Adding value with
RCM or RCA..
What 's it gonna be?
Ron Vonk / CoThink
July 5th 2016
Introduction
2008200019951990
Loopbaan
Ir. Ron Vonk
Partner, senior facilitator & trainer bij CoThink
Why this presentation?
RCM?
RCA?
RCM &
RCA?
 Choices made between RCM and RCA prove
not always to be the best ones…
 No satisfactory answer when the question is asked:
“Why focus on RCM?” or “Why focus on RCA?”
Content
1. Introduction RCM and RCA
2. Similarities and distinctions
3. Pros and cons
4. Choice between RCM and RCA
5. Conclusions & recommendations
Reliability Centred Maintenance (RCM)
Best practice to determine and optimize a maintenance
program for equipments, to maximize availability for
minimum costs, taking into account all requirements set
in advance
Reliability Centred Maintenance (Wikipedia)
Failure Mode Effect & Criticality Analysis (FMECA)
RCM2Failure Mode & Effect Analyse (FMEA)
Asset Performance Management Concept (APMC)
Dynamic RCM ….Streamlined RCM
Variants of RCM
Introduction RCM
en RCA
Similarities and
disctinctions
Pros and cons
Choice between
RCM and RCA
Conclusions &
recommendations
Root Cause Analysis (RCA)
A class of problem solving methods aimed at identifying
the root causes of problems or events, in which a root
cause is used to describe the depth in the causal chain
where an intervention could reasonably be implemented
to change performance and prevent an undesirable
outcome.
Root Cause Analysis (Wikipedia)
RCA approaches
(approaches for continuous
improvement
RCA methods
RATIO
DMAIC
8D
A3
Kaizen
SCOPE
….
Event Mapping
Ishikawa Diagram
5 Why
Problem Analysis
Current Reality Tree
Tripod
Barrier analysis
…Apollo
Introduction RCM
en RCA
Similarities and
disctinctions
Pros and cons
Choice between
RCM and RCA
Conclusions &
recommendations
Content
1. Introduction RCM and RCA
2. Similarities and distinctions
3. Pros and cons
4. Choice between RCM and RCA
5. Conclusions & recommendations
RCM process
RCA process
Similarities RCM and RCA
Method (how)Input Output
Asset/Maintenance objectives
Asset/Maint. performances
Knowledge & experience
Documentation
Improvement proposals
- Preventive Maintenance
- Modifications
- Operation procedures
- ...
Use of methods
(FMEA/FMECA/RCM2/…)
Team with facilitator
Use of software
(Excel, Optimizer+, …)
Method (how)Input Output
Asset/Maintenance objectives
Asset/Maint. performances
Knowledge & experience
Documentation
Improvement proposals
- Preventive Maintenance
- Modifications
- Operation procedures
- ...
Use of methods
(5Why, Event Mapping,..)
Team with facilitator
Use of software
(Excel, Optimizer+, …)
Use of methods
(FMEA/FMECA/RCM2/…)
Team with facilitator
Use of software
(Excel, Optimizer+, …)
Use of methods
(5Why, Event Mapping,..)
Team with facilitator
Use of software
(Excel, Optimizer+, ...)
Introduction RCM
en RCA
Similarities and
disctinctions
Pros and cons
Choice between
RCM and RCA
Conclusions &
recommendations
TimeNow
Methods to find root
causes, to solve and
prevent a problem that
actually occurred
Methods to prevent
unacceptable potential
problems
RCA RCM
Distinctions between RCM and RCA
Introduction RCM
en RCA
Similarities and
disctinctions
Pros and cons
Choice between
RCM and RCA
Conclusions &
recommendations
RCM RCA
Proactive Reactive
Mostly long during
interventions
Mostly short
interventions
Implementation of
improvement proposals
often difficult
- A lot of work
- Lack of buy-in/support
- Higher probility of budget
issues
Implementation of
improvement proporals
relatively easy
- Less work
- Strong buy-in/support
- Lower probability of
budget issues
Analyses quit often
“boring” (caused by
repetiveness)
Analyses mostly
“exciting” (different
every time)
Distinctions between RCM and RCA
Introduction RCM
en RCA
Similarities and
disctinctions
Pros and cons
Choice between
RCM and RCA
Conclusions &
recommendations
Content
