1. INSTRUMENT QA/QC ENGINEER
REGU.T
reguece701@gmail.com,
Mobile No: +91 - 8012735451
+974 - 31412384
SUMMARY
Having 6 + years of relevant experience in India and Abroad in Petrochemical Plant,
Refinery, Gas plant, construction, commissioning and maintenance works as an ELECTRICAL
and INSTRUMENT QA/QC ENGINEER. I am fully conversant with the NEC International
Code and SABIC standard procedures. And I was successfully completed my Primavera latest
version P8.2.So I able to work as a E&I Planning Engineer too.
Profile
Regular surveillance/inspection of construction and maintenance activities as per project
inspection and test plan.
Assign and monitor respective duties of other QC inspectors
Store and maintain all quality records.
Coordinate with execution personnel about ongoing inspection issues.
Regular reporting to QC Manager, on any major issues which require immediate action.
Ensure proper implementation of ISO 9001.
QC inspection for instrumentation system as per quality control procedure, c.
Inspection of primary and secondary cable tray installation conduit installation instrument
installation impulse line, air line installation and pressure test, glanding
Termination meggering & continuity test junction box installation marshaling.
Ensuring all instrument were installed & tested as per project quality procedure
And project specification and prepare ITP forms
Preparing RFI for Inspection to client for joint inspection of completed.
All activities during the construction commissioning & maintenance of control cable
meggering and measuring earth resistance test. Ensuring all instrumentation were
installed and tested as per project quality procedure and project specification and
preparation of ITP forms for instrument installation and maintenance inspection.
Coordination with pressure testing team of impulse lines and preparation of ITP forms
and Test Reports.
To ensure that all inspection and test records are properly documented and made
available to the client on completion in accordance with contract requirements.
2. Review of design, construction and maintenance related document conducting material
inspections.
Conduct all instrument inspection as per Approved ITP.
Prepare non-conformance with the customer’s representative to ensure good quality.
Mechanical completion acceptance from execution and responsible for recording and
clearing all instrumentation punch list and documentation.
Ensure that inspection are performed in a timely manner and recorded as per
specification and standard detail drawing ITP’s and QCP’s
Witness of fire and gas loop checking, process loop check, instrument loop wiring
continuity, instrument loop folder release forms.
Issuing material discrepancy reports for any deficiency.
Issuing non-conformance report (NCR) for the discrepancies of works.
Inform client representative by the official application of inspection and arrange the joint
inspection according to relevant ITP.
Receive the execution RFI and determine execution works status i.e. check installation
conformity to project specification.
Education Qualification
SSLC
Percentage of Mark : 90 % (First Class 2003)
HSC
Percentage of Mark : 81 % (First Class 2005)
Technical Qualification
BE-ECE ( Electronics And Communication Engineering)
Percentage of Mark : 65 % (First Class)
Year of Passing : 2009
University : Anna University
Familiarized and deep understanding of industry codes and practices-API-RP-550 (Manual for
installation of refinery instruments and control system) ISA, NEC/NFPA, NEMA &IEEE.
3. SOFTWARE EXPOSURE
Operating system :Win 98, Win Xp, Win 7,Win 8,MS Office,Roser System.
Technical software :Certified person (Primavera - Computerized project
planning and management)
OVERSEAS PROJECT & WORK HISTORY
COMPANY : KENTECH,QATAR TECHNICAL SERVICES,WLL.
CLIENT : SHELL GTL LTD.
PROJECT : PEARL GTL TRAIN 2
ROLE : INSTRUMENT QC INSPECTOR.
DURATION : Present Company
Regular reporting to QA/QC ENGINEER & discussion with on any major issues which
required immediate action. And handling QVD (quality verification department)
Ensuring all maintenance instruments were repaired, installed and tested as per project
quality, such as
Using Roser system, preparing all the documents required for the Instrumentation and
Electrical Maintenance activities.
Replacement of Flow serves valve positioner.
Valve Overhauling -needs to remove and re install the SOV and limit switch
connections(Tubing and Cabling)
Anti-Surge valve repairing (assisting vendor)
Redas system(assisting vendor)
SIA system checking
IPF testing
GWR level transmitter removing ,cleaning and reinstalling
QMI sample Probe replacement
Hydraulic valve Overhauling
Dp type level transmitter replacement(including tubing)
Governor valve repairing(assisting vendor)
Install partial stroke test facilities
Removing and reinstalling Transmitters(PT,TT,FT)
Cariolis transmitter removal, stem checking and cleaning if required after reinstallation.
