SlideShare a Scribd company logo
1 of 11
Vincent Gerald Lee
5/8/2015
Contact Number 083-648-8878
Address 23 Cole Street, Kensington
Marital Status Divorced
Dependents 1
Emaill Leevin1960@gmail.com
S K I L L S
 Over 23 years of experience as a Draughtsman mainly
contracting for specific projects then move on to next project.
 3 years project coordinating and project management
 26 Years in engineering experience ,Mining infrastructure,
Piping, Mechanical , Structural and Manufacturing
 Conversant with most SABS, BS and ISO Drawing Standards
 Adaptable to changing responsibilities and targets
 Can work under pressure
 Enthusiastic and a quick learner
E D U C A T I O N
 NTC6
o Power Machines, Mechanical Drawing and Design,
Strength of Materials and Structures, Mechano-technics.
 Draughting Course (6 months)
 System Administrator Courses
 AutoCAD Courses – Various
 AutoCAD R2014
 AutoCAD 3D Modeling
 Windows, MS Office, Excel etc
Vincent Gerald Lee
Page 2
 Microstation V8.
 Inventor 2014
 Project Management Professional thru College SA
 MS Projects
J O B D E S C R I P T I O N A N D R E S P O N S I B I L I T I E S
E X P E R I E N C E
D e sign D r aughtsman.
May 2015 to Current.
Working from home doing layouts Drawings and shop detailing
of structures and buildings for Engineering firms doing work in
Africa as and when they require my services.
D e sign D r aughtsman & P r ojec t M anagement A b out
A i r P o llution.
July 2014 to March 2015
1. Great 3D layout drawing of bag houses and all Ducking for
various plants
2. Put project together from Tenders, Manufacturing to site
installation.
3. KT Wash project running project from weekly meeting with
client to Fabrication and installations of ducting and 14 dust
extraction units as a project manager.
D e sign D r aughtsman & P r ojec t S ite C o ordinator
| S C AW M E TAL S
Vincent Gerald Lee
Page 3
September 2013 to July 2014
Job Description and Responsibilities
1. Update Wheel Plant layout and add new Line for increased
production of Train Wheels.
2. Problem Solving of existing Equipment to eliminate breakdowns.
3. High chrome Ball plant 3d layout of new gas Furnace for heat
treatment of Chrome balls for ball Mills.
4. Create budget for new gas Plant Furnace from Civil,
Structural , Mechanical to instrumentation, Complete project.
Communicate with Supplies(Local & overseas ) , Engineers and High
Chrome plant Managers to put Project together.
D e sign D r aughtsman | B usbar I ns tallation
July 2013 to Aug 2013
Job Description and Responsibilities
3d model of bus bars from transformers to mcc for the mines.
Generate 2d drawing for manufacturing of bus bars & trunking .
D e sign a n d L ayout D r aughtsman W or ley P ar sons
T W P
January 2011–June 2013
Job Description and Responsibilities
 Project: Twickenham Platinum Mine
Twickenham & Hackney decline Shaft Surface and
Underground Mining
o Decline Conveyors, Transfer Points, Chair Lifts, Ore
Vincent Gerald Lee
Page 4
Passes, Equipment & Structures.
o 3D Layout of Chutes and Transfer Point for Materials
Flow Simulation Packages.
 Project: Mogalakwena North – MNC de Bottlenecking
o Materials Handling for Dry Section Pre-Crushing and
Screening
o Generate Layouts & General Arrangements of
Conveyors & Equipment for the Plant Including Site
Visits.
o Existing Plant Running at 340 tons per hour
Objective: To Increase to 700-900 tons per hour for
FEL3 phase of project.
S e nior Me chanical D e sig ner | T A G GART J HDA
July 2010 – Jan 2011
Job Description and Responsibilities
 Projects: Various small Projects for Coal Mining
Companies (Xstrata &Exxaro).
 Materials handling.
 Plate work.
 Conveyor and general layouts.
M e chanical S tr uctur al D r aughtsman|SANDVIK
December 2009 – July 2010
Job Description and Responsibilities
 Project: Trekkopje.
