An Update on  OSHA’s Chemical PSM National Emphasis Program
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Chem NEP Inspections
Chem NEP Inspections – Facility Type
Chem NEP Inspections – Facility Type
Chem NEP Inspections – Facility Type
Chem NEP Citations by PSM Element Element Description % of PSM Citations Cumulative % j Mechanical Integrity 22.5% 22.5% d Process Safety Information 21.6% 44.1% e Process Hazard Analysis 17.9% 62.1% f Operating Procedures 12.1% 74.1% g Training 4.4% 78.5% l Management of Change 4.3% 82.8% h Contractors 3.5% 86.3% o Compliance Audits 3.5% 89.9% c Employee participation 3.0% 92.9% m Incident Investigation 2.5% 95.4% n Emergency Planning & Response 2.3% 97.7% i Pre-startup Review 1.6% 99.3% k Hot Work 0.7% 100.0%
Chem NEP Citations by PSM Element
Chem NEP Citations by OSHA Standard  Sub-element Sub-element Description % All Citations Cumulative % 119(d)(3)(ii) PSI RAGAGEP 3.8% 3.8% 119(j)(2) MI written procedures 3.8% 7.5% 119(j)(4)(i) MI I&T performed 2.2% 9.7% 119(e)(5) PHA findings & recommendations 2.0% 11.7% 119(j)(4)(iii) I&T frequency 2.0% 13.7% 29(b)(1) Mobile ladders and scaffolds 1.9% 15.6% 119(j)(5) MI equipment deficiencies 1.8% 17.4% 119(d)(3)(i)(B) PSI P&IDs 1.6% 19.0% 119(j)(4)(iv) MI I&T documentation 1.6% 20.6% 119(n) Emergency Planning & Response 1.6% 22.2% 119(o)(1) Compliance Audits performed 1.6% 23.9% 119(e)(1) PHAs performed 1.5% 25.3% 119(e)(3)(iii) PHA engineering controls 1.5% 26.8% 119(f)(3) Operating Procedures certification 1.5% 28.3%
Chem NEP Citations by OSHA Standard  Sub-element (continued) Sub-element Description % All Citations Cumulative % 119(f)(4) OP safe work practices 1.5% 29.8% 151(c) Eyewash stations (mostly NH3) 1.5% 31.3% 119(l)(1) MOC not performed 1.3% 32.6% GDC General Duty Clause (wide variety) 1.2% 33.8% 23(c)(1) Guarding floor openings 1.2% 35.0% 119(f)(1) OP not developed & implemented 1.2% 36.3% 119(g)(1)(i) Initial Training 1.2% 37.5% 119(e)(3)(i) PHA - address hazards of process 1.1% 38.5% 119(e)(6) PHA - reval at least every 5 years 1.1% 39.6% 119(d)(3)(i)(D) PSI - relief system des & des basis 0.9% 40.6% 119(d)(3)(i)(E) PSI - ventilation system design 0.9% 41.5%
Chem NEP Citations by OSHA Standard  Sub-element
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Chem NEP
[object Object],[object Object],[object Object],[object Object],[object Object]

More Related Content

Similar to PSM Chemical Plant NEP UPDATE March 2011

ACI_CP_1_38th_Edition_Concrete_Field_Testing_Technician—Grade_I.pdf
ACI_CP_1_38th_Edition_Concrete_Field_Testing_Technician—Grade_I.pdfACI_CP_1_38th_Edition_Concrete_Field_Testing_Technician—Grade_I.pdf
ACI_CP_1_38th_Edition_Concrete_Field_Testing_Technician—Grade_I.pdf
sandipanpaul16
 
M&E Key Performance Indicators 2016
M&E Key Performance Indicators 2016M&E Key Performance Indicators 2016
M&E Key Performance Indicators 2016
Nerissa Delos Santos
 
Cem com example-qa_qc_plan
Cem com example-qa_qc_planCem com example-qa_qc_plan
Cem com example-qa_qc_plan
EWAY1
 
MultivariableProcessIdentificationforMPC-TheAsymptoticMethodanditsApplication...
MultivariableProcessIdentificationforMPC-TheAsymptoticMethodanditsApplication...MultivariableProcessIdentificationforMPC-TheAsymptoticMethodanditsApplication...
MultivariableProcessIdentificationforMPC-TheAsymptoticMethodanditsApplication...
ssusere3c688
 
Sample Paper 1233140926359988 2
Sample Paper 1233140926359988 2Sample Paper 1233140926359988 2
Sample Paper 1233140926359988 2
mnassef
 

Similar to PSM Chemical Plant NEP UPDATE March 2011 (20)

Risk analysis
Risk analysis  Risk analysis
Risk analysis
 
Requirements Engineering Best Practice
Requirements Engineering Best PracticeRequirements Engineering Best Practice
Requirements Engineering Best Practice
 
