SlideShare a Scribd company logo
1 of 2
RICHARD ALEX MOHR
1123 Fernway Road  Chattanooga, TN  423-320-3058  alexmohr4@gmail.com
DEGREES AND CERTIFICATIONS
• Bachelors of Science in Mechanical Engineering, Fall 2012, Magna Cum Laude
• Lean Six Sigma Black Belt Certification, February 2014
• EIT, Engineer In Training, Fall 2012
• Lean Six Sigma Green Belt Certification, Fall 2012
• Associates of Applied Science in Engineering, Spring 2011
RELEVANT EXPERIENCE
Engineering Technician-Starting Position September 2011
Associate Manufacturing Engineer Current
Accellent Cardiovascular Trenton, GA
• Purchasing, Installation, Qualification and Validation
• Design processes, products and quality controls
• Design, fabricate and build fixtures and machines using SolidWorks and machining equipment
• Use Six Sigma statistical analysis to make processes more accurate and precise while reducing testing
expenses
• Implement process controls to maintain improvements
• Use Lean Manufacturing to reduce labor, overhead and lead times
• Technical Skills: Microsoft Excel, Word and PowerPoint; Minitab; SolidWorks and CATIA; Acro Basic;
LabView
ENGINEERING ACCOMPLISHMENTS
• Designed and developed a process that reduced three separate modes of failure and variation in part
travel by over 50%
• Lean modifications that resulted in a 26% higher production rate and attained one by one flow
• Six Sigma Black Belt project was part of a 19% increase in rolled throughput yield for one product line
• Worked with an engineering team to increase product yield from approximately 30% to over 60%
• Led a Six Sigma Green Belt project that increased yield over 25% and lean manufacturing changes with
potential annual cost savings of $200,000
• Designed environmental controls for a process that reduces standard deviation of outer diameter
approximately 67%. The modification holds tighter specifications, reduces operator input and increases
yield and impacts of most products manufactured in the facility
• Designed equipment that increased process output at least 250% and reduced floor space approximately
270%
• Increased efficiency of automation programming for three production lines
AWARDS AND ACTIVITIES
• American Society of Mechanical Engineers, May 2012 - Present
• Accelerating Success Award, Accellent Cardiovascular, Q4 2013
• Accelerating Success Award, Accellent Cardiovascular, Q2 2013
• Dean’s List, UTC, Summer 2011, Fall 2011, Summer 2012, Fall 2012
• Certificate of Appreciation, Regional Science Olympiad Tournament, Spring 2011
• Awarded Empowerment Access and Diversity Grant, Spring 2011
• Departmental Award, Physical Science, Calculus Based-Physics Award, CSCC, 2010-2011
Richard A. Mohr – 2
• Departmental Award, Pre-Engineering, Outstanding Service and Dedication to the Engineering
Technology Division, CSCC, 2010-2011
• Dean’s List, CSCC, Summer 2010, Fall 2010, Spring 2011
• Sales Person of the Month For FanFare Media Works (highest sales in the U.S.), February 2008

More Related Content

What's hot

SunEdison Manages Cash Flow with SAP Business Planning and Consolidations
SunEdison Manages Cash Flow with SAP Business Planning and ConsolidationsSunEdison Manages Cash Flow with SAP Business Planning and Consolidations
SunEdison Manages Cash Flow with SAP Business Planning and Consolidationsrnaramore
 
Deploying Mobile Construction Inspection Forms as a Case Study for Technology...
Deploying Mobile Construction Inspection Forms as a Case Study for Technology...Deploying Mobile Construction Inspection Forms as a Case Study for Technology...
Deploying Mobile Construction Inspection Forms as a Case Study for Technology...Project Consulting Services, Inc.
 
N. Wassef Resume 2016
N. Wassef Resume 2016N. Wassef Resume 2016
N. Wassef Resume 2016Nagy Wassef
 
JamesHunterRead-Resume
JamesHunterRead-ResumeJamesHunterRead-Resume
JamesHunterRead-ResumeHunter Read
 
Wesley Yan Resume
Wesley Yan ResumeWesley Yan Resume
Wesley Yan ResumeWesley Yan
 
Asset Virtualization - Digitize, then add Intelligence 2014
Asset Virtualization - Digitize, then add Intelligence 2014Asset Virtualization - Digitize, then add Intelligence 2014
Asset Virtualization - Digitize, then add Intelligence 2014PaulOberle
 
