Subject: for the Post of Planning Engineer (Pipeline)
Dear Sir/Madam,
I am a graduate Mechanical Engineer with a Diploma in Engineering. I have over 10 years of rich experience in
project planning & scheduling and contract administration in the Pipeline works for Power Plants and as well as in
water works.
My capabilities include managing the complete planning activities of large projects. I have proven capabilities of
developing Level 1 to Level 2 schedules using Primavera P6. I am also experienced in developing set-up
calendars, WBS and listing activities according to project BBU/BOQ, developing budgets according to project
manuals on SAP, identifying the critical path of the project and preparing work orders with higher management
approval.
I have sound experience of monitoring progress of the project and allocating materials and plan logistics using
Primavera/MS Project, arranging plant & machinery, subcontracts and coordinating with site teams for smooth
execution of the project.
My experience also covers preparing all progress, status, quality and ISO documents and managing all
contractual correspondence. I am well versed in preparing all MIS reports to monitor project progress, cost
control and risk management.
I am thoroughly conversant with various conditions of contract and am capable of managing all commercial
activities including client billing, processing subcontractor payments, variations & claims management and
computing cost to complete data.
Currently I am working with TATA Projects Ltd. As a Dy. Manager (Planning & Billing) Rejuvenation of
Amanishah Nallah (Dravyavati River), Jaipur (Rajasthan) Including Area Development and
Operation & Maintenance (O&M) for a Period of 10 Years in Jaipur (RJ). Earlier I worked with SMPL
Infra as Assistant Manager Planning & Billing at the Rs105 crore 2x500 MW Simhadri STTP Phase II (PIPING
PACKAGE) of NTPC Ltd. at Visakhapatnam. And I also worked with IVRCL Infrastructure & Projects as
Engineer Planning and Billing in various water supply schemes in Kerala with a total project value of INR +237
crore.
I am Much Confident of adding value to your company, I enclose my resume. I look forward to a meeting to
discuss how I can contribute to the successful completion of large projects meeting all predefined objectives.
Thanking you,
Yours sincerely,
G Kishore
RESUME
G KISHORE
C/o Ghanshyam Patel,
Shivam Vihar, Kotra Road,
Raigarh, 496001
Mobile: 9440 142 606 (AP) – 7300049186 (Jaipur)
email id: kishore.mec@gmail.com kishore.mec@rediff.com kishore.mec@live.com
Profile:
Self-motivated, hard and smart working personnel, who is seeking top level assignments in Mechanical
Engineering with a growth oriented organization. Eager to prove the teamwork, leadership skills, includes
managing and motivating colleagues to achieve the company and client objectives. An effective communicator at
all levels. Willing to work well under pressure for achieve the client's deadlines.
Current working fields
Power Plant Engineer with Water Piping Packages Environment
PIPELINE EXECUTION WORKS (SITE)
_________________________________________________________________________________
Total Experience: 10 years +
Present Working Details: (2012 to Present)
Company Name: TATA Projects Limited
Working as a Dy. Manager (Planning & Billing)
Present Handled Major Power Projects under TATA Projects Limited
Client: Jaipur Development Authority
Project Value: 1267 Crores
Description of the project: Rejuvenation of Amanishah Nallah (Dravyavati River), Jaipur
(Rajasthan) Including Area Development and Operation & Maintenance (O&M) for a
Period of 10 Years
Rolls & Responsibilities as a Planning Engineer:
• Managing the entire planning Activities for the above said projects.
• Preparation of L1, L2, Schedules using Primavera 6.
• Using Primavera (v6) Preparation of Setup Calendars & WBS Structures and Listing
activities as per the Project BBU/BOQ, Resource assigning, Daily Progress Entry