6Sigma
6Sigma6Sigma
6Sigma
 
ACI_CP_1_38th_Edition_Concrete_Field_Testing_Technician—Grade_I.pdf
ACI_CP_1_38th_Edition_Concrete_Field_Testing_Technician—Grade_I.pdfACI_CP_1_38th_Edition_Concrete_Field_Testing_Technician—Grade_I.pdf
ACI_CP_1_38th_Edition_Concrete_Field_Testing_Technician—Grade_I.pdf
 
Achieving ss thru_fta
Achieving ss thru_ftaAchieving ss thru_fta
Achieving ss thru_fta
 
Q7 a
Q7 aQ7 a
Q7 a
 
M&E Key Performance Indicators 2016
M&E Key Performance Indicators 2016M&E Key Performance Indicators 2016
M&E Key Performance Indicators 2016
 
Risk management in complex changeovers through cfmea
Risk management in complex changeovers through cfmeaRisk management in complex changeovers through cfmea
Risk management in complex changeovers through cfmea
 
Risk Management in Sterile Environments
Risk Management in Sterile Environments Risk Management in Sterile Environments
Risk Management in Sterile Environments
 
Cem com example-qa_qc_plan
Cem com example-qa_qc_planCem com example-qa_qc_plan
Cem com example-qa_qc_plan
 
Condition-Based Maintenance Basics by Carl Byington - PHM Design, LLC
Condition-Based Maintenance Basics by Carl Byington - PHM Design, LLCCondition-Based Maintenance Basics by Carl Byington - PHM Design, LLC
Condition-Based Maintenance Basics by Carl Byington - PHM Design, LLC
 
NCQC Knowledge Test 08
NCQC Knowledge Test 08NCQC Knowledge Test 08
NCQC Knowledge Test 08
 
FMEA.pdf
FMEA.pdfFMEA.pdf
FMEA.pdf
 
Test Metrics
Test MetricsTest Metrics
Test Metrics
 
Viva voce 17 may 2018
Viva voce 17  may 2018Viva voce 17  may 2018
Viva voce 17 may 2018
 
Burant, Larry resume 01_2014
Burant, Larry resume 01_2014Burant, Larry resume 01_2014
Burant, Larry resume 01_2014
 
Pid controller mcq answers
Pid controller   mcq answersPid controller   mcq answers
Pid controller mcq answers
 
Thesis MSC
Thesis MSCThesis MSC
Thesis MSC
 
MultivariableProcessIdentificationforMPC-TheAsymptoticMethodanditsApplication...
MultivariableProcessIdentificationforMPC-TheAsymptoticMethodanditsApplication...MultivariableProcessIdentificationforMPC-TheAsymptoticMethodanditsApplication...
MultivariableProcessIdentificationforMPC-TheAsymptoticMethodanditsApplication...
 
Sample Paper 1233140926359988 2
Sample Paper 1233140926359988 2Sample Paper 1233140926359988 2
Sample Paper 1233140926359988 2
 

More from Bryan Haywood

Applicability of caa section112(r) & general duty clause
Applicability of caa section112(r) & general duty clauseApplicability of caa section112(r) & general duty clause
Applicability of caa section112(r) & general duty clause
Bryan Haywood
 
Costs of falls and workerscomp
Costs of falls and workerscompCosts of falls and workerscomp
Costs of falls and workerscomp
Bryan Haywood
 
Gi2011hotworks abridged
Gi2011hotworks abridgedGi2011hotworks abridged
Gi2011hotworks abridged
Bryan Haywood
 
Boiler safety 11 28 2011 abridged
Boiler safety 11 28 2011 abridgedBoiler safety 11 28 2011 abridged
Boiler safety 11 28 2011 abridged
Bryan Haywood
 
Hats of test 03 compatable
Hats of test 03 compatableHats of test 03 compatable
Hats of test 03 compatable
Bryan Haywood
 
Safety Culture (Unknown Source)
Safety Culture (Unknown Source)Safety Culture (Unknown Source)
Safety Culture (Unknown Source)
Bryan Haywood
 

More from Bryan Haywood (11)

Applicability of caa section112(r) & general duty clause
Applicability of caa section112(r) & general duty clauseApplicability of caa section112(r) & general duty clause
Applicability of caa section112(r) & general duty clause
 
Costs of falls and workerscomp
Costs of falls and workerscompCosts of falls and workerscomp
Costs of falls and workerscomp
 
Gi2011hotworks abridged
Gi2011hotworks abridgedGi2011hotworks abridged
Gi2011hotworks abridged
 
Boiler safety 11 28 2011 abridged
Boiler safety 11 28 2011 abridgedBoiler safety 11 28 2011 abridged
Boiler safety 11 28 2011 abridged
 
Frac tank explosion_steps
Frac tank explosion_stepsFrac tank explosion_steps
Frac tank explosion_steps
 
Gi2011machineguard
Gi2011machineguardGi2011machineguard
Gi2011machineguard
 
Hats of test 03 compatable
Hats of test 03 compatableHats of test 03 compatable
Hats of test 03 compatable
 
