1. Name: SANDEEP.MAMILLAPALLI
Address: H No. 4-23-55,
Opp Men’s Medical Hostel,
N.T.R Colony-2nd
Lane,
Amaravathi road,
GUNTUR
Andhra Pradesh 522006.
OBJECTIVE
To associate with a progressive organisation that gives me scope to upgrade my
knowledge, skills and be a part of team, that dynamically works towards the growth of
self and organisation.
TOTAL PROFESSIONAL EXPERIENCE:
COMPANY DURATION
DESIGNATI
ON
WORK PROFILE
IVRCL INFRA LTD Apr 2007 to Mar
2008 (1-Year)
G.E.T GRADUATE ENGINEER TRAINEE
S.B.C INFRA
STRUCTURE
Apr 2008 to Mar
2010 (2-Year)
Engineer
SITE EXECUTIVE ENGINEER
TATA CONSULTING
ENGINEERS LTD.
(POSCO)
April 2012 to
March 2013
Senior
Engineer
PLANNING ENGINEER
TATA CONSULTING
ENGINEERS LTD
April 2013 to
Till date
Asst
Manager
PLANNING ENGINEER
ACADEMIC
PROJECTS
Final BE Project Study of optimal irrigation
Mini Thesis (NICMAR) Cost minimization through inventory control
Final Thesis (NICMAR) Project selection through FUZZY and AHP.
TATA CONSULTING ENGINEERS LTD, PUNE
QUALIFICATION BOARD INSTITUTE
YEAR OF
PASSING
% MARKS
/CPI/CGPA
PGP ACM NICMAR
National Institute Of
Construction
Management
and Research.
(NICMAR)
Hyderabad
2012 75.5
B.E. Civil
ACHARYA
NAGARJUNA
UNIVERSITY
R.V.R&J.C 2007 65
12th class
BOARD OF
INTERMEDIATE
SRI CHAITANYA
JUNIOR COLLEGE,
GUNTUR
2003 75.4
10th
class
SSC.
S.R.B.K
2001 72.0
INDUSTRY EXPOSURE
CURRICULUM VITAE
Contact no: 08092269854, 07799212962
Email: mamillapalli.sandeep@gmail.com
2. ORGANISATION
LEARNINGS
TATA CONSULTING
ENGINEERS LTD
(May 2014 to till date)
TITLE : NEW ADMINISTRATIVE BUILDING
LOCATION : Jamshepur, JHARKHAND
CLIENT : TATA STEEL PLANT LIMITED
DESCRIPTION: COST OF PROJECT (34 Crs.) & 2500 cum concrete
PP- Complex : Building with Pile Foundation G+3
FF- Complex: Building With Footing Foundation. G+3
Work done:-
• Prepared list of activities in SEQUENCE as per Scope and BOQ for the
current project and also prepared OBS as per Orgonogram using MS project
2010 & P6
• Base line was set as per work order submitted by Client, using MS project &
P6 Tracking and monitoring the BASE LINE
• The project containing CRITICAL activities will informed to Vendor after
setting base line using MS-Project 2010 and Primavera(P6)
• Scheduling (EST & EFT) the current project using scheduling option in MS
project 2010 & P6monitoring at site on weekly basis.
• Assigning the RESOURCES for the current project in MSP 2010 and finding
over allocation for the current projects.
• Preparing the project S- curve in both MSP and Primavera and updating on
monthly basis and circulating to client for Monitoring & Tracking.
• Monitoring and Tracking the quantities as per BOQ using CANDY software
(Which was newly introduced in project)
• Tracking both the projects by assigning the actual start and finish dates as per
site and estimating completion of time.
• VARIENCE for both Budget & Schedule is calculated using EMV (Earned
Value Management in MS project 2010 for both Projects.
• Using VARIENCE Graph which contains Head Schedule, Behind Schedule,
and Over Budget can be monitored on monthly basis.
• Conducting the meeting (W.R.M) between client and contractor regarding
Critical paths, scheduling, and safety and Quality issues at site and preparing
MOM. (Minutes Of Meeting)
• Monthly updating the project in oracle primavera P6 and circulating to head of
departments.(TCE & TSL)
• Preparation of MPR (Monthly Progress Report) and MIS (Monthly
Informative System) on monthly basis for the project and circulating to higher
authority.
• Involved in solving some design related issues for buildings along with client.
• Updating the drawing list and involved in preparation of reconciliation report
for cement and reinforcement for both the projects.
• Involved in completion of critical activities of the project as per schedule.