TechnologyOne_Andrew Szekeres CV v1.0_2015
TechnologyOne_Andrew Szekeres CV v1.0_2015TechnologyOne_Andrew Szekeres CV v1.0_2015
TechnologyOne_Andrew Szekeres CV v1.0_2015Andrew Szekeres
 
Final Presentation
Final PresentationFinal Presentation
Final PresentationNimish Yadav
 
SAS Global Forum 2015 Presentation
SAS Global Forum 2015 PresentationSAS Global Forum 2015 Presentation
SAS Global Forum 2015 PresentationDhanashree Arole
 
William Baxter Professional Resume
William Baxter Professional ResumeWilliam Baxter Professional Resume
William Baxter Professional ResumeWilliam Baxter
 
ARIN 34 ARIN Reports: Human Resources and Administration
ARIN 34 ARIN Reports: Human Resources and AdministrationARIN 34 ARIN Reports: Human Resources and Administration
ARIN 34 ARIN Reports: Human Resources and AdministrationARIN
 
Nick_Marr_Resume
Nick_Marr_ResumeNick_Marr_Resume
Nick_Marr_ResumeNick Marr
 

What's hot (15)

SunEdison Manages Cash Flow with SAP Business Planning and Consolidations
SunEdison Manages Cash Flow with SAP Business Planning and ConsolidationsSunEdison Manages Cash Flow with SAP Business Planning and Consolidations
SunEdison Manages Cash Flow with SAP Business Planning and Consolidations
 
prospectiveResume
prospectiveResumeprospectiveResume
prospectiveResume
 
Deploying Mobile Construction Inspection Forms as a Case Study for Technology...
Deploying Mobile Construction Inspection Forms as a Case Study for Technology...Deploying Mobile Construction Inspection Forms as a Case Study for Technology...
Deploying Mobile Construction Inspection Forms as a Case Study for Technology...
 
N. Wassef Resume 2016
N. Wassef Resume 2016N. Wassef Resume 2016
N. Wassef Resume 2016
 
JamesHunterRead-Resume
JamesHunterRead-ResumeJamesHunterRead-Resume
JamesHunterRead-Resume
 
Loco Shed Management System Process
Loco Shed Management System ProcessLoco Shed Management System Process
Loco Shed Management System Process
 
Wesley Yan Resume
Wesley Yan ResumeWesley Yan Resume
Wesley Yan Resume
 
Resume_Num1
Resume_Num1Resume_Num1
Resume_Num1
 
Asset Virtualization - Digitize, then add Intelligence 2014
Asset Virtualization - Digitize, then add Intelligence 2014Asset Virtualization - Digitize, then add Intelligence 2014
Asset Virtualization - Digitize, then add Intelligence 2014
 
TechnologyOne_Andrew Szekeres CV v1.0_2015
TechnologyOne_Andrew Szekeres CV v1.0_2015TechnologyOne_Andrew Szekeres CV v1.0_2015
TechnologyOne_Andrew Szekeres CV v1.0_2015
 
Final Presentation
Final PresentationFinal Presentation
Final Presentation
 
SAS Global Forum 2015 Presentation
SAS Global Forum 2015 PresentationSAS Global Forum 2015 Presentation
SAS Global Forum 2015 Presentation
 
William Baxter Professional Resume
William Baxter Professional ResumeWilliam Baxter Professional Resume
William Baxter Professional Resume
 
ARIN 34 ARIN Reports: Human Resources and Administration
ARIN 34 ARIN Reports: Human Resources and AdministrationARIN 34 ARIN Reports: Human Resources and Administration
ARIN 34 ARIN Reports: Human Resources and Administration
 
Nick_Marr_Resume
Nick_Marr_ResumeNick_Marr_Resume
Nick_Marr_Resume
 

Similar to Resume-11 20 14

Similar to Resume-11 20 14 (20)

Resume_AndrewClaxton
Resume_AndrewClaxtonResume_AndrewClaxton
Resume_AndrewClaxton
 
alagha Resume 2016
alagha Resume 2016alagha Resume 2016
alagha Resume 2016
 
Carlton R. Albritton QE 1
Carlton R. Albritton QE 1Carlton R. Albritton QE 1
Carlton R. Albritton QE 1
 
May 01 Resume[1]
May 01 Resume[1]May 01 Resume[1]
May 01 Resume[1]
 
RESUME_MECHANICAL_VARUN RAWAL 2015
RESUME_MECHANICAL_VARUN RAWAL 2015 RESUME_MECHANICAL_VARUN RAWAL 2015
RESUME_MECHANICAL_VARUN RAWAL 2015
 
