Electrical Engineer (1)
 
Michael E. Cruz - C.V.
Michael E. Cruz - C.V.Michael E. Cruz - C.V.
Michael E. Cruz - C.V.
 
Electronic& Electrical Engineer, LUAY's PROFESSIONAL RESUME in English .
Electronic& Electrical Engineer, LUAY's PROFESSIONAL RESUME in English .Electronic& Electrical Engineer, LUAY's PROFESSIONAL RESUME in English .
Electronic& Electrical Engineer, LUAY's PROFESSIONAL RESUME in English .
 
Hani Shaker mep
Hani Shaker mepHani Shaker mep
Hani Shaker mep
 
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
 
Ahmed nasr - low current systems design engineer
Ahmed nasr - low current systems design engineerAhmed nasr - low current systems design engineer
Ahmed nasr - low current systems design engineer
 
CV 10-5-2014
CV 10-5-2014CV 10-5-2014
CV 10-5-2014
 
B.Eng Resume_new
B.Eng Resume_newB.Eng Resume_new
B.Eng Resume_new
 
Moin Resume
Moin ResumeMoin Resume
Moin Resume
 
Sadiq new Resume
Sadiq new ResumeSadiq new Resume
Sadiq new Resume
 

Viewers also liked

Perspektif Sosiologi Kewarganegaraan dalam Kasus Kesetaraan Penyandang Disab...
Perspektif Sosiologi Kewarganegaraan dalam Kasus Kesetaraan Penyandang  Disab...Perspektif Sosiologi Kewarganegaraan dalam Kasus Kesetaraan Penyandang  Disab...
Perspektif Sosiologi Kewarganegaraan dalam Kasus Kesetaraan Penyandang Disab...Tasya Andiana Putri
 
Cavilam Alliance Française, Vichy - Adriana Vaio
Cavilam Alliance Française, Vichy - Adriana VaioCavilam Alliance Française, Vichy - Adriana Vaio
Cavilam Alliance Française, Vichy - Adriana VaioPiero Pavanini
 
石头汤-JC
石头汤-JC石头汤-JC
石头汤-JCdan zhao
 
Normas de etiqueta de internet
Normas de etiqueta de internetNormas de etiqueta de internet
Normas de etiqueta de internetCjaimes64
 
Libre office descarga
Libre office descargaLibre office descarga
Libre office descargajesusA30boet
 
LauraMeaseResume2016_upd
LauraMeaseResume2016_updLauraMeaseResume2016_upd
LauraMeaseResume2016_updLaura Mease
 
Vehicles elèctrics
Vehicles elèctricsVehicles elèctrics
Vehicles elèctricskevin386
 
Informatica jesus boet
Informatica jesus boetInformatica jesus boet
Informatica jesus boetjesusA30boet
 
Política de uso responsable de los medios de comunicación digital
Política de uso responsable de los medios de comunicación digitalPolítica de uso responsable de los medios de comunicación digital
Política de uso responsable de los medios de comunicación digitalalejitavaca78
 
Ppt reg. 11 e 12 corrigido (1) (1)
Ppt reg. 11 e 12 corrigido (1) (1)Ppt reg. 11 e 12 corrigido (1) (1)
Ppt reg. 11 e 12 corrigido (1) (1)j_sdias
 

Viewers also liked (15)

Perspektif Sosiologi Kewarganegaraan dalam Kasus Kesetaraan Penyandang Disab...
Perspektif Sosiologi Kewarganegaraan dalam Kasus Kesetaraan Penyandang  Disab...Perspektif Sosiologi Kewarganegaraan dalam Kasus Kesetaraan Penyandang  Disab...
Perspektif Sosiologi Kewarganegaraan dalam Kasus Kesetaraan Penyandang Disab...
 
Cavilam Alliance Française, Vichy - Adriana Vaio
Cavilam Alliance Française, Vichy - Adriana VaioCavilam Alliance Française, Vichy - Adriana Vaio
Cavilam Alliance Française, Vichy - Adriana Vaio
 
Curriculum Vitae B.TECH
Curriculum Vitae B.TECHCurriculum Vitae B.TECH
Curriculum Vitae B.TECH
 
石头汤-JC
石头汤-JC石头汤-JC
石头汤-JC
 
Normas de etiqueta de internet
Normas de etiqueta de internetNormas de etiqueta de internet
Normas de etiqueta de internet
 
Libre office descarga
Libre office descargaLibre office descarga
Libre office descarga
 
Guevara lucero angie
Guevara lucero angieGuevara lucero angie
Guevara lucero angie
 
LauraMeaseResume2016_upd
LauraMeaseResume2016_updLauraMeaseResume2016_upd
LauraMeaseResume2016_upd
 
Vehicles elèctrics
Vehicles elèctricsVehicles elèctrics
Vehicles elèctrics
 
Cidade de deus
Cidade de deusCidade de deus
Cidade de deus
 
Slide Design
Slide DesignSlide Design
Slide Design
 
Informatica jesus boet
Informatica jesus boetInformatica jesus boet
Informatica jesus boet
 
