SlideShare a Scribd company logo
1 of 3
Ryan D. Daly
2791 River Hills Road, Fort Madison, IA 52627
ryadaly2003@yahoo.com
(319) 470-0172
OBJECTIVE
Engineering Manager for an innovative company in the food manufacturing industry
BUSINESS EXPERIENCE
IDNR P2 Pollution Prevention Internship Program, Summer of 2003, Dial Corp
• Energy Management for the Dial Corporation/Pinnacle Foods Group
• Implemented the addition of a Power Factor Correction Capacitor Bank to generate
an estimated annual cost savings of $50,000 and reduced overall emissions
Process Engineer/Project Manager, Dial Corporation/Pinnacle Foods Group, 2004 - Present
• Highlights
o Produced 4.9 million in cost savings by successfully managing 9.42 million
in capital spending over the last 6 years
o Responsible for leading contractor and maintenance personnel to complete
project installations on time and at budget
• Manage and Implement Capital Projects
o Line analysis
 Process flow analysis
 Theory of constraints
 Ergonomic studies
o Project feasibility and cost analysis
o Equipment specification and quoting
o AutoCAD layout and design
o Capital approval documentation
o Gantt chart project timeline
o Equipment and installation contract documentation
o Vendor negotiations
o Capital spending management
o OSHA requirements
o USDA sanitary requirements
o Project Management of outside contractors, local labor, and vendors for
equipment installation
o Standard operating procedures (SOP)
o Equipment recommended spare parts documentation
o Preventative maintenance documentation
• Notable Project Implementations
o Cost Savings
 Automation
• 5 oz. Vienna can dumper
• Broth automation
• Automated Dried Beef
• Laser Guided Vehicle System
 Process Improvement
• Vienna Packer output increase
• Vienna Expansion 3rd
filler/seamer
• Blancher Installation
 Energy Savings
• Compressor system replacemen
o With heat recovery and water reduction
• Compressed air use reduction
o Can Dryer installations
• Secondary Economizer
 Water Reduction Project Manager
• 80 MM gallons/yr reduced since 2012
o Pinnacle “Winning Moments” winner
o New Product Development
 Combination Expansion
• 16,000 sq. ft building addition
• Equipment Relocation
 Armour to Go Project Engineer
• Designed changeover parts
• Installation of new capper, airveyor system, cup denester,
conveyor system, and platform
o Quality – Capital Project Manager
 Installed 7 X-Ray units
• On-site technical leader
 Installed meat block & pipe line metal detectors
o Safety – Capital Project Manager
 $1.5MM invested in safety enhancements since 2012
 OSHA citation abatement
o Sanitation
 CIP systems
 Sanitation curtains
• Maintenance Support
o TPM support
o Provide technical line support
o Weekend Maintenance Manager
o Assist as Maintenance Supervisor
 Schedule line coverage
 Job planning for mechanics and electricians
 PM planning and scheduling
o Continuous Improvement
 Tooling design/modification
 Standardization of work methods
 Kaizen
• Performed project implementation for additional Pinnacle facilities
 Fork Truck Clamp Project at Jackson, TN
 Douglas case packer Installation at Centralia, IL
 Celeste Pizza line startup assistance at Jackson, TN
 Vacuum Bag Lift System Design at St. Elmo, IL
EDUCATION
Bachelor of Science in Mechanical Engineering, May 2004
The University of Iowa College of Engineering, Iowa City, Iowa
A.A.S. in CAD/Mechanical Engineering Technology, May 2000
Kirkwood Community College, Cedar Rapids, Iowa
COMPUTER SKILLS
• Microsoft Office
• Microsoft Excel
• Microsoft Power Point
• Microsoft Project
• SAP, EAM, ELKE, Maximo
• AutoCAD 2010
• PLC 5, 500, 5000
• RS View
• Square D Power Monitoring software
• Speclink
TRAINING
• Single Minute Exchange of Die (SMED)
• Overall Equipment Effectiveness (OEE)
• Total Preventive Maintenance (TPM)
• Kaizen
• 6S practices
• Lean Manufacturing
• Energy Management • Theory of Constraints

More Related Content

What's hot

Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...
Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...
Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...IoEnergy, Inc.
 