• Budget Preparation by using Working Software’s Like Excel and same entry in to the
ERP & SAP
• Work Order Preparation’s & Status checking with Higher Officials after clearing the
queries raised by them for getting the approvals.
• Maintaining all the Daily Site Progress, Gradual Monitoring and allocating the project
materials, logistics routes and assigning the resources by using Microsoft
Project/Primavera software.
• Responsible for gathering the project remarks from the site engineers and update the
same to the site project manager.
• Responsible for analyzing the original status of the project and to find the CPM
(critical path method) and WBS (Work Break down Structure) Using ERP.
• Assigned to find the project delayed status and responsible for fixing the breakdowns.
• Preparing engineering plans, drawings, specifications and cost estimates.
• Assisting in survey work needed for design and Erection of pipeline of projects.
• Preparing Of Mobilization Plan & Organization Chart.
• Mobilize the Staff and manpower, Materials.
• Informing the concern for Searching Sub Agency & Mobilize the Sub Agency in
Proper Time at The Site and as per the schedule requirement.
• Analyzing Material Stock and order the Material in required time.
• Analyzing P & M (Plant & Machinery) Sources and Arrange the Proper P & M
Sources.
• Agency, Material, Labour, Follow up & Distribution in Correct Time at site.
• Preparation of project Schedule in (Primavera (P6), Microsoft Project).
• Preparation of Weekly, Monthly, Annual Backlog And Recovery Schedule.
• Preparation of Rate Analysis & Comparing with the Actual R.A Bill Flow.
• Preparation of Monthly and Annual Budgeting & Cash flow of Project.
• Preparation of JCR (Job Cost Report), Analyzing of the Project Profit Percentage and
Expenses details.
• Analyzing of Cost Control Methods and Compare with our Cash Flow Analysis.
• Preparation of Daily Progress Report, and Analysis with Our Bar Chart and
Comparing Daily, weekly, Monthly Progress Back Logs.
• Preparation of Fit Up reports, welding reports, all types of Quality reports with Daily
Drawing Updating, drawing Correspondence Handling & Distribution.
• Client Correspondence (Mails & Letters) Maintaining & Clearing of NCR.
• Analyzing of Client Bill, Sub Contractor Bill with Consumption of Material & Site
Overheads.
• Preparation of Project Performance & MIS Report (Management Information system)
for Every Month and year.
• If material Cost Increase handing over of proper documentation Authority and get rate
approval from Clients.
• If Project delayed Submitting the Proper Reason Document and Get EOT (Extension
of TIME) for avoid the Fine.
• Preparing the Methodology for Project and get the Approval from clients.
• Preparation of Shuttering scheme, Analysis & Arrange the shuttering Material in
Proper Time Interval for Avoiding the Waste.
• Preparation of Concrete Plan for Every Week & Month.
• Preparation of QS (Quantity Survey) for total site depends upon Latest drawing.
• Conduct the meeting For Explain about Our Project Stage & How to improve our
Project Without any Backlog.
• Collecting the practical difficulties of the project from Site engineers and Submit to
the project Manager.
• Preparing & Maintaining of ISO Documents & Records.
• Updating Of Total Documentation and Facing the ISO and Other Internal Audits.
• Analyzing of Bulk Materials, Arrangement and Distribution for Batching Plant
Regular Concrete protection.
• Preparing of Planned Vs Achieved programmed and bill details for Conducting the
Meeting to R.P.M & R.M office for every week & Month.
• Updating & Maintaining of ERP System (Enterprises Resource Planning).
• Conducting of Weekly & Monthly Review Meeting for Explaining about the Mile
Stone Activities & gather the actual site condition.
Under Billing
• After collecting the respective System progress from Engineers & supervisors
estimating the cost occurred for the completion.
• Analyzing the above with the client rate for finding the Profit / Loss
