ISOL 533 - Information Security and Risk Management
DISASTER RECOVERY PLAN
University of the Cumberlands
Information Technology Statement of Intent
This document delineates Health Network, Inc. (Health
Network) policies and procedures for
technology disaster recovery, as well as our process-level plans
for recovering critical technology
platforms and the telecommunications infrastructure. This
document summarizes our
recommended procedures. In the event of an actual emergency
situation, modifications to this
document may be made to ensure physical safety of our people,
our systems, and our data.
Our mission is to ensure information system uptime, data
integrity and availability, and
business continuity.
Policy Statement
Corporate management has approved the following policy
statement:
recovery plan.
nt shall be undertaken to determine the
requirements for the disaster
recovery plan.
critical infrastructure elements,
systems and networks, in accordance with key business
activities.
disaster recovery plan should be periodically tested in a
simulated environment to ensure
that it can be implemented in emergency situations and that the
management and staff
understand how it is to be executed.
isaster recovery plan
and their own respective roles.
account changing
circumstances.
Objectives
The principal objective of the disaster recovery program is to
develop, test and document a well-
structured and easily understood plan which will help the
company recover as quickly and
effectively as possible from an unforeseen disaster or
emergency which interrupts information
systems and business operations. Additional objectives include
the following:
• The need to ensure that all employees fully understand their
duties in implementing such a
plan
• The need to ensure that operational policies are adhered to
within all planned activities
• The need to ensure that proposed contingency arrangements
are cost-effective
• The need to consider implications on other company sites
• Disaster recovery capabilities as applicable to key customers,
vendors and others
2
Key Personnel Contact Info
Name, Title Contact Option Contact Number
Work
Alternate
Mobile
Home
Email Address
Alternate Email
Work
Alternate
Mobile
Home
Email Address
Alternate Email
Work
Alternate
Mobile
Home
Email Address
Alternate Email
Work
Alternate
Mobile
Home
Email Address
Alternate Email
Work
Alternate
Mobile
Home
Email Address
Alternate Email
Work
Alternate
Mobile
Home
Email Address
Alternate Email
3
Notification Calling Tree
Person
Identifying
Incident
4
External Contacts
Name, Title Contact Option Contact Number
Landlord / Property Manager
Account Number None
Work
Mobile
Home
Email Address
Power Company
Account Number Work
Mobile
Home
Email Address
Telecom Carrier 1
Account Number Work
Mobile
Fax
Home
Email Address
Telecom Carrier 2
Account Number Work
Mobile
Home
Email Address
Hardware Supplier 1
Account Number Work
Mobile
Emergency Reporting
Email Address
Server Supplier 1
Account Number. Work
Mobile
Fax
Email Address
Workstation Supplier 1
Account Number Work
Mobile
Home
Email Address
Office Supplies 1
Account Number C3095783 Work
Mobile
Home
Email Address
Insurance – Name
5
Name, Title Contact Option Contact Number
Account Number Work
Mobile
Home
Email Address
Site Security –
Account Number Work
Mobile
Home
Email Address
Off-Site Storage 1
Account Number Work
Mobile
Home
Email Address
Off-Site Storage 2
Account Number User ID
Password
Home
Email Address
HVAC –
Account Number Work
Mobile
Home
Email Address
Power Generator –
Account Number Work
Mobile
Home
Email Address
Other –
Account Number Work
Mobile
Home
Email Address
6
External Contacts Calling Tree
7
1 Plan Overview
1.1 Plan Updating
It is necessary for the DRP updating process to be properly
structured and controlled. Whenever
changes are made to the plan they are to be fully tested and
appropriate amendments should be
made to the training materials. This will involve the use of
formalized change control procedures
under the control of the IT Director.
1.2 Plan Documentation Storage
Copies of this Plan, CD, and hard copies will be stored in
secure locations to be defined by the
company. Each member of senior management will be issued a
CD and hard copy of this plan to
be filed at home. Each member of the Disaster Recovery Team
and the Business Recovery
Team will be issued a CD and hard copy of this plan. A master
protected copy will be stored on
specific resources established for this purpose.
1.3 Backup Strategy
Key business processes and the agreed backup strategy for each
are listed below. The strategy
chosen is for a fully mirrored recovery site at the company’s
alternate sites. This strategy entails
the maintenance of a fully mirrored duplicate site which will
enable instantaneous switching
between the live site (headquarters) and the backup site.
KEY BUSINESS PROCESS BACKUP STRATEGY
IT Operations Fully mirrored recovery site
Tech Support - Hardware Fully mirrored recovery site
Tech Support – Software Fully mirrored recovery site
Facilities Management Fully mirrored recovery site
Email Fully mirrored recovery site
Purchasing Fully mirrored recovery site
Disaster Recovery Fully mirrored recovery site
Finance Fully mirrored recovery site
Contracts Admin Fully mirrored recovery site
Warehouse & Inventory Fully mirrored recovery site
Product Sales Fully mirrored recovery site
Maintenance Sales Fully mirrored recovery site
Human Resources Off-site data storage facility
Testing Fully Mirrored Recovery site - Fully mirrored recovery
site
Workshop Fully Mirrored Recovery site - Fully mirrored
recovery site
Call Center Fully mirrored recovery site
Web Site Fully mirrored recovery site
1.4 Risk Management
There are many potential disruptive threats which can occur at
any time and affect the normal
business process. We have considered a wide range of potential
threats and the results of our
deliberations are included in this section. Each potential
environmental disaster or emergency
situation has been examined. The focus here is on the level of
business disruption which could
arise from each type of disaster.
8
Potential disasters have been assessed as follows:
Potential Disaster Probability Rating Impact Rating
Brief Description Of Potential
Consequences & Remedial
Actions
<Flood> <3> <4> <All critical equipment is
located on 1st Floor>
Probability: 1=Very High, 5=Very Low Impact: 1=Total
destruction, 5=Minor annoyance
2 Emergency Response
2.1 Alert, escalation and plan invocation
2.1.1 Plan Triggering Events
Key trigger issues at headquarters that would lead to activation
of the DRP are:
• Total loss of all communications
• Total loss of power
• Flooding of the premises
• Loss of the building
2.1.2 Assembly Points
Where the premises need to be evacuated, the DRP invocation
plan identifies two evacuation
assembly points:
• Primary – Far end of main parking lot;
• Alternate – Parking lot of company across the street
2.1.3 Activation of Emergency Response Team
When an incident occurs the Emergency Response Team (ERT)
must be activated. The ERT will
then decide the extent to which the DRP must be invoked. All
employees must be issued a
Quick Reference card containing ERT contact details to be used
in the event of a disaster.
Responsibilities of the ERT are to:
• Respond immediately to a potential disaster and call
emergency services;
• Assess the extent of the disaster and its impact on the
business, data center, etc.;
• Decide which elements of the DR Plan should be activated;
• Establish and manage disaster recovery team to maintain vital
services and return to normal
operation;
• Ensure employees are notified and allocate responsibilities
and activities as required.
2.2 Disaster Recovery Team
The team will be contacted and assembled by the ERT. The
team's responsibilities include:
• Establish facilities for an emergency level of service within
2.0 business hours;
• Restore key services within 4.0 business hours of the incident;
• Recover to business as usual within 8.0 to 24.0 hours after the
incident;
9
• Coordinate activities with disaster recovery team, first
responders, etc.
• Report to the emergency response team.
2.3 Emergency Alert, Escalation and DRP Activation
This policy and procedure has been established to ensure that in
the event of a disaster or crisis,
personnel will have a clear understanding of who should be
contacted. Procedures have been
addressed to ensure that communications can be quickly
established while activating disaster
recovery.
The DR plan will rely principally on key members of
management and staff who will provide the
technical and management skills necessary to achieve a smooth
technology and business
recovery. Suppliers of critical goods and services will continue
to support recovery of business
operations as the company returns to normal operating mode.
2.3.1 Emergency Alert
The person discovering the incident calls a member of the
Emergency Response Team in the
order listed:
Emergency Response Team
• <_________>
• <_________>
• <_________>
If not available try:
• <_________>
• <_________>
The Emergency Response Team (ERT) is responsible for
activating the DRP for disasters
identified in this plan, as well as in the event of any other
occurrence that affects the company’s
capability to perform normally.
One of the tasks during the early stages of the emergency is to
notify the Disaster Recovery
Team (DRT) that an emergency has occurred. The notification
will request DRT members to
assemble at the site of the problem and will involve sufficient
information to have this request
effectively communicated. The Business Recovery Team (BRT)
will consist of senior
representatives from the main business departments. The BRT
Leader will be a senior member of
the company's management team, and will be responsible for
taking overall charge of the
process and ensuring that the company returns to normal
working operations as early as
possible.
2.3.2 DR Procedures for Management
Members of the management team will keep a hard copy of the
names and contact numbers of
each employee in their departments. In addition, management
team members will have a hard
copy of the company’s disaster recovery and business continuity
plans on file in their homes in
the event that the headquarters building is inaccessible,
unusable, or destroyed.
2.3.3 Contact with Employees
Managers will serve as the focal points for their departments,
while designated employees will
call other employees to discuss the crisis/disaster and the
company’s immediate plans.
Employees who cannot reach staff on their call list are advised
to call the staff member’s
emergency contact to relay information on the disaster.
10
2.3.4 Backup Staff
If a manager or staff member designated to contact other staff
members is unavailable or
incapacitated, the designated backup staff member will perform
notification duties.
2.3.5 Recorded Messages / Updates
For the latest information on the disaster and the organization’s
response, staff members can call
a toll-free hotline listed in the DRP wallet card. Included in
messages will be data on the nature
of the disaster, assembly sites, and updates on work resumption.
2.3.7 Alternate Recovery Facilities / Hot Site
If necessary, the hot site at SunGard will be activated and
notification will be given via recorded
messages or through communications with managers. Hot site
staffing will consist of members of
the disaster recovery team only for the first 24 hours, with other
staff members joining at the hot
site as necessary.
2.3.8 Personnel and Family Notification
If the incident has resulted in a situation which would cause
concern to an employee’s immediate
family such as hospitalization of injured persons, it will be
necessary to notify their immediate
family members quickly.
3 Media
3.1 Media Contact
Assigned staff will coordinate with the media, working
according to guidelines that have been
previously approved and issued for dealing with post-disaster
communications.
3.2 Media Strategies
1. Avoiding adverse publicity
2. Take advantage of opportunities for useful publicity
3. Have answers to the following basic questions:
3.3 Media Team
• <____________________________________________>
• <____________________________________________>
• <____________________________________________>
3.4 Rules for Dealing with Media
Only the media team is permitted direct contact with the media;
anyone else contacted should
refer callers or in-person media representatives to the media