Política de uso responsable de los medios de comunicación digital
Política de uso responsable de los medios de comunicación digitalPolítica de uso responsable de los medios de comunicación digital
Política de uso responsable de los medios de comunicación digital
 
Tecnología e informática jhon
Tecnología e informática  jhonTecnología e informática  jhon
Tecnología e informática jhon
 
Ppt reg. 11 e 12 corrigido (1) (1)
Ppt reg. 11 e 12 corrigido (1) (1)Ppt reg. 11 e 12 corrigido (1) (1)
Ppt reg. 11 e 12 corrigido (1) (1)
 

Similar to N.A. Wijitha CV MEP UD

Similar to N.A. Wijitha CV MEP UD (20)

Covering Letter
Covering LetterCovering Letter
Covering Letter
 
Resume - Hasitha Ketanwila
Resume - Hasitha KetanwilaResume - Hasitha Ketanwila
Resume - Hasitha Ketanwila
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
CV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEERCV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEER
 
Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJ
 
Resume
Resume Resume
Resume
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer)
 
VK-Resume
VK-ResumeVK-Resume
VK-Resume
 
Senior Level Assignment
Senior Level AssignmentSenior Level Assignment
Senior Level Assignment
 
LATEST CV
LATEST CVLATEST CV
LATEST CV
 
Kerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum Vitae
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammed
 
Michael e. cruz c.v.
Michael e. cruz   c.v.Michael e. cruz   c.v.
Michael e. cruz c.v.
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
NASEER CV JUNE 2015
NASEER CV JUNE 2015NASEER CV JUNE 2015
NASEER CV JUNE 2015
 
MANZAR_CVH
MANZAR_CVHMANZAR_CVH
MANZAR_CVH
 
Cv of nageshwar sharma 2019 (ce)
Cv of nageshwar sharma 2019 (ce)Cv of nageshwar sharma 2019 (ce)
Cv of nageshwar sharma 2019 (ce)
 
QAQC
QAQCQAQC
QAQC
 
Jerickson Villas_ CV
Jerickson Villas_  CVJerickson Villas_  CV
Jerickson Villas_ CV
 

