SUMMARY
Having 6 + years of relevant experience in India and Abroad in Petrochemical Plant,
Refinery, Gas plant, construction, commissioning and maintenance works as an ELECTRICAL
and INSTRUMENT QA/QC ENGINEER. I am fully conversant with the NEC International
Code and SABIC standard procedures. And I was successfully completed my Primavera latest
version P8.2.So I able to work as a E&I Planning Engineer too.
Profile
 Regular surveillance/inspection of construction and maintenance activities as per project
inspection and test plan.
 Assign and monitor respective duties of other QC inspectors
 Store and maintain all quality records.
 Coordinate with execution personnel about ongoing inspection issues.
 Regular reporting to QC Manager, on any major issues which require immediate action.
 Ensure proper implementation of ISO 9001.
 QC inspection for instrumentation system as per quality control procedure, c.
 Inspection of primary and secondary cable tray installation conduit installation instrument
installation impulse line, air line installation and pressure test, glanding
Termination meggering & continuity test junction box installation marshaling.
 Ensuring all instrument were installed & tested as per project quality procedure
 And project specification and prepare ITP forms
 Preparing RFI for Inspection to client for joint inspection of completed.
 All activities during the construction commissioning & maintenance of control cable
meggering and measuring earth resistance test. Ensuring all instrumentation were
installed and tested as per project quality procedure and project specification and
preparation of ITP forms for instrument installation and maintenance inspection.
 Coordination with pressure testing team of impulse lines and preparation of ITP forms
and Test Reports.
 To ensure that all inspection and test records are properly documented and made
available to the client on completion in accordance with contract requirements.
 Review of design, construction and maintenance related document conducting material
inspections.
 Conduct all instrument inspection as per Approved ITP.
 Prepare non-conformance with the customer’s representative to ensure good quality.
 Mechanical completion acceptance from execution and responsible for recording and
clearing all instrumentation punch list and documentation.
 Ensure that inspection are performed in a timely manner and recorded as per
specification and standard detail drawing ITP’s and QCP’s
 Witness of fire and gas loop checking, process loop check, instrument loop wiring
continuity, instrument loop folder release forms.
 Issuing material discrepancy reports for any deficiency.
 Issuing non-conformance report (NCR) for the discrepancies of works.
 Inform client representative by the official application of inspection and arrange the joint
inspection according to relevant ITP.
 Receive the execution RFI and determine execution works status i.e. check installation
conformity to project specification.
Education Qualification
SSLC
Percentage of Mark : 90 % (First Class 2003)
HSC
Percentage of Mark : 81 % (First Class 2005)
Technical Qualification
BE-ECE ( Electronics And Communication Engineering)
Percentage of Mark : 65 % (First Class)
Year of Passing : 2009
University : Anna University
Familiarized and deep understanding of industry codes and practices-API-RP-550 (Manual for
installation of refinery instruments and control system) ISA, NEC/NFPA, NEMA &IEEE.
SOFTWARE EXPOSURE
Operating system :Win 98, Win Xp, Win 7,Win 8,MS Office,Roser System.
Technical software :Certified person (Primavera - Computerized project
planning and management)
OVERSEAS PROJECT & WORK HISTORY
COMPANY : KENTECH,QATAR TECHNICAL SERVICES,WLL.
CLIENT : SHELL GTL LTD.
PROJECT : PEARL GTL TRAIN 2
ROLE : INSTRUMENT QC INSPECTOR.
DURATION : Present Company
 Regular reporting to QA/QC ENGINEER & discussion with on any major issues which
required immediate action. And handling QVD (quality verification department)
 Ensuring all maintenance instruments were repaired, installed and tested as per project
quality, such as
 Using Roser system, preparing all the documents required for the Instrumentation and
Electrical Maintenance activities.
 Replacement of Flow serves valve positioner.
 Valve Overhauling -needs to remove and re install the SOV and limit switch