1. Introduction RCM and RCA
2. Similarities and distinctions
3. Pros and cons
4. Choice between RCM and RCA
5. Conclusions & recommendations
RCM
RCA
Pros and cons RCM and RCA
Pros
 Proactive, also potential problems
will be taken in consideration
during analysis
 Development or improvement of
maintenance concept for total
equipment
 Contribution to compliancy: being
able to demonstrate correct
preventive actions are in place
Pros
 Costing less time and money
 Rapid results
 Less/no challenges to get or
maintain buy-in
Cons
 Relatively costly in terms of
money and time
 Results less visible on short
term
 Obtain and maintain buy-in is
a challenge
Cons
 Reactive: problem has already
occurred
 Improvement of maintenance
concept (if applicable) only for
part of equipment: to prevent
reoccurance of specific failure
Introduction RCM
en RCA
Similarities and
disctinctions
Pros and cons
Choice between
RCM and RCA
Conclusions &
recommendations
Content
1. Introduction RCM and RCA
2. Similarities and distinctions
3. Pros and cons
4. Choice between RCM and RCA
5. Conclusions & recommendations
Why RCM or RCA?
Bron: Mainnovation,
“VDM, New faith in maintenance”
RCM
RCARCA
 Application of RCM and RCA are recurring
steps in continuous improvement circle!
Introduction RCM
en RCA
Similarities and
disctinctions
Pros and cons
Choice between
RCM and RCA
Conclusions &
recommendations
Focus RCM better then RCA?
% costs
preventive
maintenance
Benchmark costs of preventive maintenance
As % of total maintenance costs
Organisations in benchmark
 Biased preference
for prevention is
sometimes
obstinately!
 Is that the reason
why there seems to
be a preference to
focus on RCM
instead of RCA?
Introduction RCM
en RCA
Similarities and
disctinctions
Pros and cons
Choice between
RCM and RCA
Conclusions &
recommendations
 If we need to decide between Preventive or Corrective
Maintenance, we seem to be wise: we choose based on
risk and minimum total costs
Probability
Seriousness
of
effect
Acceptable
 Corrective
measures
Not acceptable
 Preventive
measures
Risk = Probability x Seriousness
Costs
preventive
maintenance
Total costs
 Why should we do it differently when choosing
between RCM and RCA?
€
Level of preventive maintenance
Costs corrective
maintenance +
downtime costs
Minimum total costs
Focus RCM better then RCA?
Introduction RCM
en RCA
Similarities and
disctinctions
Pros and cons
Choice between
RCM and RCA
Conclusions &
recommendations
Focus on RCM or RCA?
Big failure, incident
or accident
RCA
Asset/Maintenance objectives
Asset/Maint. Performance
Knowledge & Experience
Documentation
Quick FMECA
Equipment (still)
critical?
No Yes
RCA** RCM
** RCA based on “cost drivers” and “performance killers”
Current
maintenance
concept *
* If there is not (yet) a compliancy issue. Otherwise, start from scretch.
Introduction RCM
en RCA
Similarities and
disctinctions
Pros and cons
Choice between
RCM and RCA
Conclusions &
recommendations
Content
1. Introduction RCM and RCA
2. Similarities and distinctions
3. Pros and cons
4. Choice between RCM and RCA
5. Conclusions & recommendations
Conclusions & recommendations
Adding value with RCM or RCA?
 It is not “RCM or RCA?”, it should be “RCM and RCA!”
 In any case of big failures or incidents: always apply RCA.
Define clear “triggers” though: What is big?
 Is compliancy an issue? Apply RCM for critical equipment,
starting with “If we won’t do any maintenance…”
 Is compliancy not an issue? Apply RCM for equipment
which are still critical, regardless the current maintenance
concept (where there are still unacceptable risks)
 For non-critical equipments: focus with RCA on elimination
of “cost drivers” and “performance killers”!
Introduction RCM
en RCA
Similarities and
disctinctions
Pros and cons
Choice between
RCM and RCA
Conclusions &
recommendations
More info…
CoThink: www.cothink.nl

