Project by Anthony Felt
The KÖLD project started as a business idea combining two services, floatation and cryotherapy as a hybrid
physical recovery business.
Initial Phase: Project’s purpose, scope and justification.
- Accepted the contract offer to build a business as a test franchise.
- Conducted a series of meetings with stakeholders to better understand the overall goal and write up the
characteristics of this business.
- A simple Business strategy was written for the initial year of business.
- Created a brand name, KÖLD with a color scheme and style.
- Created revenue projections and estimated total cost of the project.
Planning Phase:
- 3D rendering made for proposed layout on Google Sketch Up (show frame)
- Spent 6 weeks seeking an ideal location.
- Closed a 5 year lease in a bustling part of central Houston.
- Requested bids for planner and interior buildout.
Executing Phase:
- Full demolition and complete interior rebuild was required.
- Demolition began Aug 15th
2015
- Interior buildout began late August.
- New 200 AMP electrical panel was installed to accommodate high electrical use.
- Multiple wall frames and doorways were built. Some walls required extensive drywall, including hush
board to reduce noise interference.
- Adjustments to existing A/C were made.
- Major plumbing work, including new water lines were installed into the foundation.
- Custom showers we’re built into the space.
- Equipment installation began in October.
- Float pods were installed over a week long period.
- The Cryotherapy unit was delivered and installed within a day.
- Washer/dryer, mop sink, and a new toilet we’re installed in Late October.
- Changing booths were custom made using a metal pipe frame and curtains.
- Interior buildout finalized in early December 2015.
Monitoring and Controlling Phase:
- All permits with the city, including the Certificate of Occupancy finalized on Jan 2nd
, 2016.
- Training employees to new services and updates within the business.
- Adjusting prices and offers based off indications from revenue and client choices.
- Created several different marketing campaigns to gain exposure and determine which produces the
greatest return on investment through careful tracking.
Closing Phase:
- Creating a more efficient processes to all of KÖLD’s operations.
- Fix any minor issues and obstacles.
- Maintain a great reputation to our clientele.
Obstacles and Challenges:
- Closing a space without a personal guarantee.
- Dispute over A/C system with neighboring tenant.
- Houston Permitting center delay
- Equipment lacked UL certification. Needed 3rd
party inspection.
- Electrical panel limitations.
- Creating a quiet, insulated environment for the Floatation pods.
Considerable planning went into the layout
to complement the limited space we had
available.
Minor adjustments had to be made. I was
able to accomplish this without running
behind schedule.
The lease required a complete interior
demolition and build out.
The buildout cost $50,000. New electrical panel and layout.
Demolition and initial buildout Logo and color scheme coming along
The entire buildout was completed on schedule Equipment installs
Float rooms are double insulated Cryotherapy room with adjustable changing booths
The final product The business has fantastic exposure along a busy street
First 6 months of Revenue
KÖLD CRYOTHERAPY AND FLOATATION
Jan Feb Mar Apr May Jun
Cryo Session Revenue 4,492.18$ 4,997.18$ 9,518.12$ 12,010.00$ 15,091.53$ 15,430.09$
Floatation Session Revenue 330.00$ 653.10$ 1,939.40$ 1,199.48$ 2,343.59$ 3,652.27$
Aggregate Revenue 4,822.18$ 5,650.28$ 11,457.52$ 13,209.48$ 17,435.12$ 19,082.36$

More Related Content

What's hot

Renovia Apartment Case study 7-15
Renovia Apartment Case study  7-15Renovia Apartment Case study  7-15
Renovia Apartment Case study 7-15Brian Johnson
 
New Standards June 2010
New Standards June 2010New Standards June 2010
New Standards June 2010VWOA
 
Concrete Polishing Floor Concepts v1
Concrete Polishing Floor Concepts v1Concrete Polishing Floor Concepts v1
Concrete Polishing Floor Concepts v1Mark Conlon
 