 Detailing and Drawing Conveyors.
 Bulk Materials and Minerals Handling Equipment.
 GeneralPlant Layouts and Arrangements.
 Layouts, GeneralArrangements & Details of
Vincent Gerald Lee
Page 5
Conveyors..
D e sign a n d L ayout D r aughtsman |MINER O M INING
C O .
July 2009 – November 2009
Job Description and Responsibilities
 3D Layouts Screening Building Conveyors, Crushing
Plants & Silos.
 Generate General Arrangements of all Equipment,
Structures& Mine Infrastructure for Zinc Mine.
M e chanical D e signer|RSVENCO
August 2008 – June 2009
Job Description and Responsibilities
 Plant Layouts for a Coal Mine.
 From Tip, Crushing, Conveyors, Washing Plant to
Local & Export Stockpiles & pumps with piping to
surface.
 Mine Infrastructure Buildings, Pollution Control
Dams, Piping Pump Houses, etc.
D e sign a n d L ayout D r aughtsman |SENET
June 2008 – July 2008 (Reason for leaving: Project placed on hold)
Job Description and Responsibilities
 Layout of Gold Plants.
D e sign a n d L ayout D r aughtsman |SANDVIK
Vincent Gerald Lee
Page 6
August 2006 – May 2008
Job Description and Responsibilities
 2D & 3D Conveyor Layouts(Above & Under Ground).
 Transfer Tower, Screening & Crushing Buildings (for
Anglo).
 Generate General Arrangements & Details of
Conveyors, Chutes.
 Screening & Crushing Buildings.
 3D Models of Plants for Tender Purposes.
D e sign D r aughtsman & P r ojec t S ite
C o or dinator|SCAW M ETAL S
January 2003 – July 2006
Job Description and Responsibilities
 Project: High Chrome 3 Ball Plant
o Layout of High Chrome 3 Plant (Value R 130 M)
o Consisting of Sand Plant, Foundry, Ball Sorting,
Cooling Pump Station, Transformer Rooms, Control
Rooms, Arc Furnaces, Cranes, Buildings, Roads,
Storm Water Dam & Culverts, Dust Extraction, Furnex
Storage Hoppers, Heat Treatment & Storage.
o Design & Model Plant in 3D for Ball Sorting Area.
o Generate Fabrication Drawings from 3D Model.
 Structural
o Main Building 25,000 m², Link to Existing Buildings
with a 35 m Spanned Bridge, Hoppers, Connecting
Walkways & Platforms between Equipment.
o Support Structure for Equipment & Stairs.
o Conveyors (Troughed & Pocket Belts), Structure &
Chutes.
 Mechanical
Vincent Gerald Lee
Page 7
o Conveyor Drivers, Pulley Shafts, etc.
o Pumps, Vibrating Feeders, Breaker & Shaker Drums.
o Design Conveyors using Helix Design Program.
o Liaison with InternationalSuppliers Placing their
Equipment in Plant Layout.
o Position, Pipe Routing, Civil Foundation, etc.
o Liaison with Engineers, Project Engineers, Sub-
Contractors, Local Suppliers and Operators &
Checking of Tenders.
 Project
o Charge Preparation for Furnaces (Value R 15 M)
o Various ingredients to be Fed into Ladles to Charge
Arc Furnaces.
o 3D Layout of Equipment & Pit (Various Options).Have
Layouts Approved.
o Compile Budgets for Funds Approval
o Consisting of Feeders, Conveyors, Weighing Hoppers
&trackingLadles to make sure right recipe go to right
arc furnaces.
 Project: Ge-Bogie Frames (Value R 19 M)
o Various parts of the plant to be upgraded to meet
new orders - Foundry, Fettling, Heat Treatment, MPI
& X-ray inspection, Machine Shop, Dispatch,
Buildings, Cranes
o Layout of Equipment & Process Flow Diagrams.
o Obtain Quotes & Put Budget Together.
o Run Project until Signed off by various Departments.
 Project: Ge Bogie Frames Phase Two (Value R 35 M)
o Various parts of the plant to be upgraded to meet
new orders - Foundry, Fettling, Heat Treatment, MPI
& X-ray inspection.
o Machine Shop, Dispatch, Buildings, Cranes
Vincent Gerald Lee
Page 8
o Layout of Equipment & Process Flow Diagrams.
o Obtain Quotes & Put Budget Together.
o Run Project until Signed off by various Departments.
D e sign D r aughtsman- o n S ite|COL UMB US S T AINLESS
S T EEL
June 2002 – December 2002
Job Description and Responsibilities