More Related Content

What's hot

Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenanceSHIVAJI CHOUDHURY
 
Managing system reliability and maintenance under performance based contract ...
Managing system reliability and maintenance under performance based contract ...Managing system reliability and maintenance under performance based contract ...
Managing system reliability and maintenance under performance based contract ...ASQ Reliability Division
 
Reliability-Centered Maintenance. An introduction to by JBM
Reliability-Centered Maintenance. An introduction to by JBMReliability-Centered Maintenance. An introduction to by JBM
Reliability-Centered Maintenance. An introduction to by JBMmartinjib
 
Reliability Program Approval Presentation_
Reliability Program Approval Presentation_Reliability Program Approval Presentation_
Reliability Program Approval Presentation_Chad Broussard
 
Reliability centered maintenance
Reliability centered maintenanceReliability centered maintenance
Reliability centered maintenancePankaj Singh
 
Is Reliability Centered Maintenance (RCM) right for you?
Is Reliability Centered Maintenance (RCM) right for you?Is Reliability Centered Maintenance (RCM) right for you?
Is Reliability Centered Maintenance (RCM) right for you?Nancy Regan
 
Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceDibyendu De
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1Matthew Clemens
 
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...marcus evans Network
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsMatthew Clemens
 
Reliability Centred Maintenance - RCM by Aminul Islam
Reliability Centred Maintenance - RCM by Aminul IslamReliability Centred Maintenance - RCM by Aminul Islam
Reliability Centred Maintenance - RCM by Aminul IslamMd.Aminul Islam ,CMRP,CSSBB
 
Improving Rotating Equipment Reliability and Machinery Health
Improving Rotating Equipment Reliability and Machinery HealthImproving Rotating Equipment Reliability and Machinery Health
Improving Rotating Equipment Reliability and Machinery HealthMexxusts
 
Equipment reliability l2
Equipment reliability l2Equipment reliability l2
Equipment reliability l2Matthew Clemens
 
7 Steps to a Working Failure Reporting System - FRACAS
7 Steps to a Working Failure Reporting System - FRACAS7 Steps to a Working Failure Reporting System - FRACAS
7 Steps to a Working Failure Reporting System - FRACASRicky Smith CMRP, CMRT
 
Boeing - Reliability Centered Maintenance
Boeing - Reliability Centered MaintenanceBoeing - Reliability Centered Maintenance
Boeing - Reliability Centered MaintenanceNandhagopal Muralithar
 
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...Ricky Smith CMRP, CMRT
 
Reducing Product Development Risk with Reliability Engineering Methods
Reducing Product Development Risk with Reliability Engineering MethodsReducing Product Development Risk with Reliability Engineering Methods
Reducing Product Development Risk with Reliability Engineering MethodsWilde Analysis Ltd.
 
The Antidote to Implementation Failure in the World of Asset Management
The Antidote to Implementation Failure in the World of Asset ManagementThe Antidote to Implementation Failure in the World of Asset Management
The Antidote to Implementation Failure in the World of Asset ManagementNancy Regan
 

What's hot (20)

Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
 
Managing system reliability and maintenance under performance based contract ...
Managing system reliability and maintenance under performance based contract ...Managing system reliability and maintenance under performance based contract ...
Managing system reliability and maintenance under performance based contract ...
 
Reliability-Centered Maintenance. An introduction to by JBM
Reliability-Centered Maintenance. An introduction to by JBMReliability-Centered Maintenance. An introduction to by JBM
Reliability-Centered Maintenance. An introduction to by JBM
 
Reliability Program Approval Presentation_
Reliability Program Approval Presentation_Reliability Program Approval Presentation_
Reliability Program Approval Presentation_
 
Reliability centered maintenance
Reliability centered maintenanceReliability centered maintenance
Reliability centered maintenance
 
Is Reliability Centered Maintenance (RCM) right for you?
Is Reliability Centered Maintenance (RCM) right for you?Is Reliability Centered Maintenance (RCM) right for you?
Is Reliability Centered Maintenance (RCM) right for you?
 
Why RCM Doesn't Work?
Why RCM Doesn't Work?Why RCM Doesn't Work?
Why RCM Doesn't Work?
 
Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered Maintenance
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1
 
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
 
Rcm
RcmRcm
Rcm
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teams
 
Reliability Centred Maintenance - RCM by Aminul Islam
Reliability Centred Maintenance - RCM by Aminul IslamReliability Centred Maintenance - RCM by Aminul Islam
Reliability Centred Maintenance - RCM by Aminul Islam
 
Improving Rotating Equipment Reliability and Machinery Health
Improving Rotating Equipment Reliability and Machinery HealthImproving Rotating Equipment Reliability and Machinery Health
Improving Rotating Equipment Reliability and Machinery Health
 
Equipment reliability l2
Equipment reliability l2Equipment reliability l2
Equipment reliability l2
 
7 Steps to a Working Failure Reporting System - FRACAS
7 Steps to a Working Failure Reporting System - FRACAS7 Steps to a Working Failure Reporting System - FRACAS
7 Steps to a Working Failure Reporting System - FRACAS
 
Boeing - Reliability Centered Maintenance
Boeing - Reliability Centered MaintenanceBoeing - Reliability Centered Maintenance
Boeing - Reliability Centered Maintenance
 
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
 
Reducing Product Development Risk with Reliability Engineering Methods
Reducing Product Development Risk with Reliability Engineering MethodsReducing Product Development Risk with Reliability Engineering Methods
Reducing Product Development Risk with Reliability Engineering Methods
 
The Antidote to Implementation Failure in the World of Asset Management
The Antidote to Implementation Failure in the World of Asset ManagementThe Antidote to Implementation Failure in the World of Asset Management
The Antidote to Implementation Failure in the World of Asset Management
 

Viewers also liked

O edificio menos_eficiente
O edificio menos_eficienteO edificio menos_eficiente
O edificio menos_eficienteAdriane Becker
 
Rcfa1.pptx 1418837560468
Rcfa1.pptx 1418837560468Rcfa1.pptx 1418837560468
Rcfa1.pptx 1418837560468Dibyendu De
 
FMEA Criticality analysis
FMEA Criticality analysisFMEA Criticality analysis
FMEA Criticality analysisMichael Herman
 
Introduction to FMEA/FMECA
Introduction to FMEA/FMECAIntroduction to FMEA/FMECA
Introduction to FMEA/FMECAMichael Herman
 
FMEA 4th Edition for Beginer
FMEA 4th Edition for BeginerFMEA 4th Edition for Beginer
FMEA 4th Edition for BeginerNukool Thanuanram
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.pptbowerj
 
Fmea Handbook V4.1[1][1]
Fmea Handbook V4.1[1][1]Fmea Handbook V4.1[1][1]
Fmea Handbook V4.1[1][1]ExerciseLeanLLC
 
FMEA and FMECA
FMEA and FMECAFMEA and FMECA
FMEA and FMECASjur
 
ICH Guideline Q9 - Quality Risk Management
ICH Guideline Q9 - Quality Risk ManagementICH Guideline Q9 - Quality Risk Management
ICH Guideline Q9 - Quality Risk Managementmuna_ali
 

Viewers also liked (14)

BIODATA
BIODATABIODATA
BIODATA
 
O edificio menos_eficiente
O edificio menos_eficienteO edificio menos_eficiente
O edificio menos_eficiente
 
Ge r 101.0 fmea
Ge r 101.0   fmeaGe r 101.0   fmea
Ge r 101.0 fmea
 
RCFA Pro Brochure ver1
RCFA Pro Brochure ver1RCFA Pro Brochure ver1
RCFA Pro Brochure ver1
 
Rcfa1.pptx 1418837560468
Rcfa1.pptx 1418837560468Rcfa1.pptx 1418837560468
Rcfa1.pptx 1418837560468
 
FMEA Criticality analysis
FMEA Criticality analysisFMEA Criticality analysis
FMEA Criticality analysis
 
F.M.E.C.A pdf
F.M.E.C.A pdfF.M.E.C.A pdf
F.M.E.C.A pdf
 
Introduction to FMEA/FMECA
Introduction to FMEA/FMECAIntroduction to FMEA/FMECA
Introduction to FMEA/FMECA
 
Reliability centered maintenance
Reliability centered maintenanceReliability centered maintenance
Reliability centered maintenance
 
FMEA 4th Edition for Beginer
FMEA 4th Edition for BeginerFMEA 4th Edition for Beginer
FMEA 4th Edition for Beginer
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.ppt
 
Fmea Handbook V4.1[1][1]
Fmea Handbook V4.1[1][1]Fmea Handbook V4.1[1][1]
Fmea Handbook V4.1[1][1]
 
FMEA and FMECA
FMEA and FMECAFMEA and FMECA
FMEA and FMECA
 
ICH Guideline Q9 - Quality Risk Management
ICH Guideline Q9 - Quality Risk ManagementICH Guideline Q9 - Quality Risk Management
ICH Guideline Q9 - Quality Risk Management
 