• Preparation of the client bills with respective the progress achieved for the respective
month and submission of the same RA Bills to the client.
• Preparation of the sub contractor's monthly bills with respective the M-Book prepared
by the engineers and forwarding to the accounts department for further proceedings
• Follow up with the client for certification of the Monthly RA Bill with the various
departments like Mechanical Erection Dept, Quality control, Finance Dept etc.
• Preparation of the monthly Sub Contractor bills Abstracts.
• Preparation of the CTC (Cost to Complete) and submitting the same along with the
Monthly Review Meeting Documents.
Previous Working Details:
Company Name: SPML Infra Ltd. 9(2010 to 2012)
Working as a Asst. Manager (Planning & Billing) Plant Piping Package
Handled Major Power Projects under SPML
• NTPC Simhadri Super Thermal Power Plant Stage II (2 X 500MW) (STATION
PIPING PACKAGE) - 105 Crores
IVRCL Infrastructures & Projects Limited (2004 to 2010)
Working as a Engineer (Planning & Billing) in IVRCL Infra Structures & Projects Ltd.
Handled Major Projects under Kerala Government
• AWSS - Choondy Project Pipeline in Ernakulam (Cochin) - 18.02 Crore
• CWSS - Chavara Project Pipeline in Kollam DT. - 5.36 Crore
• JICA - Project Package II and Package III Aleppy DT. - 172 Crore
• KSUDP -Peechi Project Thrissur DT. - 42.18 Crore
Working as Asst - Engineer (Execution)
Handled Major Projects under Gujarat and Tamilnadu Government
• Honeywell PLC Panels Erection and Commissioning - Total GEB (Gujarat Electricity
Board) - Gujarat
• Total Automation Works Installation and commissioning - Trichy IOCL Plant –
Tamilnadu
Educational Qualification:-
B.Tech in Mechanical Engineering with 65% from Nagarjuna University (2000 - 2004).
Diploma in ECE with 70% from SBTET - Hyderabad (1996 - 1999).
S.S.C from State Board with 62%
Proficiency in Planning:
In depth knowledge, to identify the objectives, means, resources, actions etc to accomplish the project goal.
Costing & Estimating:
Ability to prepare and provide basis for project management, business planning, budget preparation, inflow and
outflow of project cost.
Information Technology Skills:
Platforms/Operating Systems: Win XP, Windows 7 & Windows 8.1
ERP Tools: Oracle E-Business Suite, C, FoxPro & SAP 7.1
Engineering Tools: Auto CAD -2000, 2004, 2010, 2011 & 2012
Windows: Microsoft Office 2011 (Strong & Remarkable Knowledge in Word, Excel and Power Point) all versions
up to 2013
Planning software: Primavera 6 & MS-Project 2003
Personal Profile:
Date of Birth : July 16, 1979
Father's Name: G. Thomas
Sex: Male
Marital Status: Married
Languages Known: English, Hindi, Telugu, Tamil, Guajarati and
Malayalam
Yours Truly
Kishore Gonthupulugu
(+91 7300049186, +91 9440142606)
• Total Automation Works Installation and commissioning - Trichy IOCL Plant –
Tamilnadu
Educational Qualification:-
B.Tech in Mechanical Engineering with 65% from Nagarjuna University (2000 - 2004).
Diploma in ECE with 70% from SBTET - Hyderabad (1996 - 1999).
S.S.C from State Board with 62%
Proficiency in Planning:
In depth knowledge, to identify the objectives, means, resources, actions etc to accomplish the project goal.
Costing & Estimating:
Ability to prepare and provide basis for project management, business planning, budget preparation, inflow and
outflow of project cost.
Information Technology Skills:
Platforms/Operating Systems: Win XP, Windows 7 & Windows 8.1
ERP Tools: Oracle E-Business Suite, C, FoxPro & SAP 7.1
Engineering Tools: Auto CAD -2000, 2004, 2010, 2011 & 2012
Windows: Microsoft Office 2011 (Strong & Remarkable Knowledge in Word, Excel and Power Point) all versions
up to 2013
Planning software: Primavera 6 & MS-Project 2003
Personal Profile:
Date of Birth : July 16, 1979
Father's Name: G. Thomas
Sex: Male
Marital Status: Married
Languages Known: English, Hindi, Telugu, Tamil, Guajarati and
Malayalam
Yours Truly
Kishore Gonthupulugu
(+91 7300049186, +91 9440142606)

