SlideShare a Scribd company logo
1 of 23
Topic : Hydrology, Run-off Measurement Instruments &
Site Analysis.
GROUP MEMBERS :
1. SHANKAR SHEGADE
2. DINESH PATIL
3. RAVEEN RAMANAN
4. MAHESH YENNAM
5. ASHISH SINGH
Contents
 Introduction-Hydrology.
 Hydrological Cycle.
 Literature Review
 Runoff (Definition, Needs & Factors).
 Runoff Measurement Methods.
 Runoff measuring instruments.
 Factors considered for Site Analysis of Hydro-Electric
power plants.
 Case Study.
Introduction
• The science of hydrology deals with the occurrence and distribution
of water over and above the earth’s surface.
• Hydrology is that branch of physical science, which deals with the
origin, distribution, and properties of water of the earth.
• It deals with the transportation of water through the air, over the
ground surface and through the earth strata.
• The knowledge of hydrology is of basic importance in all walks of life
that involve the use and supply of water for any purpose what so
ever.
• Therefore the knowledge of hydrology is not only useful in the field
of engineering, but also in agriculture, forestry and other branches
of natural sciences.
HYDROLOGICAL CYCLE
A hydrological cycle involves the following processes :-
1) Precipitation (Rainfall, Snowfall, Dew & Mist).
It Varies by :-
a. Amount
b. Intensity
c. Form by Season
d. Geographic Location.
2) Interception (precipitation that does not reach the soil, but is instead intercepted by the
leaves and branches of plants and the forest floor).
3) Infiltration (It is the process by which water on the ground surface enters the soil).
Depends on :-
I. soil characteristics
II. Rainfall intensity.
4) Transpiration (process of water movement through a plant and its evaporation from aerial
parts, such as leaves, stems and flowers).
5) Evaporation
6) Condensation
7) Surface Run-off (flows over the land surface).
8) Sub-Surface Run-off (water that infiltrates in soil).
Literature Review
SR.
NO
Authors & Year Title Conclusion
1. R. D. Stewart1, Z. Liu2, D. E.
Rupp3, C. W. Higgins2, and J.
S. Selker2. (2015)
Instrument to measure
plot-scale runoff.
The instrument is accurate low cost simple
reliable and proper choice measuring runoff.
2. Bhoumika Sahu1, Sanjiv
Kumar2 , Dhananjay Kumar
Sahu3 ,Brijesh patel4,Kalpit
P. Kaurase5. (2015)
Performance of
Gangrel Hydroelectric
Power
Plant.
Should increase the use of renewable energy
sources and reduce the use of non-renewable
resources.
3. Imran Ahmed, Siraj Y. Abed.
(2014)
A SIMULATION MODEL
FOR STAGE –IV KOYNA
HYDROPOWER PLANT
The model helped to identify the optimal
values of different input parameters namely
head, flow rate & turbine efficiency which are
key elements to maximize power generation.
4. Meenakshi Lohani. (2014) Impact of Landuse
Change on Hydrology:
A Case Study of
Gurgaon City.
Groundwater harvesting is essential for
the region. Rain water Harvesting
should be made mandatory for new
constructions.
5. T.S.Mehra1), N.I.Alvi1) ,
A.Rajasekhar1). (2007)
Tawa Hydroelectric
power plant.
The encouraging performance shown by the
Tawa project itself set an example for inviting
private investment in the small Hydro Power
Project sector.
Runoff
• The water available after hydrological process in the form of stream flows,
rivers, lakes, etc is known as Runoff.
Mathematical form,
Runoff(R) = Precipitation(P) – Losses(L)
Runoff(R) = Surface runoff + Subsurface runoff
Need of Runoff
 Design of drains, canals & other channels.
 Prediction of water levels in streams & rivers.
 Storage for irrigation, power generation, river transport.
 Rainfall Pattern.
 Character of catchment area.
 Hill slope.
 Vegetation.
 Weather condition.
 Geology of area.
Factors affecting the runoff
Run-Off Measurement Methods
 It can be measured by the following methods-
1. From rainfall records
2. Empirical formulae
a) Khosla’s formula
R-Annual run-off in mm.
P-Annual rainfall in mm.
T-mean temperature in ˚C.
b) Inglis formula for areas of Maharashtra
For ghat region,
For plain region,
R = 0.88 P – 304.8
R = (P-177.8) x P / 2540
R = P - 4.811 T
Run-off over the catchment = rainfall x coefficient
c) Lacey’s formula
R = monsoon run-off in mm.
S = catchment area factor.
F = monsoon duration factor.
P = monsoon rainfall in mm.
Type of
catchment
Value of S
Flat, cultivated &
black cotton soils
0.25
Flat, partly
cultivated, various
soils
0.6
Average
catchment
1.0
Hills & place with
little cultivation
1.70
Very hilly & steep,
with hardly any
cultivation
3.45
Class of
monsoon
Value of F
Very short 0.50
Standard length 1.00
Very long 1.50
R = P / (1 + 3084 F / PS)
3. Run-off curves
a. Hydrograph
(Discharge v/s Time(months) Graph)
 It indicates the power
available from the stream
at different times of day,
week, month or year
b. Flow duration curve
(Discharge v/s Time(%) Graph)
 Flow duration curves are
most useful for preliminary
studies and for comparison
between streams.
Mass Curve
Cumulative discharge v/s Time Graph.
4. Discharge observation method
 To find out the sub-surface run-off it is essential to separate the subsurface flow
from the total flow. The separation can be on an approximate basis but with
correct analysis.
Runoff Measuring Instruments
• In field most commonly used devices for
measuring water runoff are-
1. Weirs
2. Pre shall flumes
3. Orifices
4. Meter gates.
1. Weirs:
