DANCO METAL FINISHING
	 TENT IMPROVEMENT 	
	  MEZZANINE
LOCATION: 1745 Monticello
	 Ontario, CA 91761
PROJECT SUMMARY:
Danco Metal Surfacing Company is planed
to the following “tenant improved”, which
entailed Modifying the existing office and
warehouse space and the installation of a
mezzanine area.
SCOPE OF WORK: My participation
throughout this project started with task
of picking up existing redlines, and draft-
ing the missing details. Upon which i need
to coordinated between the various gov-
ernmental agencies and act as project
coordinator with the on site project man-
ager.
FINISHED FLOOR PLAN OF THE OVERALL
BUILDING.
GENERAL CONSOLIDATED CONSTRUCTORS
 MANNING ENGINEERING
pg 
MASONRY CONSTRUCTION DETAILS CRE-
ATED FOR THE MECHANICAL ROOM. ALL
DETAILS WHERE CREATED BY AUTOCAD
2012.
18'-6
16'-0
17'-0
(E) CONC.
SLAB
(E) TILT-UP
CONC. WALL
(N) MASONRY
COLUMN
7/8 WITH EPOXY COATING
CEMENT PLASTER AT
UNDERSIDE
(E) 2X15 RAFTER
10 OFF, EQ. SPACED
(E) SUB-PURLINS
2X4 @ 2' O.C. TYP
(E) 6X18 BEAM
(N) MASONRY
COLUMN
(E) CONC. COLUMN
(IN BACKGROUND)
(N) MASONRY
COLUMN
SAW CUT (E)SLAB
FOR (N) SLAB SLOPED
(N) CONC. BLOCK
WALL PER STRUCT.
(E) REINF. CONC.
SLAB
FLOOR PIT
PER DETAIL
LOWEST POINT
IN ROOM
CONT. PLASTIC LINER
SEE DETAIL 1 OF D-1
(N) REINF. CONC.
SLAB PER STRUCT.
1/4PER FT. SLOPE
(E) FOOTING
3X PLATE
(E) 6X18 BEAM
1/4 : 12
(E) CONC. COLUMN
(IN BACKGROUND)
(N) MASONRY
COLUMN
(N) MASONRY
COLUMN (N) EQUIPMENT ON RAISED
ON CONC. PAD
(N) 4X BEAM
SEE STRUCT.
SECTION A SCALE: 1/4 = 1'-0
14' - 0
TORCHDOWN
MODIFIED BITUMEN MEMBRANE ROOFING W/ MINERAL
GRANULAR SURFACE, COLOR; TBD AS MANUFACTURED
BY CERTAINTEED CORP, FLINTASTIC GTA,
ICC-ES ESR-1388 OVER 1-PLY 30# GLASBASE
(OR EQUAL) OVER CDX PLYWOOD
(E) PARAPET
(N) 8 THK CONC.
BLOCKWALL
(N) REINF. CONC. SLAB
PER STRUCT.
20' - 0
(E) ROLL - DOOR
TOALIGNTOADJACENTTILT-UPWALLALONGNORTHSIDE
TOALIGNTOADJACENTTILT-UPWALLALONGNORTHSIDE
20' - 0
GENERALCONSOLIDATEDINC.
DANCO,EN,LLC.
TENANTIMPROVEMENT
REVISIO
4/8/1
MEZZANINE 
CONTAINMENT SECTION
DETAILS ELEVATIONS AND SECTION
pg 
SUPERIOR QUALITY
FOODS
LOCATION: 2355 EAST FRANCIS ST.
	 Ontario, CA 91761
PROJECT SUMMARY:
Superior Quality Food wished to expand
the production of existing product line by
the installation of two new boilers and the
demolition of the existing boiler.
SCOPE OF WORK: This project was de-
sign build within General Consolidated
Constructors. The design was created by
Rob McCoy  myself based on a previous
project. This project was created with
Autocad 2012.
FLOOR PLAN
GENERAL CONSOLIDATED CONSTRUCTORS
 MANNING ENGINEERING
SITE PLAN
FLOOR PLAN OF THE NEW BOILER
EXTENSION.
pg 
ELEVATION AND DETAILSROOF PLAN
ROOF PLAN OF THE BOILER CANOPY. STRUCTURAL SECTION OF THE CANOPY POST CONNECTION
EQUIPMENT ELEVATION
pg 
LA ZAMORANA CANDY
					 CO.
LOCATION: 7700 WILSON AVE.
	 HUNTINGTON PARK , CA 91761
PROJECT SUMMARY:
La Zamorana Candy Co. required a new fa-
cility in order to me the expanding. So the
construction of a new production kitchen
and waste line as a “tenant improve-
ment” was required.
SCOPE OF WORK: This project was design
build within General Consolidated Con-
structors. The design was created by Rob
McCoy based on the requirement given
to us by the client. The difficulty of this
project was coordinate between Public
Health and Industrial Waste.
GENERAL CONSOLIDATED CONSTRUCTORS
 HAITHAM ENGINEERING
FLOOR PLAN WAS CREATED IN AUTOCAD 2012. THEY
LAYOUT OF THE DESIGN WAS CREATED BY ROB MCCOY
AND MY SELF BASED ON THE FUTURE NEEDS OF THE
CLIENT
pg 
STRUCTURAL DETAIL STAIR SECTION AND INTERIOR EQUIPMENT ELEVATION
THE STRUCTURAL DETAIL WAS
CREATED UNDER THE DIRECTION
OF THE PROJECT ENGINEER.