More Related Content

What's hot

Siddhant Singh Parmar-new resume (17.02.2016).compressed
Siddhant Singh Parmar-new resume (17.02.2016).compressedSiddhant Singh Parmar-new resume (17.02.2016).compressed
Siddhant Singh Parmar-new resume (17.02.2016).compressedsiddhant singh parmar
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CVSajith Nair
 
Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)Kirk Doerr
 
CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)sundeep khare
 
CV_Tarun Kumar Behera
CV_Tarun Kumar BeheraCV_Tarun Kumar Behera
CV_Tarun Kumar BeheraTarun Behera
 
resume sm revised Final 15
resume sm revised Final 15resume sm revised Final 15
resume sm revised Final 15Sham Lokhande
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineerSankar Sundaram PMP
 
CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & EngineeringCV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & EngineeringM.K NARAYANA
 
Resume-ParanthamanKrishnasamy
Resume-ParanthamanKrishnasamyResume-ParanthamanKrishnasamy
Resume-ParanthamanKrishnasamyParan K
 

What's hot (20)

Siddhant Singh Parmar-new resume (17.02.2016).compressed
Siddhant Singh Parmar-new resume (17.02.2016).compressedSiddhant Singh Parmar-new resume (17.02.2016).compressed
Siddhant Singh Parmar-new resume (17.02.2016).compressed
 
CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
Resume of Hariom
Resume of HariomResume of Hariom
Resume of Hariom
 
Roberto Guevara-CV
Roberto Guevara-CVRoberto Guevara-CV
Roberto Guevara-CV
 
2013 CIP executive summary 131204
2013 CIP executive summary 1312042013 CIP executive summary 131204
2013 CIP executive summary 131204
 
Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)
 
CV M.Ilyas - 1
CV M.Ilyas - 1CV M.Ilyas - 1
CV M.Ilyas - 1
 
CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)
 
CV_Tarun Kumar Behera
CV_Tarun Kumar BeheraCV_Tarun Kumar Behera
CV_Tarun Kumar Behera
 
resume sm revised Final 15
resume sm revised Final 15resume sm revised Final 15
resume sm revised Final 15
 
CV - Hassan-Planning
CV - Hassan-PlanningCV - Hassan-Planning
CV - Hassan-Planning
 
PPT_Final_18-02-15
PPT_Final_18-02-15PPT_Final_18-02-15
PPT_Final_18-02-15
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
shafaqat cv 1
shafaqat cv 1shafaqat cv 1
shafaqat cv 1
 
Sajjad Ahmed-02
Sajjad Ahmed-02Sajjad Ahmed-02
Sajjad Ahmed-02
 
CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & EngineeringCV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
 
CV _Rajasekhar- Project Management
CV _Rajasekhar- Project ManagementCV _Rajasekhar- Project Management
CV _Rajasekhar- Project Management
 
Vikas Resume
Vikas ResumeVikas Resume
Vikas Resume
 
Resume-ParanthamanKrishnasamy
Resume-ParanthamanKrishnasamyResume-ParanthamanKrishnasamy
Resume-ParanthamanKrishnasamy
 

Viewers also liked

為什麼要舉行公民運動
為什麼要舉行公民運動為什麼要舉行公民運動
為什麼要舉行公民運動宏新 魏
 
dress | Fox News Magazine
dress | Fox News Magazinedress | Fox News Magazine
dress | Fox News Magazineamuckear9771
 
為什麼要舉行公民運動
為什麼要舉行公民運動為什麼要舉行公民運動
為什麼要舉行公民運動宏新 魏
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled PresentationRenee N
 
為什麼要舉行公民運動 (1)
為什麼要舉行公民運動 (1)為什麼要舉行公民運動 (1)
為什麼要舉行公民運動 (1)宏新 魏
 
Steal from the Startups: Growth Tactics for Grownups with Kevin Henrikson
Steal from the Startups: Growth Tactics for Grownups with Kevin Henrikson Steal from the Startups: Growth Tactics for Grownups with Kevin Henrikson
Steal from the Startups: Growth Tactics for Grownups with Kevin Henrikson Search Engine Journal
 
