SlideShare a Scribd company logo
1 of 1
Inspection Checklist
70. Verify & Monitor Contractor Medevac Procedure (7.1.12)
Description Safe At Risk Remarks
1 Medevac Procedure
01 Medevac Procedure
1. Contractor shall ensure that Medical emergency and disaster response (Medevac) procedures are
incorporated into their emergency response procedures (ERP) as a part of their CSSP Ref: CSAR 9.6 A
2. Contractor’s Medevac procedure are in align with GI 1321.015. Ref: MMSR Section 9 / GI 1321.015
02 Call out list
03 Emergency Response Training
04 Medical Facilities and Disaster response plan
1. Contractor medical emergency and disaster call-out list shall be posted in the work site medical facility
(clinic). Each facility shall have at least one emergency response bag as specified in the MMSR manual. Ref:
CSAR 9.3 E
1. Contractor HCP shall provide all medical services required to operate the work site medical facility to include
emergency/disaster response planning and training. Ref: CSAR 9.3 f
1. Contractor’s Ambulance Movement Log to include False Alarms, Ambulance runs, and MEDEVACs. Ref: MMSR
Figure 6-4
2. Contractor medical facilities have a 24-hour emergency and key personnel telephone numbers available and
that it is properly displayed in the clinic to facilitate proper
/ timely response in the event of medical emergencies, disasters, transfers and Medivacs.
At a minimum the list includes the following telephone numbers:
1. Company Security Operations.
2. Saudi Aramco Security Operation.
3. Police.
4. Red Crescent.
5. Nearest healthcare facilities including MOH hospitals.
6. Company designated hospitals.
7. On-call company representative or alternate (construction Manager / Admin
Manager/Health or Safety Advisor).
8. First Aid Trained employees, list updated and displayed.
9. Evacuation group leader, where applicable. Ref: MMSR Figure 6-4
3. For Category/Level C (Nurse operated Facility), The contractor shall have an established medical support and
logistic network, e.g., a referral system for the duty nurse to immediately consult a physician for advice and
treatment as well as the capability to arrange an immediate transfer or MEDIVAC. Ref: MMSR Category /
Level of Medi
Page 1 of 1
Area :
Name :
Date :
Signature :

More Related Content

Similar to 70. Verify & Monitor Contractor Medevac Procedure (7.1.12).pptx

WFHSS Guideline on Reprocessing Medical Devices in / for Healthcare Establis...
WFHSS Guideline on Reprocessing Medical  Devices in / for Healthcare Establis...WFHSS Guideline on Reprocessing Medical  Devices in / for Healthcare Establis...
WFHSS Guideline on Reprocessing Medical Devices in / for Healthcare Establis...Carmen Villar Bustos
 
Draft Emergency Management Final Rule Standards Revision
Draft Emergency Management Final Rule Standards Revision  Draft Emergency Management Final Rule Standards Revision
Draft Emergency Management Final Rule Standards Revision Lindsey P. Anthony
 
Sample Incident Response Plan
Sample Incident Response PlanSample Incident Response Plan
Sample Incident Response PlanMatthew J McMahon
 
October AST Training
October AST TrainingOctober AST Training
October AST TrainingJared Rodgers
 
HEALTH & SAFETY IN HOSPITAL CREATING A SAFE WORK PLACE..pptx
HEALTH & SAFETY IN HOSPITAL CREATING A SAFE WORK PLACE..pptxHEALTH & SAFETY IN HOSPITAL CREATING A SAFE WORK PLACE..pptx
HEALTH & SAFETY IN HOSPITAL CREATING A SAFE WORK PLACE..pptxHamzi Hadi
 
Auto Injury Claim Tips for Urgent Care
Auto Injury Claim Tips for Urgent CareAuto Injury Claim Tips for Urgent Care
Auto Injury Claim Tips for Urgent CareSolemanOne
 