More Related Content

What's hot

Cedarvale-Forest Hill CLC Presentation - November 27 2019
Cedarvale-Forest Hill CLC Presentation - November 27 2019Cedarvale-Forest Hill CLC Presentation - November 27 2019
Cedarvale-Forest Hill CLC Presentation - November 27 2019Crosstown TO
 
SIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGSIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGWilliam Wieners
 
Fairbank & Oakwood Construction Liaison Committee July 2018
Fairbank & Oakwood Construction Liaison Committee July 2018Fairbank & Oakwood Construction Liaison Committee July 2018
Fairbank & Oakwood Construction Liaison Committee July 2018Crosstown TO
 
dave resume sept 2015
dave resume sept 2015dave resume sept 2015
dave resume sept 2015Dave Hoover
 
Western works final
Western works final Western works final
Western works final Crosstown TO
 
Superintendent Portfolio
Superintendent PortfolioSuperintendent Portfolio
Superintendent PortfolioJD King
 
SP-6-05 Flagler Avenue Retail-Residential Project
SP-6-05 Flagler Avenue Retail-Residential ProjectSP-6-05 Flagler Avenue Retail-Residential Project
SP-6-05 Flagler Avenue Retail-Residential ProjectSeann Smith, AICP
 
Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)Crosstown TO
 
Rehab work & costing
Rehab work & costingRehab work & costing
Rehab work & costingHHSCapital
 
Preliminary Plat Staff Report (S-6-05 NSB SE Interchange)
Preliminary Plat Staff Report (S-6-05 NSB SE Interchange)Preliminary Plat Staff Report (S-6-05 NSB SE Interchange)
Preliminary Plat Staff Report (S-6-05 NSB SE Interchange)Seann Smith, AICP
 
CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021 CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021 Crosstown TO
 
Eglinton - Mount Pleasant CLC 13 Jan 2021
Eglinton - Mount Pleasant CLC 13 Jan 2021Eglinton - Mount Pleasant CLC 13 Jan 2021
Eglinton - Mount Pleasant CLC 13 Jan 2021Crosstown TO
 
Ongoing & Suspended Projects as of September 2011
Ongoing & Suspended Projects as of September 2011Ongoing & Suspended Projects as of September 2011
Ongoing & Suspended Projects as of September 2011cmogsc
 
KÖLD CRYOTHERAPY PDF portfolio
KÖLD CRYOTHERAPY PDF portfolioKÖLD CRYOTHERAPY PDF portfolio
KÖLD CRYOTHERAPY PDF portfolioAnthony Felt
 
Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019Crosstown TO
 

What's hot (20)

27 Hurst Ave
27 Hurst Ave27 Hurst Ave
27 Hurst Ave
 
Scott M Tidwell Resume 030415
Scott M Tidwell Resume 030415Scott M Tidwell Resume 030415
Scott M Tidwell Resume 030415
 
Cedarvale-Forest Hill CLC Presentation - November 27 2019
Cedarvale-Forest Hill CLC Presentation - November 27 2019Cedarvale-Forest Hill CLC Presentation - November 27 2019
Cedarvale-Forest Hill CLC Presentation - November 27 2019
 
SIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGSIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERING
 
Uniworld garden-2 up date
Uniworld garden-2 up dateUniworld garden-2 up date
Uniworld garden-2 up date
 
Fairbank & Oakwood Construction Liaison Committee July 2018
Fairbank & Oakwood Construction Liaison Committee July 2018Fairbank & Oakwood Construction Liaison Committee July 2018
Fairbank & Oakwood Construction Liaison Committee July 2018
 
dave resume sept 2015
dave resume sept 2015dave resume sept 2015
dave resume sept 2015
 
Western works final
Western works final Western works final
Western works final
 
Superintendent Portfolio
Superintendent PortfolioSuperintendent Portfolio
Superintendent Portfolio
 
SP-6-05 Flagler Avenue Retail-Residential Project
SP-6-05 Flagler Avenue Retail-Residential ProjectSP-6-05 Flagler Avenue Retail-Residential Project
SP-6-05 Flagler Avenue Retail-Residential Project
 
Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)
 
Rehab work & costing
Rehab work & costingRehab work & costing
Rehab work & costing
 
Preliminary Plat Staff Report (S-6-05 NSB SE Interchange)
Preliminary Plat Staff Report (S-6-05 NSB SE Interchange)Preliminary Plat Staff Report (S-6-05 NSB SE Interchange)
Preliminary Plat Staff Report (S-6-05 NSB SE Interchange)
 
CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021 CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021
 
Eglinton - Mount Pleasant CLC 13 Jan 2021
Eglinton - Mount Pleasant CLC 13 Jan 2021Eglinton - Mount Pleasant CLC 13 Jan 2021
Eglinton - Mount Pleasant CLC 13 Jan 2021
 
Ongoing & Suspended Projects as of September 2011
Ongoing & Suspended Projects as of September 2011Ongoing & Suspended Projects as of September 2011
Ongoing & Suspended Projects as of September 2011
 
KÖLD CRYOTHERAPY PDF portfolio
KÖLD CRYOTHERAPY PDF portfolioKÖLD CRYOTHERAPY PDF portfolio
KÖLD CRYOTHERAPY PDF portfolio
 
resume 6.0
resume 6.0resume 6.0
resume 6.0
 
CV Kevin Maguire
CV Kevin MaguireCV Kevin Maguire
CV Kevin Maguire
 
Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019
 

Similar to Linkeden files

Mission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMcKenney's Inc
 
Success is in the Details - Colocation Data Centers
Success is in the Details - Colocation Data CentersSuccess is in the Details - Colocation Data Centers
Success is in the Details - Colocation Data CentersMcKenney's Inc
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal EngineerAhmad Hassan
 
MEC - COMPANY PROFILE
MEC - COMPANY PROFILEMEC - COMPANY PROFILE
MEC - COMPANY PROFILECarlos Camino
 
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski
 
Resume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELResume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELkrishna kumar
 
Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)kevin breiter
 
Cooperating on a Campus Modernization - HVAC and Plumbing Renovation
Cooperating on a Campus Modernization - HVAC and Plumbing RenovationCooperating on a Campus Modernization - HVAC and Plumbing Renovation
Cooperating on a Campus Modernization - HVAC and Plumbing RenovationMcKenney's Inc
 
VG_Lee_CV_2015_1
VG_Lee_CV_2015_1VG_Lee_CV_2015_1
VG_Lee_CV_2015_1Vincent Lee
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016Subhash Dhiman
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1Dan Caouette
 