connections(Tubing and Cabling)
 Anti-Surge valve repairing (assisting vendor)
 Redas system(assisting vendor)
 SIA system checking
 IPF testing
 GWR level transmitter removing ,cleaning and reinstalling
 QMI sample Probe replacement
 Hydraulic valve Overhauling
 Dp type level transmitter replacement(including tubing)
 Governor valve repairing(assisting vendor)
 Install partial stroke test facilities
 Removing and reinstalling Transmitters(PT,TT,FT)
 Cariolis transmitter removal, stem checking and cleaning if required after reinstallation.
 Assign and monitors respective duties of other QA/QC inspector.
 Store and maintain all quality records for client.
 Coordinate with execution personal about ongoing inspection issues.
 Inspection witness for all the hazardarous area instrument maintenance and execution.
COMPANY : KENTECH,GULF HOLDINGS
CLIENT : EXON MOBIL CEPU LTD.
PROJECT : BANYU URIP PROJECT,INDONESIA
ROLE : E&I QC ENGINEER.
DURATION : FROM 4TH
April 2015 TO 15TH
Oct 2015.
 Regular reporting to QA/QC Manager & discussion with on any major issues which
required immediate action. And handling QVD (quality verification department)
 Ensuring all electrical equipments and instruments were installed and tested as per
project quality,
 Assisting vendor for Hi-pot test and motor test as well as relay testing activities.
 Assign and monitors respective duties of other QA/QC inspector.
 Store and maintain all quality records for client.
 Coordinate with execution personal about ongoing inspection issues.
 Inspection witness for all the hazardarous area instrument maintenance and execution.
MAINTANENCE SHUTDOWN EXPERIENCE
COMPANY : KENTECH,QATAR TECHNICAL SERVICES,WLL.
CLIENT : SHELL GTL LTD.
PROJECT : PEARL GTL TRAIN 1
ROLE : INSTRUMENT QC INSPECTOR.
DURATION : FROM 7TH
Jan 2015 TO 4TH
April 2015.
 Regular reporting to QA/QC ENGINEER & discussion with on any major issues which
required immediate action. And handling QVD (quality verification department)
 Ensuring all maintenance instruments were repaired, installed and tested as per project
quality, such as
 Using Roser system, preparing all the documents required for the Instrumentation and
Electrical Maintenance activities.
 Replacement of Flow serves valve positioner.
 Valve Overhauling -needs to remove and re install the SOV and limit switch
connections(Tubing and Cabling)
 Anti-Surge valve repairing (assisting vendor)
 Redas system(assisting vendor)
 SIA system checking
 IPF testing
 GWR level transmitter removing ,cleaning and reinstalling
 QMI sample Probe replacement
 Hydraulic valve Overhauling
 Dp type level transmitter replacement(including tubing)
 Governor valve repairing(assisting vendor)
 Install partial stroke test facilities
 Removing and reinstalling Transmitters(PT,TT,FT)
 Cariolis transmitter removal, stem checking and cleaning if required after reinstallation.
 Assign and monitors respective duties of other QA/QC inspector.
 Store and maintain all quality records for client.
 Coordinate with execution personal about ongoing inspection issues.
 Inspection witness for all the hazardarous area instrument maintenance and execution.
LONG TERM EXPERIENCE:
COMPANY : GULF ASIA CONSOLIDATED CONTRACTING LLC.
CONTRACTOR : JGC ARABIA COMPANY
PROJECT : SADARA AROMATICS PROJECT (SADARA)
ROLE : INSTRUMENT QA/QC ENGINEER.
DURATION : FROM SEP 2013 TO AUG 2014.
 Regular reporting to QA/QC manager& discussion with on any major issues which
required immediate action. And handling QVD (quality verification department)
 Ensuring all instruments maintenance were done , installed and tested as per project
quality
 Assign and monitors respective duties of other QA/QC inspector.
 Store and maintain all quality records for client.
 Coordinate with construction personal about ongoing inspection issues.
COMPANY : NASSER.S.AL.HAJRI.CORPORATION, SAUDI
CONTRACTOR : FLUOR ARABIA COMPANY
PROJECT : SUPER ABSORBENT POLYMER PROJECT (TASNEE)
ROLE : INSTRUMENT QA/QCENGINEER.
DURATION : FROM OCT 2012 TO AUGUST 2013.
 Regular reporting to QA/QC manager& discussion with on any major issues which
required immediate action. And handling QVD (quality verification department)
 Ensuring all instruments were installed and tested as per project quality
 Assign and monitors respective duties of other QA/QC inspector.
