SlideShare a Scribd company logo
1 of 3
GOVIND SINGH LATWAL
99B E Block, Sahibabad Ghaziabad
Contact No. : 9910207405,
Email ID : latwalgovind@gmail.com
ACADEMIC QUALIFICATION : 12(Science stream)
From Almora (U.A BOARD)
PROFESSIONAL QUALIFICATION : I.T.I. (Civil Draughtsman)-2005
From Almora, Uttranchal
SOFTWARES : Microstation SE (Bentley)
Microstation Jawa (Bentley
: AUTO CAD
2004, 2006 & 2010
: MS Word, MS Excel
WORK EXPERIENCE
From: 2012 To Till Date AECOM India Pvt. Ltd., Gurgaon, India
Project CAD Technician (Civil)
Associated with the following projects
Northeast Frontier Railway Jiribam Tupul New BG Line - Tunnel T12-27
• Rock Stabilization : Plan and sections of Cladding details with anchorage of rock surface
• Tunnel : General Layout, Plan & L-section, Excavation, rock supporting & shotcreting
Delhi Delhi Jal Board
Design & construction of interceptor sewers along Najafgarh, supplementary & Shahdara drain for
abatement of pollution in river yamuna (package-3)
 General arrangement of base slab for bharatnagar pumping station,
 R.C.C detail of base slab for bharatnagar pumping station
 GA & RC detail of coronation pipe bridge - pile & pile cap
 Detail of coupler position in Diaphragm wall for bharat nagar pumping station
 R.C.C. Detail of first level permanent strut for barath nagar pumping station
 Typical connection details between strut with waler for bharat nagar pumping station
 Coronation pillar alignment layout & elevation detail of pipe bridge forpier & piercap
 General arrangement details for superstructures of coronation pipe bridge
Delhi Metro Rail Corporation Ltd – CC18 Detail Design
 Prepared Running tunnel-natm G.A & R.C.C Detailing
 Prepared Cross passage temporary steel frame drawings
 Prepared Cross passage sprayed concrete lining ground improvement by method of forepoling
and Grouting
Delhi Metro Rail Corporation Ltd - CC23 Definitive Design
 CC-23 Underground metro tunnel
 Prepared G.A & R.C.C Detailing Drawings
 Panchsheel park station dimension detail of plunge column and reinforcement detail of
permanent column and Panchsheel Park station traffic decking details
 Hauz Khas launching shaft gad of steel decking and
Delhi Metro Rail Corporation Ltd – CC-66
 CC-66 Underground metro tunnel, Open ramp and Steel temporary work covered ramp drawings
 Prepared General alignment drawing, and main line G.A. plan & longitudinal section, cross
section R.C.C drawings
 Temporary steel work and Typical Connection details
 Prepared launching shaft diaphragm wall and guide wall details & TBM face wall using R.C.C
diaphragm-RC detail
 Prepared Najafgarh station reinforcement. details for d-wall
 Prepared B.B.S Covered ramp and open ramp portion
From: 2006 to 2012 JAYPEE Ventures Pvt. Ltd. Noida, India
CAD Draughtsman (Civil)
Associated with the following projects-
BAGLIHAR HYDRO-ELECTRIC PROJECT, JAMMU & KASHMIR (450MW)
Involvement in Dam Works:
 Diesel Generator Set Building & High Speed Diesel Tank on Dam Top :
 General Layout, Concrete outline and Reinforcement details in plan and sections
 Rock Stabilization : Plan and sections of Cladding details with anchorage of rock surface
between dam top & Tail-track.
 Dam Foundation Galleries : Drainage arrangement Escape Channel :
 Plan & sections showing concrete outline details of scour treatment in the Escape channel
 Curtain Grouting for dam : Grout holes pattern along galleries and dam axis Control Room
 General Layout, Concrete outline and Reinforcement details in plan and sections of Control room
for Intake Structure & Auxiliary Spillway
 Plunge pool : Drainage system, Rock anchorage details
 Right training wall of dam : Concrete outline, Reinforcement details & Rock slope protection work
drawings
 Septic Tank : Layout, Concrete outline and Reinforcement details
 Transformer Pedestal on Dam Top : Layout, Concrete outline & reinforcement details, Layout of
cable trenches & their sectional details
 Control Block : Sludge and plumbing details
Involvement in Underground Works:
 Adits : General Layout, Plan & L-section, Excavation, rock supporting & shotcreting details,
Fabrication details of Ribs
 Erection Gallery : Plan, L-section, Excavation & supporting details
 Head Race Tunnel : Excavation & rock supporting details
 Tail Race Tunnel : Layout, Plan & L-section, Excavation & rock supporting details
BINA THERMAL POWER PROJECT, M.P. (2X250 MW)
Involvement in Weir & Barrage Portion
 Drawing of river diversion & river protection works for Betwa river
 Excavation drawings
 Plan & sections of Concrete outline and Reinforcement details for Weir, Barrage,
 Training walls, Intake structure & Stilling Basin
 Fabrication Details of Steel bridge Deck for 12M.Span
 Drawing showing arrangement of drainage system
 Details of Rock anchors, Water-stops, Contraction Joints & Porous drains
From: 2005 to 2006 M/S Sunando Dasgupta & Associates Pvt. Delhi, India
CAD Draughtsman (Civil)
Responsibilities:
Preparation of drawings for Raft Foundation, Isolated Foundation and Layout details of beams,
columns & frames with RCC detailing
Projects Undertaken
 IRWO Group housing, Asansole (kolkata)
 I.R.C.T Architectural, Engineering & Interior consultancy work for renovation at Rail Yatri Niwas ,
New Delhi
 Preparation of Architectural, Structural and Survey Drawings
PERSONAL DETAILS
Date of Birth : 05th
May 1981
Father’s Name : Sh. Jagnnath Singh Latwal
Nationality : Indian
Marital Status : Married
Languages Known : English and Hindi
CERTIFICATION
I, the undersigned, certify that to the best of my knowledge & belief, this resume correctly describes
me, my qualifications & my work experience.
GOVIND SINGH LATWAL