team.
4 Insurance
As part of the company’s disaster recovery and business
continuity strategies a number of
insurance policies have been put in place. These include errors
and omissions, directors &
officers liability, general liability, and business interruption
insurance.
11
If insurance-related assistance is required following an
emergency out of normal business hours,
please contact:
<___________________________________________>
Policy Name
Coverage
Type
Coverage
Period
Amount Of
Coverage
Person
Responsible
For Coverage
Next Renewal
Date
5 Financial and Legal Issues
5.1 Financial Assessment
The emergency response team shall prepare an initial
assessment of the impact of the incident
on the financial affairs of the company. The assessment should
include:
5.2 Financial Requirements
The immediate financial needs of the company must be
addressed. These can include:
ow position
etc.
services required post-disaster
5.3 Legal Actions
The company legal department and ERT will jointly review the
aftermath of the incident and
decide whether there may be legal actions resulting from the
event; in particular, the possibility of
claims by or against the company for regulatory violations, etc.
6 DRP Exercising
Disaster recovery plan exercises are an essential part of the plan
development process. In a
DRP exercise no one passes or fails; everyone who participates
learns from exercises – what
needs to be improved, and how the improvements can be
implemented. Plan exercising ensures
that emergency teams are familiar with their assignments and,
more importantly, are confident in
their capabilities.
Successful DR plans launch into action smoothly and effectively
when they are needed. This will
only happen if everyone with a role to play in the plan has
rehearsed the role one or more times.
The plan should also be validated by simulating the
circumstances within which it has to work and
seeing what happens.
12
Appendix A – Technology Disaster Recovery Plan Templates
Disaster Recovery Plan for <System One>
SYSTEM
OVERVIEW
PRODUCTION SERVER Location: Enter location
Server Model: Operating System: CPUs: Memory: Total
Disk:
System Handle: System Serial #: DNS Entry: IP Address:
Other:
HOT SITE SERVER
APPLICATIONS
(Use bold for Hot Site)
ASSOCIATED SERVERS
KEY CONTACTS
Hardware Vendor
System Owners
Database Owner
Application Owners
Software Vendors
Offsite Storage
BACKUP STRATEGY FOR
SYSTEM ONE
Daily / Monthly / Quarterly Choose which strategy on the left
you would use and provide
details on why.
SYSTEM ONE
DISASTER RECOVERY
PROCEDURE
Scenario 1
Total Loss of Data
Provide details
Scenario 2
Total Loss of HW
Provide details
13
Database/File Systems
File System as of <enter
current date>
Minimal file systems to be
backed-up and restored:
Filesystem kbytes Used Avail %used
Mounted on
<Provide details on each Database/File System>
Other critical files to
modify
Necessary directories to
create
Critical files to restore
Secondary files to restore
Other files to restore
14
Disaster Recovery Plan for Local Area Network (LAN)
<Since the scenario does not contain information needed below,
leave this area
blank.>
SYSTEM
OVERVIEW
SERVER Location:
Server Model: Operating System: CPUs:
Memory: Total Disk: System Handle: System Serial #:
DNS Entry: IP Address:
Other:
HOT SITE SERVER Provide details
APPLICATIONS
(Use bold for Hot Site)
ASSOCIATED SERVERS
KEY CONTACTS
Hardware Vendor Provide details
System Owners Provide details
Database Owner Provide details
Application Owners Provide details
Software Vendors Provide details
Offsite Storage Provide details
BACKUP STRATEGY for
SYSTEM TWO
Daily Provide details
Monthly Provide details
Quarterly Provide details
SYSTEM TWO
DISASTER RECOVERY
PROCEDURE
Scenario 1
Total Loss of Data
Provide details
Scenario 2
Total Loss of HW
Provide details
15
ADDENDUM
CONTACTS
File Systems <date>
File System as of
<date>
Minimal file systems
to be created and
restored from
backup:
<List>
Filesystem kbytes Used Avail %used
Mounted on
<Provide details>
Other critical files to
modify
<Provide details>
Necessary directories
to create
<Provide details>
Critical files to restore <Provide details>
Secondary files to
restore
<Provide details>
Other files to restore <Provide details>
16
Disaster Recovery Plan for Wide Area Network (WAN)
<Since the scenario does not contain information needed below,
leave this area
blank.>
SYSTEM
OVERVIEW
EQUIPMENT Location:
Device Type: Model No.: Technical Specifications:
Network Interfaces: Power Requirements;
System Serial #: DNS Entry: IP Address:
Other:
HOT SITE EQUIPMENT Provide details
SPECIAL APPLICATIONS
ASSOCIATED DEVICES
KEY CONTACTS
Hardware Vendor Provide details
System Owners Provide details
Database Owner Provide details
Application Owners Provide details
Software Vendors Provide details
Offsite Storage Provide details
Network Services Provide details
BACKUP STRATEGY for
SYSTEM TWO
Daily Provide details
Monthly Provide details
Quarterly Provide details
SYSTEM TWO
DISASTER RECOVERY
PROCEDURE
Scenario 1
Total Loss of Network
Provide details
Scenario 2
Total Loss of HW
Provide details
17
ADDENDUM
CONTACTS
Support Systems <date>
Support system
<Provide details>
Critical network
assets
<Provide details>
Critical interfaces <Provide details>
Critical files to restore <Provide details>
Critical network
services to restore
<Provide details>
Other services <Provide details>
18
Disaster Recovery Plan for Remote Connectivity
<Since the scenario does not contain information needed below,
leave this area
blank.>
SYSTEM
OVERVIEW
EQUIPMENT Location:
Device Type: Model No.:
Technical Specifications: Network Interfaces:
Power Requirements; System Serial #:
DNS Entry: IP Address:
Other:
HOT SITE EQUIPMENT Provide details
SPECIAL APPLICATIONS
ASSOCIATED DEVICES
KEY CONTACTS
Hardware Vendor Provide details
System Owners Provide details
Database Owner Provide details
Application Owners Provide details
Software Vendors Provide details
Offsite Storage Provide details
Network Services Provide details
BACKUP STRATEGY for
SYSTEM TWO
Daily Provide details
Monthly Provide details
Quarterly Provide details
SYSTEM TWO
DISASTER RECOVERY
PROCEDURE
Scenario 1
Total Loss of Network
Provide details
Scenario 2
Total Loss of HW
Provide details
19
ADDENDUM
CONTACTS
Support Systems <date>
Support system
<Provide details>
Critical network
assets
<Provide details>
Critical interfaces <Provide details>
Critical files to restore <Provide details>
Critical network
services to restore
<Provide details>
Other services <Provide details>
20
Disaster Recovery Plan for Voice Communications
<Since the scenario does not contain information needed below,
leave this area
blank.>
SYSTEM
OVERVIEW
EQUIPMENT Location:
Device Type: Model No.:
Technical Specifications: Network Interfaces:
Power Requirements; System Serial #:
DNS Entry: IP Address:
Other:
HOT SITE EQUIPMENT Provide details
SPECIAL APPLICATIONS
ASSOCIATED DEVICES
KEY CONTACTS
Hardware Vendor Provide details
System Owners Provide details
Database Owner Provide details
Application Owners Provide details
Software Vendors Provide details
Offsite Storage Provide details
Network Services Provide details
BACKUP STRATEGY for
SYSTEM TWO
Daily Provide details
Monthly Provide details
Quarterly Provide details
SYSTEM TWO
DISASTER RECOVERY
PROCEDURE
Scenario 1
Total Loss of Switch
Provide details
Scenario 2
Total Loss of Network
Provide details
21
ADDENDUM
CONTACTS
Support Systems <date>
Support system
<Provide details>
Critical network
assets
<Provide details>
Critical interfaces <Provide details>
Critical files to restore <Provide details>
Critical network
services to restore
<Provide details>
Other services <Provide details>
22
Appendix B – Suggested Forms
<Leave this area blank.>
Damage Assessment Form
Key Business
Process Affected
Description Of Problem Extent Of Damage
_____________
Management of DR Activities Form
• During the disaster recovery process all activities will be
determined using a standard
structure;
• Where practical, this plan will need to be updated on a regular
basis throughout the disaster
recovery period;
• All actions that occur during this phase will need to be
recorded.
Activity Name:
Reference Number:
Brief Description:
Commencement
Date/Time
Completion
Date/Time
Resources Involved In Charge
__________________
23
Disaster Recovery Event Recording Form
• All key events that occur during the disaster recovery phase
must be recorded.
• An event log shall be maintained by the disaster recovery team
leader.
• This event log should be started at the commencement of the
emergency and a copy of the
log passed on to the business recovery team once the initial
dangers have been controlled.
• The following event log should be completed by the disaster
recovery team leader to record
all key events during disaster recovery, until such time as
responsibility is handed over to the
business recovery team.
Description of Disaster:
Commencement Date:
Date/Time DR Team Mobilized:
Activities Undertaken by DR
Team
Date and
Time
Outcome
Follow-On Action
Required
Disaster Recovery Team's Work Completed: <Date>
Event Log Passed to Business Recovery Team: <Date>
_________________
24
Disaster Recovery Activity Report Form
• On completion of the initial disaster recovery response the
DRT leader should prepare a
report on the activities undertaken.
• The report should contain information on the emergency, who
was notified and when, action
taken by members of the DRT together with outcomes arising
from those actions.
• The report will also contain an assessment of the impact to
normal business operations.
• The report should be given to business recovery team leader,
with a copy to senior
management, as appropriate.
• A disaster recovery report will be prepared by the DRT leader
on completion of the initial
disaster recovery response.
• In addition to the business recovery team leader, the report
will be distributed to senior
management
The report will include:
• A description of the emergency or incident
• Those people notified of the emergency (including dates)
• Action taken by members of the DRT
• Outcomes arising from actions taken
• An assessment of the impact to normal business operations
• Assessment of the effectiveness of the BCP and lessons
learned
• Lessons learned
__________
Mobilizing the Disaster Recovery Team Form
• Following an emergency requiring recovery of technology
infrastructure assets, the disaster
recovery team should be notified of the situation and placed on
standby.
• The format shown below can be used for recording the
activation of the DR team once the
work of the damage assessment and emergency response teams
has been completed.
Description of Emergency:
Date Occurred:
Date Work of Disaster Recovery Team Completed:
Name of
Team Member
Contact
Details
Contacted On
(Time / Date)
By Whom Response
Start Date
Required
Relevant Comments (e.g., Specific Instructions Issued)
___________
25
Mobilizing the Business Recovery Team Form
tion of the disaster
recovery team, the business
recovery team should be notified of the situation and placed on
standby.
activation of the business recovery
team once the work of the disaster recovery team has been
completed.
Description of Emergency:
Date Occurred:
Date Work of Business Recovery Team Completed:
Name of
Team Member
Contact
Details
Contacted On
(Time / Date)
By Whom Response
Start Date
Required
Relevant Comments (e.g., Specific Instructions Issued)
____________
Monitoring Business Recovery Task Progress Form
• The progress of technology and business recovery tasks must
be closely monitored during
this period of time.
• Since difficulties experienced by one group could significantly
affect other dependent tasks it
is important to ensure that each task is adequately resourced and
that the efforts required to
restore normal business operations have not been
underestimated.
Note: A priority sequence must be identified although, where
possible, activities will be carried out
simultaneously.
Recovery Tasks
(Order of Priority)
Person(s)
Responsible
Completion Date Milestones
Identified
Other Relevant
Information Estimated Actual
1.
2.
3.
4.
5.
6.
7.
___________
26
Preparing the Business Recovery Report Form
should prepare a report on the
activities undertaken and completed.
event, who was notified and when,
action taken by members of the BRT together with outcomes
arising from those actions.
ain an assessment of the impact to
normal business operations.
appropriate.