Safety Culture (Unknown Source)
Safety Culture (Unknown Source)Safety Culture (Unknown Source)
Safety Culture (Unknown Source)
 
Gi forklift 7 27 2011
Gi forklift 7 27 2011Gi forklift 7 27 2011
Gi forklift 7 27 2011
 
Ladders 5 31 11
Ladders 5 31 11Ladders 5 31 11
Ladders 5 31 11
 
RMP e-Submit Webinar Presentation
RMP e-Submit Webinar PresentationRMP e-Submit Webinar Presentation
RMP e-Submit Webinar Presentation
 

Recently uploaded

Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot ReportFuture of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Dubai Multi Commodity Centre
 

Recently uploaded (20)

Pitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckPitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deck
 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future Prospects
 
Potato Flakes Manufacturing Plant Project Report.pdf
Potato Flakes Manufacturing Plant Project Report.pdfPotato Flakes Manufacturing Plant Project Report.pdf
Potato Flakes Manufacturing Plant Project Report.pdf
 
Copyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to KnowCopyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to Know
 
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
 
Powers and Functions of CPCB - The Water Act 1974.pdf
Powers and Functions of CPCB - The Water Act 1974.pdfPowers and Functions of CPCB - The Water Act 1974.pdf
Powers and Functions of CPCB - The Water Act 1974.pdf
 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
 
FEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service LightningFEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service Lightning
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024
 
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot ReportFuture of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future world
 
New Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9loNew Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9lo
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptx
 
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
 
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdfبروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
 
Event Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridEvent Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybrid
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.
 
PitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for StartupsPitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for Startups
 
LinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptxLinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptx
 

PSM Chemical Plant NEP UPDATE March 2011

  • 1.
  • 2. An Update on OSHA’s Chemical PSM National Emphasis Program
  • 3.
  • 4. Chem NEP Inspections – Facility Type
  • 5. Chem NEP Inspections – Facility Type
  • 6. Chem NEP Inspections – Facility Type
  • 7. Chem NEP Citations by PSM Element Element Description % of PSM Citations Cumulative % j Mechanical Integrity 22.5% 22.5% d Process Safety Information 21.6% 44.1% e Process Hazard Analysis 17.9% 62.1% f Operating Procedures 12.1% 74.1% g Training 4.4% 78.5% l Management of Change 4.3% 82.8% h Contractors 3.5% 86.3% o Compliance Audits 3.5% 89.9% c Employee participation 3.0% 92.9% m Incident Investigation 2.5% 95.4% n Emergency Planning & Response 2.3% 97.7% i Pre-startup Review 1.6% 99.3% k Hot Work 0.7% 100.0%
  • 8. Chem NEP Citations by PSM Element
  • 9. Chem NEP Citations by OSHA Standard Sub-element Sub-element Description % All Citations Cumulative % 119(d)(3)(ii) PSI RAGAGEP 3.8% 3.8% 119(j)(2) MI written procedures 3.8% 7.5% 119(j)(4)(i) MI I&T performed 2.2% 9.7% 119(e)(5) PHA findings & recommendations 2.0% 11.7% 119(j)(4)(iii) I&T frequency 2.0% 13.7% 29(b)(1) Mobile ladders and scaffolds 1.9% 15.6% 119(j)(5) MI equipment deficiencies 1.8% 17.4% 119(d)(3)(i)(B) PSI P&IDs 1.6% 19.0% 119(j)(4)(iv) MI I&T documentation 1.6% 20.6% 119(n) Emergency Planning & Response 1.6% 22.2% 119(o)(1) Compliance Audits performed 1.6% 23.9% 119(e)(1) PHAs performed 1.5% 25.3% 119(e)(3)(iii) PHA engineering controls 1.5% 26.8% 119(f)(3) Operating Procedures certification 1.5% 28.3%
  • 10. Chem NEP Citations by OSHA Standard Sub-element (continued) Sub-element Description % All Citations Cumulative % 119(f)(4) OP safe work practices 1.5% 29.8% 151(c) Eyewash stations (mostly NH3) 1.5% 31.3% 119(l)(1) MOC not performed 1.3% 32.6% GDC General Duty Clause (wide variety) 1.2% 33.8% 23(c)(1) Guarding floor openings 1.2% 35.0% 119(f)(1) OP not developed & implemented 1.2% 36.3% 119(g)(1)(i) Initial Training 1.2% 37.5% 119(e)(3)(i) PHA - address hazards of process 1.1% 38.5% 119(e)(6) PHA - reval at least every 5 years 1.1% 39.6% 119(d)(3)(i)(D) PSI - relief system des & des basis 0.9% 40.6% 119(d)(3)(i)(E) PSI - ventilation system design 0.9% 41.5%
  • 11. Chem NEP Citations by OSHA Standard Sub-element
  • 12.
  • 13.

Editor's Notes

  1. A total of 416 PSM citations have been proposed, out of 742 total
  2. Many PPE standards also cited.