 Project: Picking Plant for Stainless Steel Sheeting
o Design & model table conveyor lines in 3D.
o Generate fabrication drawings from 3D model.
o Hydraulic cylinder for lifting & rotating tables.
o Structural table frames, walkways, crawl beams, etc.
o Mechanical drive rollers& roller shafts, chains &
sprockets, etc.
D e sign D r aughtsman - o n S i te|RICHARDS B A Y
M I NERAL S
February 2001– May 2002
Job Description and Responsibilities
 Project: Secondary Dredge on Mining Pond C
o Model dredge in 3D and generate fabrication
drawings from 3D model.
o Plate work, sponsan tanks, control rooms, etc.
o Structural, mechanical, pumps & Piping
D e signer|BAYDR AFT ( Se lf E mployed)
January1999 – Jan 2001
Vincent Gerald Lee
Page 9
Job Description and Responsibilities
 Drafting & problem solving for Bayside and Hillside
Aluminum as well as Various Engineering Companies in
Richards Bay
D r aw ing O f fice D e signer |DAVID H EATH
December1997– December1998
Job Description and Responsibilities
 Projects: Draughtsman for various clients.
o Bayside and Hillside Aluminum
o Various Engineer companies around Richard Bay
area.
o Manager for David Heath Drawing Office for one
year.
D e sign D r aughtsman – O n - Site|AL USAF H IL LSIDE
S M EL TER
October1995 – November1997
Job Description and Responsibilities
 Projects: Design and modification of mechanical, structural
and piping of existing and new projects.
o Involved with projects from conceptual design stage
to commissioning.
o Commissioning, Liaison with Engineers, Project
Engineers, Sub-Contractors, Suppliers and
Operators.
D e tail D r aughts man o n B o ar d|ENVIR OTECH
Vincent Gerald Lee
Page 10
May1988 – September1995
Job Description and Responsibilities
o CAD Draughtsman (4.5 years)
o Mechanical Layouts and detailing of mechanical
components and equipment (drives, lifting devices,
shafts, etc.).
o Applying close tolerances, geometric tolerances,
limits and fits where applicable.
o Structural layouts and detailing of structural
components (bridges, walkways, stairways, tanks,
etc.).
o Civil layouts of civil foundations for elevated
buildings, thickeners, etc.
o Layouts from distribution box to large sand filter
tanks with interconnecting wears, utilizing hydraulic
heads to create flow of liquids.
o Foundation layouts and detailing for pumps, plinths,
tanks, etc.
o Piping layouts of interconnecting piping between
various parts of equipment, tanks, valves, etc. from
layouts to generating piping Isometric drawings.
o Computer Maintenance of CAD stations (hardware
and software).
o Problem solving.
o Training drawing office personnel on CAD.
o Assisting Engineers and Sales Personnelwith
presentations, using scanners, PC projectors, etc.
o Keeping abreast of new technology to increase
productivity and making recommendations to
management.
o Generaldrawing office duties i.e. assisting Project
Engineers, Manufacturers, etc.
Vincent Gerald Lee
Page 11
o Turnkey projects.
o Plant layouts (from tender to completed project).
o Schematic flow diagrams and P&ID’s.
o Design and detailing of rubber mill liners and molds.
o Working from Engineers sketches and instructions
liaising telephonically with suppliers regarding price
and availability of equipment, etc.
o Site and sub-contractor visits.
o Equipment Knowledge.
o Thickeners, shriver presses, drum- disk and sand
filters, delta stacks, flotation machines, HMS drums,
classifiers and clarifiers.
o Generalprocess equipment – pump valves,
conveyors, etc.
E le ctr ical C o ntr acting |SELF -EMPLOYED
Mar 1986 – April1988
Job Description and Responsibilities
o Electrical Contracting
M e chanical I n spector|PUTC O
February1985 – February 1986
Job Description and Responsibilities
o Responsible for vehicle inspection and maintenance.
.

