SlideShare a Scribd company logo
1 of 3
Download to read offline
Peter Knowles
9 Cimarron Park Green, Okotoks, AB T1S2K2 | (H) 403.938.2981 | (C) 403.813.8536 | florida1@telus.net
LinkedIn: https://ca.linkedin.com/in/peter-knowles-882008123
Objective: Looking for a career opportunity that utilizes my existing skills in a
rewarding environment, where I can bring my experience to contribute to
the growth of any company.
Qualifications:
• Previous experience working as a Foreman or General Foreman most
of my career & recently as a Site Project manager.
• Able to maintain a good level of communication with various groups
to keep them aware of what is going on in regards to fire system
installation as well as testing and commissioning.
• Previous involvement in all types of installations commercial,
industrial, residential, full working knowledge of all types of
installations.
• Very versatile to changing conditions, able to redirect focus as
situations evolve to make the most efficient use of time and materials.
• Familiar with trades pertaining to the installation of all types of
sprinkler systems and interacting with them, worked with and
mentored apprentices throughout my career.
• Well organized and committed to effective time management
• Extensive experience in maintenance and repair of all types of
sprinkler systems.
• Years of experience in the ordering and distribution of parts and
components for multiple industrial applications.
• Comprehensive understanding of Industrial equipment and tools and
there use and applications.
• Computer literate with excel, word and part management systems.
• Able to manage and control budgets for projects ranging from
$250,000 to $8,000,000
• Very versatile working independently or as a team builder, team lead
or team member, strong promoter of a team culture.
• Willing to travel, work in remote locations and travel to work at
various foreign jurisdictions.
• Willing to work variable shifts and any day of week.
Career History: Simplexgrinnell Strongsville, Ohio
November 2015 – July 2016
Site Project Manager
• Interfaced with various levels of management and labour to ensure
quality of work and timely completion of the project.
• Attended site and coordination meetings with Contractors and Owners.
• Supervised functionality testing of the Fire Protection Systems and
related Components.
• Inspect Fire Protection Systems to ensure code compliance.
Churchill Fire Protection Calgary, Alberta
June 2015 – October 2015
Superintendent
• Material and parts procurement and disbursement to end users to
ensure continual installation of Fire Protection Systems with no time
loss or excess material costs
• Allocation of manpower to ensure installation keeps up with project
schedule
• Inspect Fire Protection Systems to ensure code compliance
• Day to Day documentation of Time and Job Hazard Analysis Reports
• Supervised functional testing of the Fire Protection Systems and
related components
Simplexgrinnell Regina & Calgary
October 2012 – May 2015
Foreman
• Organized workers to do tasks that best suited their abilities in order to
comply with deadlines and exceed customer expectations
• Material and parts procurement and distribution to end users to ensure
continual installation of Fire Protection Systems with no time loss or
excess material costs
• Daily site coordination meetings and weekly safety meetings
• Day to Day documentation of Time and Job Hazard Analysis Reports
• Supervised functional testing of the Fire Protection Systems and
related components
Constant Fire Protection Calgary, Alberta
October 2002 – September 2012
Foreman
• Organized workers to do tasks that best suited their abilities in order to
complete the project in a cost effective and timely manner.
• Site coordination meetings.
• Material and parts procurement and disbursement to end users to
ensure continued installation of Fire Protection Systems with no time
lost or excess material costs.
• Day to Day documentation of Time and Job Hazard Analysis Reports.
• Supervising sub-trades doing related work pertaining to the
functionality of the Fire Protection Systems, ensuring work is
completed in a timely manner and exceeds customer expectations.
• Supervised installations crews including sub-trades up to 20 craftsmen
at any given time.
• Inspect Fire Protection Systems to ensure code compliance and quality
of work.
Completed Projects
& Achievements:
• Rona Distribution Centre (8-10 sprinkler fitters)
• Developed procedures for QA/QC structures, designing formats
including the implementation and execution of the QA/QC structures.
• Bow Valley College Renovation (2-6 sprinkler fitters) 3 year project.
Fire protection Systems where kept active while renovations were
taking place as the College was still functioning as partial floors were
being used as renovations were taking place.
• University of Calgary Engineering Blocks Renovation (2-15 sprinkler
fitters)
$2.1 million budget (time & material) completed project $1.6 million.
• LDS Temple (2-3 sprinkler fitters)
• West Wing Kamloops General Hospital
• Federal Building, Whitehorse Yukon Territory (6-8 sprinkler fitters)
• Enmax Electrical Generation Plant (2-8 sprinkler fitters)
$8 million project completed ahead of schedule and under budget.
• Goodyear Tire Factory (Brazil) (6-8 sprinkler fitters)
• U.S. / Canada Border Crossing Sweetgrass Montana / Coutts Alberta
• Strategic planning for large projects to ensure timely installation and to
foresee any design issues so they can be rectified beforehand in order
to minimize conflict with other disciplines and prevent time loss and
extra costs.
• Project Management, material procurement and disbursement,
effective labour allocation.
• All the above installations included electric and or diesel fire pumps
and related equipment.
• Set up procedures for functional tests and commissioning of Fire
Protection Systems, for the above projects.
Certifications:
• Leadership for safety Excellence.
• Aerial Platform
• Standard First-Aid and CPR/AED
• Fall Protection
• CSTS Construction end user
• WHIMS
• Journeyman Sprinkler Fitter