The contents of the report shall include:
including dates)
business continuity plan
Communications Form
recovery activities that all
affected persons and organizations are kept properly informed.
ll parties must be accurate and
timely.
working operations should be
announced with care.
with media queries.
Groups of Persons or
Organizations Affected
by Disruption
Persons Selected To Coordinate Communications
to Affected Persons / Organizations
Name Position Contact Details
Customers
Management & Staff
Suppliers
Media
Stakeholders
Others
____________
27
Returning Recovered Business Operations to Business Unit
Leadership
necessary to return the
responsibility for specific operations to the appropriate business
unit leader.
parties understand the change in
overall responsibility, and the transition to business-as-usual.
responsibility may have been assigned to
the business recovery process lead.
involved throughout the recovery,
but in order for the recovery process to be fully effective,
overall responsibility during the
recovery period should probably be with a business recovery
process team.
____________
Business Process/Function Recovery Completion Form
The following transition form should be completed and signed
by the business recovery team
leader and the responsible business unit leader, for each process
recovered.
A separate form should be used for each recovered business
process.
Name Of Business Process
Completion Date of Work Provided by Business Recovery Team
Date of Transition Back to Business Unit Management
(If different than completion date)
I confirm that the work of the business recovery team has been
completed in accordance with
the disaster recovery plan for the above process, and that
normal business operations have
been effectively restored.
Business Recovery Team Leader Name:
________________________________________
Signature:
_____________________________________________________
___________
Date: __________________________
(Any relevant comments by the BRT leader in connection with
the return of this business
process should be made here.)
I confirm that above business process is now acceptable for
normal working conditions.
Name:
_____________________________________________________
______________
Title:
_____________________________________________________
_______________
Signature:
_____________________________________________________
___________
Date: __________________________
Discussion1
In many small business organizations, the management (owners
who don’t have a dedicated CRO) of the organization mostly
make key decisions about business expansion and production.
This management has a very good knowledge about designing
more products and expanding business but have minimal
knowledge about risk mitigation techniques such as
inflammation differences, cash flow issues, competitive threats,
lawsuits and money management. When a CRO appointed in any
organization it helps organization to bring an order in
management and structure in ownership. The CRO of
organization responsibilities are continuously evolving over the
years. CRO functions include identifying risks and plan to
mitigate the risk, form good communication between
organization key decision making team by conducting meetings
and updating risk tolerance level periodically (Kenton, W.,
2017).
On coming to Blue Wood Chocolates Company, the
CRO should interact with both CEO and CFO, because the
company CEO knows everything about business such as past
activities and major key decisions which are made previously.
Since the CFO is new to organization and he/she is going to be
part of future business process CFO should also be in interacted
with CRO. The CFO should lead the process at the company
while implementing ERM.
In the case of Kilgore Custom Milling, the CRO
must be interacted with all the team because in this company
even the Steve MacLinden is the CEO, each department has
their own heads like manufacturing, customer relationship, sales
and treasure. So the CRO should conduct common meetings
with team to mitigate risk.
In above both organizations there is clear visibility
of communication gap among the management, concerns with
cash flow, lack of proper risk mitigation plans indicates the
mandatory presence of CRO. Since both the companies are
small and cannot afford to have a dedicated CRO, it is best
advised they should conduct annual risk review about legal,
financial and other competitive factors to mitigate risks
(Kirkup, D., 2017).
Discussion2
As per the current financial situation of the organizations it is
suggested to appoint a Chief risk officer to develop a risk
management framework and it’s like walking into a hornet's
nest in her new position as CFO of Blue Wood Chocolates. The
business was underperforming, and urgent action was required
to respond to pressure from the banks and provide an action
plan to the board of directors. There would be definitely
disagreement among senior executives and board members about
the strategy and overall objectives the company should pursue,
and nobody had a grasp of all major risk factors. There was no
oversight of the hedging practices and little effective internal
communication among various functions, or even within some
of the functions.
Authorized person needed to have an overall view of the
corporate objectives before developing and implementing
specific operating procedures. He/She needed to get a grasp on
the major risks facing the company so that she could develop
appropriate responses to these risks. An ERM framework
seemed appropriate. However, this would need buy-in from the
top, specifically the CEO, chairman, and the board. She needed
to develop an overarching proposal incorporating objectives,
strategy, and an ERM outline framework for presentation to the
board. She would first need to get the CEO on board, not an
easy task given his disinterest in what he considers bureaucratic
matters that he hires people like CFO to deal with.
Operational procedures, including commodity and currency
hedging, would be important but would need to be developed
within an overall ERM framework. She also needed to
determine how financial performance could be improved.
Profitability seemed lackluster, with a high expense base and no
real control on major purchasing inputs. Revenues had held up
fairly well but could be under competitive threat if margins
continued to fall below the industry average.
Every business owner probably has the most critical business
risks on his or her radar. Input from insurance and legal
advisors will help identify them. But some important risks may
have been simply overlooked or may not be fully appreciated.
Further, the potential size of the risk may not have been
quantified, and steps to mitigate the risk may not have been
developed. It is worth carrying out an annual risk review with
legal, insurance, and accounting advisors, along with the
management team, to clarify the key risks, determine their
likelihood of occurrence, and then start to build a risk
management plan to alleviate them.
The below are the responsibilities of CRO with respect to board
in implementing the risk management framework
• The CRO has representation at the respective board-
level committees and the independent audit committee either as
a standing member or a regular invitee.
• An independent board level risk committee exists which
is attended by the CEO, CFO and CRO.
• An executive risk committee chaired by the CRO and
reporting to the board level risk committee.
• The CRO has regular representation in key
subcommittees enabling the CRO to input into key strategic and
business planning decisions from the outset.
Discussion3
In a situation whereby, Blue Wood Chocolate and Kilgore
Custom Milling are to develop a risk management framework, it
is the responsibility of the Chief Risk Officer to ensure that the
risk management framework is developed in an effective
manner. This will play important roles in ensuring that the risks
experienced by an organization are reduced for the success of
the businesses. The development of the risk management
framework enables the companies to address the issues
experienced in a way that will bring about success to the
entities. (Sampedro, 2019)
The risk management framework to be developed effectively,
the companies should appoint Chief Risk Officer. The Chief
Risk Officer will play important roles in ensuring that the
threats experienced by the businesses are assessed and mitigated
effectively. The technological threats experienced by the
businesses will therefore be handled in a way that will reduce
the losses experienced by the companies. This will help in
increasing the profitability of the businesses. (Shad, 2019)
The appointed Chief Risk Officer should be able to report to the
top management of the businesses for the purposes of ensuring
that the activities carried out by the business are carried out in
an effective manner. When the risks experienced by the
companies are reported to the top management of the business,
it becomes easy for the right measures to put in place so as to
ensure that the businesses are run accordingly.
On the other hand, smaller companies without the resources for
a dedicated Chief Risk Officer should deal with enterprise risk
management by encouraging the employees to report the
occurrence of incidents in the businesses. This will help in
ensuring that the cases of risks are addressed in the shortest
time possible. Again, the board in the businesses will play
important roles in ensuring that the operations of the business
are assessed. (Yazdani, 2019)
ITS 835 Chapter 18
Blue Wood Chocolates Enterprise Risk Management
Introduction
• Background
• Market overview
• Blue Wood financial performance
• Conclusion
Background
• U.S. Manufacturer of chocolate products
• Privately owned (family)
• New CFO
• Outsider
• Brought in to stabilize financial performance
• Blue Wood risk management practice in doubt
• Banks wondering if RM gaps are causing unstable finances
• Considering taking action
• Internal politics and conflict
Market Overview
• Growing market
• Major competitive factors
• Large producers
• Brand recognition / reputation
• Cocoa markets overview
• Sugar markets overview
• Milk markets overview
Blue Wood Financial Performance
• Profitability measures worse that competitors
• Lots of internal finger pointing
• Deteriorated cash position
• Currently borrowing against revolving line
• Retained earnings falling
• Substantial investments
• In case cash flow couldn't cover dividend payments
• Potential $10 million lawsuit
• Risky entrance into currency hedges and futures
Conclusion
• Business underperforming
• Immediate action is necessary to respond to banks
• CFO requires
• Overall view of corporate objectives
• Major risks facing the company
• Must have support from the top
• After initial pass
• Implement ERM
ITS 835 Chapter 19
Kilgore Custom Milling Enterprise Risk Management
Introduction
• Background
• The management team
• The company
• The new contract
• The financial risk management meeting
Background
• Kilgore Custom Milling
• Small private manufacturer
• Power window assemblies
• Based in southern Ontario, Canada
• Pursued contracts to supply plants in the U.S.
• Successful in negotiating a contract with Japanese
manufacturer
• Previous international contracts resulted in loss
• Due to currency volatility
The Management Team
• Owner and CEO
• Steve MacLinden
• Left day-to-day operations for the rest of the team
• Manufacturing and Plant operations
• Rory Sullivan
• Sales and Client relationships
• Casey Dobblestyn
• Treasurer and CFO
• CathyWilliams
The Company
• Privately owned
• 100% by Steve MacLinden
• Planning to retire in 5 – 10 years
• Main focus is cash flow management
• Concerns with currency related cash flow issues
• Additional concern about inflation differences
• Between U.S. and Canada
The New Contract
• Dramatically increase sales
• Over 100% for 5 years
• Complex and exacting specifications
• All proceeds in U.S. dollars
• Kilgore must manage financial risk
• Contract could be extended for 3 years
• But at the same price, benefitting the buyer
The Financial Risk Management Meeting
• U.S. and Canadian dollars near par
• Caused concern over U.S. competition
• Multiple options to deal with currency risk
• Long term swap contracts
• Short term forward contract
• Currency options
• Management team lack understanding of the options
• More open questions than answers
• Lots more to do ...