Similar to 20160704 rv presentation rca versus rcm

IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFPieter van Asten
 
ASQ RD Webinar: Design for reliability a roadmap for design robustness
ASQ RD Webinar: Design for reliability   a roadmap for design robustnessASQ RD Webinar: Design for reliability   a roadmap for design robustness
ASQ RD Webinar: Design for reliability a roadmap for design robustnessASQ Reliability Division
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management trainingdrdej19
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE Julian Kalac P.Eng
 
Malinin PDMA Presentation
Malinin PDMA PresentationMalinin PDMA Presentation
Malinin PDMA PresentationLen Malinin
 
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxReliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxSamuel Gher
 
Whole life performance lecture south bank university
Whole life performance lecture   south bank universityWhole life performance lecture   south bank university
Whole life performance lecture south bank universityKim Newman
 
002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]lcgg59
 
Condition Based Asset Management R K Gupta
Condition Based Asset Management R K GuptaCondition Based Asset Management R K Gupta
Condition Based Asset Management R K GuptaRajuGupta88
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Failure Mode and Ef...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Failure Mode and Ef...Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Failure Mode and Ef...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Failure Mode and Ef...J. García - Verdugo
 
Costof quality
Costof qualityCostof quality
Costof qualityOmnex Inc.
 
RCM extension for Maximo - Cohesive Solutions (IMUG 2017)
RCM extension for Maximo - Cohesive Solutions (IMUG 2017)RCM extension for Maximo - Cohesive Solutions (IMUG 2017)
RCM extension for Maximo - Cohesive Solutions (IMUG 2017)Cyrus Sorab
 
Cohesive imug 2017 RCM extension for Maximo
Cohesive imug 2017 RCM extension for MaximoCohesive imug 2017 RCM extension for Maximo
Cohesive imug 2017 RCM extension for MaximoBrandonWilhelm4
 
Asset Reliability Begins With Your Operators
Asset Reliability Begins With Your OperatorsAsset Reliability Begins With Your Operators
Asset Reliability Begins With Your OperatorsRicky Smith CMRP, CMRT
 
Randleman Presentation
Randleman PresentationRandleman Presentation
Randleman Presentationbrandleman
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 

Similar to 20160704 rv presentation rca versus rcm (20)

IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDF
 
ASQ RD Webinar: Design for reliability a roadmap for design robustness
ASQ RD Webinar: Design for reliability   a roadmap for design robustnessASQ RD Webinar: Design for reliability   a roadmap for design robustness
ASQ RD Webinar: Design for reliability a roadmap for design robustness
 
3-Intro to Lean t2
3-Intro to Lean t23-Intro to Lean t2
3-Intro to Lean t2
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
 
Malinin PDMA Presentation
Malinin PDMA PresentationMalinin PDMA Presentation
Malinin PDMA Presentation
 
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxReliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
 
Design & Process FMEA Manual
Design & Process FMEA ManualDesign & Process FMEA Manual
Design & Process FMEA Manual
 
Whole life performance lecture south bank university
Whole life performance lecture   south bank universityWhole life performance lecture   south bank university
Whole life performance lecture south bank university
 
002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]
 
Condition Based Asset Management R K Gupta
Condition Based Asset Management R K GuptaCondition Based Asset Management R K Gupta
Condition Based Asset Management R K Gupta
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Failure Mode and Ef...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Failure Mode and Ef...Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Failure Mode and Ef...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Failure Mode and Ef...
 
Costof quality
Costof qualityCostof quality
Costof quality
 
RCM extension for Maximo - Cohesive Solutions (IMUG 2017)
RCM extension for Maximo - Cohesive Solutions (IMUG 2017)RCM extension for Maximo - Cohesive Solutions (IMUG 2017)
RCM extension for Maximo - Cohesive Solutions (IMUG 2017)
 
Cohesive imug 2017 RCM extension for Maximo
Cohesive imug 2017 RCM extension for MaximoCohesive imug 2017 RCM extension for Maximo
Cohesive imug 2017 RCM extension for Maximo
 
Asset Reliability Begins With Your Operators
Asset Reliability Begins With Your OperatorsAsset Reliability Begins With Your Operators
Asset Reliability Begins With Your Operators
 
Randleman Presentation
Randleman PresentationRandleman Presentation
Randleman Presentation
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 