Assign and monitors respective duties of other QA/QC inspector.
Store and maintain all quality records for client.
Coordinate with execution personal about ongoing inspection issues.
Inspection witness for all the hazardarous area instrument maintenance and execution.
4. COMPANY : KENTECH,GULF HOLDINGS
CLIENT : EXON MOBIL CEPU LTD.
PROJECT : BANYU URIP PROJECT,INDONESIA
ROLE : E&I QC ENGINEER.
DURATION : FROM 4TH
April 2015 TO 15TH
Oct 2015.
Regular reporting to QA/QC Manager & discussion with on any major issues which
required immediate action. And handling QVD (quality verification department)
Ensuring all electrical equipments and instruments were installed and tested as per
project quality,
Assisting vendor for Hi-pot test and motor test as well as relay testing activities.
Assign and monitors respective duties of other QA/QC inspector.
Store and maintain all quality records for client.
Coordinate with execution personal about ongoing inspection issues.
Inspection witness for all the hazardarous area instrument maintenance and execution.
MAINTANENCE SHUTDOWN EXPERIENCE
COMPANY : KENTECH,QATAR TECHNICAL SERVICES,WLL.
CLIENT : SHELL GTL LTD.
PROJECT : PEARL GTL TRAIN 1
ROLE : INSTRUMENT QC INSPECTOR.
DURATION : FROM 7TH
Jan 2015 TO 4TH
April 2015.
Regular reporting to QA/QC ENGINEER & discussion with on any major issues which
required immediate action. And handling QVD (quality verification department)
Ensuring all maintenance instruments were repaired, installed and tested as per project
quality, such as
Using Roser system, preparing all the documents required for the Instrumentation and
Electrical Maintenance activities.
Replacement of Flow serves valve positioner.
Valve Overhauling -needs to remove and re install the SOV and limit switch
connections(Tubing and Cabling)
Anti-Surge valve repairing (assisting vendor)
Redas system(assisting vendor)
SIA system checking
IPF testing
GWR level transmitter removing ,cleaning and reinstalling
QMI sample Probe replacement
5. Hydraulic valve Overhauling
Dp type level transmitter replacement(including tubing)
Governor valve repairing(assisting vendor)
Install partial stroke test facilities
Removing and reinstalling Transmitters(PT,TT,FT)
Cariolis transmitter removal, stem checking and cleaning if required after reinstallation.
Assign and monitors respective duties of other QA/QC inspector.
Store and maintain all quality records for client.
Coordinate with execution personal about ongoing inspection issues.
Inspection witness for all the hazardarous area instrument maintenance and execution.
LONG TERM EXPERIENCE:
COMPANY : GULF ASIA CONSOLIDATED CONTRACTING LLC.
CONTRACTOR : JGC ARABIA COMPANY
PROJECT : SADARA AROMATICS PROJECT (SADARA)
ROLE : INSTRUMENT QA/QC ENGINEER.
DURATION : FROM SEP 2013 TO AUG 2014.
Regular reporting to QA/QC manager& discussion with on any major issues which
required immediate action. And handling QVD (quality verification department)
Ensuring all instruments maintenance were done , installed and tested as per project
quality
Assign and monitors respective duties of other QA/QC inspector.
Store and maintain all quality records for client.
Coordinate with construction personal about ongoing inspection issues.
COMPANY : NASSER.S.AL.HAJRI.CORPORATION, SAUDI
CONTRACTOR : FLUOR ARABIA COMPANY
PROJECT : SUPER ABSORBENT POLYMER PROJECT (TASNEE)
ROLE : INSTRUMENT QA/QCENGINEER.
DURATION : FROM OCT 2012 TO AUGUST 2013.
Regular reporting to QA/QC manager& discussion with on any major issues which
required immediate action. And handling QVD (quality verification department)
Ensuring all instruments were installed and tested as per project quality
Assign and monitors respective duties of other QA/QC inspector.
Store and maintain all quality records for client.
Coordinate with construction personal about ongoing inspection issues.