Steal From the Startups: Growth Tactics for Grown Ups
Steal From the Startups: Growth Tactics for Grown Ups Steal From the Startups: Growth Tactics for Grown Ups
Steal From the Startups: Growth Tactics for Grown Ups Search Engine Journal
 
Agricultural Economics Mid Term Progress Submission
Agricultural Economics Mid Term Progress SubmissionAgricultural Economics Mid Term Progress Submission
Agricultural Economics Mid Term Progress SubmissionAnirudh Jayaraman
 

Viewers also liked (10)

為什麼要舉行公民運動
為什麼要舉行公民運動為什麼要舉行公民運動
為什麼要舉行公民運動
 
dress | Fox News Magazine
dress | Fox News Magazinedress | Fox News Magazine
dress | Fox News Magazine
 
為什麼要舉行公民運動
為什麼要舉行公民運動為什麼要舉行公民運動
為什麼要舉行公民運動
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 
為什麼要舉行公民運動 (1)
為什麼要舉行公民運動 (1)為什麼要舉行公民運動 (1)
為什麼要舉行公民運動 (1)
 
Steal from the Startups: Growth Tactics for Grownups with Kevin Henrikson
Steal from the Startups: Growth Tactics for Grownups with Kevin Henrikson Steal from the Startups: Growth Tactics for Grownups with Kevin Henrikson
Steal from the Startups: Growth Tactics for Grownups with Kevin Henrikson
 
Chap 2 linear kinematics
Chap 2  linear kinematics Chap 2  linear kinematics
Chap 2 linear kinematics
 
Steal From the Startups: Growth Tactics for Grown Ups
Steal From the Startups: Growth Tactics for Grown Ups Steal From the Startups: Growth Tactics for Grown Ups
Steal From the Startups: Growth Tactics for Grown Ups
 
How Any Company Can Use #Snapchat
How Any Company Can Use #Snapchat How Any Company Can Use #Snapchat
How Any Company Can Use #Snapchat
 
Agricultural Economics Mid Term Progress Submission
Agricultural Economics Mid Term Progress SubmissionAgricultural Economics Mid Term Progress Submission
Agricultural Economics Mid Term Progress Submission
 

Similar to Cover Letter for Planning Engineer Role

Similar to Cover Letter for Planning Engineer Role (20)

Nawaz Eng-OCT
Nawaz Eng-OCTNawaz Eng-OCT
Nawaz Eng-OCT
 
Mech Q.S.
Mech Q.S.Mech Q.S.
Mech Q.S.
 
2016 - Balaji Manivel - CV
2016 - Balaji Manivel - CV2016 - Balaji Manivel - CV
2016 - Balaji Manivel - CV
 
Haythem jamli candidature cv
Haythem jamli   candidature cvHaythem jamli   candidature cv
Haythem jamli candidature cv
 
Resume- 4 years exp
Resume- 4 years expResume- 4 years exp
Resume- 4 years exp
 
Varun Garg_CV
Varun Garg_CVVarun Garg_CV
Varun Garg_CV
 
selva-cv
selva-cvselva-cv
selva-cv
 
RESUME_31-Oct-16
RESUME_31-Oct-16RESUME_31-Oct-16
RESUME_31-Oct-16
 
Kiran H K 17-06-2016
Kiran H K 17-06-2016Kiran H K 17-06-2016
Kiran H K 17-06-2016
 
Project Planning & Control Engineer
Project Planning & Control EngineerProject Planning & Control Engineer
Project Planning & Control Engineer
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
HIDAIPP
HIDAIPPHIDAIPP
HIDAIPP
 
Mujtaba Ahmed Khan Resume (2)
Mujtaba Ahmed Khan Resume (2)Mujtaba Ahmed Khan Resume (2)
Mujtaba Ahmed Khan Resume (2)
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
Sheahan peter d'souza executive cv.pdf
Sheahan peter d'souza executive cv.pdfSheahan peter d'souza executive cv.pdf
Sheahan peter d'souza executive cv.pdf
 
