Sample Airport Projects
1. Southwest Wyoming Regional Airport – KRKS, Rock Springs, Wyoming
2. Mc Pherson Airport – MPR, Mc Pherson, Kansas
3. Ogden-Hinckley Airport – OGD, Ogden Utah
4. Delta Municipal Airport – DTA, Delta, Utah
5. Lawrence Airport – LWC, Lawrence , Kansas
* All Civil 3D CAD calculations include but not
limited to: Corridor modeling, feature lines, grading
objects, earth work calculations, fillet design,
intersection design, geometric design, plan
production, Faarfield input etc.…
* All drainage analysis done with SSA
(Storm & Sanitary Analysis) to include but not
limited to culverts, underground pipelines, catch
basins, ditches, drop inlets, channels etc.…
1. Infield Grading
1 1 1 1
2. Runway & Taxiway Rehab
3. Parking Lot Rehab
4. New Terminal Building
2 2 2 2
2
3
4
Limits of construction
2
1
Rock Springs - Wyoming (3 Projects)
1.Infield Grading (Project 1 – 2015)
a. RPR (Resident Project Representative / Engineer – 6 months in the field)
i. Inspected construction contract related to the airport
ii. Reviewed contract plans and specifications for constructability, notes, errors, omissions and potential problem areas
iii. Scheduled, planned, coordinated, and completed site inspections
iv. Coordinated construction related system outages with client facilities
v. Prepared complete inspection reports
vi. Maintained complete project files including a project photo file
vii. Kept detailed records of construction progress, changed conditions, and as built drawings
viii. Prepared monthly estimates of quantities of construction completed
ix. Established and maintained effective working relationship with Prime contractor, Superintendent and airport owner
x. Verified intended drainage profile ( v – ditch, culvert inflow/outflow)
2. Runway & Multiple Taxiways Rehabilitation (Project 2 – 2016)
a. RPR (Resident Project Representative / Engineer – 2 months in the field)
i. Same as above
3. Parking Lot Rehabilitation (Project 3 – 2017)
a. RPR (Resident Project Representative / Engineer – 1 months in the field)
i. Inspected construction contract related to the airport
ii. Reviewed contract plans and specifications for constructability, notes, errors, omissions and potential problem areas
iii. Scheduled, planned, coordinated, and completed site inspections
iv. Coordinated construction related system outages with client facilities
v. Prepared complete inspection reports
vi. Maintained complete project files including a project photo file
vii. Kept detailed records of construction progress, changed conditions, and as built drawings
viii. Prepared monthly estimates of quantities of construction completed
ix. Established and maintained effective working relationship with Prime contractor, Project manager, Superintendent and airport owner
4. New Terminal Building (Project 3 – 2017)
a. RPR (Resident Project Representative / Engineer – 1 months in the field)
i. Same as above
1. Demolished Existing Taxiway
1
2
2
3. Designed: Drainage
(Channels & Culverts)
4. Designed: Turf Runway
333
3
3
4
Taxiway A
Taxiway A-3
2. Designed: New
Perpendicular And
Parallel Taxiways & Infield
Grading (to the runway)
3
Mc Pherson - Kansas (2 Projects)
1. Demolished Existing Taxiway (Project 1 – 2017)