RESUME-RAJAN MOUDGILL 2016
RESUME-RAJAN MOUDGILL 2016RESUME-RAJAN MOUDGILL 2016
RESUME-RAJAN MOUDGILL 2016Rajan Moudgill
 
Current Construction Projects, City of Chicago, August 21, 2008
Current Construction Projects, City of Chicago, August 21, 2008Current Construction Projects, City of Chicago, August 21, 2008
Current Construction Projects, City of Chicago, August 21, 2008Daniel X. O'Neil
 
Item # 6 Notice of Intent - 934 Patterson The Argyle
Item # 6   Notice of Intent - 934 Patterson The ArgyleItem # 6   Notice of Intent - 934 Patterson The Argyle
Item # 6 Notice of Intent - 934 Patterson The Argyleahcitycouncil
 
Item # 9 - Award ADA Swimming Pool Renovations
Item # 9 - Award ADA Swimming Pool RenovationsItem # 9 - Award ADA Swimming Pool Renovations
Item # 9 - Award ADA Swimming Pool Renovationsahcitycouncil
 
Tmh Cdc Repair Restoration Sample Projects
Tmh Cdc Repair Restoration Sample ProjectsTmh Cdc Repair Restoration Sample Projects
Tmh Cdc Repair Restoration Sample Projectstimmhovey
 
Sharon Construction Case Study
Sharon Construction Case StudySharon Construction Case Study
Sharon Construction Case Studyst0000000000
 
Large renovations and what you need to know 2010
Large renovations and what you need to know 2010Large renovations and what you need to know 2010
Large renovations and what you need to know 2010Wo Built
 
Wankhede nomination 31-08-2013
Wankhede nomination   31-08-2013Wankhede nomination   31-08-2013
Wankhede nomination 31-08-2013engineeringwatch
 
Harper summer 2020 co op presentation
Harper summer 2020 co op presentationHarper summer 2020 co op presentation
Harper summer 2020 co op presentationMadison Dudley
 

What's hot (19)

Renovia Apartment Case study 7-15
Renovia Apartment Case study  7-15Renovia Apartment Case study  7-15
Renovia Apartment Case study 7-15
 
cofieldresume
cofieldresumecofieldresume
cofieldresume
 
resume_BFR
resume_BFRresume_BFR
resume_BFR
 
Binder2
Binder2Binder2
Binder2
 
Austyn Holderfield Resume 1
Austyn Holderfield Resume 1Austyn Holderfield Resume 1
Austyn Holderfield Resume 1
 
New Standards June 2010
New Standards June 2010New Standards June 2010
New Standards June 2010
 
Concrete Polishing Floor Concepts v1
Concrete Polishing Floor Concepts v1Concrete Polishing Floor Concepts v1
Concrete Polishing Floor Concepts v1
 
RESUME-RAJAN MOUDGILL 2016
RESUME-RAJAN MOUDGILL 2016RESUME-RAJAN MOUDGILL 2016
RESUME-RAJAN MOUDGILL 2016
 
Current Construction Projects, City of Chicago, August 21, 2008
Current Construction Projects, City of Chicago, August 21, 2008Current Construction Projects, City of Chicago, August 21, 2008
Current Construction Projects, City of Chicago, August 21, 2008
 
Item # 6 Notice of Intent - 934 Patterson The Argyle
Item # 6   Notice of Intent - 934 Patterson The ArgyleItem # 6   Notice of Intent - 934 Patterson The Argyle
Item # 6 Notice of Intent - 934 Patterson The Argyle
 
Item # 9 - Award ADA Swimming Pool Renovations
Item # 9 - Award ADA Swimming Pool RenovationsItem # 9 - Award ADA Swimming Pool Renovations
Item # 9 - Award ADA Swimming Pool Renovations
 
Experience
ExperienceExperience
Experience
 
Tmh Cdc Repair Restoration Sample Projects
Tmh Cdc Repair Restoration Sample ProjectsTmh Cdc Repair Restoration Sample Projects
Tmh Cdc Repair Restoration Sample Projects
 
Sharon Construction Case Study
Sharon Construction Case StudySharon Construction Case Study
Sharon Construction Case Study
 
Large renovations and what you need to know 2010
Large renovations and what you need to know 2010Large renovations and what you need to know 2010
Large renovations and what you need to know 2010
 