More Related Content

What's hot

Design & Analysis of High rise Building With & Without Floating Column Using ...
Design & Analysis of High rise Building With & Without Floating Column Using ...Design & Analysis of High rise Building With & Without Floating Column Using ...
Design & Analysis of High rise Building With & Without Floating Column Using ...IJSRD
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentationguest2d44ee
 
IRJET- Comparative Analysis of Seismic Behavior of Flat Slab and Conventional...
IRJET- Comparative Analysis of Seismic Behavior of Flat Slab and Conventional...IRJET- Comparative Analysis of Seismic Behavior of Flat Slab and Conventional...
IRJET- Comparative Analysis of Seismic Behavior of Flat Slab and Conventional...IRJET Journal
 
Telegraph Road Walkway Phase 1 August 2020
Telegraph Road Walkway Phase 1 August 2020Telegraph Road Walkway Phase 1 August 2020
Telegraph Road Walkway Phase 1 August 2020Fairfax County
 
IRJET- Seismic Analysis of Curve Cable-Stayed Bridge
IRJET- Seismic Analysis of Curve Cable-Stayed BridgeIRJET- Seismic Analysis of Curve Cable-Stayed Bridge
IRJET- Seismic Analysis of Curve Cable-Stayed BridgeIRJET Journal
 
Erim Gurdal CV
Erim Gurdal CVErim Gurdal CV
Erim Gurdal CVerimathome
 
SAJJAD HUSSAIN UP DATE CV - Copy
SAJJAD HUSSAIN UP DATE CV - CopySAJJAD HUSSAIN UP DATE CV - Copy
SAJJAD HUSSAIN UP DATE CV - Copysajjad Hussain
 
Caledonia Station: Preliminary Design Consultation
Caledonia Station: Preliminary Design ConsultationCaledonia Station: Preliminary Design Consultation
Caledonia Station: Preliminary Design ConsultationCrosstown TO
 