TATA CONSULTING ENGINEERS LTD, PUNE
3. TATA CONSULTING
ENGINEERS LTD
(May 2013 to April 2014)
TITLE : BUILDINGS FOR COKE OVEN PLANT
LOCATION : Jajpur, ORRISA
CLIENT : TATA STEEL PLANT LIMITED
DESCRIPTION: COST OF PROJECT (50 Crs.) & 6000 cum concrete
Contains Cafeteria, Rest Rooms, IT complex & Ware houses.
Contains Sewer Line, Drinking Line, Etc
Work done: -
• Tracking the project by using actual start and actual finish dates in MS Project
2010 & P6-Oracled.
• Conducting DCM (Daily communication meeting) between client and
contractor.
• Preparation of monthly information report (MIS) which contains confidential
Information of the project and circulating Head Office.
• As per client requirement prepared WHY – WHY ANALYSIS regarding
issues occurred at site.
• Inspection of housekeeping at site in critical areas by using 6’S
(SEITON,SERI,SEKETSU,SETUSKE)
• Updating daily progress report and circulating to higher authorities.
• Responsible for conducting meeting regarding critical issues at site.
• Updating daily observation report for manpower and equipment’s at site.
• Inspection of site on daily basis for progress of structures and updating in MS-
Projects as well as Primavera P6.
• Conducting DRM (Daily Review Meeting) between contractors and client
• Updating progress of project in Primavera P-6 on monthly basis and
circulating through mail to higher authorities and HOD.
• Preparing monthly reports like MPR (Monthly progress Report) and MIS
(Monthly Information Report)
• Updating structures by photograph comparison on weekly basis.
• Updating activities as per actual and planned activities by using Base Line in
Ms Project.
• The project containing CRITICAL activities will informed to Vendor after
setting base line using MS-Project 2010 and Primavera(P6)
• VARIENCE for both Budget & Schedule is calculated using EMV (Earned
Value Management in MS project 2010 for both Projects.
TATA CONSULTING ENGINEERS LTD, PUNE
4. TATA CONSULTING
ENGINEERS LTD
(March 2013 to April
2013)
TITLE : INDUSTRIAL WARE HOUSE
LOCATION : Hyderabad,
CLIENT : PROCTOR & GAMBLING (P&G)
DESCRIPTION : Ware house consists
Personnel guard house, Drivers rest area, and Fork lifter Battery room.
WBM and WMM road for Truck park area.
Mono rail, Distribution Room and Customizing Room.
Strom water drainage and sewer line.
Work done: -
• Prepared QA/QC checklist (before concrete pour and after concrete pour).
• Inspection of Reinforcement, shuttering as per approved & revised drawing
before concrete pour.
• Daily inspection of QA/QC Laboratory and involved in tests like
a)Compaction test
b) Compression test for Concrete cube & Bricks
c) Slump test and silt test
d) Rebar test (physical & chemical test)
c) Concrete flow test
d) consistency test
e) Impact and crushed value test
• Inspection of batching plant during concreting at site for good quality control.
• Conducting daily review meeting on weekly basis regarding Quality major &
minor Issues observed at site and resolving by suggesting approved technical
methods.
• Controlling and coordinating the site engineers who are working in batching
plant to get good quality concrete so that durability of structure increase.
• Preparing MQR (Monthly Quality Report) on monthly basis for every month.
• Prepared Radar/SPIDER Chart for showing Quality Index on monthly basis
for tracking the quality.
• Conducting meeting (Weekly Review Meeting) between client, Vendor on
weekly basis for quality compliance and non-compliance at site.
• Prepared punch list regarding quality at the end of the project and involved in
completing and handing over the project for client.
TATA CONSULTING
ENGINEERS LTD
(April 2012 to Feb 2013).
TITLE : Steel plant – Cold Rolling Mill
LOCATION : MAHARASTRA-Raighad district
CLIENT : POSCO Maharastra steel private ltd (PMSPL)
DESCRIPTION : Steel Plant consists AMENITIES, ROAD & DRAINS, REST
ROOMS,
• AMENITIES
TATA CONSULTING ENGINEERS LTD, PUNE
5. • ROADS & DRAINS
• REST ROOMS
• WARE HOUSE
• CAL Entry Looper foundation
• CAL Exit Looper and Deff Roll and Skin Pass mill Raft foundation
Work done: -
• Participated in preparation of rate analysis report for the current project
• Preparation of Monthly and weekly Quality report and Monthly Informative
System(MIS)
• Coordinating & conducting meeting between Client and Contractor regarding
Quality issues and observations at site and giving solutions for rectifications.
• Monitoring cost and baseline details of project on weekly basis.
• Executing the site units as per drawing and giving approval for concrete
pouring and preparation of checklist for concrete pour.
• Conducting Daily review meeting between client and contractor regarding
quality issues and critical safety points at site.