Bloodborne Pathogen MEEI- MB
Bloodborne Pathogen MEEI- MBBloodborne Pathogen MEEI- MB
Bloodborne Pathogen MEEI- MBMichael Boyer
 
The health care manager
The health care managerThe health care manager
The health care managerBrijesh Shukla
 
The health care manager
The health care managerThe health care manager
The health care managerBrijesh Shukla
 
Hosp. transport services
Hosp. transport servicesHosp. transport services
Hosp. transport servicesNc Das
 
ISOL 533 - Information Security and Risk Management DIS.docx
ISOL 533 - Information Security and Risk Management        DIS.docxISOL 533 - Information Security and Risk Management        DIS.docx
ISOL 533 - Information Security and Risk Management DIS.docxvrickens
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction TrainingThe Pathway Group
 
Cd and-power-disaster-recovery-plan
Cd and-power-disaster-recovery-planCd and-power-disaster-recovery-plan
Cd and-power-disaster-recovery-plangotpowerinc
 
Ambulance billing policies and procedures
Ambulance billing policies and proceduresAmbulance billing policies and procedures
Ambulance billing policies and proceduresalicecarlos1
 
Ambulance billing policies and procedures
Ambulance billing policies and proceduresAmbulance billing policies and procedures
Ambulance billing policies and proceduresalicecarlos1
 
Ambulance billing policies and procedures
Ambulance billing policies and proceduresAmbulance billing policies and procedures
Ambulance billing policies and proceduresalicecarlos1
 

Similar to 70. Verify & Monitor Contractor Medevac Procedure (7.1.12).pptx (20)

WFHSS Guideline on Reprocessing Medical Devices in / for Healthcare Establis...
WFHSS Guideline on Reprocessing Medical  Devices in / for Healthcare Establis...WFHSS Guideline on Reprocessing Medical  Devices in / for Healthcare Establis...
WFHSS Guideline on Reprocessing Medical Devices in / for Healthcare Establis...
 
SOP ONE BKC
SOP ONE BKCSOP ONE BKC
SOP ONE BKC
 
Draft Emergency Management Final Rule Standards Revision
Draft Emergency Management Final Rule Standards Revision  Draft Emergency Management Final Rule Standards Revision
Draft Emergency Management Final Rule Standards Revision
 
Sample Incident Response Plan
Sample Incident Response PlanSample Incident Response Plan
Sample Incident Response Plan
 
Healthcare Blog Malcolm - AtHoc 1
Healthcare Blog  Malcolm - AtHoc 1Healthcare Blog  Malcolm - AtHoc 1
Healthcare Blog Malcolm - AtHoc 1
 
OIG UR Handout 4 mds mentor-march2011
OIG UR Handout 4   mds mentor-march2011OIG UR Handout 4   mds mentor-march2011
OIG UR Handout 4 mds mentor-march2011
 
October AST Training
October AST TrainingOctober AST Training
October AST Training
 
HEALTH & SAFETY IN HOSPITAL CREATING A SAFE WORK PLACE..pptx
HEALTH & SAFETY IN HOSPITAL CREATING A SAFE WORK PLACE..pptxHEALTH & SAFETY IN HOSPITAL CREATING A SAFE WORK PLACE..pptx
HEALTH & SAFETY IN HOSPITAL CREATING A SAFE WORK PLACE..pptx
 
Ppt med equipment plan
Ppt med equipment planPpt med equipment plan
Ppt med equipment plan
 
Auto Injury Claim Tips for Urgent Care
Auto Injury Claim Tips for Urgent CareAuto Injury Claim Tips for Urgent Care
Auto Injury Claim Tips for Urgent Care
 
Bloodborne Pathogen MEEI- MB
Bloodborne Pathogen MEEI- MBBloodborne Pathogen MEEI- MB
Bloodborne Pathogen MEEI- MB
 
The health care manager
The health care managerThe health care manager
The health care manager
 