More Related Content

What's hot

AHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_originalAHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_originalAhamed Mohideen
 
Freelance Preview
Freelance PreviewFreelance Preview
Freelance Previewahmed mohie
 
Primavera Project Manager And Construction Projects
Primavera Project Manager And Construction ProjectsPrimavera Project Manager And Construction Projects
Primavera Project Manager And Construction Projectsbeverly0bennett8
 
Sean Mason CV 2016
Sean Mason  CV  2016Sean Mason  CV  2016
Sean Mason CV 2016Sean Mason
 
Hesham Mohamed Elsawy
Hesham Mohamed ElsawyHesham Mohamed Elsawy
Hesham Mohamed ElsawyHesham Elsawy
 
Presentation On Structure of Plinth Beam and Rebar Process
Presentation On Structure of Plinth Beam and Rebar ProcessPresentation On Structure of Plinth Beam and Rebar Process
Presentation On Structure of Plinth Beam and Rebar Processuttamsingh107
 
Jacob Dustin Crawford Resume
Jacob Dustin Crawford  ResumeJacob Dustin Crawford  Resume
Jacob Dustin Crawford ResumeDustin Crawford
 
MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)mohamed atef
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed El Banna
 
Mohamed Hamdy (Resume)
Mohamed Hamdy (Resume)Mohamed Hamdy (Resume)
Mohamed Hamdy (Resume)Mohamed Hamdy
 

What's hot (20)

AHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_originalAHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_original
 
Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)
 
Freelance Preview
Freelance PreviewFreelance Preview
Freelance Preview
 
Primavera Project Manager And Construction Projects
Primavera Project Manager And Construction ProjectsPrimavera Project Manager And Construction Projects
Primavera Project Manager And Construction Projects
 
Sultan C.V
Sultan C.VSultan C.V
Sultan C.V
 
Sean Mason CV 2016
Sean Mason  CV  2016Sean Mason  CV  2016
Sean Mason CV 2016
 
Hesham Mohamed Elsawy
Hesham Mohamed ElsawyHesham Mohamed Elsawy
Hesham Mohamed Elsawy
 
Presentation On Structure of Plinth Beam and Rebar Process
Presentation On Structure of Plinth Beam and Rebar ProcessPresentation On Structure of Plinth Beam and Rebar Process
Presentation On Structure of Plinth Beam and Rebar Process
 
Resume of jeonghoon woo
Resume of jeonghoon wooResume of jeonghoon woo
Resume of jeonghoon woo
 
asrasr 253.04.2016
asrasr 253.04.2016asrasr 253.04.2016
asrasr 253.04.2016
 
HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
Jacob Dustin Crawford Resume
Jacob Dustin Crawford  ResumeJacob Dustin Crawford  Resume
Jacob Dustin Crawford Resume
 
MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)
 
Summery
SummerySummery
Summery
 
Derek Pattison CV1
Derek Pattison CV1Derek Pattison CV1
Derek Pattison CV1
 
Mamdouh cv
Mamdouh cvMamdouh cv
Mamdouh cv
 
1 Essam CV
1 Essam CV1 Essam CV
1 Essam CV
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
 
Mohamed Hamdy (Resume)
Mohamed Hamdy (Resume)Mohamed Hamdy (Resume)
Mohamed Hamdy (Resume)
 
Len Platten-CV
Len Platten-CVLen Platten-CV
Len Platten-CV
 

Similar to VG_Lee_CV_2015_1 (20)

Shane Duxbury Latest Resume
Shane Duxbury Latest ResumeShane Duxbury Latest Resume
Shane Duxbury Latest Resume
 
I.a.fletcher c.v. may 2016
I.a.fletcher c.v.  may 2016I.a.fletcher c.v.  may 2016
I.a.fletcher c.v. may 2016
 
RESUME
RESUMERESUME
RESUME
 
Sr. Civil & Structural Designer
Sr. Civil & Structural DesignerSr. Civil & Structural Designer
Sr. Civil & Structural Designer
 
Scbj 070618-cv
Scbj 070618-cvScbj 070618-cv
Scbj 070618-cv
 
SMA CV2016-1
SMA CV2016-1SMA CV2016-1
SMA CV2016-1
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
SM CV2016
SM CV2016SM CV2016
SM CV2016
 
GARYCV_2015_Dec_complete
GARYCV_2015_Dec_completeGARYCV_2015_Dec_complete
GARYCV_2015_Dec_complete
 
siddappa MA (1)
siddappa MA (1)siddappa MA (1)
siddappa MA (1)
 
RESUME DJT van der Merwe
RESUME DJT van der MerweRESUME DJT van der Merwe
RESUME DJT van der Merwe
 