• Involved in preparation of AUDIT documents as per TCE standards.
• Assigning the RESOURCES for the current project in MSP 2010 and finding
over allocation for the current projects.
• Preparing the project S- curve in both MSP and Primavera and updating on
monthly basis and circulating to client for Monitoring & Tracking.
• Monitoring and Tracking the quantities as per BOQ using CANDY software
(Which was newly introduced in project)
• Tracking both the projects by assigning the actual start and finish dates as per
site and estimating completion of time.
• VARIENCE for both Budget & Schedule is calculated using EMV (Earned
Value Management in MS project 2010 for both Projects.
• Using VARIENCE Graph which contains Head Schedule, Behind Schedule,
and Over Budget can be monitored on monthly basis.
• Conducting the meeting (W.R.M) between client and contractor regarding
Critical paths, scheduling, and safety and Quality issues at site and preparing
MOM. (Minutes Of Meeting)
• Monthly updating the project in oracle primavera P6 and circulating to head of
departments.(TCE & TSL)
• Preparation of MPR (Monthly Progress Report) and MIS (Monthly
Informative System) on monthly basis for the project and circulating to higher
authority
S.B.C INFRA
STRUCTURE
Apr 2008 to Mar 2010
TITLE :RESIDENTIAL BUILDINGS
LOCATION :KARNATAKA(BELLARY)
CLIENT :KHADHRI CONSULTANCE
DESCRIPTION : Town Ship P, Q and R Sectors consists of Cluster
Cluster consists of 10 sectors and each sector having 10 G+2 buildings total
TATA CONSULTING ENGINEERS LTD, PUNE
6. 100 building and 300 floors.
Bitumen road
Cement concrete road
Parking area
Water proofing
Strom Water drainage and sewer line
Work done: -
• Responsible for giving marking on ground and excavating the marked area as per
approved drawing. And maintaining ASBUILT records
• Based on soil condition some building structures are designed as LOAD BEARING
STRUCTURES and others are FOOTINGS.
• Responsible and Executing the site as per drawing and taking approval for
concrete pour from consultant and checking checklist of concrete.
• Detailed Measurement of Project, Preparing Daily Progress reports,
Preparation of Bar bending schedules and Reconciliation of Materials.
• Responsible for supervision of mixing of concrete as per Design mix and
Grade of concrete.
• Involved in testing of concrete like Slump test, Cube test, Bricks test, and all
other incoming materials to site for construction.
• Executed the finishing activities of building structure like Internal & External
Plastering & Painting, Laying of floor tiles.
• Responsible for water proofing (BRICK BAT COBA) activity on roof and
also involved in plumbing work.
• Partly involved in handing over the building structures to the client after
completion of punch points.
IVRCL INFRA LTD
Apr 2007 to Mar 2008 TITL E : LIFT IRRIGATION PUMP HOUSE
LOCATION :MAHARASTRA(NAGAPUR)
CLIENT :GOVT CONSULTANCE
DESCRIPTION
Worked as a Graduate Engineer Trainee in IVRCL INFRA LTD at Maharashtra
(Nagpur)
Project name is lift irrigation system which is useful to pump the water to nearby
villages through Under lined pipes.
Work done: -
• Area grading, Marking and excavating the area as per approved Drawing.
• Surveying the land and recording NGL in measurement book by using
theodolite and Total station.
• Supervision of batching plant on daily basis and also in recording quantities of
material in measurement book
• Executing and supervision of reinforcement, shuttering as per approved
TATA CONSULTING ENGINEERS LTD, PUNE
7. drawing. Like Raft foundation, Footing, Retaining wall, & Columns
ORGANISATION LEARNINGS
C.E.G LTD BUSINESS DEVELOPMENT
FUNCTIONAL AREAS
OF PROFESSIONAL
INTEREST
Planning, Finance, Business Development,
SOFTWARE
PROFICIENCY
Microsoft Projects, Primavera P-6 professional R8.2, Candy & TORA
LANGUAGES KNOWN English, Hindi, Telugu, kanada.
Reference: K.RAMESH
Vice President
TATA CONSULTING ENGINEERS LTD
Pune
I hereby affirm that the information furnished in this form is true and correct.
Date:
Place: Jamshedpur SANDEEP.M
Asst Manager E2-Planning -CIVIL
TATA CONSULTING ENGINEERS LTD, PUNE
1. Topper of the school drawing competition in SSC
2. Worked as an EVENT COORDINATOR in TECHNOZION’08 &’07
3. Got appreciation from Korean client Mr. KIM (M.D) regarding quality at POSCO site
4. Since last two years I got two promotions from TCE.