The health care manager
The health care managerThe health care manager
The health care manager
 
Hosp. transport services
Hosp. transport servicesHosp. transport services
Hosp. transport services
 
ISOL 533 - Information Security and Risk Management DIS.docx
ISOL 533 - Information Security and Risk Management        DIS.docxISOL 533 - Information Security and Risk Management        DIS.docx
ISOL 533 - Information Security and Risk Management DIS.docx
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction Training
 
Cd and-power-disaster-recovery-plan
Cd and-power-disaster-recovery-planCd and-power-disaster-recovery-plan
Cd and-power-disaster-recovery-plan
 
Ambulance billing policies and procedures
Ambulance billing policies and proceduresAmbulance billing policies and procedures
Ambulance billing policies and procedures
 
Ambulance billing policies and procedures
Ambulance billing policies and proceduresAmbulance billing policies and procedures
Ambulance billing policies and procedures
 
Ambulance billing policies and procedures
Ambulance billing policies and proceduresAmbulance billing policies and procedures
Ambulance billing policies and procedures
 

Recently uploaded

SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxCHAIRMAN M
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样A
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Studentskannan348865
 
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书c3384a92eb32
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/FootingEr. Suman Jyoti
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashidFaiyazSheikh
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfSkNahidulIslamShrabo
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsMathias Magdowski
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfKira Dess
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelDrAjayKumarYadav4
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdfAlexander Litvinenko
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...AshwaniAnuragi1
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfEr.Sonali Nasikkar
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...IJECEIAES
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Stationsiddharthteach18
 
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...mikehavy0
 
DBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxDBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxrajjais1221
 

Recently uploaded (20)

SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/Footing
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
 
DBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxDBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptx
 

70. Verify & Monitor Contractor Medevac Procedure (7.1.12).pptx

  • 1. Inspection Checklist 70. Verify & Monitor Contractor Medevac Procedure (7.1.12) Description Safe At Risk Remarks 1 Medevac Procedure 01 Medevac Procedure 1. Contractor shall ensure that Medical emergency and disaster response (Medevac) procedures are incorporated into their emergency response procedures (ERP) as a part of their CSSP Ref: CSAR 9.6 A 2. Contractor’s Medevac procedure are in align with GI 1321.015. Ref: MMSR Section 9 / GI 1321.015 02 Call out list 03 Emergency Response Training 04 Medical Facilities and Disaster response plan 1. Contractor medical emergency and disaster call-out list shall be posted in the work site medical facility (clinic). Each facility shall have at least one emergency response bag as specified in the MMSR manual. Ref: CSAR 9.3 E 1. Contractor HCP shall provide all medical services required to operate the work site medical facility to include emergency/disaster response planning and training. Ref: CSAR 9.3 f 1. Contractor’s Ambulance Movement Log to include False Alarms, Ambulance runs, and MEDEVACs. Ref: MMSR Figure 6-4 2. Contractor medical facilities have a 24-hour emergency and key personnel telephone numbers available and that it is properly displayed in the clinic to facilitate proper / timely response in the event of medical emergencies, disasters, transfers and Medivacs. At a minimum the list includes the following telephone numbers: 1. Company Security Operations. 2. Saudi Aramco Security Operation. 3. Police. 4. Red Crescent. 5. Nearest healthcare facilities including MOH hospitals. 6. Company designated hospitals. 7. On-call company representative or alternate (construction Manager / Admin Manager/Health or Safety Advisor). 8. First Aid Trained employees, list updated and displayed. 9. Evacuation group leader, where applicable. Ref: MMSR Figure 6-4 3. For Category/Level C (Nurse operated Facility), The contractor shall have an established medical support and logistic network, e.g., a referral system for the duty nurse to immediately consult a physician for advice and treatment as well as the capability to arrange an immediate transfer or MEDIVAC. Ref: MMSR Category / Level of Medi Page 1 of 1 Area : Name : Date : Signature :