2. Designed New Perpendicular And Parallel Taxiway & Infield Grading (Project 1 & 2, 2016 & 2017)
a. Civil 3D
i. Corridor modeling, feature lines, Grading objects, Culverts etc…
b. Faarfield
i. Pavement design
3. Designed Drainage (Project 1 & 2 - 2016 & 2017)
a. AutoCAD SSA (Storm And Sanitary Analysis)
i. Culverts and channels
1. Drainage Analysis
a. Catch basins, Average cumulative rainfall for 50 - year storm, Channel design, culvert
capacity, TOC, sheet flow, Channel flow and shallow concentrated flow for adequacy
4. Designed Turf Runway (Project 2 – 2017)
a. Using the same methods as above Civil 3D & SSA
Ogden Airport
Airport code: OGD
Before construction
1. Demolished Existing Taxiways
1
Ogden Airport
Airport code: OGD
After Construction
2. Designed: New Construction of Taxiways, Aprons,
Roadway
3. Designed: Mill and Overlay of Multiple Taxiways
4. Designed: Drainage – Underground pipelines, Junctions
And Drop Inlets Flowing To Retention Pond
5. Designed: Site Development For New Apron, Parking
Lot, Access Road & Hangars
2
2
2
2
3
3
3
2
6
2
2
6. Designed: Full Depth Reclamation of North Apron
4
2
5
2
5
New
Apron New
Hangar
New
Hangar
3
6
2
2
3
North Apron
Ogden Airport - Utah (3 Projects)
1. Demolished Existing Taxiway (Project 1 – 2019)
a. RPR duties (Resident Project Representative / Engineer – 4 months in the field 2018 - 2019)
2. Designed New Taxiways and Apron (Project 1 - 2018)
a. RPR duties (2018 - 2019)
3. Designed Mill & Overlays of Multiple Taxiways (Project 1 - 2018)
a. RPR duties (2018 - 2019)
4. Designed Underground Pipelines, Junctions And Drop Inlets Flowing To Retention Pond (Project 1 – 2018)
a. RPR duties (2018 - 2019)
5. Designed Site for New Apron, Parking Lot, Access Road & Hangars (Project 2– 2019)
6. Designed Full Depth Reclamation of North Apron (Project 3 – 2019)
Delta Airport
Airport code: DTA
Before construction
Delta Airport
Airport code: DTA
After construction
1. Designed: New Extended Runway
Partially Demolished Existing Runway
2. Designed: New Taxiways
3. Designed: Mill And Overlay Of
Runway, Taxiways, Apron And Access
Road
4. Partially Milled Existing Taxiway and
[Shoulders (x)]
1
2 2
3
3
3
3
3
2
4 4
5. Designed: New Drainage (Culverts,
Underground Pipelines Junctions And
Ditches)
5
5 5
5
Delta Airport – Utah (1 Project, 2019)
1. Designed Runway
a. Mill & Overlay the first half
b. Rebuilt the other half of the runway plus extended it
i. Demolished existing half of the runway (which was rebuilt)
2. Designed New Taxiway’s
a. Added elbows and new standard fillet design according to FAA standards
i. Partially demolished taxiways where necessary
3. Designed Mill & Overlay
a. Taxiways, runway, apron and access road
4. Milled In Place Shoulders of taxiway (it was previously a runway)
a. Shaped into drainage ditch
5. Designed New Drainage
a. Culverts, ditches, underground pipelines, junctions
Lawrence Airport
Airport code: LWC
Before Construction
Lawrence Airport
Airport code: LWC
After Construction
1. Designed Mill And Overlay Of
Specified Taxiways And Runways
Lawrence Airport – Kansas (1 Project, 2020)
1. Designed Mill And Overlay
a. Runway 15 – 33 (complete)
i. Full depth reclamation
b. All indicated taxiways (partial)
i. Standard mill and overlay
c. Runway 1-19 (partial)
i. Full depth reclamation