Abhinandan_Sen_3D_CV_latest
Abhinandan_Sen_3D_CV_latestAbhinandan_Sen_3D_CV_latest
Abhinandan_Sen_3D_CV_latest
 
Resume rks 2016 - Mar
Resume rks 2016 - MarResume rks 2016 - Mar
Resume rks 2016 - Mar
 
KANNAN RESUME
KANNAN RESUMEKANNAN RESUME
KANNAN RESUME
 
Shilpesh CV
Shilpesh CVShilpesh CV
Shilpesh CV
 
Ramy Mikhail updated
Ramy Mikhail updatedRamy Mikhail updated
Ramy Mikhail updated
 
Scbj 0706187-cv
Scbj 0706187-cvScbj 0706187-cv
Scbj 0706187-cv
 
Graham Barton CV
Graham Barton CVGraham Barton CV
Graham Barton CV
 
Lisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -newLisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -new
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 

VG_Lee_CV_2015_1

  • 1. Vincent Gerald Lee 5/8/2015 Contact Number 083-648-8878 Address 23 Cole Street, Kensington Marital Status Divorced Dependents 1 Emaill Leevin1960@gmail.com S K I L L S  Over 23 years of experience as a Draughtsman mainly contracting for specific projects then move on to next project.  3 years project coordinating and project management  26 Years in engineering experience ,Mining infrastructure, Piping, Mechanical , Structural and Manufacturing  Conversant with most SABS, BS and ISO Drawing Standards  Adaptable to changing responsibilities and targets  Can work under pressure  Enthusiastic and a quick learner E D U C A T I O N  NTC6 o Power Machines, Mechanical Drawing and Design, Strength of Materials and Structures, Mechano-technics.  Draughting Course (6 months)  System Administrator Courses  AutoCAD Courses – Various  AutoCAD R2014  AutoCAD 3D Modeling  Windows, MS Office, Excel etc
  • 2. Vincent Gerald Lee Page 2  Microstation V8.  Inventor 2014  Project Management Professional thru College SA  MS Projects J O B D E S C R I P T I O N A N D R E S P O N S I B I L I T I E S E X P E R I E N C E D e sign D r aughtsman. May 2015 to Current. Working from home doing layouts Drawings and shop detailing of structures and buildings for Engineering firms doing work in Africa as and when they require my services. D e sign D r aughtsman & P r ojec t M anagement A b out A i r P o llution. July 2014 to March 2015 1. Great 3D layout drawing of bag houses and all Ducking for various plants 2. Put project together from Tenders, Manufacturing to site installation. 3. KT Wash project running project from weekly meeting with client to Fabrication and installations of ducting and 14 dust extraction units as a project manager. D e sign D r aughtsman & P r ojec t S ite C o ordinator | S C AW M E TAL S
  • 3. Vincent Gerald Lee Page 3 September 2013 to July 2014 Job Description and Responsibilities 1. Update Wheel Plant layout and add new Line for increased production of Train Wheels. 2. Problem Solving of existing Equipment to eliminate breakdowns. 3. High chrome Ball plant 3d layout of new gas Furnace for heat treatment of Chrome balls for ball Mills. 4. Create budget for new gas Plant Furnace from Civil, Structural , Mechanical to instrumentation, Complete project. Communicate with Supplies(Local & overseas ) , Engineers and High Chrome plant Managers to put Project together. D e sign D r aughtsman | B usbar I ns tallation July 2013 to Aug 2013 Job Description and Responsibilities 3d model of bus bars from transformers to mcc for the mines. Generate 2d drawing for manufacturing of bus bars & trunking . D e sign a n d L ayout D r aughtsman W or ley P ar sons T W P January 2011–June 2013 Job Description and Responsibilities  Project: Twickenham Platinum Mine Twickenham & Hackney decline Shaft Surface and Underground Mining o Decline Conveyors, Transfer Points, Chair Lifts, Ore