Peter Knowles Resume
Peter Knowles ResumePeter Knowles Resume
Peter Knowles ResumePeter Knowles
 
Samuel M Lewis Resume 2016
Samuel M Lewis Resume 2016Samuel M Lewis Resume 2016
Samuel M Lewis Resume 2016Sam Lewis
 
Evan Gritman Lewis
Evan Gritman LewisEvan Gritman Lewis
Evan Gritman LewisEvan Lewis
 
Calvin jamerson resume 08-23-2015a
Calvin jamerson   resume 08-23-2015aCalvin jamerson   resume 08-23-2015a
Calvin jamerson resume 08-23-2015aCalvin Jamerson
 
Pope ATC LEED Profile
Pope ATC LEED ProfilePope ATC LEED Profile
Pope ATC LEED ProfileSean Haynes
 
Gerdeman_Lance_Resume 1.7.16
Gerdeman_Lance_Resume 1.7.16Gerdeman_Lance_Resume 1.7.16
Gerdeman_Lance_Resume 1.7.16Lance Gerdeman
 
Kalyan Chunchu Resume
Kalyan Chunchu Resume Kalyan Chunchu Resume
Kalyan Chunchu Resume Kalyan Chunchu
 
Resume-11 20 14
Resume-11 20 14Resume-11 20 14
Resume-11 20 14Alex Mohr
 
Techshore Inspection Services in Kochi Kollam Calicut Thrissur Pathanamthitta...
Techshore Inspection Services in Kochi Kollam Calicut Thrissur Pathanamthitta...Techshore Inspection Services in Kochi Kollam Calicut Thrissur Pathanamthitta...
Techshore Inspection Services in Kochi Kollam Calicut Thrissur Pathanamthitta...Techshore Inspection Services
 
Anthony R. Moore 06_24_16
Anthony R. Moore  06_24_16Anthony R. Moore  06_24_16
Anthony R. Moore 06_24_16Anthony Moore
 
Calvin Jamerson Resume 09-12-2015a
Calvin Jamerson Resume 09-12-2015aCalvin Jamerson Resume 09-12-2015a
Calvin Jamerson Resume 09-12-2015aCalvin Jamerson
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony Vitola
 
Staley_Terrell_Resume_V1
Staley_Terrell_Resume_V1Staley_Terrell_Resume_V1
Staley_Terrell_Resume_V1Terrell Staley
 
John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)John Reeves
 
Gabauer.Dale_PROJECTS JAN2016
Gabauer.Dale_PROJECTS JAN2016Gabauer.Dale_PROJECTS JAN2016
Gabauer.Dale_PROJECTS JAN2016Dale F. Gabauer
 

What's hot (20)

Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...
Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...
Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...
 
resume_montminy
resume_montminyresume_montminy
resume_montminy
 
Peter Knowles Resume
Peter Knowles ResumePeter Knowles Resume
Peter Knowles Resume
 
CV_KaitlinMaloney
CV_KaitlinMaloneyCV_KaitlinMaloney
CV_KaitlinMaloney
 
Samuel M Lewis Resume 2016
Samuel M Lewis Resume 2016Samuel M Lewis Resume 2016
Samuel M Lewis Resume 2016
 
Evan Gritman Lewis
Evan Gritman LewisEvan Gritman Lewis
Evan Gritman Lewis
 
Calvin jamerson resume 08-23-2015a
Calvin jamerson   resume 08-23-2015aCalvin jamerson   resume 08-23-2015a
Calvin jamerson resume 08-23-2015a
 