MW Project Experience Updated 7-24-16
MW Project Experience Updated 7-24-16MW Project Experience Updated 7-24-16
MW Project Experience Updated 7-24-16Mark Williams
 
Graham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairGraham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairFairfax County
 
Expediting a Smooth Move - Design Assist Services in Norcross, GA
 Expediting a Smooth Move - Design Assist Services in Norcross, GA  Expediting a Smooth Move - Design Assist Services in Norcross, GA
Expediting a Smooth Move - Design Assist Services in Norcross, GA McKenney's Inc
 
Item #12 ppt Judson Nature Trail Building
Item #12   ppt Judson Nature Trail BuildingItem #12   ppt Judson Nature Trail Building
Item #12 ppt Judson Nature Trail Buildingahcitycouncil
 

Similar to Linkeden files (20)

Mission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NC
 
Muhammad_Aslam_CV
Muhammad_Aslam_CVMuhammad_Aslam_CV
Muhammad_Aslam_CV
 
Krishna kumar cv
Krishna kumar cvKrishna kumar cv
Krishna kumar cv
 
Success is in the Details - Colocation Data Centers
Success is in the Details - Colocation Data CentersSuccess is in the Details - Colocation Data Centers
Success is in the Details - Colocation Data Centers
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
MEC - COMPANY PROFILE
MEC - COMPANY PROFILEMEC - COMPANY PROFILE
MEC - COMPANY PROFILE
 
projects
projectsprojects
projects
 
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16
 
Resume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELResume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_EL
 
Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)
 
Cooperating on a Campus Modernization - HVAC and Plumbing Renovation
Cooperating on a Campus Modernization - HVAC and Plumbing RenovationCooperating on a Campus Modernization - HVAC and Plumbing Renovation
Cooperating on a Campus Modernization - HVAC and Plumbing Renovation
 
VG_Lee_CV_2015_1
VG_Lee_CV_2015_1VG_Lee_CV_2015_1
VG_Lee_CV_2015_1
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
 
jahangir
jahangirjahangir
jahangir
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1
 
MW Project Experience Updated 7-24-16
MW Project Experience Updated 7-24-16MW Project Experience Updated 7-24-16
MW Project Experience Updated 7-24-16
 
Graham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairGraham Port Plaza Emergency Repair
Graham Port Plaza Emergency Repair
 
Expediting a Smooth Move - Design Assist Services in Norcross, GA
 Expediting a Smooth Move - Design Assist Services in Norcross, GA  Expediting a Smooth Move - Design Assist Services in Norcross, GA
Expediting a Smooth Move - Design Assist Services in Norcross, GA
 
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 
Item #12 ppt Judson Nature Trail Building
Item #12   ppt Judson Nature Trail BuildingItem #12   ppt Judson Nature Trail Building
Item #12 ppt Judson Nature Trail Building
 