UCM-CV
UCM-CVUCM-CV
UCM-CV
 
Nawaz Eng-OCT
Nawaz Eng-OCTNawaz Eng-OCT
Nawaz Eng-OCT
 
sravankumar
sravankumarsravankumar
sravankumar
 
Job Profile as a Planning Engineer
Job Profile as a Planning EngineerJob Profile as a Planning Engineer
Job Profile as a Planning Engineer
 

Cover Letter for Planning Engineer Role

  • 1. Covering Letter G KISHORE C/o Ghanshyam Patel, Shivam Vihar, Kotra Road, Raigarh, 496001 Email : kishore.mec@gmail.com, kishore.mec@india.com M: 9575886684, 9440142606, 8985671047 Date : 22-05-2013 Subject: for the Post of Planning Engineer (Pipeline) Dear Sir/Madam, I am a graduate Mechanical Engineer with a Diploma in Engineering. I have over 10 years of rich experience in project planning & scheduling and contract administration in the Pipeline works for Power Plants and as well as in water works. My capabilities include managing the complete planning activities of large projects. I have proven capabilities of developing Level 1 to Level 2 schedules using Primavera P6. I am also experienced in developing set-up calendars, WBS and listing activities according to project BBU/BOQ, developing budgets according to project manuals on SAP, identifying the critical path of the project and preparing work orders with higher management approval. I have sound experience of monitoring progress of the project and allocating materials and plan logistics using Primavera/MS Project, arranging plant & machinery, subcontracts and coordinating with site teams for smooth execution of the project. My experience also covers preparing all progress, status, quality and ISO documents and managing all contractual correspondence. I am well versed in preparing all MIS reports to monitor project progress, cost control and risk management. I am thoroughly conversant with various conditions of contract and am capable of managing all commercial activities including client billing, processing subcontractor payments, variations & claims management and computing cost to complete data. Currently I am working with TATA Projects Ltd. As a Dy. Manager (Planning & Billing) Rejuvenation of Amanishah Nallah (Dravyavati River), Jaipur (Rajasthan) Including Area Development and Operation & Maintenance (O&M) for a Period of 10 Years in Jaipur (RJ). Earlier I worked with SMPL Infra as Assistant Manager Planning & Billing at the Rs105 crore 2x500 MW Simhadri STTP Phase II (PIPING PACKAGE) of NTPC Ltd. at Visakhapatnam. And I also worked with IVRCL Infrastructure & Projects as Engineer Planning and Billing in various water supply schemes in Kerala with a total project value of INR +237 crore. I am Much Confident of adding value to your company, I enclose my resume. I look forward to a meeting to discuss how I can contribute to the successful completion of large projects meeting all predefined objectives. Thanking you, Yours sincerely, G Kishore
  • 2. RESUME G KISHORE C/o Ghanshyam Patel, Shivam Vihar, Kotra Road, Raigarh, 496001 Mobile: 9440 142 606 (AP) – 7300049186 (Jaipur) email id: kishore.mec@gmail.com kishore.mec@rediff.com kishore.mec@live.com Profile: Self-motivated, hard and smart working personnel, who is seeking top level assignments in Mechanical Engineering with a growth oriented organization. Eager to prove the teamwork, leadership skills, includes managing and motivating colleagues to achieve the company and client objectives. An effective communicator at all levels. Willing to work well under pressure for achieve the client's deadlines. Current working fields Power Plant Engineer with Water Piping Packages Environment PIPELINE EXECUTION WORKS (SITE) _________________________________________________________________________________ Total Experience: 10 years + Present Working Details: (2012 to Present) Company Name: TATA Projects Limited Working as a Dy. Manager (Planning & Billing) Present Handled Major Power Projects under TATA Projects Limited Client: Jaipur Development Authority Project Value: 1267 Crores Description of the project: Rejuvenation of Amanishah Nallah (Dravyavati River), Jaipur (Rajasthan) Including Area Development and Operation & Maintenance (O&M) for a Period of 10 Years Rolls & Responsibilities