More Related Content

Similar to ISOL 533 - Information Security and Risk Management DIS.docx

BCM Roadmap
BCM RoadmapBCM Roadmap
BCM Roadmapbtrmuray
 
Mastering disaster a data center checklist
Mastering disaster a data center checklistMastering disaster a data center checklist
Mastering disaster a data center checklistChris Wick
 
Business continuity planning and disaster recovery
Business continuity planning and disaster recoveryBusiness continuity planning and disaster recovery
Business continuity planning and disaster recoveryKrutiShah114
 
Planning for contingencies
Planning for contingenciesPlanning for contingencies
Planning for contingenciesHassanein Alwan
 
Promotion_of_Business_Continuity_Management_-_Plan_Guide_and_template.pdf
Promotion_of_Business_Continuity_Management_-_Plan_Guide_and_template.pdfPromotion_of_Business_Continuity_Management_-_Plan_Guide_and_template.pdf
Promotion_of_Business_Continuity_Management_-_Plan_Guide_and_template.pdfCPittman3
 
Cd and-power-disaster-recovery-plan
Cd and-power-disaster-recovery-planCd and-power-disaster-recovery-plan
Cd and-power-disaster-recovery-plangotpowerinc
 
Commercial Properties: PROTECHS Disaster Emergency Response Plan (D-ERP)
Commercial Properties: PROTECHS Disaster Emergency Response Plan (D-ERP)Commercial Properties: PROTECHS Disaster Emergency Response Plan (D-ERP)
Commercial Properties: PROTECHS Disaster Emergency Response Plan (D-ERP)Protechs Restoration | Fire Water Mold
 
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...VAST
 
RUNNING HEADER Disaster Recovery Plan Information and Documentat.docx
RUNNING HEADER Disaster Recovery Plan Information and Documentat.docxRUNNING HEADER Disaster Recovery Plan Information and Documentat.docx
RUNNING HEADER Disaster Recovery Plan Information and Documentat.docxanhlodge
 
Business Continuity Plan
Business Continuity PlanBusiness Continuity Plan
Business Continuity PlanBizPlanss
 
Cyber Security and Business Continuity an Integrated Discipline
Cyber Security and Business Continuity an Integrated DisciplineCyber Security and Business Continuity an Integrated Discipline
Cyber Security and Business Continuity an Integrated DisciplineGraeme Parker
 
01 facility management definition and scope opt
01   facility management definition and scope opt01   facility management definition and scope opt
01 facility management definition and scope optArya Wirabhuana
 
Contingency Planning And Disaster Recovery Planning
Contingency Planning And Disaster Recovery PlanningContingency Planning And Disaster Recovery Planning
Contingency Planning And Disaster Recovery Planningmmohamme1124
 
Business continuity in general
Business continuity in generalBusiness continuity in general
Business continuity in generalJohn Johari
 
You have been hired as a consultant to design BCP for SanGrafix, a v.docx
You have been hired as a consultant to design BCP for SanGrafix, a v.docxYou have been hired as a consultant to design BCP for SanGrafix, a v.docx
You have been hired as a consultant to design BCP for SanGrafix, a v.docxshantayjewison
 
Disaster Biz Resumpt
Disaster Biz ResumptDisaster Biz Resumpt
Disaster Biz ResumptJimGroark
 
Varrow Madness 2014 DR Presentation
Varrow Madness 2014 DR PresentationVarrow Madness 2014 DR Presentation
Varrow Madness 2014 DR PresentationAndrew Miller
 

Similar to ISOL 533 - Information Security and Risk Management DIS.docx (20)

BCM Roadmap
BCM RoadmapBCM Roadmap
BCM Roadmap
 
Mastering disaster a data center checklist
Mastering disaster a data center checklistMastering disaster a data center checklist
Mastering disaster a data center checklist
 
Business continuity planning and disaster recovery
Business continuity planning and disaster recoveryBusiness continuity planning and disaster recovery
Business continuity planning and disaster recovery
 
Planning for contingencies
Planning for contingenciesPlanning for contingencies
Planning for contingencies
 
The Ultimate Data Protection Solution
The Ultimate Data Protection SolutionThe Ultimate Data Protection Solution
The Ultimate Data Protection Solution
 
Your company .docx
Your company                                                .docxYour company                                                .docx
Your company .docx
 
Promotion_of_Business_Continuity_Management_-_Plan_Guide_and_template.pdf
Promotion_of_Business_Continuity_Management_-_Plan_Guide_and_template.pdfPromotion_of_Business_Continuity_Management_-_Plan_Guide_and_template.pdf
Promotion_of_Business_Continuity_Management_-_Plan_Guide_and_template.pdf
 
Cd and-power-disaster-recovery-plan
Cd and-power-disaster-recovery-planCd and-power-disaster-recovery-plan
Cd and-power-disaster-recovery-plan
 
Commercial Properties: PROTECHS Disaster Emergency Response Plan (D-ERP)
Commercial Properties: PROTECHS Disaster Emergency Response Plan (D-ERP)Commercial Properties: PROTECHS Disaster Emergency Response Plan (D-ERP)
Commercial Properties: PROTECHS Disaster Emergency Response Plan (D-ERP)
 
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...
 
RUNNING HEADER Disaster Recovery Plan Information and Documentat.docx
RUNNING HEADER Disaster Recovery Plan Information and Documentat.docxRUNNING HEADER Disaster Recovery Plan Information and Documentat.docx
RUNNING HEADER Disaster Recovery Plan Information and Documentat.docx
 
Disaster Recovery Plan
Disaster Recovery PlanDisaster Recovery Plan
Disaster Recovery Plan
 
Business Continuity Plan
Business Continuity PlanBusiness Continuity Plan
Business Continuity Plan
 
Cyber Security and Business Continuity an Integrated Discipline
Cyber Security and Business Continuity an Integrated DisciplineCyber Security and Business Continuity an Integrated Discipline
Cyber Security and Business Continuity an Integrated Discipline
 
01 facility management definition and scope opt
01   facility management definition and scope opt01   facility management definition and scope opt
01 facility management definition and scope opt
 
Contingency Planning And Disaster Recovery Planning
Contingency Planning And Disaster Recovery PlanningContingency Planning And Disaster Recovery Planning
Contingency Planning And Disaster Recovery Planning
 
Business continuity in general
Business continuity in generalBusiness continuity in general
Business continuity in general
 
You have been hired as a consultant to design BCP for SanGrafix, a v.docx
You have been hired as a consultant to design BCP for SanGrafix, a v.docxYou have been hired as a consultant to design BCP for SanGrafix, a v.docx
You have been hired as a consultant to design BCP for SanGrafix, a v.docx
 
Disaster Biz Resumpt
Disaster Biz ResumptDisaster Biz Resumpt
Disaster Biz Resumpt
 
Varrow Madness 2014 DR Presentation
Varrow Madness 2014 DR PresentationVarrow Madness 2014 DR Presentation
Varrow Madness 2014 DR Presentation
 

More from vrickens

1000 words, 2 referencesBegin conducting research now on your .docx
1000 words, 2 referencesBegin conducting research now on your .docx1000 words, 2 referencesBegin conducting research now on your .docx
1000 words, 2 referencesBegin conducting research now on your .docxvrickens
 
1000 words only due by 5314 at 1200 estthis is a second part to.docx
1000 words only due by 5314 at 1200 estthis is a second part to.docx1000 words only due by 5314 at 1200 estthis is a second part to.docx
1000 words only due by 5314 at 1200 estthis is a second part to.docxvrickens
 
1000 words with refernceBased on the American constitution,” wh.docx
1000 words with refernceBased on the American constitution,” wh.docx1000 words with refernceBased on the American constitution,” wh.docx
1000 words with refernceBased on the American constitution,” wh.docxvrickens
 
10.1. In a t test for a single sample, the samples mean.docx
10.1. In a t test for a single sample, the samples mean.docx10.1. In a t test for a single sample, the samples mean.docx
10.1. In a t test for a single sample, the samples mean.docxvrickens
 