Prime consulting group brochure
Prime consulting group brochurePrime consulting group brochure
Prime consulting group brochureMANOJ PATNE
 
Western Works Construction Liaison Committee - November 2017
Western Works Construction Liaison Committee - November 2017Western Works Construction Liaison Committee - November 2017
Western Works Construction Liaison Committee - November 2017Crosstown TO
 
Kanaka Project
Kanaka ProjectKanaka Project
Kanaka ProjectJunha Jeon
 
Resume + Abstract-update 4-15-16
Resume + Abstract-update 4-15-16Resume + Abstract-update 4-15-16
Resume + Abstract-update 4-15-16Kristy Plummer
 

What's hot (20)

Design & Analysis of High rise Building With & Without Floating Column Using ...
Design & Analysis of High rise Building With & Without Floating Column Using ...Design & Analysis of High rise Building With & Without Floating Column Using ...
Design & Analysis of High rise Building With & Without Floating Column Using ...
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentation
 
Abugattas, Abraham
Abugattas, AbrahamAbugattas, Abraham
Abugattas, Abraham
 
Resume of jeonghoon woo
Resume of jeonghoon wooResume of jeonghoon woo
Resume of jeonghoon woo
 
IRJET- Comparative Analysis of Seismic Behavior of Flat Slab and Conventional...
IRJET- Comparative Analysis of Seismic Behavior of Flat Slab and Conventional...IRJET- Comparative Analysis of Seismic Behavior of Flat Slab and Conventional...
IRJET- Comparative Analysis of Seismic Behavior of Flat Slab and Conventional...
 
Telegraph Road Walkway Phase 1 August 2020
Telegraph Road Walkway Phase 1 August 2020Telegraph Road Walkway Phase 1 August 2020
Telegraph Road Walkway Phase 1 August 2020
 
IRJET- Seismic Analysis of Curve Cable-Stayed Bridge
IRJET- Seismic Analysis of Curve Cable-Stayed BridgeIRJET- Seismic Analysis of Curve Cable-Stayed Bridge
IRJET- Seismic Analysis of Curve Cable-Stayed Bridge
 
Brian K. Hollier
Brian K. HollierBrian K. Hollier
Brian K. Hollier
 
C.V wesam -UPDATED-
C.V wesam -UPDATED-C.V wesam -UPDATED-
C.V wesam -UPDATED-
 
John Pearson C.V.
John Pearson C.V.John Pearson C.V.
John Pearson C.V.
 
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
 
Erim Gurdal CV
Erim Gurdal CVErim Gurdal CV
Erim Gurdal CV
 
SAJJAD HUSSAIN UP DATE CV - Copy
SAJJAD HUSSAIN UP DATE CV - CopySAJJAD HUSSAIN UP DATE CV - Copy
SAJJAD HUSSAIN UP DATE CV - Copy
 
Caledonia Station: Preliminary Design Consultation
Caledonia Station: Preliminary Design ConsultationCaledonia Station: Preliminary Design Consultation
Caledonia Station: Preliminary Design Consultation
 
Graham Barton CV
Graham Barton CVGraham Barton CV
Graham Barton CV
 
Prime consulting group brochure
Prime consulting group brochurePrime consulting group brochure
Prime consulting group brochure
 
Western Works Construction Liaison Committee - November 2017
Western Works Construction Liaison Committee - November 2017Western Works Construction Liaison Committee - November 2017
Western Works Construction Liaison Committee - November 2017
 
Byron CV 2016v5
Byron CV 2016v5Byron CV 2016v5
Byron CV 2016v5
 
Kanaka Project
Kanaka ProjectKanaka Project
Kanaka Project
 
Resume + Abstract-update 4-15-16
Resume + Abstract-update 4-15-16Resume + Abstract-update 4-15-16
Resume + Abstract-update 4-15-16
 

Similar to GOVIND LATWAL

Similar to GOVIND LATWAL (20)

Shilpesh CV
Shilpesh CVShilpesh CV
Shilpesh CV
 
CV Structral Cad Designer_Sree Kumar
CV Structral Cad Designer_Sree KumarCV Structral Cad Designer_Sree Kumar
CV Structral Cad Designer_Sree Kumar
 