 Store and maintain all quality records for client.
 Coordinate with construction personal about ongoing inspection issues.
COMPANY : NASSER.S.AL.HAJRI.CORPORATION, JUBAIL
PROJECT : LDPE PROJECT SABIC (SAUDI KAYAN)
ROLE : INSTRUMENTATION QC INSPECTOR.
DURATION : JAN 2012 TO SEP 2012
 Preparing punch list items, making surveillance of execution activities.
 Witness of instrument calibration.
 maintenance of cable tray, conduit, junction boxes, instrument system, instruments.
 Coordination with client in pressure testing of impulse lines& Air Lines
 Ensuring al maintenance instruments were repaired, installed & tested as per project
quality procedure, project specification and preparation of ITP forms (Instrument
maintenance)
 Inspection for all activities during the maintenance and commissioning.
 Daily inspection and surveillance for ongoing construction activities .coordinate with
execution and raising RFI for inspection with client
 Carried out inspection of main and branch cable tray, conduit, instrument
 Installation glanding and termination of primary &secondary cable meggering
and continuity, impulse line, air line installation and pressure test, Junction box
 Panel maintenance and maintenance of all type instrument etc.
 Ensuring all instruments were installed and tested as per project quality
 Assign and monitors respective duties of other QA/QC inspector.
 Store and maintain all quality records for client.
 Coordinate with execution personal about ongoing inspection issues.
 Ensure proper implementation of ISO 9001.
 Regular reporting to QA/QC Engineer & manager discussion with on any major issues
which required immediate action.
 the calibration of all types of process instrumentation, installation, maintenance, tubing
(Pneumatic and process hookup), cable Tray ,Instrument Installation Cable testing,
laying, glanding and termination, function test, loop checking, instrumentation and
system, fault finding and trouble shooting of process instrumentation during
commissioning period.
 Final preparation of various drawings such as P&ID, Logic Drawing, Wiring diagram,
Instrument loop diagrams.
EXPERIENCES IN INDIA:
Worked as an Instrumentation engineer for Tamilnadu Petro products limited at Chennai and
HOFFINCONS at UDUPI, India. Having good expertise in maintenance & commissioning of
instruments, PLC systems, Review of Loop drawing, Hook-up, QA,QC documents, FAT,
SAT and Engineering documents preparations.
SHUTDOWN EXPERIENCE
Plant : UDUPI POWER CORPORATION LTD.
Capacity : 600MW X 2
Client : LANCO
Location : Kuthethoor, Karnataka, India.
Scheme : Boiler, Steam Turbine, Ash Handling System, Flue Gas Desulphurization.
Automation : Invensys DCS, Allen Bradley PLC.
Duration : Sep 2014
TAMILNADU PETROPRODUCTS LIMITED, Chennai
Duration : May 2009 – NOV2011
Worked in Cut fast Division of the ISO 9002:2000 and ISO 14000 PUBLIC SECTOR
organization.
Maintenance Engineer
Responsible for the all types of process instrumentation, installation, tubing (Pneumatic and
process hookup), cable Tray ,Instrument Installation Cable testing, laying, glanding and
termination, function test, loop checking, instrumentation and system, fault finding and trouble
shooting of process instrumentation during commissioning period.
Final preparation of various drawings such as P&ID, Logic Drawing, Wiring diagram, Instrument
loop diagrams.
Responsible for all types of process instrumentation,maintanence, tubing (Pneumatic and
process hookup), cable Tray ,Instrument Installation Cable testing, laying, glanding and
termination, function test, loop checking, instrumentation and system
Job Knowledge
Familiar with the following international Standards & Codes.
F A T - Factory Acceptance Test.
S A T - Site Acceptance Test.
R A T - Run Acceptance Test.
NEMA - Natinol Electrical Manufacture Assoaction.
Familiar with the following Saudi Aram co QMIS (Quality Management Information system).
Familiar with Schedule-Q.
Familiar with the Saudi Aram co Level of inspections..
PERSONAL INFORMATION
Name T.REGU
Fathers Name T.THANGASWAMY
Date of Birth 20/05/1988
Nationality Indian
Language English, Hindi, Tamil, Malayalam
Passport No L8933930
Date of Issue 23-04-2014
Date of Expiry 22-04-2024
Marital status Married.
Religion Hindu.
Contact no +91 - 8012735451
+974 - 31412384
PLACE: SIGNAUATRE
REGU.T