Cable,Tiffany_Resume
Cable,Tiffany_ResumeCable,Tiffany_Resume
Cable,Tiffany_Resume
 
Cable,Tiffany_Resume
Cable,Tiffany_ResumeCable,Tiffany_Resume
Cable,Tiffany_Resume
 
jermaine_brown resume 2016 updated
jermaine_brown resume 2016 updatedjermaine_brown resume 2016 updated
jermaine_brown resume 2016 updated
 
Jps16
Jps16Jps16
Jps16
 
Kevin Resume 11-2-2015
Kevin Resume 11-2-2015Kevin Resume 11-2-2015
Kevin Resume 11-2-2015
 
Resume-Satbir Minhas
Resume-Satbir MinhasResume-Satbir Minhas
Resume-Satbir Minhas
 
resume
resumeresume
resume
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resume
 
Rod Cornell ResumeA2
Rod Cornell ResumeA2Rod Cornell ResumeA2
Rod Cornell ResumeA2
 
Matt Elmer- Resume
Matt Elmer- ResumeMatt Elmer- Resume
Matt Elmer- Resume
 
Nate Simpson
Nate SimpsonNate Simpson
Nate Simpson
 
resume
resumeresume
resume
 
Eric K Reneker 2016.1
Eric K Reneker 2016.1Eric K Reneker 2016.1
Eric K Reneker 2016.1
 
Gabe_Cahn_Resume_Sept2015
Gabe_Cahn_Resume_Sept2015Gabe_Cahn_Resume_Sept2015
Gabe_Cahn_Resume_Sept2015
 
Resume
ResumeResume
Resume
 

Resume-11 20 14

  • 1. RICHARD ALEX MOHR 1123 Fernway Road  Chattanooga, TN  423-320-3058  alexmohr4@gmail.com DEGREES AND CERTIFICATIONS • Bachelors of Science in Mechanical Engineering, Fall 2012, Magna Cum Laude • Lean Six Sigma Black Belt Certification, February 2014 • EIT, Engineer In Training, Fall 2012 • Lean Six Sigma Green Belt Certification, Fall 2012 • Associates of Applied Science in Engineering, Spring 2011 RELEVANT EXPERIENCE Engineering Technician-Starting Position September 2011 Associate Manufacturing Engineer Current Accellent Cardiovascular Trenton, GA • Purchasing, Installation, Qualification and Validation • Design processes, products and quality controls • Design, fabricate and build fixtures and machines using SolidWorks and machining equipment • Use Six Sigma statistical analysis to make processes more accurate and precise while reducing testing expenses • Implement process controls to maintain improvements • Use Lean Manufacturing to reduce labor, overhead and lead times • Technical Skills: Microsoft Excel, Word and PowerPoint; Minitab; SolidWorks and CATIA; Acro Basic; LabView ENGINEERING ACCOMPLISHMENTS • Designed and developed a process that reduced three separate modes of failure and variation in part travel by over 50% • Lean modifications that resulted in a 26% higher production rate and attained one by one flow • Six Sigma Black Belt project was part of a 19% increase in rolled throughput yield for one product line • Worked with an engineering team to increase product yield from approximately 30% to over 60% • Led a Six Sigma Green Belt project that increased yield over 25% and lean manufacturing changes with potential annual cost savings of $200,000 • Designed environmental controls for a process that reduces standard deviation of outer diameter approximately 67%. The modification holds tighter specifications, reduces operator input and increases yield and impacts of most products manufactured in the facility • Designed equipment that increased process output at least 250% and reduced floor space approximately 270% • Increased efficiency of automation programming for three production lines AWARDS AND ACTIVITIES • American Society of Mechanical Engineers, May 2012 - Present • Accelerating Success Award, Accellent Cardiovascular, Q4 2013 • Accelerating Success Award, Accellent Cardiovascular, Q2 2013 • Dean’s List, UTC, Summer 2011, Fall 2011, Summer 2012, Fall 2012 • Certificate of Appreciation, Regional Science Olympiad Tournament, Spring 2011 • Awarded Empowerment Access and Diversity Grant, Spring 2011 • Departmental Award, Physical Science, Calculus Based-Physics Award, CSCC, 2010-2011
  • 2. Richard A. Mohr – 2 • Departmental Award, Pre-Engineering, Outstanding Service and Dedication to the Engineering Technology Division, CSCC, 2010-2011 • Dean’s List, CSCC, Summer 2010, Fall 2010, Spring 2011 • Sales Person of the Month For FanFare Media Works (highest sales in the U.S.), February 2008