1. Sample Airport Projects
1. Southwest Wyoming Regional Airport – KRKS, Rock Springs, Wyoming
2. Mc Pherson Airport – MPR, Mc Pherson, Kansas
3. Ogden-Hinckley Airport – OGD, Ogden Utah
4. Delta Municipal Airport – DTA, Delta, Utah
5. Lawrence Airport – LWC, Lawrence , Kansas
* All Civil 3D CAD calculations include but not
limited to: Corridor modeling, feature lines, grading
objects, earth work calculations, fillet design,
intersection design, geometric design, plan
production, Faarfield input etc.…
* All drainage analysis done with SSA
(Storm & Sanitary Analysis) to include but not
limited to culverts, underground pipelines, catch
basins, ditches, drop inlets, channels etc.…
2. 1. Infield Grading
1 1 1 1
2. Runway & Taxiway Rehab
3. Parking Lot Rehab
4. New Terminal Building
2 2 2 2
2
3
4
Limits of construction
2
1
3. Rock Springs - Wyoming (3 Projects)
1.Infield Grading (Project 1 – 2015)
a. RPR (Resident Project Representative / Engineer – 6 months in the field)
i. Inspected construction contract related to the airport
ii. Reviewed contract plans and specifications for constructability, notes, errors, omissions and potential problem areas
iii. Scheduled, planned, coordinated, and completed site inspections
iv. Coordinated construction related system outages with client facilities
v. Prepared complete inspection reports
vi. Maintained complete project files including a project photo file
vii. Kept detailed records of construction progress, changed conditions, and as built drawings
viii. Prepared monthly estimates of quantities of construction completed
ix. Established and maintained effective working relationship with Prime contractor, Superintendent and airport owner
x. Verified intended drainage profile ( v – ditch, culvert inflow/outflow)
2. Runway & Multiple Taxiways Rehabilitation (Project 2 – 2016)
a. RPR (Resident Project Representative / Engineer – 2 months in the field)
i. Same as above
3. Parking Lot Rehabilitation (Project 3 – 2017)
a. RPR (Resident Project Representative / Engineer – 1 months in the field)
i. Inspected construction contract related to the airport
ii. Reviewed contract plans and specifications for constructability, notes, errors, omissions and potential problem areas
iii. Scheduled, planned, coordinated, and completed site inspections
iv. Coordinated construction related system outages with client facilities
v. Prepared complete inspection reports
vi. Maintained complete project files including a project photo file
vii. Kept detailed records of construction progress, changed conditions, and as built drawings
viii. Prepared monthly estimates of quantities of construction completed
ix. Established and maintained effective working relationship with Prime contractor, Project manager, Superintendent and airport owner
4. New Terminal Building (Project 3 – 2017)
a. RPR (Resident Project Representative / Engineer – 1 months in the field)
i. Same as above
5. 2
2
3. Designed: Drainage
(Channels & Culverts)
4. Designed: Turf Runway
333
3
3
4
Taxiway A
Taxiway A-3
2. Designed: New
Perpendicular And
Parallel Taxiways & Infield
Grading (to the runway)
3
6.
7.
8. Mc Pherson - Kansas (2 Projects)
1. Demolished Existing Taxiway (Project 1 – 2017)
2. Designed New Perpendicular And Parallel Taxiway & Infield Grading (Project 1 & 2, 2016 & 2017)
a. Civil 3D
i. Corridor modeling, feature lines, Grading objects, Culverts etc…
b. Faarfield
i. Pavement design
3. Designed Drainage (Project 1 & 2 - 2016 & 2017)
a. AutoCAD SSA (Storm And Sanitary Analysis)
i. Culverts and channels
1. Drainage Analysis
a. Catch basins, Average cumulative rainfall for 50 - year storm, Channel design, culvert
capacity, TOC, sheet flow, Channel flow and shallow concentrated flow for adequacy
4. Designed Turf Runway (Project 2 – 2017)
a. Using the same methods as above Civil 3D & SSA
10. Ogden Airport
Airport code: OGD
After Construction
2. Designed: New Construction of Taxiways, Aprons,
Roadway
3. Designed: Mill and Overlay of Multiple Taxiways
4. Designed: Drainage – Underground pipelines, Junctions
And Drop Inlets Flowing To Retention Pond
5. Designed: Site Development For New Apron, Parking
Lot, Access Road & Hangars
2
2
2
2
3
3
3
2
6
2
2
6. Designed: Full Depth Reclamation of North Apron
4
2
5
2
13. Ogden Airport - Utah (3 Projects)
1. Demolished Existing Taxiway (Project 1 – 2019)
a. RPR duties (Resident Project Representative / Engineer – 4 months in the field 2018 - 2019)
2. Designed New Taxiways and Apron (Project 1 - 2018)
a. RPR duties (2018 - 2019)
3. Designed Mill & Overlays of Multiple Taxiways (Project 1 - 2018)
a. RPR duties (2018 - 2019)
4. Designed Underground Pipelines, Junctions And Drop Inlets Flowing To Retention Pond (Project 1 – 2018)
a. RPR duties (2018 - 2019)
5. Designed Site for New Apron, Parking Lot, Access Road & Hangars (Project 2– 2019)
6. Designed Full Depth Reclamation of North Apron (Project 3 – 2019)
15. Delta Airport
Airport code: DTA
After construction
1. Designed: New Extended Runway
Partially Demolished Existing Runway
2. Designed: New Taxiways
3. Designed: Mill And Overlay Of
Runway, Taxiways, Apron And Access
Road
4. Partially Milled Existing Taxiway and
[Shoulders (x)]
1
2 2
3
3
3
3
3
2
4 4
5. Designed: New Drainage (Culverts,
Underground Pipelines Junctions And
Ditches)
5
5 5
5
16. Delta Airport – Utah (1 Project, 2019)
1. Designed Runway
a. Mill & Overlay the first half
b. Rebuilt the other half of the runway plus extended it
i. Demolished existing half of the runway (which was rebuilt)
2. Designed New Taxiway’s
a. Added elbows and new standard fillet design according to FAA standards
i. Partially demolished taxiways where necessary
3. Designed Mill & Overlay
a. Taxiways, runway, apron and access road
4. Milled In Place Shoulders of taxiway (it was previously a runway)
a. Shaped into drainage ditch
5. Designed New Drainage
a. Culverts, ditches, underground pipelines, junctions
19. Lawrence Airport – Kansas (1 Project, 2020)
1. Designed Mill And Overlay
a. Runway 15 – 33 (complete)
i. Full depth reclamation
b. All indicated taxiways (partial)
i. Standard mill and overlay
c. Runway 1-19 (partial)
i. Full depth reclamation