RAJA NARAYANASWAMY__Senior Civil & Structural Designer
RAJA NARAYANASWAMY__Senior Civil & Structural DesignerRAJA NARAYANASWAMY__Senior Civil & Structural Designer
RAJA NARAYANASWAMY__Senior Civil & Structural Designer
 
Sr. Civil & Structural Designer
Sr. Civil & Structural DesignerSr. Civil & Structural Designer
Sr. Civil & Structural Designer
 
Draughtsman_Sai
Draughtsman_SaiDraughtsman_Sai
Draughtsman_Sai
 
RESUME_ARP
RESUME_ARPRESUME_ARP
RESUME_ARP
 
Resume
ResumeResume
Resume
 
Adeel Ahemd Chishty
Adeel Ahemd ChishtyAdeel Ahemd Chishty
Adeel Ahemd Chishty
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
 
Jvm1
Jvm1Jvm1
Jvm1
 
Ajay-Patil
Ajay-PatilAjay-Patil
Ajay-Patil
 
CV - Sasikumar M
CV - Sasikumar MCV - Sasikumar M
CV - Sasikumar M
 
Chandrasekar updated 2016
Chandrasekar updated 2016Chandrasekar updated 2016
Chandrasekar updated 2016
 
RAJA K RAJA - RESUME
RAJA K RAJA - RESUMERAJA K RAJA - RESUME
RAJA K RAJA - RESUME
 
Prime Consulting Group Profile
Prime Consulting Group ProfilePrime Consulting Group Profile
Prime Consulting Group Profile
 
13.12.15. Bio-Data.Pabitra Roy.DOC
13.12.15. Bio-Data.Pabitra Roy.DOC13.12.15. Bio-Data.Pabitra Roy.DOC
13.12.15. Bio-Data.Pabitra Roy.DOC
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
 
Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)
 