More Related Content

What's hot (20)

David c brooks resume 06 2018
David c brooks resume 06 2018David c brooks resume 06 2018
David c brooks resume 06 2018
 
Resume Jaime Lopez 2016
Resume Jaime Lopez 2016Resume Jaime Lopez 2016
Resume Jaime Lopez 2016
 
Tony Dickey Resume_3-14-16
Tony Dickey Resume_3-14-16Tony Dickey Resume_3-14-16
Tony Dickey Resume_3-14-16
 
CURRICULUM
CURRICULUMCURRICULUM
CURRICULUM
 
Resume word format
Resume word formatResume word format
Resume word format
 
Russ Spencer1
Russ Spencer1Russ Spencer1
Russ Spencer1
 
Jasper Resume
Jasper ResumeJasper Resume
Jasper Resume
 
Qc
QcQc
Qc
 
Manoj Subhash Patil AD H
Manoj Subhash Patil AD HManoj Subhash Patil AD H
Manoj Subhash Patil AD H
 
shahul updated resume
shahul updated resumeshahul updated resume
shahul updated resume
 
resume open 2015
resume open 2015resume open 2015
resume open 2015
 
SECS White Paper For Folders
SECS White Paper For FoldersSECS White Paper For Folders
SECS White Paper For Folders
 
Daniel Lee Wells - CV
Daniel Lee Wells - CVDaniel Lee Wells - CV
Daniel Lee Wells - CV
 
Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.doc
 
Chen Qiu Round Table Pitch Out
Chen Qiu Round Table Pitch OutChen Qiu Round Table Pitch Out
Chen Qiu Round Table Pitch Out
 
MC resume 2016
MC resume 2016MC resume 2016
MC resume 2016
 
Resume Rafael July 2016 NEW
Resume Rafael July 2016 NEWResume Rafael July 2016 NEW
Resume Rafael July 2016 NEW
 
Lyndell's resume
Lyndell's resumeLyndell's resume
Lyndell's resume
 
jamesb-cv4-1
jamesb-cv4-1jamesb-cv4-1
jamesb-cv4-1
 
Mick Lovett Resume 2015
Mick Lovett Resume 2015Mick Lovett Resume 2015
Mick Lovett Resume 2015
 

Viewers also liked

Deepak R (Process & Test Automation Lead)
Deepak R (Process & Test Automation Lead)Deepak R (Process & Test Automation Lead)
Deepak R (Process & Test Automation Lead)Deepak R
 
O melhor do recruta zero
O melhor do recruta zeroO melhor do recruta zero
O melhor do recruta zeroLeo Alves
 
Proyecto ecuaciones diferenciales, cambio de la temperatura de la tierra en f...
Proyecto ecuaciones diferenciales, cambio de la temperatura de la tierra en f...Proyecto ecuaciones diferenciales, cambio de la temperatura de la tierra en f...
Proyecto ecuaciones diferenciales, cambio de la temperatura de la tierra en f...Miguel Urrea
 
New presentación de microsoft power point (2)
New presentación de microsoft power point (2)New presentación de microsoft power point (2)
New presentación de microsoft power point (2)Elena Penoth
 
