1. Janardan N Dave
Sr. Manager (Shift operation of 752 MW Combined Cycle Power
Plant)
Reliance Utilities & Power Pvt. Ltd., Jamnagar
E-mail:-dave.janardan@rediffmail.com
B.E. (Mechanical)
1 st Class Boiler Proficiency Engineer
Energy Auditor
Expertise enriched with 17+ years of exposure in
all aspects of coal/lignite/gas/oilbased
Captive,Co-Generation, Thermal &
Combined Cycle Power Plants
Rich experience in Commissioning & Operation of Power Plants of Reliance Industries, GSFC &
Nirma Ltd.
Well versed with computer technology - Windows XP and Vista Operating Systems; Microsoft Office
packages like Word, Excel, Project, Power Point & Visio; Computerized Material Interfaced
Maintenance Management System, SAP and Auto CAD.
Experience: Reliance, Jamnagar since June 2007
Working as a Shift Superintendent in the captive power plant. Responsibilities include looking after
reliable operation of plant, to ensure un-interrupted Power, Steam and processing feed water supply to
other process plants of refinery. Various operational activities (like safety valve floating, start up and shut
down of equipments, CI, HGPI,PM CM etc), and ensuring adherence to safe work policies, co-ordination
of emergencies etcSoft skills to be an asset of the company - : Training Panel Engineers & Field
Engineers/Operators, Effective communication skills, Preparation & delivering Presentation, Skilled in
establishing rapport, Good motivator.
Previous Experience – Total 8.5+ years: CFBC Boilers, Steam Turbines, RO DM & Material
Handling Plant
Nirma Limited: (October 2000 to March2006 at Bhavnagar) As Engineer Operation, I
commissioned the plant efficiently by giving organized training to fresh engineers & less skilled
operators. I developed confidence among them to run the plant efficiently.
In Head office, as a member of Project team, I was actively involved in equipment ordering & follow-
up. During erection activities, I worked as site-coordinator.
GSFC (Govt. of Gujarat): (March 2006 to June 2007 at Vadodara): As Shift In-charge, I was actively
involved in commissioning, PG Test, & operation of Cogeneration power plant. With efforts of
highly motivated team members, we have made DCS operation user friendly and made operation of
the plant very efficient. I did take lead, motivated team members & solved the problems our plant
faced time by time with same enthusiasm.
Initiatives:
Reliance: Prepared Standard Operating Procedures, Drawings & Checklists, Initiated drive for full
compliance of personal protective equipments & safety devices, Technical training to sub-ordinates to
improve themselves, Developed program in Excel to calculate efficiency of oil fired Boiler.
Nirma Limited: Coordination with various agencies for implementation and management of ERP
Procedures, Management of quality & enforcement of safety in Power Plant, Preparation plant
manual, & other such programs,
GSFC: Giving & inviting suggestions for Development of Graphics & DCS operation, implementation
of the same to make DCS computer friendly. Total set up of trends and control groups in YBL DCS
Centum XL as per operation requirements. Preparation of plant manual, I trained Panel engineers &
field operators by giving presentation, drawings, lectures and on-site training. Motivating team
members by giving required help & suggestions for performance Improvement of the plant.
2. Professional Experience: Equipments
Boilers
Nirma Limited: CFBC 4x100 TPH Lignite/Coal fired (110 kg/cm2 & 510°C) IJT
GSFC : 2Nos. X 50TPH Natural Gas/ LSHS Oil Fired Boiler with 37 Kg/sq.cm and 380 Deg. C Temp
Make- Babcock and Wilcock; 2No X 130TPH Natural Gas/ LSHS Oil Fired Boiler with 105 Kg/sq.cm and
510 Deg. C Temp; 1No X125TPH HRSG
Reliance: HRSG (with suppl. Firing) (6x315 TPH Thermax), Aux. Boilers: Oil/Gas Fired (4x275 TPH
Thermax),
Steam Turbine:
Nirma Limited: 2X16.4 MW Condensing Cum Extraction STG Set ( Make TOYO Denki Japan)
1X6.5 Back Pressure STG Set ( Make BHEL )
GSFC: 2NoX 15 MW Extractions cum Back Pressure Turbine Make- Siemens; 30MW Gas Turbine of GE
Frame VI with Mark IV controller
20MW Extraction Cum Condensing Turbine make BHEL
Reliance: 2x28 MW Man Turbo Back Pressure (In: 43.2 kg/cm2 & 391 °C; Out: 17.85 kg/cm2 & 29 °C)
Gas Turbine:
Reliance: 6 x116 MW Frame 9 GE (France) (controlled by Mark VI) (HMI), Gas & Liquid Fuel
DG set:
Reliance: (4.2 MW KOEL)
Balance of Plants: Demineralization Water Plant (RO + MB of Thermax as well as Anion-Cat-ion),
Waste water treatment plant, Cooling Towers, PRDS, De-aerators etc.
Material Handling Plant: Coal/Lignite/Lime Stone Handling & Ash Handling Plant (Pneumatic
Dense Phase)
Professional Experience: Responsibilities
OPERATIONS :
Working as a Shift Superintendent in the captive power plant. Responsibilities include looking after
reliable operation of plant, to ensure un-interrupted Power, Steam and processing feed water supply
to other process plants of refinery.
Working as a Reliability Manager which include to prepare MIS report related to Power & Steam
Generation, Fuel consumption, Daily Plant Performance report, planning report, and Monitoring the
Power Plant critical parameter, Heat Rate monitoring , Performance testing of Power plant major
equipment like Steam turbine, Boiler , Gas Turbine and related auxiliary , Steam system audit and
monitoring, Tripping analysis and corrective & preventive action . Involve in Plant interface meeting,
Weekly Planning, Plant Performance review, CPP Site Meet, and provide input related to
Benchmarking report.
Worked as PIMS (Plant Integrated Management System Coordinator
COMMISSIONING
Member of the commissioning team of PG9171E gas turbines (126 MW at ISO conditions) with dual
fuel firing supplied by GE.
Successfully commissioned a 315 TPH Heat Recovery Steam Generator (Waste Heat Recovery Boiler
49 kg/cm2, 395 deg C) & 275 TPH Auxillary Boiler (49 kg/cm2, 395 deg C)
Successfully commissioned the fuel system. The activities included lines loop checking as per
Isometric Drawing, Hydro-test, Loop cleaning by cardboard blasting and pigging, Leak test, Purging
and Line charging.
Remuneration:
Rs. 19.60 Lac per annum + Schooling & Mobile bill expenses.
A very good recreational, hospital, shopping & transportation facilities are available in well-maintained
township.
Declaration
I hereby declare that the abov e- furnished information is correct and true to the best of my knowledge and belief.
Date –
Place – Jamnagar Janardan N Dave