More Related Content

What's hot

Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC EngineerSalman Faris
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikMOHAMAD ANWAR MALIK
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineerMubashir ahmee
 
Karthikeyan. ex insp cv
Karthikeyan.  ex insp cvKarthikeyan.  ex insp cv
Karthikeyan. ex insp cvKarthi keyan
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar Patel
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
 
Resume of jaison varkey, QA/QC inspector welding,coating offshore Oil & Gas
Resume of jaison varkey, QA/QC  inspector welding,coating offshore Oil & GasResume of jaison varkey, QA/QC  inspector welding,coating offshore Oil & Gas
Resume of jaison varkey, QA/QC inspector welding,coating offshore Oil & Gasjaison varkey
 
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.Madhava Rao V
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFChandra Battu
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years expParthsarathy vijayan
 
QA/QC Civil Engineer
QA/QC Civil EngineerQA/QC Civil Engineer
QA/QC Civil EngineerRavi chandran
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revisedAdnan Rehmat
 

What's hot (20)

CV Electrical QA QC Engineer
CV Electrical QA QC EngineerCV Electrical QA QC Engineer
CV Electrical QA QC Engineer
 
RAJU CV
RAJU  CVRAJU  CV
RAJU CV
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC Engineer
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
QAQC E&I
QAQC E&IQAQC E&I
QAQC E&I
 
Karthikeyan. ex insp cv
Karthikeyan.  ex insp cvKarthikeyan.  ex insp cv
Karthikeyan. ex insp cv
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 
Resume of jaison varkey, QA/QC inspector welding,coating offshore Oil & Gas
Resume of jaison varkey, QA/QC  inspector welding,coating offshore Oil & GasResume of jaison varkey, QA/QC  inspector welding,coating offshore Oil & Gas
Resume of jaison varkey, QA/QC inspector welding,coating offshore Oil & Gas
 
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
 
QA QC Engineer CV
QA QC Engineer CVQA QC Engineer CV
QA QC Engineer CV
 
Manohar CV QA-QC
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QC
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp
 
QA/QC Civil Engineer
QA/QC Civil EngineerQA/QC Civil Engineer
QA/QC Civil Engineer
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
Shafiq CV
Shafiq CVShafiq CV
Shafiq CV
 
MOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QCMOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QC
 

Viewers also liked

80 instrumentation interview questions with answers
80 instrumentation interview questions with answers80 instrumentation interview questions with answers
80 instrumentation interview questions with answerskirstymoore071
 
132 qa interview questions and answers pdf
132 qa interview questions and answers pdf132 qa interview questions and answers pdf
132 qa interview questions and answers pdfQualityManager88
 
E&I QAQC Sup,Insp
E&I QAQC Sup,InspE&I QAQC Sup,Insp
E&I QAQC Sup,InspEZAZ ALAM
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2mohammad tanweer
 
H.R. Group of companies
H.R. Group of companiesH.R. Group of companies
H.R. Group of companiesAdil Naim
 
Saudi aramco standards
Saudi aramco standardsSaudi aramco standards
Saudi aramco standardsJithu John
 