  • 4. Vincent Gerald Lee Page 4 Passes, Equipment & Structures. o 3D Layout of Chutes and Transfer Point for Materials Flow Simulation Packages.  Project: Mogalakwena North – MNC de Bottlenecking o Materials Handling for Dry Section Pre-Crushing and Screening o Generate Layouts & General Arrangements of Conveyors & Equipment for the Plant Including Site Visits. o Existing Plant Running at 340 tons per hour Objective: To Increase to 700-900 tons per hour for FEL3 phase of project. S e nior Me chanical D e sig ner | T A G GART J HDA July 2010 – Jan 2011 Job Description and Responsibilities  Projects: Various small Projects for Coal Mining Companies (Xstrata &Exxaro).  Materials handling.  Plate work.  Conveyor and general layouts. M e chanical S tr uctur al D r aughtsman|SANDVIK December 2009 – July 2010 Job Description and Responsibilities  Project: Trekkopje.  Detailing and Drawing Conveyors.  Bulk Materials and Minerals Handling Equipment.  GeneralPlant Layouts and Arrangements.  Layouts, GeneralArrangements & Details of
  • 5. Vincent Gerald Lee Page 5 Conveyors.. D e sign a n d L ayout D r aughtsman |MINER O M INING C O . July 2009 – November 2009 Job Description and Responsibilities  3D Layouts Screening Building Conveyors, Crushing Plants & Silos.  Generate General Arrangements of all Equipment, Structures& Mine Infrastructure for Zinc Mine. M e chanical D e signer|RSVENCO August 2008 – June 2009 Job Description and Responsibilities  Plant Layouts for a Coal Mine.  From Tip, Crushing, Conveyors, Washing Plant to Local & Export Stockpiles & pumps with piping to surface.  Mine Infrastructure Buildings, Pollution Control Dams, Piping Pump Houses, etc. D e sign a n d L ayout D r aughtsman |SENET June 2008 – July 2008 (Reason for leaving: Project placed on hold) Job Description and Responsibilities  Layout of Gold Plants. D e sign a n d L ayout D r aughtsman |SANDVIK
  • 6. Vincent Gerald Lee Page 6 August 2006 – May 2008 Job Description and Responsibilities  2D & 3D Conveyor Layouts(Above & Under Ground).  Transfer Tower, Screening & Crushing Buildings (for Anglo).  Generate General Arrangements & Details of Conveyors, Chutes.  Screening & Crushing Buildings.  3D Models of Plants for Tender Purposes. D e sign D r aughtsman & P r ojec t S ite C o or dinator|SCAW M ETAL S January 2003 – July 2006 Job Description and Responsibilities  Project: High Chrome 3 Ball Plant o Layout of High Chrome 3 Plant (Value R 130 M) o Consisting of Sand Plant, Foundry, Ball Sorting, Cooling Pump Station, Transformer Rooms, Control Rooms, Arc Furnaces, Cranes, Buildings, Roads, Storm Water Dam & Culverts, Dust Extraction, Furnex Storage Hoppers, Heat Treatment & Storage. o Design & Model Plant in 3D for Ball Sorting Area. o Generate Fabrication Drawings from 3D Model.  Structural o Main Building 25,000 m², Link to Existing Buildings with a 35 m Spanned Bridge, Hoppers, Connecting Walkways & Platforms between Equipment. o Support Structure for Equipment & Stairs. o Conveyors (Troughed & Pocket Belts), Structure & Chutes.  Mechanical
  • 7. Vincent Gerald Lee Page 7 o Conveyor Drivers, Pulley Shafts, etc. o Pumps, Vibrating Feeders, Breaker & Shaker Drums. o Design Conveyors using Helix Design Program. o Liaison with InternationalSuppliers Placing their Equipment in Plant Layout. o Position, Pipe Routing, Civil Foundation, etc. o Liaison with Engineers, Project Engineers, Sub- Contractors, Local Suppliers and Operators & Checking of Tenders.  Project o Charge Preparation for Furnaces (Value R 15 M) o Various ingredients to be Fed into Ladles to Charge Arc Furnaces. o 3D Layout of Equipment & Pit (Various Options).Have Layouts Approved. o Compile Budgets for Funds Approval o Consisting of Feeders, Conveyors, Weighing Hoppers &trackingLadles to make sure right recipe go to right arc furnaces.  Project: Ge-Bogie Frames (Value R 19 M) o Various parts of the plant to be upgraded to meet new orders - Foundry, Fettling, Heat Treatment, MPI & X-ray inspection, Machine Shop, Dispatch, Buildings, Cranes o Layout of Equipment & Process Flow Diagrams. o Obtain Quotes & Put Budget Together. o Run Project until Signed off by various Departments.  Project: Ge Bogie Frames Phase Two (Value R 35 M) o Various parts of the plant to be upgraded to meet new orders - Foundry, Fettling, Heat Treatment, MPI & X-ray inspection. o Machine Shop, Dispatch, Buildings, Cranes