Pope ATC LEED Profile
Pope ATC LEED ProfilePope ATC LEED Profile
Pope ATC LEED Profile
 
Gerdeman_Lance_Resume 1.7.16
Gerdeman_Lance_Resume 1.7.16Gerdeman_Lance_Resume 1.7.16
Gerdeman_Lance_Resume 1.7.16
 
Kalyan Chunchu Resume
Kalyan Chunchu Resume Kalyan Chunchu Resume
Kalyan Chunchu Resume
 
Resume-11 20 14
Resume-11 20 14Resume-11 20 14
Resume-11 20 14
 
Techshore Inspection Services in Kochi Kollam Calicut Thrissur Pathanamthitta...
Techshore Inspection Services in Kochi Kollam Calicut Thrissur Pathanamthitta...Techshore Inspection Services in Kochi Kollam Calicut Thrissur Pathanamthitta...
Techshore Inspection Services in Kochi Kollam Calicut Thrissur Pathanamthitta...
 
Anthony R. Moore 06_24_16
Anthony R. Moore  06_24_16Anthony R. Moore  06_24_16
Anthony R. Moore 06_24_16
 
Calvin Jamerson Resume 09-12-2015a
Calvin Jamerson Resume 09-12-2015aCalvin Jamerson Resume 09-12-2015a
Calvin Jamerson Resume 09-12-2015a
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_Resume
 
Enrico S. Simon
Enrico S. SimonEnrico S. Simon
Enrico S. Simon
 
Staley_Terrell_Resume_V1
Staley_Terrell_Resume_V1Staley_Terrell_Resume_V1
Staley_Terrell_Resume_V1
 
Annette Siverling Resume
Annette Siverling ResumeAnnette Siverling Resume
Annette Siverling Resume
 
John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)
 
Gabauer.Dale_PROJECTS JAN2016
Gabauer.Dale_PROJECTS JAN2016Gabauer.Dale_PROJECTS JAN2016
Gabauer.Dale_PROJECTS JAN2016
 

Viewers also liked (20)

Lawless Resume 2010
Lawless Resume 2010Lawless Resume 2010
Lawless Resume 2010
 
George Campbell Resume
George Campbell ResumeGeorge Campbell Resume
George Campbell Resume
 
Resume 12 10-15
Resume 12 10-15Resume 12 10-15
Resume 12 10-15
 
Resume[1][2]
Resume[1][2]Resume[1][2]
Resume[1][2]
 
resume 2016
resume 2016resume 2016
resume 2016
 
JAIME Resume
JAIME ResumeJAIME Resume
JAIME Resume
 
Rob Castro Resume 2016
Rob Castro  Resume 2016Rob Castro  Resume 2016
Rob Castro Resume 2016
 
Ajay resume new
Ajay resume newAjay resume new
Ajay resume new
 
Koneeski Gregg RESUME1.3.1
Koneeski Gregg RESUME1.3.1Koneeski Gregg RESUME1.3.1
Koneeski Gregg RESUME1.3.1
 
Chris Scocco Resume
Chris Scocco ResumeChris Scocco Resume
Chris Scocco Resume
 
Resume 2014 2
Resume 2014 2Resume 2014 2
Resume 2014 2
 
Sonya Morrison resume
Sonya Morrison resumeSonya Morrison resume
Sonya Morrison resume
 
Resume
ResumeResume
Resume
 
Don Brown 62216
Don Brown 62216Don Brown 62216
Don Brown 62216
 
Resume
ResumeResume
Resume
 
2014 Melia Hoston Resume
2014 Melia Hoston Resume2014 Melia Hoston Resume
2014 Melia Hoston Resume
 
Safety Resume 6.24.15
Safety Resume 6.24.15Safety Resume 6.24.15
Safety Resume 6.24.15
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015
 