More from RonVonk

Prestatieverbetering door Innovative Root Cause Analysis
Prestatieverbetering door Innovative Root Cause AnalysisPrestatieverbetering door Innovative Root Cause Analysis
Prestatieverbetering door Innovative Root Cause AnalysisRonVonk
 
Six ways to link training to bussiness performance
Six ways to link training to bussiness performanceSix ways to link training to bussiness performance
Six ways to link training to bussiness performanceRonVonk
 
Vier bouwstenen bepalen succes Reliability en Maintenance Engineering
Vier bouwstenen bepalen succes Reliability en Maintenance EngineeringVier bouwstenen bepalen succes Reliability en Maintenance Engineering
Vier bouwstenen bepalen succes Reliability en Maintenance EngineeringRonVonk
 
Succesvolle Reliability of Maintenance Engineering functie vraagt meer
Succesvolle Reliability of Maintenance Engineering functie vraagt meerSuccesvolle Reliability of Maintenance Engineering functie vraagt meer
Succesvolle Reliability of Maintenance Engineering functie vraagt meerRonVonk
 
5 valkuilen voor Reliability & Maintenance Engineering
5 valkuilen voor Reliability & Maintenance Engineering5 valkuilen voor Reliability & Maintenance Engineering
5 valkuilen voor Reliability & Maintenance EngineeringRonVonk
 
Opmerkzaamheid, Sleutel tot hogere betrouwbaarheid
Opmerkzaamheid, Sleutel tot hogere betrouwbaarheidOpmerkzaamheid, Sleutel tot hogere betrouwbaarheid
Opmerkzaamheid, Sleutel tot hogere betrouwbaarheidRonVonk
 
5 Why en Visgraat, verslik je niet
5 Why en Visgraat, verslik je niet5 Why en Visgraat, verslik je niet
5 Why en Visgraat, verslik je nietRonVonk
 
De toegevoegde waarde van een facilitator
De toegevoegde waarde van een facilitatorDe toegevoegde waarde van een facilitator
De toegevoegde waarde van een facilitatorRonVonk
 
20120316 rv presentatie 5 valkuilen voor r&me, studieavond bemas 20 3-2012
20120316 rv presentatie 5 valkuilen voor r&me, studieavond bemas 20 3-201220120316 rv presentatie 5 valkuilen voor r&me, studieavond bemas 20 3-2012
20120316 rv presentatie 5 valkuilen voor r&me, studieavond bemas 20 3-2012RonVonk
 
De harde en hardnekkige kanten van root cause analyse (rca)
De harde en hardnekkige kanten van root cause analyse (rca)De harde en hardnekkige kanten van root cause analyse (rca)
De harde en hardnekkige kanten van root cause analyse (rca)RonVonk
 

More from RonVonk (10)

Prestatieverbetering door Innovative Root Cause Analysis
Prestatieverbetering door Innovative Root Cause AnalysisPrestatieverbetering door Innovative Root Cause Analysis
Prestatieverbetering door Innovative Root Cause Analysis
 
Six ways to link training to bussiness performance
Six ways to link training to bussiness performanceSix ways to link training to bussiness performance
Six ways to link training to bussiness performance
 
Vier bouwstenen bepalen succes Reliability en Maintenance Engineering
Vier bouwstenen bepalen succes Reliability en Maintenance EngineeringVier bouwstenen bepalen succes Reliability en Maintenance Engineering
Vier bouwstenen bepalen succes Reliability en Maintenance Engineering
 
Succesvolle Reliability of Maintenance Engineering functie vraagt meer
Succesvolle Reliability of Maintenance Engineering functie vraagt meerSuccesvolle Reliability of Maintenance Engineering functie vraagt meer
Succesvolle Reliability of Maintenance Engineering functie vraagt meer
 
5 valkuilen voor Reliability & Maintenance Engineering
5 valkuilen voor Reliability & Maintenance Engineering5 valkuilen voor Reliability & Maintenance Engineering
5 valkuilen voor Reliability & Maintenance Engineering
 
Opmerkzaamheid, Sleutel tot hogere betrouwbaarheid
Opmerkzaamheid, Sleutel tot hogere betrouwbaarheidOpmerkzaamheid, Sleutel tot hogere betrouwbaarheid
Opmerkzaamheid, Sleutel tot hogere betrouwbaarheid
 