100 WORDS OR MOREConsider your past experiences either as a studen.docx
100 WORDS OR MOREConsider your past experiences either as a studen.docx100 WORDS OR MOREConsider your past experiences either as a studen.docx
100 WORDS OR MOREConsider your past experiences either as a studen.docxvrickens
 
1000 to 2000 words Research Title VII of the Civil Rights Act of.docx
1000 to 2000 words Research Title VII of the Civil Rights Act of.docx1000 to 2000 words Research Title VII of the Civil Rights Act of.docx
1000 to 2000 words Research Title VII of the Civil Rights Act of.docxvrickens
 
1000 word essay MlA Format.. What is our personal responsibility tow.docx
1000 word essay MlA Format.. What is our personal responsibility tow.docx1000 word essay MlA Format.. What is our personal responsibility tow.docx
1000 word essay MlA Format.. What is our personal responsibility tow.docxvrickens
 
100 wordsGoods and services that are not sold in markets.docx
100 wordsGoods and services that are not sold in markets.docx100 wordsGoods and services that are not sold in markets.docx
100 wordsGoods and services that are not sold in markets.docxvrickens
 
100 word responseChicago style citingLink to textbook httpbo.docx
100 word responseChicago style citingLink to textbook httpbo.docx100 word responseChicago style citingLink to textbook httpbo.docx
100 word responseChicago style citingLink to textbook httpbo.docxvrickens
 
100 word response to the followingBoth perspectives that we rea.docx
100 word response to the followingBoth perspectives that we rea.docx100 word response to the followingBoth perspectives that we rea.docx
100 word response to the followingBoth perspectives that we rea.docxvrickens
 
100 word response to the followingThe point that Penetito is tr.docx
100 word response to the followingThe point that Penetito is tr.docx100 word response to the followingThe point that Penetito is tr.docx
100 word response to the followingThe point that Penetito is tr.docxvrickens
 
100 word response to the folowingMust use Chicago style citing an.docx
100 word response to the folowingMust use Chicago style citing an.docx100 word response to the folowingMust use Chicago style citing an.docx
100 word response to the folowingMust use Chicago style citing an.docxvrickens
 
100 word response using textbook Getlein, Mark. Living with Art, 9t.docx
100 word response using textbook Getlein, Mark. Living with Art, 9t.docx100 word response using textbook Getlein, Mark. Living with Art, 9t.docx
100 word response using textbook Getlein, Mark. Living with Art, 9t.docxvrickens
 
100 word response to the following. Must cite properly in MLA.Un.docx
100 word response to the following. Must cite properly in MLA.Un.docx100 word response to the following. Must cite properly in MLA.Un.docx
100 word response to the following. Must cite properly in MLA.Un.docxvrickens
 
100 original, rubric, word count and required readings must be incl.docx
100 original, rubric, word count and required readings must be incl.docx100 original, rubric, word count and required readings must be incl.docx
100 original, rubric, word count and required readings must be incl.docxvrickens
 
100 or more wordsFor this Discussion imagine that you are speaki.docx
100 or more wordsFor this Discussion imagine that you are speaki.docx100 or more wordsFor this Discussion imagine that you are speaki.docx
100 or more wordsFor this Discussion imagine that you are speaki.docxvrickens
 
10. (TCOs 1 and 10) Apple, Inc. a cash basis S corporation in Or.docx
10. (TCOs 1 and 10) Apple, Inc. a cash basis S corporation in Or.docx10. (TCOs 1 and 10) Apple, Inc. a cash basis S corporation in Or.docx
10. (TCOs 1 and 10) Apple, Inc. a cash basis S corporation in Or.docxvrickens
 
10-12 slides with Notes APA Style ReferecesThe prosecutor is getti.docx
10-12 slides with Notes APA Style ReferecesThe prosecutor is getti.docx10-12 slides with Notes APA Style ReferecesThe prosecutor is getti.docx
10-12 slides with Notes APA Style ReferecesThe prosecutor is getti.docxvrickens
 
10-12 page paer onDiscuss the advantages and problems with trailer.docx
10-12 page paer onDiscuss the advantages and problems with trailer.docx10-12 page paer onDiscuss the advantages and problems with trailer.docx
10-12 page paer onDiscuss the advantages and problems with trailer.docxvrickens
 
10. Assume that you are responsible for decontaminating materials in.docx
10. Assume that you are responsible for decontaminating materials in.docx10. Assume that you are responsible for decontaminating materials in.docx
10. Assume that you are responsible for decontaminating materials in.docxvrickens
 

More from vrickens (20)

1000 words, 2 referencesBegin conducting research now on your .docx
1000 words, 2 referencesBegin conducting research now on your .docx1000 words, 2 referencesBegin conducting research now on your .docx
1000 words, 2 referencesBegin conducting research now on your .docx
 
1000 words only due by 5314 at 1200 estthis is a second part to.docx
1000 words only due by 5314 at 1200 estthis is a second part to.docx1000 words only due by 5314 at 1200 estthis is a second part to.docx
1000 words only due by 5314 at 1200 estthis is a second part to.docx
 
1000 words with refernceBased on the American constitution,” wh.docx
1000 words with refernceBased on the American constitution,” wh.docx1000 words with refernceBased on the American constitution,” wh.docx
1000 words with refernceBased on the American constitution,” wh.docx
 
10.1. In a t test for a single sample, the samples mean.docx
10.1. In a t test for a single sample, the samples mean.docx10.1. In a t test for a single sample, the samples mean.docx
10.1. In a t test for a single sample, the samples mean.docx
 
100 WORDS OR MOREConsider your past experiences either as a studen.docx
100 WORDS OR MOREConsider your past experiences either as a studen.docx100 WORDS OR MOREConsider your past experiences either as a studen.docx
100 WORDS OR MOREConsider your past experiences either as a studen.docx
 
1000 to 2000 words Research Title VII of the Civil Rights Act of.docx
1000 to 2000 words Research Title VII of the Civil Rights Act of.docx1000 to 2000 words Research Title VII of the Civil Rights Act of.docx
1000 to 2000 words Research Title VII of the Civil Rights Act of.docx
 
1000 word essay MlA Format.. What is our personal responsibility tow.docx
1000 word essay MlA Format.. What is our personal responsibility tow.docx1000 word essay MlA Format.. What is our personal responsibility tow.docx
1000 word essay MlA Format.. What is our personal responsibility tow.docx
 
100 wordsGoods and services that are not sold in markets.docx
100 wordsGoods and services that are not sold in markets.docx100 wordsGoods and services that are not sold in markets.docx
100 wordsGoods and services that are not sold in markets.docx
 
100 word responseChicago style citingLink to textbook httpbo.docx
100 word responseChicago style citingLink to textbook httpbo.docx100 word responseChicago style citingLink to textbook httpbo.docx
100 word responseChicago style citingLink to textbook httpbo.docx
 
100 word response to the followingBoth perspectives that we rea.docx
100 word response to the followingBoth perspectives that we rea.docx100 word response to the followingBoth perspectives that we rea.docx
100 word response to the followingBoth perspectives that we rea.docx
 
100 word response to the followingThe point that Penetito is tr.docx
100 word response to the followingThe point that Penetito is tr.docx100 word response to the followingThe point that Penetito is tr.docx
100 word response to the followingThe point that Penetito is tr.docx
 
100 word response to the folowingMust use Chicago style citing an.docx
100 word response to the folowingMust use Chicago style citing an.docx100 word response to the folowingMust use Chicago style citing an.docx
100 word response to the folowingMust use Chicago style citing an.docx
 
100 word response using textbook Getlein, Mark. Living with Art, 9t.docx
100 word response using textbook Getlein, Mark. Living with Art, 9t.docx100 word response using textbook Getlein, Mark. Living with Art, 9t.docx
100 word response using textbook Getlein, Mark. Living with Art, 9t.docx
 
100 word response to the following. Must cite properly in MLA.Un.docx
100 word response to the following. Must cite properly in MLA.Un.docx100 word response to the following. Must cite properly in MLA.Un.docx
100 word response to the following. Must cite properly in MLA.Un.docx
 
100 original, rubric, word count and required readings must be incl.docx
100 original, rubric, word count and required readings must be incl.docx100 original, rubric, word count and required readings must be incl.docx
100 original, rubric, word count and required readings must be incl.docx
 
100 or more wordsFor this Discussion imagine that you are speaki.docx
100 or more wordsFor this Discussion imagine that you are speaki.docx100 or more wordsFor this Discussion imagine that you are speaki.docx
100 or more wordsFor this Discussion imagine that you are speaki.docx
 
10. (TCOs 1 and 10) Apple, Inc. a cash basis S corporation in Or.docx
10. (TCOs 1 and 10) Apple, Inc. a cash basis S corporation in Or.docx10. (TCOs 1 and 10) Apple, Inc. a cash basis S corporation in Or.docx
10. (TCOs 1 and 10) Apple, Inc. a cash basis S corporation in Or.docx
 
10-12 slides with Notes APA Style ReferecesThe prosecutor is getti.docx
10-12 slides with Notes APA Style ReferecesThe prosecutor is getti.docx10-12 slides with Notes APA Style ReferecesThe prosecutor is getti.docx
10-12 slides with Notes APA Style ReferecesThe prosecutor is getti.docx
 
10-12 page paer onDiscuss the advantages and problems with trailer.docx
10-12 page paer onDiscuss the advantages and problems with trailer.docx10-12 page paer onDiscuss the advantages and problems with trailer.docx
10-12 page paer onDiscuss the advantages and problems with trailer.docx
 
10. Assume that you are responsible for decontaminating materials in.docx
10. Assume that you are responsible for decontaminating materials in.docx10. Assume that you are responsible for decontaminating materials in.docx
10. Assume that you are responsible for decontaminating materials in.docx
 

Recently uploaded

Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 

Recently uploaded (20)

Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 

ISOL 533 - Information Security and Risk Management DIS.docx

  • 1. ISOL 533 - Information Security and Risk Management DISASTER RECOVERY PLAN University of the Cumberlands Information Technology Statement of Intent This document delineates Health Network, Inc. (Health Network) policies and procedures for technology disaster recovery, as well as our process-level plans for recovering critical technology platforms and the telecommunications infrastructure. This document summarizes our recommended procedures. In the event of an actual emergency situation, modifications to this document may be made to ensure physical safety of our people, our systems, and our data. Our mission is to ensure information system uptime, data integrity and availability, and business continuity. Policy Statement Corporate management has approved the following policy statement:
  • 2. recovery plan. nt shall be undertaken to determine the requirements for the disaster recovery plan. critical infrastructure elements, systems and networks, in accordance with key business activities. disaster recovery plan should be periodically tested in a simulated environment to ensure that it can be implemented in emergency situations and that the management and staff understand how it is to be executed. isaster recovery plan and their own respective roles. account changing circumstances. Objectives The principal objective of the disaster recovery program is to develop, test and document a well- structured and easily understood plan which will help the company recover as quickly and effectively as possible from an unforeseen disaster or emergency which interrupts information
  • 3. systems and business operations. Additional objectives include the following: • The need to ensure that all employees fully understand their duties in implementing such a plan • The need to ensure that operational policies are adhered to within all planned activities • The need to ensure that proposed contingency arrangements are cost-effective • The need to consider implications on other company sites • Disaster recovery capabilities as applicable to key customers, vendors and others 2 Key Personnel Contact Info Name, Title Contact Option Contact Number Work Alternate Mobile
  • 4. Home Email Address Alternate Email Work Alternate Mobile Home Email Address Alternate Email Work Alternate Mobile Home Email Address Alternate Email Work Alternate
  • 5. Mobile Home Email Address Alternate Email Work Alternate Mobile Home Email Address Alternate Email Work Alternate Mobile Home Email Address Alternate Email
  • 7. 4 External Contacts Name, Title Contact Option Contact Number Landlord / Property Manager Account Number None Work Mobile Home Email Address Power Company Account Number Work Mobile Home Email Address
  • 8. Telecom Carrier 1 Account Number Work Mobile Fax Home Email Address Telecom Carrier 2 Account Number Work Mobile Home Email Address Hardware Supplier 1 Account Number Work Mobile Emergency Reporting Email Address Server Supplier 1
  • 9. Account Number. Work Mobile Fax Email Address Workstation Supplier 1 Account Number Work Mobile Home Email Address Office Supplies 1 Account Number C3095783 Work Mobile Home Email Address Insurance – Name
  • 10. 5 Name, Title Contact Option Contact Number Account Number Work Mobile Home Email Address Site Security – Account Number Work Mobile Home Email Address Off-Site Storage 1 Account Number Work Mobile Home Email Address
  • 11. Off-Site Storage 2 Account Number User ID Password Home Email Address HVAC – Account Number Work Mobile Home Email Address Power Generator – Account Number Work Mobile Home Email Address Other –
  • 12. Account Number Work Mobile Home Email Address 6 External Contacts Calling Tree
  • 13. 7
  • 14. 1 Plan Overview 1.1 Plan Updating It is necessary for the DRP updating process to be properly structured and controlled. Whenever changes are made to the plan they are to be fully tested and appropriate amendments should be made to the training materials. This will involve the use of formalized change control procedures under the control of the IT Director. 1.2 Plan Documentation Storage Copies of this Plan, CD, and hard copies will be stored in secure locations to be defined by the company. Each member of senior management will be issued a CD and hard copy of this plan to be filed at home. Each member of the Disaster Recovery Team and the Business Recovery Team will be issued a CD and hard copy of this plan. A master protected copy will be stored on specific resources established for this purpose. 1.3 Backup Strategy Key business processes and the agreed backup strategy for each are listed below. The strategy chosen is for a fully mirrored recovery site at the company’s alternate sites. This strategy entails the maintenance of a fully mirrored duplicate site which will enable instantaneous switching
  • 15. between the live site (headquarters) and the backup site. KEY BUSINESS PROCESS BACKUP STRATEGY IT Operations Fully mirrored recovery site Tech Support - Hardware Fully mirrored recovery site Tech Support – Software Fully mirrored recovery site Facilities Management Fully mirrored recovery site Email Fully mirrored recovery site Purchasing Fully mirrored recovery site Disaster Recovery Fully mirrored recovery site Finance Fully mirrored recovery site Contracts Admin Fully mirrored recovery site Warehouse & Inventory Fully mirrored recovery site Product Sales Fully mirrored recovery site Maintenance Sales Fully mirrored recovery site Human Resources Off-site data storage facility Testing Fully Mirrored Recovery site - Fully mirrored recovery site Workshop Fully Mirrored Recovery site - Fully mirrored
  • 16. recovery site Call Center Fully mirrored recovery site Web Site Fully mirrored recovery site 1.4 Risk Management There are many potential disruptive threats which can occur at any time and affect the normal business process. We have considered a wide range of potential threats and the results of our deliberations are included in this section. Each potential environmental disaster or emergency situation has been examined. The focus here is on the level of business disruption which could arise from each type of disaster. 8 Potential disasters have been assessed as follows: Potential Disaster Probability Rating Impact Rating Brief Description Of Potential Consequences & Remedial Actions
  • 17. <Flood> <3> <4> <All critical equipment is located on 1st Floor> Probability: 1=Very High, 5=Very Low Impact: 1=Total destruction, 5=Minor annoyance 2 Emergency Response 2.1 Alert, escalation and plan invocation 2.1.1 Plan Triggering Events Key trigger issues at headquarters that would lead to activation of the DRP are: • Total loss of all communications • Total loss of power • Flooding of the premises • Loss of the building 2.1.2 Assembly Points Where the premises need to be evacuated, the DRP invocation plan identifies two evacuation assembly points: • Primary – Far end of main parking lot; • Alternate – Parking lot of company across the street
  • 18. 2.1.3 Activation of Emergency Response Team When an incident occurs the Emergency Response Team (ERT) must be activated. The ERT will then decide the extent to which the DRP must be invoked. All employees must be issued a Quick Reference card containing ERT contact details to be used in the event of a disaster. Responsibilities of the ERT are to: • Respond immediately to a potential disaster and call emergency services; • Assess the extent of the disaster and its impact on the business, data center, etc.; • Decide which elements of the DR Plan should be activated; • Establish and manage disaster recovery team to maintain vital services and return to normal operation; • Ensure employees are notified and allocate responsibilities and activities as required. 2.2 Disaster Recovery Team The team will be contacted and assembled by the ERT. The team's responsibilities include: • Establish facilities for an emergency level of service within 2.0 business hours; • Restore key services within 4.0 business hours of the incident; • Recover to business as usual within 8.0 to 24.0 hours after the incident;
  • 19. 9 • Coordinate activities with disaster recovery team, first responders, etc. • Report to the emergency response team. 2.3 Emergency Alert, Escalation and DRP Activation This policy and procedure has been established to ensure that in the event of a disaster or crisis, personnel will have a clear understanding of who should be contacted. Procedures have been addressed to ensure that communications can be quickly established while activating disaster recovery. The DR plan will rely principally on key members of management and staff who will provide the technical and management skills necessary to achieve a smooth technology and business recovery. Suppliers of critical goods and services will continue to support recovery of business operations as the company returns to normal operating mode. 2.3.1 Emergency Alert The person discovering the incident calls a member of the Emergency Response Team in the order listed: Emergency Response Team • <_________> • <_________>
  • 20. • <_________> If not available try: • <_________> • <_________> The Emergency Response Team (ERT) is responsible for activating the DRP for disasters identified in this plan, as well as in the event of any other occurrence that affects the company’s capability to perform normally. One of the tasks during the early stages of the emergency is to notify the Disaster Recovery Team (DRT) that an emergency has occurred. The notification will request DRT members to assemble at the site of the problem and will involve sufficient information to have this request effectively communicated. The Business Recovery Team (BRT) will consist of senior representatives from the main business departments. The BRT Leader will be a senior member of the company's management team, and will be responsible for taking overall charge of the process and ensuring that the company returns to normal working operations as early as possible. 2.3.2 DR Procedures for Management Members of the management team will keep a hard copy of the names and contact numbers of each employee in their departments. In addition, management team members will have a hard copy of the company’s disaster recovery and business continuity
  • 21. plans on file in their homes in the event that the headquarters building is inaccessible, unusable, or destroyed. 2.3.3 Contact with Employees Managers will serve as the focal points for their departments, while designated employees will call other employees to discuss the crisis/disaster and the company’s immediate plans. Employees who cannot reach staff on their call list are advised to call the staff member’s emergency contact to relay information on the disaster. 10 2.3.4 Backup Staff If a manager or staff member designated to contact other staff members is unavailable or incapacitated, the designated backup staff member will perform notification duties. 2.3.5 Recorded Messages / Updates For the latest information on the disaster and the organization’s response, staff members can call a toll-free hotline listed in the DRP wallet card. Included in messages will be data on the nature of the disaster, assembly sites, and updates on work resumption.
  • 22. 2.3.7 Alternate Recovery Facilities / Hot Site If necessary, the hot site at SunGard will be activated and notification will be given via recorded messages or through communications with managers. Hot site staffing will consist of members of the disaster recovery team only for the first 24 hours, with other staff members joining at the hot site as necessary. 2.3.8 Personnel and Family Notification If the incident has resulted in a situation which would cause concern to an employee’s immediate family such as hospitalization of injured persons, it will be necessary to notify their immediate family members quickly. 3 Media 3.1 Media Contact Assigned staff will coordinate with the media, working according to guidelines that have been previously approved and issued for dealing with post-disaster communications. 3.2 Media Strategies 1. Avoiding adverse publicity 2. Take advantage of opportunities for useful publicity 3. Have answers to the following basic questions:
  • 23. 3.3 Media Team • <____________________________________________> • <____________________________________________> • <____________________________________________> 3.4 Rules for Dealing with Media Only the media team is permitted direct contact with the media; anyone else contacted should refer callers or in-person media representatives to the media team. 4 Insurance As part of the company’s disaster recovery and business continuity strategies a number of insurance policies have been put in place. These include errors and omissions, directors & officers liability, general liability, and business interruption insurance. 11
  • 24. If insurance-related assistance is required following an emergency out of normal business hours, please contact: <___________________________________________> Policy Name Coverage Type Coverage Period Amount Of Coverage Person Responsible For Coverage Next Renewal Date 5 Financial and Legal Issues 5.1 Financial Assessment The emergency response team shall prepare an initial assessment of the impact of the incident on the financial affairs of the company. The assessment should include:
  • 25. 5.2 Financial Requirements The immediate financial needs of the company must be addressed. These can include: ow position etc. services required post-disaster 5.3 Legal Actions The company legal department and ERT will jointly review the aftermath of the incident and decide whether there may be legal actions resulting from the event; in particular, the possibility of claims by or against the company for regulatory violations, etc. 6 DRP Exercising
  • 26. Disaster recovery plan exercises are an essential part of the plan development process. In a DRP exercise no one passes or fails; everyone who participates learns from exercises – what needs to be improved, and how the improvements can be implemented. Plan exercising ensures that emergency teams are familiar with their assignments and, more importantly, are confident in their capabilities. Successful DR plans launch into action smoothly and effectively when they are needed. This will only happen if everyone with a role to play in the plan has rehearsed the role one or more times. The plan should also be validated by simulating the circumstances within which it has to work and seeing what happens. 12 Appendix A – Technology Disaster Recovery Plan Templates Disaster Recovery Plan for <System One> SYSTEM
  • 27. OVERVIEW PRODUCTION SERVER Location: Enter location Server Model: Operating System: CPUs: Memory: Total Disk: System Handle: System Serial #: DNS Entry: IP Address: Other: HOT SITE SERVER APPLICATIONS (Use bold for Hot Site) ASSOCIATED SERVERS KEY CONTACTS Hardware Vendor System Owners Database Owner Application Owners Software Vendors Offsite Storage BACKUP STRATEGY FOR SYSTEM ONE
  • 28. Daily / Monthly / Quarterly Choose which strategy on the left you would use and provide details on why. SYSTEM ONE DISASTER RECOVERY PROCEDURE Scenario 1 Total Loss of Data Provide details Scenario 2 Total Loss of HW Provide details 13 Database/File Systems
  • 29. File System as of <enter current date> Minimal file systems to be backed-up and restored: Filesystem kbytes Used Avail %used Mounted on <Provide details on each Database/File System> Other critical files to modify Necessary directories to create Critical files to restore Secondary files to restore Other files to restore 14
  • 30. Disaster Recovery Plan for Local Area Network (LAN) <Since the scenario does not contain information needed below, leave this area blank.> SYSTEM OVERVIEW SERVER Location: Server Model: Operating System: CPUs: Memory: Total Disk: System Handle: System Serial #: DNS Entry: IP Address: Other: HOT SITE SERVER Provide details APPLICATIONS (Use bold for Hot Site) ASSOCIATED SERVERS KEY CONTACTS Hardware Vendor Provide details System Owners Provide details Database Owner Provide details Application Owners Provide details
  • 31. Software Vendors Provide details Offsite Storage Provide details BACKUP STRATEGY for SYSTEM TWO Daily Provide details Monthly Provide details Quarterly Provide details SYSTEM TWO DISASTER RECOVERY PROCEDURE Scenario 1 Total Loss of Data Provide details Scenario 2 Total Loss of HW Provide details
  • 32. 15 ADDENDUM CONTACTS File Systems <date> File System as of <date> Minimal file systems to be created and restored from backup: <List> Filesystem kbytes Used Avail %used
  • 33. Mounted on <Provide details> Other critical files to modify <Provide details> Necessary directories to create <Provide details> Critical files to restore <Provide details> Secondary files to restore <Provide details> Other files to restore <Provide details> 16 Disaster Recovery Plan for Wide Area Network (WAN) <Since the scenario does not contain information needed below,
  • 34. leave this area blank.> SYSTEM OVERVIEW EQUIPMENT Location: Device Type: Model No.: Technical Specifications: Network Interfaces: Power Requirements; System Serial #: DNS Entry: IP Address: Other: HOT SITE EQUIPMENT Provide details SPECIAL APPLICATIONS ASSOCIATED DEVICES KEY CONTACTS Hardware Vendor Provide details System Owners Provide details Database Owner Provide details Application Owners Provide details Software Vendors Provide details Offsite Storage Provide details Network Services Provide details
  • 35. BACKUP STRATEGY for SYSTEM TWO Daily Provide details Monthly Provide details Quarterly Provide details SYSTEM TWO DISASTER RECOVERY PROCEDURE Scenario 1 Total Loss of Network Provide details Scenario 2 Total Loss of HW Provide details
  • 36. 17 ADDENDUM CONTACTS Support Systems <date> Support system <Provide details> Critical network assets <Provide details> Critical interfaces <Provide details> Critical files to restore <Provide details> Critical network services to restore
  • 37. <Provide details> Other services <Provide details> 18 Disaster Recovery Plan for Remote Connectivity <Since the scenario does not contain information needed below, leave this area blank.> SYSTEM OVERVIEW EQUIPMENT Location: Device Type: Model No.: Technical Specifications: Network Interfaces: Power Requirements; System Serial #: DNS Entry: IP Address: Other: HOT SITE EQUIPMENT Provide details SPECIAL APPLICATIONS
  • 38. ASSOCIATED DEVICES KEY CONTACTS Hardware Vendor Provide details System Owners Provide details Database Owner Provide details Application Owners Provide details Software Vendors Provide details Offsite Storage Provide details Network Services Provide details BACKUP STRATEGY for SYSTEM TWO Daily Provide details Monthly Provide details Quarterly Provide details SYSTEM TWO DISASTER RECOVERY PROCEDURE
  • 39. Scenario 1 Total Loss of Network Provide details Scenario 2 Total Loss of HW Provide details 19 ADDENDUM CONTACTS Support Systems <date>
  • 40. Support system <Provide details> Critical network assets <Provide details> Critical interfaces <Provide details> Critical files to restore <Provide details> Critical network services to restore <Provide details> Other services <Provide details> 20 Disaster Recovery Plan for Voice Communications <Since the scenario does not contain information needed below, leave this area blank.>
  • 41. SYSTEM OVERVIEW EQUIPMENT Location: Device Type: Model No.: Technical Specifications: Network Interfaces: Power Requirements; System Serial #: DNS Entry: IP Address: Other: HOT SITE EQUIPMENT Provide details SPECIAL APPLICATIONS ASSOCIATED DEVICES KEY CONTACTS Hardware Vendor Provide details System Owners Provide details Database Owner Provide details Application Owners Provide details Software Vendors Provide details Offsite Storage Provide details Network Services Provide details
  • 42. BACKUP STRATEGY for SYSTEM TWO Daily Provide details Monthly Provide details Quarterly Provide details SYSTEM TWO DISASTER RECOVERY PROCEDURE Scenario 1 Total Loss of Switch Provide details Scenario 2 Total Loss of Network Provide details
  • 43. 21 ADDENDUM CONTACTS Support Systems <date> Support system <Provide details> Critical network assets <Provide details> Critical interfaces <Provide details> Critical files to restore <Provide details> Critical network services to restore <Provide details>
  • 44. Other services <Provide details> 22 Appendix B – Suggested Forms <Leave this area blank.> Damage Assessment Form Key Business Process Affected Description Of Problem Extent Of Damage _____________
  • 45. Management of DR Activities Form • During the disaster recovery process all activities will be determined using a standard structure; • Where practical, this plan will need to be updated on a regular basis throughout the disaster recovery period; • All actions that occur during this phase will need to be recorded. Activity Name: Reference Number: Brief Description: Commencement Date/Time Completion Date/Time Resources Involved In Charge
  • 46. __________________ 23 Disaster Recovery Event Recording Form • All key events that occur during the disaster recovery phase must be recorded. • An event log shall be maintained by the disaster recovery team leader. • This event log should be started at the commencement of the emergency and a copy of the log passed on to the business recovery team once the initial dangers have been controlled. • The following event log should be completed by the disaster recovery team leader to record all key events during disaster recovery, until such time as responsibility is handed over to the business recovery team.
  • 47. Description of Disaster: Commencement Date: Date/Time DR Team Mobilized: Activities Undertaken by DR Team Date and Time Outcome Follow-On Action Required Disaster Recovery Team's Work Completed: <Date> Event Log Passed to Business Recovery Team: <Date> _________________
  • 48. 24 Disaster Recovery Activity Report Form • On completion of the initial disaster recovery response the DRT leader should prepare a report on the activities undertaken. • The report should contain information on the emergency, who was notified and when, action taken by members of the DRT together with outcomes arising from those actions. • The report will also contain an assessment of the impact to normal business operations. • The report should be given to business recovery team leader, with a copy to senior management, as appropriate. • A disaster recovery report will be prepared by the DRT leader on completion of the initial disaster recovery response. • In addition to the business recovery team leader, the report will be distributed to senior management The report will include: • A description of the emergency or incident
  • 49. • Those people notified of the emergency (including dates) • Action taken by members of the DRT • Outcomes arising from actions taken • An assessment of the impact to normal business operations • Assessment of the effectiveness of the BCP and lessons learned • Lessons learned __________ Mobilizing the Disaster Recovery Team Form • Following an emergency requiring recovery of technology infrastructure assets, the disaster recovery team should be notified of the situation and placed on standby. • The format shown below can be used for recording the activation of the DR team once the work of the damage assessment and emergency response teams has been completed. Description of Emergency: Date Occurred: Date Work of Disaster Recovery Team Completed: Name of Team Member Contact Details
  • 50. Contacted On (Time / Date) By Whom Response Start Date Required Relevant Comments (e.g., Specific Instructions Issued) ___________ 25 Mobilizing the Business Recovery Team Form tion of the disaster recovery team, the business recovery team should be notified of the situation and placed on standby.
  • 51. activation of the business recovery team once the work of the disaster recovery team has been completed. Description of Emergency: Date Occurred: Date Work of Business Recovery Team Completed: Name of Team Member Contact Details Contacted On (Time / Date) By Whom Response Start Date Required Relevant Comments (e.g., Specific Instructions Issued) ____________
  • 52. Monitoring Business Recovery Task Progress Form • The progress of technology and business recovery tasks must be closely monitored during this period of time. • Since difficulties experienced by one group could significantly affect other dependent tasks it is important to ensure that each task is adequately resourced and that the efforts required to restore normal business operations have not been underestimated. Note: A priority sequence must be identified although, where possible, activities will be carried out simultaneously. Recovery Tasks (Order of Priority) Person(s) Responsible Completion Date Milestones Identified Other Relevant Information Estimated Actual 1.
  • 53. 2. 3. 4. 5. 6. 7. ___________ 26 Preparing the Business Recovery Report Form should prepare a report on the activities undertaken and completed. event, who was notified and when, action taken by members of the BRT together with outcomes