J. Salinas resume012016
J. Salinas resume012016J. Salinas resume012016
J. Salinas resume012016
 
MAS Resume 12.15
MAS Resume 12.15MAS Resume 12.15
MAS Resume 12.15
 

Similar to Resume 12-1-15

William E Davis III New
William E Davis III NewWilliam E Davis III New
William E Davis III NewWilliam Davis
 
w-o summary 10-27-15
w-o summary 10-27-15w-o summary 10-27-15
w-o summary 10-27-15Bill Moran
 
Dufour,Don E Resume C
Dufour,Don E Resume CDufour,Don E Resume C
Dufour,Don E Resume CDon Dufour
 
Austin overview 2017
Austin overview 2017Austin overview 2017
Austin overview 2017Bill Hammill
 
Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers
 
Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0Forrest Suehs
 
resume-clinton-collier-revision-2
resume-clinton-collier-revision-2resume-clinton-collier-revision-2
resume-clinton-collier-revision-2clinton collier
 
Steve James Resume
Steve James   ResumeSteve James   Resume
Steve James Resumesejames8808
 
Quanta Presentation
Quanta PresentationQuanta Presentation
Quanta PresentationJay Kapadia
 
Velpandi CV
Velpandi CV Velpandi CV
Velpandi CV Vel Pandi
 
Eric K Reneker 2016.1
Eric K Reneker 2016.1Eric K Reneker 2016.1
Eric K Reneker 2016.1Eric Reneker
 
GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015Tim Gilliatt
 
Rod Cornell ResumeA2
Rod Cornell ResumeA2Rod Cornell ResumeA2
Rod Cornell ResumeA2Rod Cornell
 
Roy Watson Resume LSSBB CPIM
Roy Watson Resume LSSBB CPIMRoy Watson Resume LSSBB CPIM
Roy Watson Resume LSSBB CPIMRoy Watson
 

Similar to Resume 12-1-15 (20)

William E Davis III New
William E Davis III NewWilliam E Davis III New
William E Davis III New
 
w-o summary 10-27-15
w-o summary 10-27-15w-o summary 10-27-15
w-o summary 10-27-15
 
Dufour,Don E Resume C
Dufour,Don E Resume CDufour,Don E Resume C
Dufour,Don E Resume C
 
alagha Resume 2016
alagha Resume 2016alagha Resume 2016
alagha Resume 2016
 
Resume 2015
Resume 2015Resume 2015
Resume 2015
 
KASHIF DADA, PMP, P.Eng
KASHIF DADA, PMP, P.EngKASHIF DADA, PMP, P.Eng
KASHIF DADA, PMP, P.Eng
 
Austin overview 2017
Austin overview 2017Austin overview 2017
Austin overview 2017
 
May 01 Resume[1]
May 01 Resume[1]May 01 Resume[1]
May 01 Resume[1]
 
Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15
 
Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0
 
resume-clinton-collier-revision-2
resume-clinton-collier-revision-2resume-clinton-collier-revision-2
resume-clinton-collier-revision-2
 
Marshall Steve (pm)
Marshall Steve (pm)Marshall Steve (pm)
Marshall Steve (pm)
 
Steve James Resume
Steve James   ResumeSteve James   Resume
Steve James Resume
 
Quanta Presentation
Quanta PresentationQuanta Presentation
Quanta Presentation
 
Velpandi CV
Velpandi CV Velpandi CV
Velpandi CV
 
1PROF_RESUME
1PROF_RESUME1PROF_RESUME
1PROF_RESUME
 
Eric K Reneker 2016.1
Eric K Reneker 2016.1Eric K Reneker 2016.1
Eric K Reneker 2016.1
 
GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015
 
Rod Cornell ResumeA2
Rod Cornell ResumeA2Rod Cornell ResumeA2
Rod Cornell ResumeA2
 
Roy Watson Resume LSSBB CPIM
Roy Watson Resume LSSBB CPIMRoy Watson Resume LSSBB CPIM
Roy Watson Resume LSSBB CPIM
 