ARMACO STANDARD
ARMACO STANDARDARMACO STANDARD
ARMACO STANDARDIrfan Ali
 
Interview questions and answers for quality assurance
Interview questions and answers for quality assuranceInterview questions and answers for quality assurance
Interview questions and answers for quality assuranceGaruda Trainings
 

Viewers also liked (10)

80 instrumentation interview questions with answers
80 instrumentation interview questions with answers80 instrumentation interview questions with answers
80 instrumentation interview questions with answers
 
132 qa interview questions and answers pdf
132 qa interview questions and answers pdf132 qa interview questions and answers pdf
132 qa interview questions and answers pdf
 
E&I QAQC Sup,Insp
E&I QAQC Sup,InspE&I QAQC Sup,Insp
E&I QAQC Sup,Insp
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
 
Instrumentation Inspector
Instrumentation InspectorInstrumentation Inspector
Instrumentation Inspector
 
H.R. Group of companies
H.R. Group of companiesH.R. Group of companies
H.R. Group of companies
 
Saudi aramco standards
Saudi aramco standardsSaudi aramco standards
Saudi aramco standards
 
ARMACO STANDARD
ARMACO STANDARDARMACO STANDARD
ARMACO STANDARD
 
Interview questions and answers for quality assurance
Interview questions and answers for quality assuranceInterview questions and answers for quality assurance
Interview questions and answers for quality assurance
 
Umar
UmarUmar
Umar
 

Similar to INSTRUMENT QA QC INSPECTOR

Similar to INSTRUMENT QA QC INSPECTOR (20)

E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)
 
BALAJI-2016
BALAJI-2016BALAJI-2016
BALAJI-2016
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
QC WELDING INSPECTOR
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTOR
 
mallick resume qc eng.
mallick resume qc eng.mallick resume qc eng.
mallick resume qc eng.
 
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEER
 
cv
cvcv
cv
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 
SHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUMESHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUME
 
Ahmed fawzy qa-qc mechanical engineer
Ahmed fawzy qa-qc mechanical engineerAhmed fawzy qa-qc mechanical engineer
Ahmed fawzy qa-qc mechanical engineer
 
Mohamad Elyaas CV & Certf
Mohamad Elyaas CV & CertfMohamad Elyaas CV & Certf
Mohamad Elyaas CV & Certf
 
G Butler - CV 2016
G Butler - CV 2016G Butler - CV 2016
G Butler - CV 2016
 
Varun Resume
Varun Resume Varun Resume
Varun Resume
 
MADHAN RESUME - UPDATED
MADHAN RESUME - UPDATEDMADHAN RESUME - UPDATED
MADHAN RESUME - UPDATED
 
REY CV
REY CVREY CV
REY CV
 
QASIM CV
QASIM CVQASIM CV
QASIM CV
 
Seeking Assignments in QA/QC , Project Site , Piping Welding/Fabrication , In...
Seeking Assignments in QA/QC , Project Site , Piping Welding/Fabrication , In...Seeking Assignments in QA/QC , Project Site , Piping Welding/Fabrication , In...
Seeking Assignments in QA/QC , Project Site , Piping Welding/Fabrication , In...
 