Wankhede nomination 31-08-2013
Wankhede nomination   31-08-2013Wankhede nomination   31-08-2013
Wankhede nomination 31-08-2013
 
Gideon Spence
Gideon SpenceGideon Spence
Gideon Spence
 
Harper summer 2020 co op presentation
Harper summer 2020 co op presentationHarper summer 2020 co op presentation
Harper summer 2020 co op presentation
 
Jack-Hollis King Resume
Jack-Hollis King ResumeJack-Hollis King Resume
Jack-Hollis King Resume
 

Viewers also liked

OHSAS POLICY, MANUAL & PROCEDURE
OHSAS POLICY, MANUAL & PROCEDUREOHSAS POLICY, MANUAL & PROCEDURE
OHSAS POLICY, MANUAL & PROCEDUREMamta Singh
 
Alternative sostenibili al consumo di acque minerali confezionate in bottigli...
Alternative sostenibili al consumo di acque minerali confezionate in bottigli...Alternative sostenibili al consumo di acque minerali confezionate in bottigli...
Alternative sostenibili al consumo di acque minerali confezionate in bottigli...Elena Tasca
 
Técnico Computación e Informática u otra carrera técnica
 Técnico Computación e Informática u otra carrera técnica Técnico Computación e Informática u otra carrera técnica
Técnico Computación e Informática u otra carrera técnicaLuis Antonio Romero
 
Simplified_Material Selection Excercise_for_armour_piercing_projectile_Tank_A...
Simplified_Material Selection Excercise_for_armour_piercing_projectile_Tank_A...Simplified_Material Selection Excercise_for_armour_piercing_projectile_Tank_A...
Simplified_Material Selection Excercise_for_armour_piercing_projectile_Tank_A...Warakorn (Tieam) Jirakarunphong
 
Celebrate New Year 2017
Celebrate New Year 2017Celebrate New Year 2017
Celebrate New Year 2017NewYearEcards
 
MANUAL DE WINDOWS SERVER 2012 zorrilla espeza marili
MANUAL DE WINDOWS SERVER 2012  zorrilla espeza mariliMANUAL DE WINDOWS SERVER 2012  zorrilla espeza marili
MANUAL DE WINDOWS SERVER 2012 zorrilla espeza mariliWILDER VILCAHUAMAN
 
Phục hồi chức năng gãy xương
Phục hồi chức năng gãy xươngPhục hồi chức năng gãy xương
Phục hồi chức năng gãy xươngMinh Dat Ton That
 
Saudi Aramco Materials System Specifications (SAMSS) 4
Saudi Aramco Materials System Specifications (SAMSS) 4Saudi Aramco Materials System Specifications (SAMSS) 4
Saudi Aramco Materials System Specifications (SAMSS) 4ROBERTO BATAHOY GAMALE JR
 

Viewers also liked (16)

Lenguaje de programación I
Lenguaje de programación ILenguaje de programación I
Lenguaje de programación I
 
Notas enfermas
Notas enfermasNotas enfermas
Notas enfermas
 
OHSAS POLICY, MANUAL & PROCEDURE
OHSAS POLICY, MANUAL & PROCEDUREOHSAS POLICY, MANUAL & PROCEDURE
OHSAS POLICY, MANUAL & PROCEDURE
 
MICROCONTROLADOR
MICROCONTROLADORMICROCONTROLADOR
MICROCONTROLADOR
 
Lenguaje de programación
Lenguaje de programaciónLenguaje de programación
Lenguaje de programación
 
Alternative sostenibili al consumo di acque minerali confezionate in bottigli...
Alternative sostenibili al consumo di acque minerali confezionate in bottigli...Alternative sostenibili al consumo di acque minerali confezionate in bottigli...
Alternative sostenibili al consumo di acque minerali confezionate in bottigli...
 