Elvin Ortiz Resume
Elvin Ortiz ResumeElvin Ortiz Resume
Elvin Ortiz Resume
 
CV_Appas J
CV_Appas JCV_Appas J
CV_Appas J
 

GOVIND LATWAL

  • 1. GOVIND SINGH LATWAL 99B E Block, Sahibabad Ghaziabad Contact No. : 9910207405, Email ID : latwalgovind@gmail.com ACADEMIC QUALIFICATION : 12(Science stream) From Almora (U.A BOARD) PROFESSIONAL QUALIFICATION : I.T.I. (Civil Draughtsman)-2005 From Almora, Uttranchal SOFTWARES : Microstation SE (Bentley) Microstation Jawa (Bentley : AUTO CAD 2004, 2006 & 2010 : MS Word, MS Excel WORK EXPERIENCE From: 2012 To Till Date AECOM India Pvt. Ltd., Gurgaon, India Project CAD Technician (Civil) Associated with the following projects Northeast Frontier Railway Jiribam Tupul New BG Line - Tunnel T12-27 • Rock Stabilization : Plan and sections of Cladding details with anchorage of rock surface • Tunnel : General Layout, Plan & L-section, Excavation, rock supporting & shotcreting Delhi Delhi Jal Board Design & construction of interceptor sewers along Najafgarh, supplementary & Shahdara drain for abatement of pollution in river yamuna (package-3)  General arrangement of base slab for bharatnagar pumping station,  R.C.C detail of base slab for bharatnagar pumping station  GA & RC detail of coronation pipe bridge - pile & pile cap  Detail of coupler position in Diaphragm wall for bharat nagar pumping station  R.C.C. Detail of first level permanent strut for barath nagar pumping station  Typical connection details between strut with waler for bharat nagar pumping station  Coronation pillar alignment layout & elevation detail of pipe bridge forpier & piercap  General arrangement details for superstructures of coronation pipe bridge Delhi Metro Rail Corporation Ltd – CC18 Detail Design  Prepared Running tunnel-natm G.A & R.C.C Detailing  Prepared Cross passage temporary steel frame drawings  Prepared Cross passage sprayed concrete lining ground improvement by method of forepoling and Grouting Delhi Metro Rail Corporation Ltd - CC23 Definitive Design  CC-23 Underground metro tunnel  Prepared G.A & R.C.C Detailing Drawings
  • 2.  Panchsheel park station dimension detail of plunge column and reinforcement detail of permanent column and Panchsheel Park station traffic decking details  Hauz Khas launching shaft gad of steel decking and Delhi Metro Rail Corporation Ltd – CC-66  CC-66 Underground metro tunnel, Open ramp and Steel temporary work covered ramp drawings  Prepared General alignment drawing, and main line G.A. plan & longitudinal section, cross section R.C.C drawings  Temporary steel work and Typical Connection details  Prepared launching shaft diaphragm wall and guide wall details & TBM face wall using R.C.C diaphragm-RC detail  Prepared Najafgarh station reinforcement. details for d-wall  Prepared B.B.S Covered ramp and open ramp portion From: 2006 to 2012 JAYPEE Ventures Pvt. Ltd. Noida, India CAD Draughtsman (Civil) Associated with the following projects- BAGLIHAR HYDRO-ELECTRIC PROJECT, JAMMU & KASHMIR (450MW) Involvement in Dam Works:  Diesel Generator Set Building & High Speed Diesel Tank on Dam Top :  General Layout, Concrete outline and Reinforcement details in plan and sections  Rock Stabilization : Plan and sections of Cladding details with anchorage of rock surface between dam top & Tail-track.  Dam Foundation Galleries : Drainage arrangement Escape Channel :  Plan & sections showing concrete outline details of scour treatment in the Escape channel  Curtain Grouting for dam : Grout holes pattern along galleries and dam axis Control Room  General Layout, Concrete outline and Reinforcement details in plan and sections of Control room for Intake Structure & Auxiliary Spillway  Plunge pool : Drainage system, Rock anchorage details  Right training wall of dam : Concrete outline, Reinforcement details & Rock slope protection work drawings  Septic Tank : Layout, Concrete outline and Reinforcement details  Transformer Pedestal on Dam Top : Layout, Concrete outline & reinforcement details, Layout of cable trenches & their sectional details  Control Block : Sludge and plumbing details Involvement in Underground Works:  Adits : General Layout, Plan & L-section, Excavation, rock supporting & shotcreting details, Fabrication details of Ribs  Erection Gallery : Plan, L-section, Excavation & supporting details  Head Race Tunnel : Excavation & rock supporting details  Tail Race Tunnel : Layout, Plan & L-section, Excavation & rock supporting details
  • 3. BINA THERMAL POWER PROJECT, M.P. (2X250 MW) Involvement in Weir & Barrage Portion  Drawing of river diversion & river protection works for Betwa river  Excavation drawings  Plan & sections of Concrete outline and Reinforcement details for Weir, Barrage,  Training walls, Intake structure & Stilling Basin  Fabrication Details of Steel bridge Deck for 12M.Span  Drawing showing arrangement of drainage system  Details of Rock anchors, Water-stops, Contraction Joints & Porous drains From: 2005 to 2006 M/S Sunando Dasgupta & Associates Pvt. Delhi, India CAD Draughtsman (Civil) Responsibilities: Preparation of drawings for Raft Foundation, Isolated Foundation and Layout details of beams, columns & frames with RCC detailing Projects Undertaken  IRWO Group housing, Asansole (kolkata)  I.R.C.T Architectural, Engineering & Interior consultancy work for renovation at Rail Yatri Niwas , New Delhi  Preparation of Architectural, Structural and Survey Drawings PERSONAL DETAILS Date of Birth : 05th May 1981 Father’s Name : Sh. Jagnnath Singh Latwal Nationality : Indian Marital Status : Married Languages Known : English and Hindi CERTIFICATION I, the undersigned, certify that to the best of my knowledge & belief, this resume correctly describes me, my qualifications & my work experience. GOVIND SINGH LATWAL