M Imran
M ImranM Imran
M Imran
 
QC E&I alhassan
QC E&I alhassanQC E&I alhassan
QC E&I alhassan
 
QC
QCQC
QC
 

INSTRUMENT QA QC INSPECTOR

  • 1. INSTRUMENT QA/QC ENGINEER REGU.T reguece701@gmail.com, Mobile No: +91 - 8012735451 +974 - 31412384 SUMMARY Having 6 + years of relevant experience in India and Abroad in Petrochemical Plant, Refinery, Gas plant, construction, commissioning and maintenance works as an ELECTRICAL and INSTRUMENT QA/QC ENGINEER. I am fully conversant with the NEC International Code and SABIC standard procedures. And I was successfully completed my Primavera latest version P8.2.So I able to work as a E&I Planning Engineer too. Profile  Regular surveillance/inspection of construction and maintenance activities as per project inspection and test plan.  Assign and monitor respective duties of other QC inspectors  Store and maintain all quality records.  Coordinate with execution personnel about ongoing inspection issues.  Regular reporting to QC Manager, on any major issues which require immediate action.  Ensure proper implementation of ISO 9001.  QC inspection for instrumentation system as per quality control procedure, c.  Inspection of primary and secondary cable tray installation conduit installation instrument installation impulse line, air line installation and pressure test, glanding Termination meggering & continuity test junction box installation marshaling.  Ensuring all instrument were installed & tested as per project quality procedure  And project specification and prepare ITP forms  Preparing RFI for Inspection to client for joint inspection of completed.  All activities during the construction commissioning & maintenance of control cable meggering and measuring earth resistance test. Ensuring all instrumentation were installed and tested as per project quality procedure and project specification and preparation of ITP forms for instrument installation and maintenance inspection.  Coordination with pressure testing team of impulse lines and preparation of ITP forms and Test Reports.  To ensure that all inspection and test records are properly documented and made available to the client on completion in accordance with contract requirements.
  • 2.  Review of design, construction and maintenance related document conducting material inspections.  Conduct all instrument inspection as per Approved ITP.  Prepare non-conformance with the customer’s representative to ensure good quality.  Mechanical completion acceptance from execution and responsible for recording and clearing all instrumentation punch list and documentation.  Ensure that inspection are performed in a timely manner and recorded as per specification and standard detail drawing ITP’s and QCP’s  Witness of fire and gas loop checking, process loop check, instrument loop wiring continuity, instrument loop folder release forms.  Issuing material discrepancy reports for any deficiency.  Issuing non-conformance report (NCR) for the discrepancies of works.  Inform client representative by the official application of inspection and arrange the joint inspection according to relevant ITP.  Receive the execution RFI and determine execution works status i.e. check installation conformity to project specification. Education Qualification SSLC Percentage of Mark : 90 % (First Class 2003) HSC Percentage of Mark : 81 % (First Class 2005) Technical Qualification BE-ECE ( Electronics And Communication Engineering) Percentage of Mark : 65 % (First Class) Year of Passing : 2009 University : Anna University Familiarized and deep understanding of industry codes and practices-API-RP-550 (Manual for installation of refinery instruments and control system) ISA, NEC/NFPA, NEMA &IEEE.
  • 3. SOFTWARE EXPOSURE Operating system :Win 98, Win Xp, Win 7,Win 8,MS Office,Roser System. Technical software :Certified person (Primavera - Computerized project planning and management) OVERSEAS PROJECT & WORK HISTORY COMPANY : KENTECH,QATAR TECHNICAL SERVICES,WLL. CLIENT : SHELL GTL LTD. PROJECT : PEARL GTL TRAIN 2 ROLE : INSTRUMENT QC INSPECTOR. DURATION : Present Company  Regular reporting to QA/QC ENGINEER & discussion with on any major issues which required immediate action. And handling QVD (quality verification department)  Ensuring all maintenance instruments were repaired, installed and tested as per project quality, such as  Using Roser system, preparing all the documents required for the Instrumentation and Electrical Maintenance activities.  