Resume 12-1-15

  • 1. Ryan D. Daly 2791 River Hills Road, Fort Madison, IA 52627 ryadaly2003@yahoo.com (319) 470-0172 OBJECTIVE Engineering Manager for an innovative company in the food manufacturing industry BUSINESS EXPERIENCE IDNR P2 Pollution Prevention Internship Program, Summer of 2003, Dial Corp • Energy Management for the Dial Corporation/Pinnacle Foods Group • Implemented the addition of a Power Factor Correction Capacitor Bank to generate an estimated annual cost savings of $50,000 and reduced overall emissions Process Engineer/Project Manager, Dial Corporation/Pinnacle Foods Group, 2004 - Present • Highlights o Produced 4.9 million in cost savings by successfully managing 9.42 million in capital spending over the last 6 years o Responsible for leading contractor and maintenance personnel to complete project installations on time and at budget • Manage and Implement Capital Projects o Line analysis  Process flow analysis  Theory of constraints  Ergonomic studies o Project feasibility and cost analysis o Equipment specification and quoting o AutoCAD layout and design o Capital approval documentation o Gantt chart project timeline o Equipment and installation contract documentation o Vendor negotiations o Capital spending management o OSHA requirements o USDA sanitary requirements o Project Management of outside contractors, local labor, and vendors for equipment installation o Standard operating procedures (SOP) o Equipment recommended spare parts documentation o Preventative maintenance documentation • Notable Project Implementations o Cost Savings  Automation • 5 oz. Vienna can dumper • Broth automation • Automated Dried Beef • Laser Guided Vehicle System  Process Improvement • Vienna Packer output increase • Vienna Expansion 3rd filler/seamer • Blancher Installation  Energy Savings • Compressor system replacemen o With heat recovery and water reduction • Compressed air use reduction o Can Dryer installations • Secondary Economizer  Water Reduction Project Manager
  • 2. • 80 MM gallons/yr reduced since 2012 o Pinnacle “Winning Moments” winner o New Product Development  Combination Expansion • 16,000 sq. ft building addition • Equipment Relocation  Armour to Go Project Engineer • Designed changeover parts • Installation of new capper, airveyor system, cup denester, conveyor system, and platform o Quality – Capital Project Manager  Installed 7 X-Ray units • On-site technical leader  Installed meat block & pipe line metal detectors o Safety – Capital Project Manager  $1.5MM invested in safety enhancements since 2012  OSHA citation abatement o Sanitation  CIP systems  Sanitation curtains • Maintenance Support o TPM support o Provide technical line support o Weekend Maintenance Manager o Assist as Maintenance Supervisor  Schedule line coverage  Job planning for mechanics and electricians  PM planning and scheduling o Continuous Improvement  Tooling design/modification  Standardization of work methods  Kaizen • Performed project implementation for additional Pinnacle facilities  Fork Truck Clamp Project at Jackson, TN  Douglas case packer Installation at Centralia, IL  Celeste Pizza line startup assistance at Jackson, TN  Vacuum Bag Lift System Design at St. Elmo, IL EDUCATION Bachelor of Science in Mechanical Engineering, May 2004 The University of Iowa College of Engineering, Iowa City, Iowa A.A.S. in CAD/Mechanical Engineering Technology, May 2000 Kirkwood Community College, Cedar Rapids, Iowa COMPUTER SKILLS • Microsoft Office • Microsoft Excel • Microsoft Power Point • Microsoft Project • SAP, EAM, ELKE, Maximo • AutoCAD 2010 • PLC 5, 500, 5000 • RS View • Square D Power Monitoring software • Speclink TRAINING • Single Minute Exchange of Die (SMED) • Overall Equipment Effectiveness (OEE) • Total Preventive Maintenance (TPM) • Kaizen • 6S practices • Lean Manufacturing
  • 3. • Energy Management • Theory of Constraints