More Related Content

What's hot

LGA Capital Plan Presentation 2009
LGA Capital Plan Presentation 2009LGA Capital Plan Presentation 2009
LGA Capital Plan Presentation 2009Jimmy Gracia
 
civil engineers project work .docx
civil engineers project work .docxcivil engineers project work .docx
civil engineers project work .docxVijay Kumar
 
Gis saaf-project
Gis saaf-projectGis saaf-project
Gis saaf-projectSalah Bakry
 
Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 AHMED afifi
 
Site_Surveying_Class (2)
Site_Surveying_Class (2)Site_Surveying_Class (2)
Site_Surveying_Class (2)Sandy Noisette
 
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET-  	  Design and Analysis of Flexible Pavement in Amaravati Governemnt C...IRJET-  	  Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...IRJET Journal
 
Advanced Session on Statutory procedure and required documentations.
Advanced Session on Statutory procedure and required documentations.Advanced Session on Statutory procedure and required documentations.
Advanced Session on Statutory procedure and required documentations.Kartikey Joshi
 
NASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldNASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldSteve Williams
 
REPORT BY SHUBHAM TRIPATHI
REPORT BY SHUBHAM TRIPATHIREPORT BY SHUBHAM TRIPATHI
REPORT BY SHUBHAM TRIPATHIShubham Tripathi
 
Senior surveyor ragab atta c.v
Senior surveyor ragab atta c.vSenior surveyor ragab atta c.v
Senior surveyor ragab atta c.vragabata
 
Needs Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status ReportNeeds Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status ReportUGPTI
 
Stephen Wiafe - Resume
Stephen Wiafe - ResumeStephen Wiafe - Resume
Stephen Wiafe - ResumeStephen Wiafe
 

What's hot (20)

GTQ Experience (2) (1)
GTQ Experience (2) (1)GTQ Experience (2) (1)
GTQ Experience (2) (1)
 
inayat ur rahman cv 1
inayat ur rahman cv 1inayat ur rahman cv 1
inayat ur rahman cv 1
 
LGA Capital Plan Presentation 2009
LGA Capital Plan Presentation 2009LGA Capital Plan Presentation 2009
LGA Capital Plan Presentation 2009
 
civil engineers project work .docx
civil engineers project work .docxcivil engineers project work .docx
civil engineers project work .docx
 
Will Mallory 2017
Will Mallory 2017Will Mallory 2017
Will Mallory 2017
 
Ramy's Resume
Ramy's ResumeRamy's Resume
Ramy's Resume
 
Will mallory 2016
Will mallory 2016Will mallory 2016
Will mallory 2016
 
Gis saaf-project
Gis saaf-projectGis saaf-project
Gis saaf-project
 
Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015
 
Site_Surveying_Class (2)
Site_Surveying_Class (2)Site_Surveying_Class (2)
Site_Surveying_Class (2)
 
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET-  	  Design and Analysis of Flexible Pavement in Amaravati Governemnt C...IRJET-  	  Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
 
Advanced Session on Statutory procedure and required documentations.
Advanced Session on Statutory procedure and required documentations.Advanced Session on Statutory procedure and required documentations.
Advanced Session on Statutory procedure and required documentations.
 
RESUME-RDP
RESUME-RDPRESUME-RDP
RESUME-RDP
 
NASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldNASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett Field
 
REPORT BY SHUBHAM TRIPATHI
REPORT BY SHUBHAM TRIPATHIREPORT BY SHUBHAM TRIPATHI
REPORT BY SHUBHAM TRIPATHI
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Senior surveyor ragab atta c.v
Senior surveyor ragab atta c.vSenior surveyor ragab atta c.v
Senior surveyor ragab atta c.v
 
Needs Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status ReportNeeds Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status Report
 
walid abou lhaf CV
walid abou lhaf  CVwalid abou lhaf  CV
walid abou lhaf CV
 
Stephen Wiafe - Resume
Stephen Wiafe - ResumeStephen Wiafe - Resume
Stephen Wiafe - Resume
 

Similar to Sample Airport / Aviation Projects (2015 - 2020)

Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...The Piedmont Environmental Council
 
150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-Cargo150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-CargoDouglas Tobin
 
06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultransConsultrans, S.A.
 
Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani PortfolioRONIEE Sparks
 
Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016ASHRAF GOMAH MOHAMED
 
Photogrammetry & Remote Sensing applications in Engineering
Photogrammetry & Remote Sensing applications in EngineeringPhotogrammetry & Remote Sensing applications in Engineering
Photogrammetry & Remote Sensing applications in EngineeringAmira Abdallah
 
Ahmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CVAhmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CVAhmed Nagdy
 
Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)IJERA Editor
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)Ahmed Kamal
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016Rolando Garcia
 

Similar to Sample Airport / Aviation Projects (2015 - 2020) (20)

Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
 
RESUME JULY 2016
RESUME JULY 2016RESUME JULY 2016
RESUME JULY 2016
 
150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-Cargo150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-Cargo
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans
 
M.foreman's resume'
M.foreman's resume'M.foreman's resume'
M.foreman's resume'
 
Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani Portfolio
 
Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016
 
Capital Programs - O'Hare 21
Capital Programs - O'Hare 21 Capital Programs - O'Hare 21
Capital Programs - O'Hare 21
 
Photogrammetry & Remote Sensing applications in Engineering
Photogrammetry & Remote Sensing applications in EngineeringPhotogrammetry & Remote Sensing applications in Engineering
Photogrammetry & Remote Sensing applications in Engineering
 
Ahmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CVAhmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CV
 
Saeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer UtilitiesSaeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer Utilities
 
cv Updated M.Anwar
cv Updated M.Anwarcv Updated M.Anwar
cv Updated M.Anwar
 
Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)
 
Abugattas, Abraham
Abugattas, AbrahamAbugattas, Abraham
Abugattas, Abraham
 
Major project highways report
Major project highways reportMajor project highways report
Major project highways report
 
GOPAL
GOPALGOPAL
GOPAL
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
Cv aniruddha
Cv aniruddhaCv aniruddha
Cv aniruddha
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 

Recently uploaded

Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 

Recently uploaded (20)

Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 

Sample Airport / Aviation Projects (2015 - 2020)

  • 1. Sample Airport Projects 1. Southwest Wyoming Regional Airport – KRKS, Rock Springs, Wyoming 2. Mc Pherson Airport – MPR, Mc Pherson, Kansas 3. Ogden-Hinckley Airport – OGD, Ogden Utah 4. Delta Municipal Airport – DTA, Delta, Utah 5. Lawrence Airport – LWC, Lawrence , Kansas * All Civil 3D CAD calculations include but not limited to: Corridor modeling, feature lines, grading objects, earth work calculations, fillet design, intersection design, geometric design, plan production, Faarfield input etc.… * All drainage analysis done with SSA (Storm & Sanitary Analysis) to include but not limited to culverts, underground pipelines, catch basins, ditches, drop inlets, channels etc.…
  • 2. 1. Infield Grading 1 1 1 1 2. Runway & Taxiway Rehab 3. Parking Lot Rehab 4. New Terminal Building 2 2 2 2 2 3 4 Limits of construction 2 1
  • 3. Rock Springs - Wyoming (3 Projects) 1.Infield Grading (Project 1 – 2015) a. RPR (Resident Project Representative / Engineer – 6 months in the field) i. Inspected construction contract related to the airport ii. Reviewed contract plans and specifications for constructability, notes, errors, omissions and potential problem areas iii. Scheduled, planned, coordinated, and completed site inspections iv. Coordinated construction related system outages with client facilities v. Prepared complete inspection reports vi. Maintained complete project files including a project photo file vii. Kept detailed records of construction progress, changed conditions, and as built drawings viii. Prepared monthly estimates of quantities of construction completed ix. Established and maintained effective working relationship with Prime contractor, Superintendent and airport owner x. Verified intended drainage profile ( v – ditch, culvert inflow/outflow) 2. Runway & Multiple Taxiways Rehabilitation (Project 2 – 2016) a. RPR (Resident Project Representative / Engineer – 2 months in the field) i. Same as above 3. Parking Lot Rehabilitation (Project 3 – 2017) a. RPR (Resident Project Representative / Engineer – 1 months in the field) i. Inspected construction contract related to the airport ii. Reviewed contract plans and specifications for constructability, notes, errors, omissions and potential problem areas iii. Scheduled, planned, coordinated, and completed site inspections iv. Coordinated construction related system outages with client facilities v. Prepared complete inspection reports vi. Maintained complete project files including a project photo file vii. Kept detailed records of construction progress, changed conditions, and as built drawings viii. Prepared monthly estimates of quantities of construction completed ix. Established and maintained effective working relationship with Prime contractor, Project manager, Superintendent and airport owner 4. New Terminal Building (Project 3 – 2017) a. RPR (Resident Project Representative / Engineer – 1 months in the field) i. Same as above