Replacement of Flow serves valve positioner.  Valve Overhauling -needs to remove and re install the SOV and limit switch connections(Tubing and Cabling)  Anti-Surge valve repairing (assisting vendor)  Redas system(assisting vendor)  SIA system checking  IPF testing  GWR level transmitter removing ,cleaning and reinstalling  QMI sample Probe replacement  Hydraulic valve Overhauling  Dp type level transmitter replacement(including tubing)  Governor valve repairing(assisting vendor)  Install partial stroke test facilities  Removing and reinstalling Transmitters(PT,TT,FT)  Cariolis transmitter removal, stem checking and cleaning if required after reinstallation.  Assign and monitors respective duties of other QA/QC inspector.  Store and maintain all quality records for client.  Coordinate with execution personal about ongoing inspection issues.  Inspection witness for all the hazardarous area instrument maintenance and execution.
  • 4. COMPANY : KENTECH,GULF HOLDINGS CLIENT : EXON MOBIL CEPU LTD. PROJECT : BANYU URIP PROJECT,INDONESIA ROLE : E&I QC ENGINEER. DURATION : FROM 4TH April 2015 TO 15TH Oct 2015.  Regular reporting to QA/QC Manager & discussion with on any major issues which required immediate action. And handling QVD (quality verification department)  Ensuring all electrical equipments and instruments were installed and tested as per project quality,  Assisting vendor for Hi-pot test and motor test as well as relay testing activities.  Assign and monitors respective duties of other QA/QC inspector.  Store and maintain all quality records for client.  Coordinate with execution personal about ongoing inspection issues.  Inspection witness for all the hazardarous area instrument maintenance and execution. MAINTANENCE SHUTDOWN EXPERIENCE COMPANY : KENTECH,QATAR TECHNICAL SERVICES,WLL. CLIENT : SHELL GTL LTD. PROJECT : PEARL GTL TRAIN 1 ROLE : INSTRUMENT QC INSPECTOR. DURATION : FROM 7TH Jan 2015 TO 4TH April 2015.  Regular reporting to QA/QC ENGINEER & discussion with on any major issues which required immediate action. And handling QVD (quality verification department)  Ensuring all maintenance instruments were repaired, installed and tested as per project quality, such as  Using Roser system, preparing all the documents required for the Instrumentation and Electrical Maintenance activities.  Replacement of Flow serves valve positioner.  Valve Overhauling -needs to remove and re install the SOV and limit switch connections(Tubing and Cabling)  Anti-Surge valve repairing (assisting vendor)  Redas system(assisting vendor)  SIA system checking  IPF testing  GWR level transmitter removing ,cleaning and reinstalling  QMI sample Probe replacement
  • 5.  Hydraulic valve Overhauling  Dp type level transmitter replacement(including tubing)  Governor valve repairing(assisting vendor)  Install partial stroke test facilities  Removing and reinstalling Transmitters(PT,TT,FT)  Cariolis transmitter removal, stem checking and cleaning if required after reinstallation.  Assign and monitors respective duties of other QA/QC inspector.  Store and maintain all quality records for client.  Coordinate with execution personal about ongoing inspection issues.  Inspection witness for all the hazardarous area instrument maintenance and execution. LONG TERM EXPERIENCE: COMPANY : GULF ASIA CONSOLIDATED CONTRACTING LLC. CONTRACTOR : JGC ARABIA COMPANY PROJECT : SADARA AROMATICS PROJECT (SADARA) ROLE : INSTRUMENT QA/QC ENGINEER. DURATION : FROM SEP 2013 TO AUG 2014.  Regular reporting to QA/QC manager& discussion with on any major issues which required immediate action. And handling QVD (quality verification department)  Ensuring all instruments maintenance were done , installed and tested as per project quality  Assign and monitors respective duties of other QA/QC inspector.  Store and maintain all quality records for client.  Coordinate with construction personal about ongoing inspection issues. COMPANY : NASSER.S.AL.HAJRI.CORPORATION, SAUDI CONTRACTOR : FLUOR ARABIA COMPANY PROJECT : SUPER ABSORBENT POLYMER PROJECT (TASNEE) ROLE : INSTRUMENT QA/QCENGINEER. DURATION : FROM OCT 2012 TO AUGUST 2013.  Regular reporting to QA/QC manager& discussion with on any major issues which required immediate action. And handling QVD (quality verification department)  Ensuring all instruments were installed and tested as per project quality  Assign and monitors respective duties of other QA/QC inspector.  Store and maintain all quality records for client.  Coordinate with construction personal about ongoing inspection issues.