6. COMPANY : NASSER.S.AL.HAJRI.CORPORATION, JUBAIL
PROJECT : LDPE PROJECT SABIC (SAUDI KAYAN)
ROLE : INSTRUMENTATION QC INSPECTOR.
DURATION : JAN 2012 TO SEP 2012
Preparing punch list items, making surveillance of execution activities.
Witness of instrument calibration.
maintenance of cable tray, conduit, junction boxes, instrument system, instruments.
Coordination with client in pressure testing of impulse lines& Air Lines
Ensuring al maintenance instruments were repaired, installed & tested as per project
quality procedure, project specification and preparation of ITP forms (Instrument
maintenance)
Inspection for all activities during the maintenance and commissioning.
Daily inspection and surveillance for ongoing construction activities .coordinate with
execution and raising RFI for inspection with client
Carried out inspection of main and branch cable tray, conduit, instrument
Installation glanding and termination of primary &secondary cable meggering
and continuity, impulse line, air line installation and pressure test, Junction box
Panel maintenance and maintenance of all type instrument etc.
Ensuring all instruments were installed and tested as per project quality
Assign and monitors respective duties of other QA/QC inspector.
Store and maintain all quality records for client.
Coordinate with execution personal about ongoing inspection issues.
Ensure proper implementation of ISO 9001.
Regular reporting to QA/QC Engineer & manager discussion with on any major issues
which required immediate action.
the calibration of all types of process instrumentation, installation, maintenance, tubing
(Pneumatic and process hookup), cable Tray ,Instrument Installation Cable testing,
laying, glanding and termination, function test, loop checking, instrumentation and
system, fault finding and trouble shooting of process instrumentation during
commissioning period.
Final preparation of various drawings such as P&ID, Logic Drawing, Wiring diagram,
Instrument loop diagrams.
7. EXPERIENCES IN INDIA:
Worked as an Instrumentation engineer for Tamilnadu Petro products limited at Chennai and
HOFFINCONS at UDUPI, India. Having good expertise in maintenance & commissioning of
instruments, PLC systems, Review of Loop drawing, Hook-up, QA,QC documents, FAT,
SAT and Engineering documents preparations.
SHUTDOWN EXPERIENCE
Plant : UDUPI POWER CORPORATION LTD.
Capacity : 600MW X 2
Client : LANCO
Location : Kuthethoor, Karnataka, India.
Scheme : Boiler, Steam Turbine, Ash Handling System, Flue Gas Desulphurization.
Automation : Invensys DCS, Allen Bradley PLC.
Duration : Sep 2014
TAMILNADU PETROPRODUCTS LIMITED, Chennai
Duration : May 2009 – NOV2011
Worked in Cut fast Division of the ISO 9002:2000 and ISO 14000 PUBLIC SECTOR
organization.
Maintenance Engineer
Responsible for the all types of process instrumentation, installation, tubing (Pneumatic and
process hookup), cable Tray ,Instrument Installation Cable testing, laying, glanding and
termination, function test, loop checking, instrumentation and system, fault finding and trouble
shooting of process instrumentation during commissioning period.
Final preparation of various drawings such as P&ID, Logic Drawing, Wiring diagram, Instrument
loop diagrams.
Responsible for all types of process instrumentation,maintanence, tubing (Pneumatic and
process hookup), cable Tray ,Instrument Installation Cable testing, laying, glanding and
termination, function test, loop checking, instrumentation and system
Job Knowledge
Familiar with the following international Standards & Codes.
F A T - Factory Acceptance Test.
S A T - Site Acceptance Test.
R A T - Run Acceptance Test.
NEMA - Natinol Electrical Manufacture Assoaction.
Familiar with the following Saudi Aram co QMIS (Quality Management Information system).
8. Familiar with Schedule-Q.
Familiar with the Saudi Aram co Level of inspections..
PERSONAL INFORMATION
Name T.REGU
Fathers Name T.THANGASWAMY
Date of Birth 20/05/1988
Nationality Indian
Language English, Hindi, Tamil, Malayalam
Passport No L8933930
Date of Issue 23-04-2014
Date of Expiry 22-04-2024
Marital status Married.
Religion Hindu.
Contact no +91 - 8012735451
+974 - 31412384
PLACE: SIGNAUATRE
REGU.T