1 ppt la atmosfera modulo virtual
1 ppt la atmosfera modulo virtual1 ppt la atmosfera modulo virtual
1 ppt la atmosfera modulo virtualtcu1958
 

Viewers also liked (7)

Deepak R (Process & Test Automation Lead)
Deepak R (Process & Test Automation Lead)Deepak R (Process & Test Automation Lead)
Deepak R (Process & Test Automation Lead)
 
O melhor do recruta zero
O melhor do recruta zeroO melhor do recruta zero
O melhor do recruta zero
 
Proyecto ecuaciones diferenciales, cambio de la temperatura de la tierra en f...
Proyecto ecuaciones diferenciales, cambio de la temperatura de la tierra en f...Proyecto ecuaciones diferenciales, cambio de la temperatura de la tierra en f...
Proyecto ecuaciones diferenciales, cambio de la temperatura de la tierra en f...
 
10 claves
10 claves10 claves
10 claves
 
New presentación de microsoft power point (2)
New presentación de microsoft power point (2)New presentación de microsoft power point (2)
New presentación de microsoft power point (2)
 
Feroz K CV
Feroz K CVFeroz K CV
Feroz K CV
 
1 ppt la atmosfera modulo virtual
1 ppt la atmosfera modulo virtual1 ppt la atmosfera modulo virtual
1 ppt la atmosfera modulo virtual
 

Similar to Peter Knowles Resume (20)

VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-
 
David Lawrence11
David Lawrence11David Lawrence11
David Lawrence11
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16
 
Res414
Res414Res414
Res414
 
Gregory_Hawkins-3-3 doc
Gregory_Hawkins-3-3 docGregory_Hawkins-3-3 doc
Gregory_Hawkins-3-3 doc
 
JackmcdowellCV
JackmcdowellCVJackmcdowellCV
JackmcdowellCV
 
Christopher Kinnon Resume
Christopher Kinnon ResumeChristopher Kinnon Resume
Christopher Kinnon Resume
 
Girish Mishra-R
Girish Mishra-RGirish Mishra-R
Girish Mishra-R
 
UCM-CV
UCM-CVUCM-CV
UCM-CV
 
GOEFF STEBBINS RESUME
GOEFF STEBBINS RESUMEGOEFF STEBBINS RESUME
GOEFF STEBBINS RESUME
 
Rick Stinnett Resume
Rick Stinnett ResumeRick Stinnett Resume
Rick Stinnett Resume
 
ANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANANANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANAN
 
Phil Staib's Resume 2016
Phil Staib's Resume 2016Phil Staib's Resume 2016
Phil Staib's Resume 2016
 
Graham Winsor Resume July 2015
Graham Winsor Resume July 2015Graham Winsor Resume July 2015
Graham Winsor Resume July 2015
 
JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)
 
Alif_Resume
Alif_ResumeAlif_Resume
Alif_Resume
 
Tito Camps Resume
Tito Camps ResumeTito Camps Resume
Tito Camps Resume
 
Tami_Strickland 8May15
Tami_Strickland 8May15Tami_Strickland 8May15
Tami_Strickland 8May15
 