Linkeden files

  • 1. pg DANCO METAL FINISHING TENT IMPROVEMENT MEZZANINE LOCATION: 1745 Monticello Ontario, CA 91761 PROJECT SUMMARY: Danco Metal Surfacing Company is planed to the following “tenant improved”, which entailed Modifying the existing office and warehouse space and the installation of a mezzanine area. SCOPE OF WORK: My participation throughout this project started with task of picking up existing redlines, and draft- ing the missing details. Upon which i need to coordinated between the various gov- ernmental agencies and act as project coordinator with the on site project man- ager. FINISHED FLOOR PLAN OF THE OVERALL BUILDING. GENERAL CONSOLIDATED CONSTRUCTORS MANNING ENGINEERING
  • 2. pg MASONRY CONSTRUCTION DETAILS CRE- ATED FOR THE MECHANICAL ROOM. ALL DETAILS WHERE CREATED BY AUTOCAD 2012. 18'-6 16'-0 17'-0 (E) CONC. SLAB (E) TILT-UP CONC. WALL (N) MASONRY COLUMN 7/8 WITH EPOXY COATING CEMENT PLASTER AT UNDERSIDE (E) 2X15 RAFTER 10 OFF, EQ. SPACED (E) SUB-PURLINS 2X4 @ 2' O.C. TYP (E) 6X18 BEAM (N) MASONRY COLUMN (E) CONC. COLUMN (IN BACKGROUND) (N) MASONRY COLUMN SAW CUT (E)SLAB FOR (N) SLAB SLOPED (N) CONC. BLOCK WALL PER STRUCT. (E) REINF. CONC. SLAB FLOOR PIT PER DETAIL LOWEST POINT IN ROOM CONT. PLASTIC LINER SEE DETAIL 1 OF D-1 (N) REINF. CONC. SLAB PER STRUCT. 1/4PER FT. SLOPE (E) FOOTING 3X PLATE (E) 6X18 BEAM 1/4 : 12 (E) CONC. COLUMN (IN BACKGROUND) (N) MASONRY COLUMN (N) MASONRY COLUMN (N) EQUIPMENT ON RAISED ON CONC. PAD (N) 4X BEAM SEE STRUCT. SECTION A SCALE: 1/4 = 1'-0 14' - 0 TORCHDOWN MODIFIED BITUMEN MEMBRANE ROOFING W/ MINERAL GRANULAR SURFACE, COLOR; TBD AS MANUFACTURED BY CERTAINTEED CORP, FLINTASTIC GTA, ICC-ES ESR-1388 OVER 1-PLY 30# GLASBASE (OR EQUAL) OVER CDX PLYWOOD (E) PARAPET (N) 8 THK CONC. BLOCKWALL (N) REINF. CONC. SLAB PER STRUCT. 20' - 0 (E) ROLL - DOOR TOALIGNTOADJACENTTILT-UPWALLALONGNORTHSIDE TOALIGNTOADJACENTTILT-UPWALLALONGNORTHSIDE 20' - 0 GENERALCONSOLIDATEDINC. DANCO,EN,LLC. TENANTIMPROVEMENT REVISIO 4/8/1 MEZZANINE CONTAINMENT SECTION DETAILS ELEVATIONS AND SECTION
  • 3. pg SUPERIOR QUALITY FOODS LOCATION: 2355 EAST FRANCIS ST. Ontario, CA 91761 PROJECT SUMMARY: Superior Quality Food wished to expand the production of existing product line by the installation of two new boilers and the demolition of the existing boiler. SCOPE OF WORK: This project was de- sign build within General Consolidated Constructors. The design was created by Rob McCoy myself based on a previous project. This project was created with Autocad 2012. FLOOR PLAN GENERAL CONSOLIDATED CONSTRUCTORS MANNING ENGINEERING SITE PLAN FLOOR PLAN OF THE NEW BOILER EXTENSION.
  • 4. pg ELEVATION AND DETAILSROOF PLAN ROOF PLAN OF THE BOILER CANOPY. STRUCTURAL SECTION OF THE CANOPY POST CONNECTION EQUIPMENT ELEVATION
  • 5. pg LA ZAMORANA CANDY CO. LOCATION: 7700 WILSON AVE. HUNTINGTON PARK , CA 91761 PROJECT SUMMARY: La Zamorana Candy Co. required a new fa- cility in order to me the expanding. So the construction of a new production kitchen and waste line as a “tenant improve- ment” was required. SCOPE OF WORK: This project was design build within General Consolidated Con- structors. The design was created by Rob McCoy based on the requirement given to us by the client. The difficulty of this project was coordinate between Public Health and Industrial Waste. GENERAL CONSOLIDATED CONSTRUCTORS HAITHAM ENGINEERING FLOOR PLAN WAS CREATED IN AUTOCAD 2012. THEY LAYOUT OF THE DESIGN WAS CREATED BY ROB MCCOY AND MY SELF BASED ON THE FUTURE NEEDS OF THE CLIENT
  • 6. pg STRUCTURAL DETAIL STAIR SECTION AND INTERIOR EQUIPMENT ELEVATION THE STRUCTURAL DETAIL WAS CREATED UNDER THE DIRECTION OF THE PROJECT ENGINEER.