  • 8. Vincent Gerald Lee Page 8 o Layout of Equipment & Process Flow Diagrams. o Obtain Quotes & Put Budget Together. o Run Project until Signed off by various Departments. D e sign D r aughtsman- o n S ite|COL UMB US S T AINLESS S T EEL June 2002 – December 2002 Job Description and Responsibilities  Project: Picking Plant for Stainless Steel Sheeting o Design & model table conveyor lines in 3D. o Generate fabrication drawings from 3D model. o Hydraulic cylinder for lifting & rotating tables. o Structural table frames, walkways, crawl beams, etc. o Mechanical drive rollers& roller shafts, chains & sprockets, etc. D e sign D r aughtsman - o n S i te|RICHARDS B A Y M I NERAL S February 2001– May 2002 Job Description and Responsibilities  Project: Secondary Dredge on Mining Pond C o Model dredge in 3D and generate fabrication drawings from 3D model. o Plate work, sponsan tanks, control rooms, etc. o Structural, mechanical, pumps & Piping D e signer|BAYDR AFT ( Se lf E mployed) January1999 – Jan 2001
  • 9. Vincent Gerald Lee Page 9 Job Description and Responsibilities  Drafting & problem solving for Bayside and Hillside Aluminum as well as Various Engineering Companies in Richards Bay D r aw ing O f fice D e signer |DAVID H EATH December1997– December1998 Job Description and Responsibilities  Projects: Draughtsman for various clients. o Bayside and Hillside Aluminum o Various Engineer companies around Richard Bay area. o Manager for David Heath Drawing Office for one year. D e sign D r aughtsman – O n - Site|AL USAF H IL LSIDE S M EL TER October1995 – November1997 Job Description and Responsibilities  Projects: Design and modification of mechanical, structural and piping of existing and new projects. o Involved with projects from conceptual design stage to commissioning. o Commissioning, Liaison with Engineers, Project Engineers, Sub-Contractors, Suppliers and Operators. D e tail D r aughts man o n B o ar d|ENVIR OTECH
  • 10. Vincent Gerald Lee Page 10 May1988 – September1995 Job Description and Responsibilities o CAD Draughtsman (4.5 years) o Mechanical Layouts and detailing of mechanical components and equipment (drives, lifting devices, shafts, etc.). o Applying close tolerances, geometric tolerances, limits and fits where applicable. o Structural layouts and detailing of structural components (bridges, walkways, stairways, tanks, etc.). o Civil layouts of civil foundations for elevated buildings, thickeners, etc. o Layouts from distribution box to large sand filter tanks with interconnecting wears, utilizing hydraulic heads to create flow of liquids. o Foundation layouts and detailing for pumps, plinths, tanks, etc. o Piping layouts of interconnecting piping between various parts of equipment, tanks, valves, etc. from layouts to generating piping Isometric drawings. o Computer Maintenance of CAD stations (hardware and software). o Problem solving. o Training drawing office personnel on CAD. o Assisting Engineers and Sales Personnelwith presentations, using scanners, PC projectors, etc. o Keeping abreast of new technology to increase productivity and making recommendations to management. o Generaldrawing office duties i.e. assisting Project Engineers, Manufacturers, etc.
  • 11. Vincent Gerald Lee Page 11 o Turnkey projects. o Plant layouts (from tender to completed project). o Schematic flow diagrams and P&ID’s. o Design and detailing of rubber mill liners and molds. o Working from Engineers sketches and instructions liaising telephonically with suppliers regarding price and availability of equipment, etc. o Site and sub-contractor visits. o Equipment Knowledge. o Thickeners, shriver presses, drum- disk and sand filters, delta stacks, flotation machines, HMS drums, classifiers and clarifiers. o Generalprocess equipment – pump valves, conveyors, etc. E le ctr ical C o ntr acting |SELF -EMPLOYED Mar 1986 – April1988 Job Description and Responsibilities o Electrical Contracting M e chanical I n spector|PUTC O February1985 – February 1986 Job Description and Responsibilities o Responsible for vehicle inspection and maintenance. .