JOSEPH LIPPS RESUME
JOSEPH LIPPS RESUMEJOSEPH LIPPS RESUME
JOSEPH LIPPS RESUME
 

Peter Knowles Resume

  • 1. Peter Knowles 9 Cimarron Park Green, Okotoks, AB T1S2K2 | (H) 403.938.2981 | (C) 403.813.8536 | florida1@telus.net LinkedIn: https://ca.linkedin.com/in/peter-knowles-882008123 Objective: Looking for a career opportunity that utilizes my existing skills in a rewarding environment, where I can bring my experience to contribute to the growth of any company. Qualifications: • Previous experience working as a Foreman or General Foreman most of my career & recently as a Site Project manager. • Able to maintain a good level of communication with various groups to keep them aware of what is going on in regards to fire system installation as well as testing and commissioning. • Previous involvement in all types of installations commercial, industrial, residential, full working knowledge of all types of installations. • Very versatile to changing conditions, able to redirect focus as situations evolve to make the most efficient use of time and materials. • Familiar with trades pertaining to the installation of all types of sprinkler systems and interacting with them, worked with and mentored apprentices throughout my career. • Well organized and committed to effective time management • Extensive experience in maintenance and repair of all types of sprinkler systems. • Years of experience in the ordering and distribution of parts and components for multiple industrial applications. • Comprehensive understanding of Industrial equipment and tools and there use and applications. • Computer literate with excel, word and part management systems. • Able to manage and control budgets for projects ranging from $250,000 to $8,000,000 • Very versatile working independently or as a team builder, team lead or team member, strong promoter of a team culture. • Willing to travel, work in remote locations and travel to work at various foreign jurisdictions. • Willing to work variable shifts and any day of week.
  • 2. Career History: Simplexgrinnell Strongsville, Ohio November 2015 – July 2016 Site Project Manager • Interfaced with various levels of management and labour to ensure quality of work and timely completion of the project. • Attended site and coordination meetings with Contractors and Owners. • Supervised functionality testing of the Fire Protection Systems and related Components. • Inspect Fire Protection Systems to ensure code compliance. Churchill Fire Protection Calgary, Alberta June 2015 – October 2015 Superintendent • Material and parts procurement and disbursement to end users to ensure continual installation of Fire Protection Systems with no time loss or excess material costs • Allocation of manpower to ensure installation keeps up with project schedule • Inspect Fire Protection Systems to ensure code compliance • Day to Day documentation of Time and Job Hazard Analysis Reports • Supervised functional testing of the Fire Protection Systems and related components Simplexgrinnell Regina & Calgary October 2012 – May 2015 Foreman • Organized workers to do tasks that best suited their abilities in order to comply with deadlines and exceed customer expectations • Material and parts procurement and distribution to end users to ensure continual installation of Fire Protection Systems with no time loss or excess material costs • Daily site coordination meetings and weekly safety meetings • Day to Day documentation of Time and Job Hazard Analysis Reports • Supervised functional testing of the Fire Protection Systems and related components Constant Fire Protection Calgary, Alberta October 2002 – September 2012 Foreman • Organized workers to do tasks that best suited their abilities in order to complete the project in a cost effective and timely manner. • Site coordination meetings. • Material and parts procurement and disbursement to end users to ensure continued installation of Fire Protection Systems with no time lost or excess material costs. • Day to Day documentation of Time and Job Hazard Analysis Reports.
  • 3. • Supervising sub-trades doing related work pertaining to the functionality of the Fire Protection Systems, ensuring work is completed in a timely manner and exceeds customer expectations. • Supervised installations crews including sub-trades up to 20 craftsmen at any given time. • Inspect Fire Protection Systems to ensure code compliance and quality of work. Completed Projects & Achievements: • Rona Distribution Centre (8-10 sprinkler fitters) • Developed procedures for QA/QC structures, designing formats including the implementation and execution of the QA/QC structures. • Bow Valley College Renovation (2-6 sprinkler fitters) 3 year project. Fire protection Systems where kept active while renovations were taking place as the College was still functioning as partial floors were being used as renovations were taking place. • University of Calgary Engineering Blocks Renovation (2-15 sprinkler fitters) $2.1 million budget (time & material) completed project $1.6 million. • LDS Temple (2-3 sprinkler fitters) • West Wing Kamloops General Hospital • Federal Building, Whitehorse Yukon Territory (6-8 sprinkler fitters) • Enmax Electrical Generation Plant (2-8 sprinkler fitters) $8 million project completed ahead of schedule and under budget. • Goodyear Tire Factory (Brazil) (6-8 sprinkler fitters) • U.S. / Canada Border Crossing Sweetgrass Montana / Coutts Alberta • Strategic planning for large projects to ensure timely installation and to foresee any design issues so they can be rectified beforehand in order to minimize conflict with other disciplines and prevent time loss and extra costs. • Project Management, material procurement and disbursement, effective labour allocation. • All the above installations included electric and or diesel fire pumps and related equipment. • Set up procedures for functional tests and commissioning of Fire Protection Systems, for the above projects. Certifications: • Leadership for safety Excellence. • Aerial Platform • Standard First-Aid and CPR/AED • Fall Protection • CSTS Construction end user • WHIMS • Journeyman Sprinkler Fitter