  • 54. arising from those actions. ain an assessment of the impact to normal business operations. appropriate. The contents of the report shall include: including dates) business continuity plan Communications Form recovery activities that all affected persons and organizations are kept properly informed.
  • 55. ll parties must be accurate and timely. working operations should be announced with care. with media queries. Groups of Persons or Organizations Affected by Disruption Persons Selected To Coordinate Communications to Affected Persons / Organizations Name Position Contact Details Customers Management & Staff Suppliers Media Stakeholders Others ____________
  • 56. 27 Returning Recovered Business Operations to Business Unit Leadership necessary to return the responsibility for specific operations to the appropriate business unit leader. parties understand the change in overall responsibility, and the transition to business-as-usual. responsibility may have been assigned to the business recovery process lead. involved throughout the recovery, but in order for the recovery process to be fully effective, overall responsibility during the recovery period should probably be with a business recovery process team. ____________
  • 57. Business Process/Function Recovery Completion Form The following transition form should be completed and signed by the business recovery team leader and the responsible business unit leader, for each process recovered. A separate form should be used for each recovered business process. Name Of Business Process Completion Date of Work Provided by Business Recovery Team Date of Transition Back to Business Unit Management (If different than completion date) I confirm that the work of the business recovery team has been completed in accordance with the disaster recovery plan for the above process, and that normal business operations have been effectively restored. Business Recovery Team Leader Name: ________________________________________ Signature: _____________________________________________________ ___________
  • 58. Date: __________________________ (Any relevant comments by the BRT leader in connection with the return of this business process should be made here.) I confirm that above business process is now acceptable for normal working conditions. Name: _____________________________________________________ ______________ Title: _____________________________________________________ _______________ Signature: _____________________________________________________ ___________ Date: __________________________ Discussion1 In many small business organizations, the management (owners who don’t have a dedicated CRO) of the organization mostly make key decisions about business expansion and production. This management has a very good knowledge about designing more products and expanding business but have minimal
  • 59. knowledge about risk mitigation techniques such as inflammation differences, cash flow issues, competitive threats, lawsuits and money management. When a CRO appointed in any organization it helps organization to bring an order in management and structure in ownership. The CRO of organization responsibilities are continuously evolving over the years. CRO functions include identifying risks and plan to mitigate the risk, form good communication between organization key decision making team by conducting meetings and updating risk tolerance level periodically (Kenton, W., 2017). On coming to Blue Wood Chocolates Company, the CRO should interact with both CEO and CFO, because the company CEO knows everything about business such as past activities and major key decisions which are made previously. Since the CFO is new to organization and he/she is going to be part of future business process CFO should also be in interacted with CRO. The CFO should lead the process at the company while implementing ERM. In the case of Kilgore Custom Milling, the CRO must be interacted with all the team because in this company even the Steve MacLinden is the CEO, each department has their own heads like manufacturing, customer relationship, sales and treasure. So the CRO should conduct common meetings with team to mitigate risk. In above both organizations there is clear visibility of communication gap among the management, concerns with cash flow, lack of proper risk mitigation plans indicates the mandatory presence of CRO. Since both the companies are small and cannot afford to have a dedicated CRO, it is best advised they should conduct annual risk review about legal, financial and other competitive factors to mitigate risks (Kirkup, D., 2017). Discussion2 As per the current financial situation of the organizations it is
  • 60. suggested to appoint a Chief risk officer to develop a risk management framework and it’s like walking into a hornet's nest in her new position as CFO of Blue Wood Chocolates. The business was underperforming, and urgent action was required to respond to pressure from the banks and provide an action plan to the board of directors. There would be definitely disagreement among senior executives and board members about the strategy and overall objectives the company should pursue, and nobody had a grasp of all major risk factors. There was no oversight of the hedging practices and little effective internal communication among various functions, or even within some of the functions. Authorized person needed to have an overall view of the corporate objectives before developing and implementing specific operating procedures. He/She needed to get a grasp on the major risks facing the company so that she could develop appropriate responses to these risks. An ERM framework seemed appropriate. However, this would need buy-in from the top, specifically the CEO, chairman, and the board. She needed to develop an overarching proposal incorporating objectives, strategy, and an ERM outline framework for presentation to the board. She would first need to get the CEO on board, not an easy task given his disinterest in what he considers bureaucratic matters that he hires people like CFO to deal with. Operational procedures, including commodity and currency hedging, would be important but would need to be developed within an overall ERM framework. She also needed to determine how financial performance could be improved. Profitability seemed lackluster, with a high expense base and no real control on major purchasing inputs. Revenues had held up fairly well but could be under competitive threat if margins continued to fall below the industry average. Every business owner probably has the most critical business risks on his or her radar. Input from insurance and legal advisors will help identify them. But some important risks may have been simply overlooked or may not be fully appreciated.
  • 61. Further, the potential size of the risk may not have been quantified, and steps to mitigate the risk may not have been developed. It is worth carrying out an annual risk review with legal, insurance, and accounting advisors, along with the management team, to clarify the key risks, determine their likelihood of occurrence, and then start to build a risk management plan to alleviate them. The below are the responsibilities of CRO with respect to board in implementing the risk management framework • The CRO has representation at the respective board- level committees and the independent audit committee either as a standing member or a regular invitee. • An independent board level risk committee exists which is attended by the CEO, CFO and CRO. • An executive risk committee chaired by the CRO and reporting to the board level risk committee. • The CRO has regular representation in key subcommittees enabling the CRO to input into key strategic and business planning decisions from the outset. Discussion3 In a situation whereby, Blue Wood Chocolate and Kilgore Custom Milling are to develop a risk management framework, it is the responsibility of the Chief Risk Officer to ensure that the risk management framework is developed in an effective manner. This will play important roles in ensuring that the risks experienced by an organization are reduced for the success of the businesses. The development of the risk management framework enables the companies to address the issues experienced in a way that will bring about success to the entities. (Sampedro, 2019) The risk management framework to be developed effectively, the companies should appoint Chief Risk Officer. The Chief Risk Officer will play important roles in ensuring that the threats experienced by the businesses are assessed and mitigated effectively. The technological threats experienced by the
  • 62. businesses will therefore be handled in a way that will reduce the losses experienced by the companies. This will help in increasing the profitability of the businesses. (Shad, 2019) The appointed Chief Risk Officer should be able to report to the top management of the businesses for the purposes of ensuring that the activities carried out by the business are carried out in an effective manner. When the risks experienced by the companies are reported to the top management of the business, it becomes easy for the right measures to put in place so as to ensure that the businesses are run accordingly. On the other hand, smaller companies without the resources for a dedicated Chief Risk Officer should deal with enterprise risk management by encouraging the employees to report the occurrence of incidents in the businesses. This will help in ensuring that the cases of risks are addressed in the shortest time possible. Again, the board in the businesses will play important roles in ensuring that the operations of the business are assessed. (Yazdani, 2019) ITS 835 Chapter 18 Blue Wood Chocolates Enterprise Risk Management Introduction • Background • Market overview • Blue Wood financial performance • Conclusion
  • 63. Background • U.S. Manufacturer of chocolate products • Privately owned (family) • New CFO • Outsider • Brought in to stabilize financial performance • Blue Wood risk management practice in doubt • Banks wondering if RM gaps are causing unstable finances • Considering taking action • Internal politics and conflict Market Overview • Growing market • Major competitive factors • Large producers • Brand recognition / reputation • Cocoa markets overview • Sugar markets overview • Milk markets overview Blue Wood Financial Performance • Profitability measures worse that competitors
  • 64. • Lots of internal finger pointing • Deteriorated cash position • Currently borrowing against revolving line • Retained earnings falling • Substantial investments • In case cash flow couldn't cover dividend payments • Potential $10 million lawsuit • Risky entrance into currency hedges and futures Conclusion • Business underperforming • Immediate action is necessary to respond to banks • CFO requires • Overall view of corporate objectives • Major risks facing the company • Must have support from the top • After initial pass • Implement ERM ITS 835 Chapter 19 Kilgore Custom Milling Enterprise Risk Management Introduction • Background • The management team • The company • The new contract • The financial risk management meeting
  • 65. Background • Kilgore Custom Milling • Small private manufacturer • Power window assemblies • Based in southern Ontario, Canada • Pursued contracts to supply plants in the U.S. • Successful in negotiating a contract with Japanese manufacturer • Previous international contracts resulted in loss • Due to currency volatility The Management Team • Owner and CEO • Steve MacLinden • Left day-to-day operations for the rest of the team • Manufacturing and Plant operations • Rory Sullivan • Sales and Client relationships • Casey Dobblestyn • Treasurer and CFO • CathyWilliams The Company • Privately owned • 100% by Steve MacLinden • Planning to retire in 5 – 10 years • Main focus is cash flow management
  • 66. • Concerns with currency related cash flow issues • Additional concern about inflation differences • Between U.S. and Canada The New Contract • Dramatically increase sales • Over 100% for 5 years • Complex and exacting specifications • All proceeds in U.S. dollars • Kilgore must manage financial risk • Contract could be extended for 3 years • But at the same price, benefitting the buyer The Financial Risk Management Meeting • U.S. and Canadian dollars near par • Caused concern over U.S. competition • Multiple options to deal with currency risk • Long term swap contracts • Short term forward contract • Currency options • Management team lack understanding of the options • More open questions than answers
  • 67. • Lots more to do ...