N.A. Wijitha CV MEP UD

  • 1. CURRICULUM VITAE Carrier Objective Seeking a position to utilize my skills & abilities in the field of MEP Quantity Surveying by working professionally in my functional areas and to elevate the value of the organization to a higher notch. Page 1 of 6 NAMMUNI ARACHCHIGE WIJITHA 4/86, Melfort Estate, 1st Lane, Gemunupura, Kaduwela, Sri Lanka Tel : 0097 52 878 5871 e-mail : nawijitha7@yahoo.com
  • 2. A. Middle East Experience (5 Years) 2. Trafalgar Technical Services Limited Worked as MEP Quantity Surveyor from November 2012 to August 2014. Key projects involved; Post Contract: Dubai World Central – Al Maktoum International Airport. Jabel Ali, Dubai, Phase 1.  Passenger Terminal Building (PTB) – MEP and Finishes, Project value USD 205 Million. Storm water Drainage and Sewerage System (Phase 1)-Remaining Areas, Project value USD 200 Million Pre Contract:  Dubai International Airport Expansion (Phase II) – Concourse, Re-Measure contract.  AX 124, Finishes for concourse 3, Project value USD 1.6 Billion.  Residential City phase 1 – Irrigation pump station. Job Responsibilities Page 2 of 6 1. Emirates Trading Agency (ETA) I have been working with Emirates Trading Agency (ETA) as a Sr. MEP Quantity Surveyor since November 2014 to date in Damac Towers by Paramount Hotels & Resorts ongoing construction Project. Job Responsibilities  Preparation/Certification/Monitoring/Agreements of Variation Claims, Variation Account, Analyzing & Reviewing of Sub-contractors Variation Order Proposals related to Mechanical, Electrical and Plumbing Works Major Variations submitted 1. IFC changers. 2. Additional 4 floors. 3. Installation of Additional CCTV samaras.  Reviewing Sub contractor payments Applications  Negotiating, resolving the disputes arising with the Consultant during the agreement of Variation Claims etc.  Buildup of Star Rates for the new items and claiming for the abortive works, damage claims Project status Original Contract value of MEP Package : 225,000,000.00 AED Variations : 45,000,000.00 AED
  • 3.  Reporting to Team leader/ Commercial Manager.  Preparation of Oder of Cost.  Take off quantities for new projects. Take off quantities and preparation of Bill of Quantities for several stages of project like preliminary, draft final , final design and tender with studying and referring of MEP drawings, preambles, and technical specifications.  Pre tender estimations.  Variation orders/ Site works instructions, Evaluation of Variations, Star Rate evaluation for new items, Negotiation of disputed items B. Sri Lanka Experience (14 Years) 1. Lanka Trading Construction Co. (Pvt.) Ltd. I have worked in Lanka Trading Construction Co. (Pvt.) Ltd. as a MEP Quantity Surveyor since January 2011 to August 2012 in various projects. 2. Japan Airport Consultants, Inc./Nippon Koei Co. Ltd. I have worked in Japan Airport consultants, Inc./Nippon Koei Co. Ltd as a MEP Quantity Surveyor since April 2004 to February 2007 in Bandaranaike International Airport Development Project Page 3 of 6 3. Juma Al Majid EST LLC. I have worked with Juma Al Majid ETS LLC. as a MEP Quantity Surveyor since June 2007 to December 2010 in The Dubai Mall Project Job Responsibilities  Preparation/Certification/Monitoring/Agreements of Variation Claims, Variation Account, Analyzing & Reviewing of Sub-contractors Variation Order Proposals related to Mechanical, Electrical (Power and ELV) and Plumbing Works Major Variations submitted 1. Main feeder and power wiring system, Power control panel board installation, Lighting panel board installation, MATV system, CCTV camera system, Low and extra voltage system, Public address system, Automatic fire alarm system, Lightning protection system, Generator installation, 1600KVA Transformer installation, Installation of escalator. 2. Installation of HVAC system; Chilled water piping, ducting etc. 3. Water Supply and Drainage System.  Reviewing Sub contractor payments Applications  Negotiating, resolving the disputes arising with the Consultant during the agreement of Variation Claims etc.  Buildup of Star Rates for the new items and claiming for the abortive works, damage claims Project status Original Contract value of MEP Package : 602,817,726.00 AED Revised Contract value after Variations : 901,861,583.00 AED
  • 4. This project involves construction of two story new cargo building, Terminal building (Renovation), two story Pier building with Boarding bridge, Two story new departure building, two story new Arrival building, water supply system, Water treatment plant and Sewage treatment plant. Estimated cost is 12 billion. Job Responsibilities 1. I have gained experience in following works.  Verification of joint measurements. Taking of quantity from shop drawing for Interim valuation and Final Account Statements  Reviewing and verification of interim valuation for interim Payment Certificates.  Evaluation of varied work 2. I have prepared measurements for following systems.  Main feeder and power wiring system, Power control panel board installation, Lighting panel board installation, Clock system, MATV system, CCTV camera system, Low and extra voltage system, Public address system, Flight information display system, Automatic fire alarm system, Lightning protection system, Generator installation, 1600KVA Transformer installation, Installation of escalator.  Installation of air conditioning system which are chillers, cooling towers, piping, ducting etc.  Pipe laying works for sewerage treatment systems. Pipe laying works for water treatment plant. Pipe laying works for plumbing system. 3. State Engineering Corporation Of Sri Lanka I have worked in state Engineering Corporation of Sri Lanka as a MEP Quantity Surveyor since March 1995 to April 2004. Key projects involved; 1. Manning Town Housing Project ( 95.03.27 – 96.08.20 ) This project involves construction and completion of 27 luxury apartments and a shopping complex provided with all the modern day facilities. 2. Head Office ( 96.08.21 – 96.10.02 ) Electrical accessories evaluation for all construction sites and site inspection. 3. University of Rajarata Project ( 96.10.03 – 96.12.14 ) This project involves construction and completion of Vice Chancellor and Dean Quarters and Lecture Halls. 4. Air Force Head Quarters Project ( 96.12.15 – 2001.07.31 ). This project involves construction and completion of 14 stories and a helipad area for helicopter landing. 5. De Soyza Hospital Project (2001.08.01 – 2002.01.21). Construction and completion of 3 story building provided with labour room , operation theatres and children words. 6. Printing Press Government project (2002.01.22 – 03.04.24) Construction and completion of 3 story building. 7. National Hospital Project (2003.04.25 – 2004 .04 09 ) Construction and completion of 5 story building provided with words and intensive care units. Page 4 of 6
  • 5. Educational Qualification 1 . Successfully completed National Diploma in Technology (NDT) in field of Electrical Engineering conducted by the University of Moratuwa,Sri Lanka (92-94) 2 . BSc Degree, obtained from Faculty of Science, University of Kelaniya, Sri Lanka. 3 . Successfully completed the Sound Contract Administration CPD course (10 courses) conducted by Prof. Indrawansa Samaratunga 4 . Having excellent knowledge in following method of measurements and contractual procedures.  FIDIC Conditions  SMM 7  ICTAD Conditions  POMI/CESMM3 Page 5 of 6
  • 6. Computer Literacy  Microsoft Office package (Including 2007,2010 version) and other related Application software  Knowledge of Auto CAD, Internet and E-mail Applications  Programming Language: Visual Basic 6 Personal Details Name in full : Nammuni Arachchige Wijitha Date Of Birth : 14th Septemebr 1967 Civil Status : Married Sex : Male Nationality : Sri Lankan I hereby certify that the above particular data furnished by me are true and correct to the best of my knowledge. N.A. Wijitha Date Page 6 of 6
  • 7. Computer Literacy  Microsoft Office package (Including 2007,2010 version) and other related Application software  Knowledge of Auto CAD, Internet and E-mail Applications  Programming Language: Visual Basic 6 Personal Details Name in full : Nammuni Arachchige Wijitha Date Of Birth : 14th Septemebr 1967 Civil Status : Married Sex : Male Nationality : Sri Lankan I hereby certify that the above particular data furnished by me are true and correct to the best of my knowledge. N.A. Wijitha Date Page 6 of 6