  • 5. 2 2 3. Designed: Drainage (Channels & Culverts) 4. Designed: Turf Runway 333 3 3 4 Taxiway A Taxiway A-3 2. Designed: New Perpendicular And Parallel Taxiways & Infield Grading (to the runway) 3
  • 6.
  • 7.
  • 8. Mc Pherson - Kansas (2 Projects) 1. Demolished Existing Taxiway (Project 1 – 2017) 2. Designed New Perpendicular And Parallel Taxiway & Infield Grading (Project 1 & 2, 2016 & 2017) a. Civil 3D i. Corridor modeling, feature lines, Grading objects, Culverts etc… b. Faarfield i. Pavement design 3. Designed Drainage (Project 1 & 2 - 2016 & 2017) a. AutoCAD SSA (Storm And Sanitary Analysis) i. Culverts and channels 1. Drainage Analysis a. Catch basins, Average cumulative rainfall for 50 - year storm, Channel design, culvert capacity, TOC, sheet flow, Channel flow and shallow concentrated flow for adequacy 4. Designed Turf Runway (Project 2 – 2017) a. Using the same methods as above Civil 3D & SSA
  • 9. Ogden Airport Airport code: OGD Before construction 1. Demolished Existing Taxiways 1
  • 10. Ogden Airport Airport code: OGD After Construction 2. Designed: New Construction of Taxiways, Aprons, Roadway 3. Designed: Mill and Overlay of Multiple Taxiways 4. Designed: Drainage – Underground pipelines, Junctions And Drop Inlets Flowing To Retention Pond 5. Designed: Site Development For New Apron, Parking Lot, Access Road & Hangars 2 2 2 2 3 3 3 2 6 2 2 6. Designed: Full Depth Reclamation of North Apron 4 2 5 2
  • 13. Ogden Airport - Utah (3 Projects) 1. Demolished Existing Taxiway (Project 1 – 2019) a. RPR duties (Resident Project Representative / Engineer – 4 months in the field 2018 - 2019) 2. Designed New Taxiways and Apron (Project 1 - 2018) a. RPR duties (2018 - 2019) 3. Designed Mill & Overlays of Multiple Taxiways (Project 1 - 2018) a. RPR duties (2018 - 2019) 4. Designed Underground Pipelines, Junctions And Drop Inlets Flowing To Retention Pond (Project 1 – 2018) a. RPR duties (2018 - 2019) 5. Designed Site for New Apron, Parking Lot, Access Road & Hangars (Project 2– 2019) 6. Designed Full Depth Reclamation of North Apron (Project 3 – 2019)
  • 14. Delta Airport Airport code: DTA Before construction
  • 15. Delta Airport Airport code: DTA After construction 1. Designed: New Extended Runway Partially Demolished Existing Runway 2. Designed: New Taxiways 3. Designed: Mill And Overlay Of Runway, Taxiways, Apron And Access Road 4. Partially Milled Existing Taxiway and [Shoulders (x)] 1 2 2 3 3 3 3 3 2 4 4 5. Designed: New Drainage (Culverts, Underground Pipelines Junctions And Ditches) 5 5 5 5
  • 16. Delta Airport – Utah (1 Project, 2019) 1. Designed Runway a. Mill & Overlay the first half b. Rebuilt the other half of the runway plus extended it i. Demolished existing half of the runway (which was rebuilt) 2. Designed New Taxiway’s a. Added elbows and new standard fillet design according to FAA standards i. Partially demolished taxiways where necessary 3. Designed Mill & Overlay a. Taxiways, runway, apron and access road 4. Milled In Place Shoulders of taxiway (it was previously a runway) a. Shaped into drainage ditch 5. Designed New Drainage a. Culverts, ditches, underground pipelines, junctions
  • 17. Lawrence Airport Airport code: LWC Before Construction
  • 18. Lawrence Airport Airport code: LWC After Construction 1. Designed Mill And Overlay Of Specified Taxiways And Runways
  • 19. Lawrence Airport – Kansas (1 Project, 2020) 1. Designed Mill And Overlay a. Runway 15 – 33 (complete) i. Full depth reclamation b. All indicated taxiways (partial) i. Standard mill and overlay c. Runway 1-19 (partial) i. Full depth reclamation