5 Why en Visgraat, verslik je niet
5 Why en Visgraat, verslik je niet5 Why en Visgraat, verslik je niet
5 Why en Visgraat, verslik je niet
 
De toegevoegde waarde van een facilitator
De toegevoegde waarde van een facilitatorDe toegevoegde waarde van een facilitator
De toegevoegde waarde van een facilitator
 
20120316 rv presentatie 5 valkuilen voor r&me, studieavond bemas 20 3-2012
20120316 rv presentatie 5 valkuilen voor r&me, studieavond bemas 20 3-201220120316 rv presentatie 5 valkuilen voor r&me, studieavond bemas 20 3-2012
20120316 rv presentatie 5 valkuilen voor r&me, studieavond bemas 20 3-2012
 
De harde en hardnekkige kanten van root cause analyse (rca)
De harde en hardnekkige kanten van root cause analyse (rca)De harde en hardnekkige kanten van root cause analyse (rca)
De harde en hardnekkige kanten van root cause analyse (rca)
 

Recently uploaded

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

20160704 rv presentation rca versus rcm

  • 1. Adding value with RCM or RCA.. What 's it gonna be? Ron Vonk / CoThink July 5th 2016
  • 2. Introduction 2008200019951990 Loopbaan Ir. Ron Vonk Partner, senior facilitator & trainer bij CoThink
  • 3. Why this presentation? RCM? RCA? RCM & RCA?  Choices made between RCM and RCA prove not always to be the best ones…  No satisfactory answer when the question is asked: “Why focus on RCM?” or “Why focus on RCA?”
  • 4. Content 1. Introduction RCM and RCA 2. Similarities and distinctions 3. Pros and cons 4. Choice between RCM and RCA 5. Conclusions & recommendations
  • 5. Reliability Centred Maintenance (RCM) Best practice to determine and optimize a maintenance program for equipments, to maximize availability for minimum costs, taking into account all requirements set in advance Reliability Centred Maintenance (Wikipedia) Failure Mode Effect & Criticality Analysis (FMECA) RCM2Failure Mode & Effect Analyse (FMEA) Asset Performance Management Concept (APMC) Dynamic RCM ….Streamlined RCM Variants of RCM Introduction RCM en RCA Similarities and disctinctions Pros and cons Choice between RCM and RCA Conclusions & recommendations
  • 6. Root Cause Analysis (RCA) A class of problem solving methods aimed at identifying the root causes of problems or events, in which a root cause is used to describe the depth in the causal chain where an intervention could reasonably be implemented to change performance and prevent an undesirable outcome. Root Cause Analysis (Wikipedia) RCA approaches (approaches for continuous improvement RCA methods RATIO DMAIC 8D A3 Kaizen SCOPE …. Event Mapping Ishikawa Diagram 5 Why Problem Analysis Current Reality Tree Tripod Barrier analysis …Apollo Introduction RCM en RCA Similarities and disctinctions Pros and cons Choice between RCM and RCA Conclusions & recommendations
  • 7. Content 1. Introduction RCM and RCA 2. Similarities and distinctions 3. Pros and cons 4. Choice between RCM and RCA 5. Conclusions & recommendations
  • 8. RCM process RCA process Similarities RCM and RCA Method (how)Input Output Asset/Maintenance objectives Asset/Maint. performances Knowledge & experience Documentation Improvement proposals - Preventive Maintenance - Modifications - Operation procedures - ... Use of methods (FMEA/FMECA/RCM2/…) Team with facilitator Use of software (Excel, Optimizer+, …) Method (how)Input Output Asset/Maintenance objectives Asset/Maint. performances Knowledge & experience Documentation Improvement proposals - Preventive Maintenance - Modifications - Operation procedures - ... Use of methods (5Why, Event Mapping,..) Team with facilitator Use of software (Excel, Optimizer+, …) Use of methods (FMEA/FMECA/RCM2/…) Team with facilitator Use of software (Excel, Optimizer+, …) Use of methods (5Why, Event Mapping,..) Team with facilitator Use of software (Excel, Optimizer+, ...) Introduction RCM en RCA Similarities and disctinctions Pros and cons Choice between RCM and RCA Conclusions & recommendations
  • 9. TimeNow Methods to find root causes, to solve and prevent a problem that actually occurred Methods to prevent unacceptable potential problems RCA RCM Distinctions between RCM and RCA Introduction RCM en RCA Similarities and disctinctions Pros and cons Choice between RCM and RCA Conclusions & recommendations