  • 6. COMPANY : NASSER.S.AL.HAJRI.CORPORATION, JUBAIL PROJECT : LDPE PROJECT SABIC (SAUDI KAYAN) ROLE : INSTRUMENTATION QC INSPECTOR. DURATION : JAN 2012 TO SEP 2012  Preparing punch list items, making surveillance of execution activities.  Witness of instrument calibration.  maintenance of cable tray, conduit, junction boxes, instrument system, instruments.  Coordination with client in pressure testing of impulse lines& Air Lines  Ensuring al maintenance instruments were repaired, installed & tested as per project quality procedure, project specification and preparation of ITP forms (Instrument maintenance)  Inspection for all activities during the maintenance and commissioning.  Daily inspection and surveillance for ongoing construction activities .coordinate with execution and raising RFI for inspection with client  Carried out inspection of main and branch cable tray, conduit, instrument  Installation glanding and termination of primary &secondary cable meggering and continuity, impulse line, air line installation and pressure test, Junction box  Panel maintenance and maintenance of all type instrument etc.  Ensuring all instruments were installed and tested as per project quality  Assign and monitors respective duties of other QA/QC inspector.  Store and maintain all quality records for client.  Coordinate with execution personal about ongoing inspection issues.  Ensure proper implementation of ISO 9001.  Regular reporting to QA/QC Engineer & manager discussion with on any major issues which required immediate action.  the calibration of all types of process instrumentation, installation, maintenance, tubing (Pneumatic and process hookup), cable Tray ,Instrument Installation Cable testing, laying, glanding and termination, function test, loop checking, instrumentation and system, fault finding and trouble shooting of process instrumentation during commissioning period.  Final preparation of various drawings such as P&ID, Logic Drawing, Wiring diagram, Instrument loop diagrams.
  • 7. EXPERIENCES IN INDIA: Worked as an Instrumentation engineer for Tamilnadu Petro products limited at Chennai and HOFFINCONS at UDUPI, India. Having good expertise in maintenance & commissioning of instruments, PLC systems, Review of Loop drawing, Hook-up, QA,QC documents, FAT, SAT and Engineering documents preparations. SHUTDOWN EXPERIENCE Plant : UDUPI POWER CORPORATION LTD. Capacity : 600MW X 2 Client : LANCO Location : Kuthethoor, Karnataka, India. Scheme : Boiler, Steam Turbine, Ash Handling System, Flue Gas Desulphurization. Automation : Invensys DCS, Allen Bradley PLC. Duration : Sep 2014 TAMILNADU PETROPRODUCTS LIMITED, Chennai Duration : May 2009 – NOV2011 Worked in Cut fast Division of the ISO 9002:2000 and ISO 14000 PUBLIC SECTOR organization. Maintenance Engineer Responsible for the all types of process instrumentation, installation, tubing (Pneumatic and process hookup), cable Tray ,Instrument Installation Cable testing, laying, glanding and termination, function test, loop checking, instrumentation and system, fault finding and trouble shooting of process instrumentation during commissioning period. Final preparation of various drawings such as P&ID, Logic Drawing, Wiring diagram, Instrument loop diagrams. Responsible for all types of process instrumentation,maintanence, tubing (Pneumatic and process hookup), cable Tray ,Instrument Installation Cable testing, laying, glanding and termination, function test, loop checking, instrumentation and system Job Knowledge Familiar with the following international Standards & Codes. F A T - Factory Acceptance Test. S A T - Site Acceptance Test. R A T - Run Acceptance Test. NEMA - Natinol Electrical Manufacture Assoaction. Familiar with the following Saudi Aram co QMIS (Quality Management Information system).
  • 8. Familiar with Schedule-Q. Familiar with the Saudi Aram co Level of inspections.. PERSONAL INFORMATION Name T.REGU Fathers Name T.THANGASWAMY Date of Birth 20/05/1988 Nationality Indian Language English, Hindi, Tamil, Malayalam Passport No L8933930 Date of Issue 23-04-2014 Date of Expiry 22-04-2024 Marital status Married. Religion Hindu. Contact no +91 - 8012735451 +974 - 31412384 PLACE: SIGNAUATRE REGU.T