Integrated Facility Sub-SystemsUptime Symposium, Spring 2012Kevin BrownVice President, Global Data Center Offer
Modular Data Center –    Built Out of Integrated Sub-Systems Could be skid or container based, located inside or outside  ...
Modular Data Center Expectations               Better            performance                   Fast Deliver               ...
First Cost Savings                                                   Lower…                                               ...
Our Approach                     ● Initial prototypes delivered                         ● NAM 500kW power and chilled wate...
Facility Module Family                     COOLING MODULE                       Chilled water                             ...
Power ModuleSchneider Electric   7
Leveraging Schneider Software Portfolio                  Individual components       SIMPLIFIED by managing the           ...
Upcoming SlideShare
Loading in …5
×

Integrated Facility Sub Systems

4,845 views

Published on

Schneider Electric's modular data center. Could be skid or container based, located inside or outside.

Published in: Technology, Business
  • Be the first to comment

  • Be the first to like this

Integrated Facility Sub Systems

  1. 1. Integrated Facility Sub-SystemsUptime Symposium, Spring 2012Kevin BrownVice President, Global Data Center Offer
  2. 2. Modular Data Center – Built Out of Integrated Sub-Systems Could be skid or container based, located inside or outside Building shell can be cheap – IT PODs with pre defined build shell and incrementally rack density capacity scale out infrastructureSchneider Electric 2
  3. 3. Modular Data Center Expectations Better performance Fast Deliver Guaranteed 8-10 week delivery performance Lower installed cost Expectation is 15-20% lower first cost Delivering all three is the key to success – The right solution will drive the market Burden Shifts from owner to solutions providerSchneider Electric 3
  4. 4. First Cost Savings Lower… • Design Costs • Installation Costs Higher… • System Costs * APC White Paper 163, Containerized Power and Cooling Modules for Data CentersSchneider Electric 4
  5. 5. Our Approach ● Initial prototypes delivered ● NAM 500kW power and chilled water ● EMEA 500 kW power and chilled water ● China and APJ versions soon ● Solution is evolving based on customer interaction initiated by the marketing of these “prototypes” ● Optimized based on portfolio delivering best of ● Cost ● Power rating ● Physical spaceSchneider Electric 5
  6. 6. Facility Module Family COOLING MODULE Chilled water COOLING MODULE 500kW Air 400kW Ecobreeze rapidly moving towards full production POWER MODULE 500kW UPSSchneider Electric 1000kW Switchgear 6
  7. 7. Power ModuleSchneider Electric 7
  8. 8. Leveraging Schneider Software Portfolio Individual components SIMPLIFIED by managing the require programming POD with embedded unique to each data center. management – more efficient and easier to manageSchneider Electric 8

×