as a Planning Engineer: • Managing the entire planning Activities for the above said projects. • Preparation of L1, L2, Schedules using Primavera 6. • Using Primavera (v6) Preparation of Setup Calendars & WBS Structures and Listing activities as per the Project BBU/BOQ, Resource assigning, Daily Progress Entry • Budget Preparation by using Working Software’s Like Excel and same entry in to the ERP & SAP • Work Order Preparation’s & Status checking with Higher Officials after clearing the queries raised by them for getting the approvals. • Maintaining all the Daily Site Progress, Gradual Monitoring and allocating the project materials, logistics routes and assigning the resources by using Microsoft Project/Primavera software.
  • 3. • Responsible for gathering the project remarks from the site engineers and update the same to the site project manager. • Responsible for analyzing the original status of the project and to find the CPM (critical path method) and WBS (Work Break down Structure) Using ERP. • Assigned to find the project delayed status and responsible for fixing the breakdowns. • Preparing engineering plans, drawings, specifications and cost estimates. • Assisting in survey work needed for design and Erection of pipeline of projects. • Preparing Of Mobilization Plan & Organization Chart. • Mobilize the Staff and manpower, Materials. • Informing the concern for Searching Sub Agency & Mobilize the Sub Agency in Proper Time at The Site and as per the schedule requirement. • Analyzing Material Stock and order the Material in required time. • Analyzing P & M (Plant & Machinery) Sources and Arrange the Proper P & M Sources. • Agency, Material, Labour, Follow up & Distribution in Correct Time at site. • Preparation of project Schedule in (Primavera (P6), Microsoft Project). • Preparation of Weekly, Monthly, Annual Backlog And Recovery Schedule. • Preparation of Rate Analysis & Comparing with the Actual R.A Bill Flow. • Preparation of Monthly and Annual Budgeting & Cash flow of Project. • Preparation of JCR (Job Cost Report), Analyzing of the Project Profit Percentage and Expenses details. • Analyzing of Cost Control Methods and Compare with our Cash Flow Analysis. • Preparation of Daily Progress Report, and Analysis with Our Bar Chart and Comparing Daily, weekly, Monthly Progress Back Logs. • Preparation of Fit Up reports, welding reports, all types of Quality reports with Daily Drawing Updating, drawing Correspondence Handling & Distribution. • Client Correspondence (Mails & Letters) Maintaining & Clearing of NCR. • Analyzing of Client Bill, Sub Contractor Bill with Consumption of Material & Site Overheads. • Preparation of Project Performance & MIS Report (Management Information system) for Every Month and year. • If material Cost Increase handing over of proper documentation Authority and get rate approval from Clients. • If Project delayed Submitting the Proper Reason Document and Get EOT (Extension of TIME) for avoid the Fine. • Preparing the Methodology for Project and get the Approval from clients. • Preparation of Shuttering scheme, Analysis & Arrange the shuttering Material in Proper Time Interval for Avoiding the Waste. • Preparation of Concrete Plan for Every Week & Month. • Preparation of QS (Quantity Survey) for total site depends upon Latest drawing. • Conduct the meeting For Explain about Our Project Stage & How to improve our Project Without any Backlog. • Collecting the practical difficulties of the project from Site engineers and Submit to the project Manager. • Preparing & Maintaining of ISO Documents & Records. • Updating Of Total Documentation and Facing the ISO and Other Internal Audits.