Base de datos en sql
Base de datos en sqlBase de datos en sql
Base de datos en sql
 
LENGUAJE TRANSACT SQL
 LENGUAJE TRANSACT SQL LENGUAJE TRANSACT SQL
LENGUAJE TRANSACT SQL
 
Técnico Computación e Informática u otra carrera técnica
 Técnico Computación e Informática u otra carrera técnica Técnico Computación e Informática u otra carrera técnica
Técnico Computación e Informática u otra carrera técnica
 
Simplified_Material Selection Excercise_for_armour_piercing_projectile_Tank_A...
Simplified_Material Selection Excercise_for_armour_piercing_projectile_Tank_A...Simplified_Material Selection Excercise_for_armour_piercing_projectile_Tank_A...
Simplified_Material Selection Excercise_for_armour_piercing_projectile_Tank_A...
 
Celebrate New Year 2017
Celebrate New Year 2017Celebrate New Year 2017
Celebrate New Year 2017
 
MANUAL DE WINDOWS SERVER 2012 zorrilla espeza marili
MANUAL DE WINDOWS SERVER 2012  zorrilla espeza mariliMANUAL DE WINDOWS SERVER 2012  zorrilla espeza marili
MANUAL DE WINDOWS SERVER 2012 zorrilla espeza marili
 
Phục hồi chức năng gãy xương
Phục hồi chức năng gãy xươngPhục hồi chức năng gãy xương
Phục hồi chức năng gãy xương
 
Desafios da Cocriação
Desafios da CocriaçãoDesafios da Cocriação
Desafios da Cocriação
 
Saudi Aramco Materials System Specifications (SAMSS) 4
Saudi Aramco Materials System Specifications (SAMSS) 4Saudi Aramco Materials System Specifications (SAMSS) 4
Saudi Aramco Materials System Specifications (SAMSS) 4
 
Piramide de kelsen
Piramide de kelsenPiramide de kelsen
Piramide de kelsen
 

Similar to KÖLD CRYOTHERAPY PDF portfolio

CEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectCEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectAllen Green
 
Slides Transcription.docx
Slides Transcription.docxSlides Transcription.docx
Slides Transcription.docxbrian157854
 
Office fit out from Dribuild
Office fit out from DribuildOffice fit out from Dribuild
Office fit out from DribuildMichael McVey
 
Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Jamal Nelson, CCM
 
Claudio Modola Design - Architectural Design Process Examples
Claudio Modola Design - Architectural Design Process Examples Claudio Modola Design - Architectural Design Process Examples
Claudio Modola Design - Architectural Design Process Examples Claudio Modola Design
 
Previous Projects
Previous ProjectsPrevious Projects
Previous Projectsmark chaar
 
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-BudgetClear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-BudgetBenjamin Leavy
 
Brief presentation for supervisors.
Brief presentation for supervisors.Brief presentation for supervisors.
Brief presentation for supervisors.Peter McNamara
 
Johnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project ManagementJohnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project Managementgrahamelanders
 
COMPANY PROFILE JJHC 2014
COMPANY PROFILE JJHC 2014COMPANY PROFILE JJHC 2014
COMPANY PROFILE JJHC 2014Louise Herbst
 
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016Willow Oak Operating Partners Cover page and Case Studies 18 May 2016
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016Roger Breedlove
 
Consultancy case studies
Consultancy case studiesConsultancy case studies
Consultancy case studiesgrahamelanders
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)Lwj Welson
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)Lwj Welson
 
Bemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings ProgramBemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings ProgramUniversity of Minnesota
 
HVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 PresentationHVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 Presentationpennsouthoffice
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1Dan Caouette
 

Similar to KÖLD CRYOTHERAPY PDF portfolio (20)

CEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectCEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final Project
 
Slides Transcription.docx
Slides Transcription.docxSlides Transcription.docx
Slides Transcription.docx
 
Office fit out from Dribuild
Office fit out from DribuildOffice fit out from Dribuild
Office fit out from Dribuild
 
Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011
 
Claudio Modola Design - Architectural Design Process Examples
Claudio Modola Design - Architectural Design Process Examples Claudio Modola Design - Architectural Design Process Examples
Claudio Modola Design - Architectural Design Process Examples
 
Operations class project
Operations class projectOperations class project
Operations class project
 
Previous Projects
Previous ProjectsPrevious Projects
Previous Projects
 
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-BudgetClear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
 
Brief presentation for supervisors.
Brief presentation for supervisors.Brief presentation for supervisors.
Brief presentation for supervisors.
 
Johnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project ManagementJohnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project Management
 
COMPANY PROFILE JJHC 2014
COMPANY PROFILE JJHC 2014COMPANY PROFILE JJHC 2014
COMPANY PROFILE JJHC 2014
 
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016Willow Oak Operating Partners Cover page and Case Studies 18 May 2016
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016
 
Consultancy case studies
Consultancy case studiesConsultancy case studies
Consultancy case studies
 
iom case.pptx
iom case.pptxiom case.pptx
iom case.pptx
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Bemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings ProgramBemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings Program
 
HVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 PresentationHVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 Presentation
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1
 
federal reserve.
federal reserve.federal reserve.
federal reserve.
 

KÖLD CRYOTHERAPY PDF portfolio

  • 1. Project by Anthony Felt The KÖLD project started as a business idea combining two services, floatation and cryotherapy as a hybrid physical recovery business. Initial Phase: Project’s purpose, scope and justification. - Accepted the contract offer to build a business as a test franchise. - Conducted a series of meetings with stakeholders to better understand the overall goal and write up the characteristics of this business. - A simple Business strategy was written for the initial year of business. - Created a brand name, KÖLD with a color scheme and style. - Created revenue projections and estimated total cost of the project. Planning Phase: - 3D rendering made for proposed layout on Google Sketch Up (show frame) - Spent 6 weeks seeking an ideal location. - Closed a 5 year lease in a bustling part of central Houston. - Requested bids for planner and interior buildout. Executing Phase: - Full demolition and complete interior rebuild was required. - Demolition began Aug 15th 2015 - Interior buildout began late August. - New 200 AMP electrical panel was installed to accommodate high electrical use. - Multiple wall frames and doorways were built. Some walls required extensive drywall, including hush board to reduce noise interference. - Adjustments to existing A/C were made. - Major plumbing work, including new water lines were installed into the foundation. - Custom showers we’re built into the space. - Equipment installation began in October. - Float pods were installed over a week long period. - The Cryotherapy unit was delivered and installed within a day. - Washer/dryer, mop sink, and a new toilet we’re installed in Late October. - Changing booths were custom made using a metal pipe frame and curtains. - Interior buildout finalized in early December 2015. Monitoring and Controlling Phase: - All permits with the city, including the Certificate of Occupancy finalized on Jan 2nd , 2016. - Training employees to new services and updates within the business. - Adjusting prices and offers based off indications from revenue and client choices. - Created several different marketing campaigns to gain exposure and determine which produces the greatest return on investment through careful tracking.
  • 2. Closing Phase: - Creating a more efficient processes to all of KÖLD’s operations. - Fix any minor issues and obstacles. - Maintain a great reputation to our clientele. Obstacles and Challenges: - Closing a space without a personal guarantee. - Dispute over A/C system with neighboring tenant. - Houston Permitting center delay - Equipment lacked UL certification. Needed 3rd party inspection. - Electrical panel limitations. - Creating a quiet, insulated environment for the Floatation pods. Considerable planning went into the layout to complement the limited space we had available. Minor adjustments had to be made. I was able to accomplish this without running behind schedule. The lease required a complete interior demolition and build out.
  • 3. The buildout cost $50,000. New electrical panel and layout. Demolition and initial buildout Logo and color scheme coming along The entire buildout was completed on schedule Equipment installs
  • 4. Float rooms are double insulated Cryotherapy room with adjustable changing booths The final product The business has fantastic exposure along a busy street First 6 months of Revenue KÖLD CRYOTHERAPY AND FLOATATION Jan Feb Mar Apr May Jun Cryo Session Revenue 4,492.18$ 4,997.18$ 9,518.12$ 12,010.00$ 15,091.53$ 15,430.09$ Floatation Session Revenue 330.00$ 653.10$ 1,939.40$ 1,199.48$ 2,343.59$ 3,652.27$ Aggregate Revenue 4,822.18$ 5,650.28$ 11,457.52$ 13,209.48$ 17,435.12$ 19,082.36$