  • 10. RCM RCA Proactive Reactive Mostly long during interventions Mostly short interventions Implementation of improvement proposals often difficult - A lot of work - Lack of buy-in/support - Higher probility of budget issues Implementation of improvement proporals relatively easy - Less work - Strong buy-in/support - Lower probability of budget issues Analyses quit often “boring” (caused by repetiveness) Analyses mostly “exciting” (different every time) Distinctions between RCM and RCA Introduction RCM en RCA Similarities and disctinctions Pros and cons Choice between RCM and RCA Conclusions & recommendations
  • 11. Content 1. Introduction RCM and RCA 2. Similarities and distinctions 3. Pros and cons 4. Choice between RCM and RCA 5. Conclusions & recommendations
  • 12. RCM RCA Pros and cons RCM and RCA Pros  Proactive, also potential problems will be taken in consideration during analysis  Development or improvement of maintenance concept for total equipment  Contribution to compliancy: being able to demonstrate correct preventive actions are in place Pros  Costing less time and money  Rapid results  Less/no challenges to get or maintain buy-in Cons  Relatively costly in terms of money and time  Results less visible on short term  Obtain and maintain buy-in is a challenge Cons  Reactive: problem has already occurred  Improvement of maintenance concept (if applicable) only for part of equipment: to prevent reoccurance of specific failure Introduction RCM en RCA Similarities and disctinctions Pros and cons Choice between RCM and RCA Conclusions & recommendations
  • 13. Content 1. Introduction RCM and RCA 2. Similarities and distinctions 3. Pros and cons 4. Choice between RCM and RCA 5. Conclusions & recommendations
  • 14. Why RCM or RCA? Bron: Mainnovation, “VDM, New faith in maintenance” RCM RCARCA  Application of RCM and RCA are recurring steps in continuous improvement circle! Introduction RCM en RCA Similarities and disctinctions Pros and cons Choice between RCM and RCA Conclusions & recommendations
  • 15. Focus RCM better then RCA? % costs preventive maintenance Benchmark costs of preventive maintenance As % of total maintenance costs Organisations in benchmark  Biased preference for prevention is sometimes obstinately!  Is that the reason why there seems to be a preference to focus on RCM instead of RCA? Introduction RCM en RCA Similarities and disctinctions Pros and cons Choice between RCM and RCA Conclusions & recommendations
  • 16.  If we need to decide between Preventive or Corrective Maintenance, we seem to be wise: we choose based on risk and minimum total costs Probability Seriousness of effect Acceptable  Corrective measures Not acceptable  Preventive measures Risk = Probability x Seriousness Costs preventive maintenance Total costs  Why should we do it differently when choosing between RCM and RCA? € Level of preventive maintenance Costs corrective maintenance + downtime costs Minimum total costs Focus RCM better then RCA? Introduction RCM en RCA Similarities and disctinctions Pros and cons Choice between RCM and RCA Conclusions & recommendations
  • 17. Focus on RCM or RCA? Big failure, incident or accident RCA Asset/Maintenance objectives Asset/Maint. Performance Knowledge & Experience Documentation Quick FMECA Equipment (still) critical? No Yes RCA** RCM ** RCA based on “cost drivers” and “performance killers” Current maintenance concept * * If there is not (yet) a compliancy issue. Otherwise, start from scretch. Introduction RCM en RCA Similarities and disctinctions Pros and cons Choice between RCM and RCA Conclusions & recommendations
  • 18. Content 1. Introduction RCM and RCA 2. Similarities and distinctions 3. Pros and cons 4. Choice between RCM and RCA 5. Conclusions & recommendations
  • 19. Conclusions & recommendations Adding value with RCM or RCA?  It is not “RCM or RCA?”, it should be “RCM and RCA!”  In any case of big failures or incidents: always apply RCA. Define clear “triggers” though: What is big?  Is compliancy an issue? Apply RCM for critical equipment, starting with “If we won’t do any maintenance…”  Is compliancy not an issue? Apply RCM for equipment which are still critical, regardless the current maintenance concept (where there are still unacceptable risks)  For non-critical equipments: focus with RCA on elimination of “cost drivers” and “performance killers”! Introduction RCM en RCA Similarities and disctinctions Pros and cons Choice between RCM and RCA Conclusions & recommendations