  • 4. • Analyzing of Bulk Materials, Arrangement and Distribution for Batching Plant Regular Concrete protection. • Preparing of Planned Vs Achieved programmed and bill details for Conducting the Meeting to R.P.M & R.M office for every week & Month. • Updating & Maintaining of ERP System (Enterprises Resource Planning). • Conducting of Weekly & Monthly Review Meeting for Explaining about the Mile Stone Activities & gather the actual site condition. Under Billing • After collecting the respective System progress from Engineers & supervisors estimating the cost occurred for the completion. • Analyzing the above with the client rate for finding the Profit / Loss • Preparation of the client bills with respective the progress achieved for the respective month and submission of the same RA Bills to the client. • Preparation of the sub contractor's monthly bills with respective the M-Book prepared by the engineers and forwarding to the accounts department for further proceedings • Follow up with the client for certification of the Monthly RA Bill with the various departments like Mechanical Erection Dept, Quality control, Finance Dept etc. • Preparation of the monthly Sub Contractor bills Abstracts. • Preparation of the CTC (Cost to Complete) and submitting the same along with the Monthly Review Meeting Documents. Previous Working Details: Company Name: SPML Infra Ltd. 9(2010 to 2012) Working as a Asst. Manager (Planning & Billing) Plant Piping Package Handled Major Power Projects under SPML • NTPC Simhadri Super Thermal Power Plant Stage II (2 X 500MW) (STATION PIPING PACKAGE) - 105 Crores IVRCL Infrastructures & Projects Limited (2004 to 2010) Working as a Engineer (Planning & Billing) in IVRCL Infra Structures & Projects Ltd. Handled Major Projects under Kerala Government • AWSS - Choondy Project Pipeline in Ernakulam (Cochin) - 18.02 Crore • CWSS - Chavara Project Pipeline in Kollam DT. - 5.36 Crore • JICA - Project Package II and Package III Aleppy DT. - 172 Crore • KSUDP -Peechi Project Thrissur DT. - 42.18 Crore Working as Asst - Engineer (Execution) Handled Major Projects under Gujarat and Tamilnadu Government • Honeywell PLC Panels Erection and Commissioning - Total GEB (Gujarat Electricity Board) - Gujarat
  • 5. • Total Automation Works Installation and commissioning - Trichy IOCL Plant – Tamilnadu Educational Qualification:- B.Tech in Mechanical Engineering with 65% from Nagarjuna University (2000 - 2004). Diploma in ECE with 70% from SBTET - Hyderabad (1996 - 1999). S.S.C from State Board with 62% Proficiency in Planning: In depth knowledge, to identify the objectives, means, resources, actions etc to accomplish the project goal. Costing & Estimating: Ability to prepare and provide basis for project management, business planning, budget preparation, inflow and outflow of project cost. Information Technology Skills: Platforms/Operating Systems: Win XP, Windows 7 & Windows 8.1 ERP Tools: Oracle E-Business Suite, C, FoxPro & SAP 7.1 Engineering Tools: Auto CAD -2000, 2004, 2010, 2011 & 2012 Windows: Microsoft Office 2011 (Strong & Remarkable Knowledge in Word, Excel and Power Point) all versions up to 2013 Planning software: Primavera 6 & MS-Project 2003 Personal Profile: Date of Birth : July 16, 1979 Father's Name: G. Thomas Sex: Male Marital Status: Married Languages Known: English, Hindi, Telugu, Tamil, Guajarati and Malayalam Yours Truly Kishore Gonthupulugu (+91 7300049186, +91 9440142606)
  • 6. • Total Automation Works Installation and commissioning - Trichy IOCL Plant – Tamilnadu Educational Qualification:- B.Tech in Mechanical Engineering with 65% from Nagarjuna University (2000 - 2004). Diploma in ECE with 70% from SBTET - Hyderabad (1996 - 1999). S.S.C from State Board with 62% Proficiency in Planning: In depth knowledge, to identify the objectives, means, resources, actions etc to accomplish the project goal. Costing & Estimating: Ability to prepare and provide basis for project management, business planning, budget preparation, inflow and outflow of project cost. Information Technology Skills: Platforms/Operating Systems: Win XP, Windows 7 & Windows 8.1 ERP Tools: Oracle E-Business Suite, C, FoxPro & SAP 7.1 Engineering Tools: Auto CAD -2000, 2004, 2010, 2011 & 2012 Windows: Microsoft Office 2011 (Strong & Remarkable Knowledge in Word, Excel and Power Point) all versions up to 2013 Planning software: Primavera 6 & MS-Project 2003 Personal Profile: Date of Birth : July 16, 1979 Father's Name: G. Thomas Sex: Male Marital Status: Married Languages Known: English, Hindi, Telugu, Tamil, Guajarati and Malayalam Yours Truly Kishore Gonthupulugu (+91 7300049186, +91 9440142606)