Weirs are used to measure the flow of runoff; an irrigation channel or discharged
of a well or channel outlet at the source.
Discharge can be Summarised as:
where Q = flow rate of fluid
C = constant for structure
L = width of the crest
H = height of head of water over
the crest
n = varies with structure.
Types of weirs :-
1. Sharp Crested:
A. Rectangular weir
(comparatively large discharge).
Q = CLHn
2. Broad crested.
Broad crested weirs are robust structures that are generally constructed from
reinforced concrete and which usually span the full width of the channel.
B. Cipolletti weir (medium discharge).
C. V-notch weir (small discharge).
2. Pre shall flumes
3. Orifices
Factors considered for Site Analysis of
Hydro-Electric power plants
1. Availability of water
– All other designs are based on it.
– Estimate should be made about the average quantity of water available throughout the year and
also about maximum and minimum quantity of water available during the year.
– These details are necessary to decide the capacity of the hydropower plant, and
– It also provide adequate spillways or gate relief during flood period.
2. Water storage
– Since there a is wide variation in rainfall during the year, therefore it is necessary to store the water
for continuous generation of power. The storage capacity can be calculated with the help of mass
curve.
– The two types of storages in use are
1. The storage is so constructed that it can make water available for power generation for one
year only.
2. Water is available in sufficient quantity even during the worst dry periods.
3. Water head
– In order to generate a requisite quantity of power it is necessary that a large quantity of water at
sufficient head should be available.
– An increase in effective head for a given output, reduces the quantity of water required to be
supplied to the turbines.
4. Accessibility of site
– The site where hydro-electric plant is to be constructed should be easy accessible. This is important
if the electric power generated is to be utilized at or near the plant site.
– The site selected should have transportation facilities of rail and road.
5. Distance from the load centre
– Power plant should be set up near the load centre, this will reduce the cost of maintenance of
transmission line.
6. Type of the land of the site
– The land to be selected for the site should be cheap and rocky.
– The ideal site will be one where the dam will have largest catchment area to store water at high
head and will be economical in construction.
– Necessary requirement of the foundation rocks for masonry dam are-
• The rock should be strong enough to withstand the stresses transmitted from the dam
structure as well as the thrust of the water when the reservoir is full.
• The rock in the foundation of the dam should be reasonably impervious.
• The rock should remain stable under all conditions.
Case Study
A new instrument to measure the plot scale runoff
R.D.Stewart1, Z.Liu2,D.E.Rupp3,C.W.Higgins2,and J.S.Selker2
Upwelling Bernoulli Tube (UBeTube).
Limitation of previous methods
1) Not useful in long term monitoring studies.
2) Expensive installation like tipping bucket, flume/weir systems.
3) Not accurate.
4) Cannot measure high flow and errors are large.
UBeTube Instrument
1) It is a pipe with slots machined in its side that is installed vertically at the base of the
runoff.
2) Flow is measured by deducing the water height within the pipe.
3) Measurements both depends on the geometry of slot and accuracy of water level
measurements.
4) It is similar in function to V notch weir, instrument is self empting, no moving parts.
UBeTube Diagram
Construction and working
1) Consists of vertical 10cm diameter pipe, with slot machine at one end.
2) Material Used :- schedule 40 aluminum pipe (relatively low cost and
rigidity ,strength , resistance to corrosion.
3) The tube is attached to the bottom of the runoff plot.
4) Runoff system piping can be buried below grade which secures the system.
5) Instrument can have variation in slots.
6) By finding the water height , inside pipe , flow rate is measured.
Measuring water height
1) Use here vented pressure transducer system.
2) 10 cm tube has range 0.3 to 300 L/min.
3) With correction factor the error are reduced less than 14.
Conclusion :- The instrument is accurate low cost simple reliable and
proper choice measuring runoff.
References
• Blair, A., Sanger, D., White, D., Holland, A. F., Vandiver, L.,Bowker, C., and
White, S. Quantifying and simulating storm water runoff in watersheds,
Hydro. Process., 28, 559–569, 2014.
• Blume, T., Zehe, E., Reusser, D. E., Iroumé, A., and Bronstert,
A.:Investigation of runoff generation in a pristine, poorly gauged
catchment in the Chilean Andes I: A multi-method experimental study,
Hydro. Process., 22, 3661–3675, 2008.
• Biswas, A.K.,History of Hydrology,Amer.Elsevier, New York,348 pp.,1970.
• Nehls, T., Nam Rim, Y., and Wessolek, G.: Technical note on measuring run-
off dynamics from pavements using a new device: the weighable tipping
bucket, Hydro. Earth Syst. Sci., 15, 1379–1386, doi:10.5194/hess-15-1379-
2011, 2011.
• Power System Engineering By R.K. Rajput
Hydrology, Runoff methods & instruments, Site selection

More Related Content

What's hot

Drip irrigation............
Drip irrigation............Drip irrigation............
Drip irrigation............Bhupesh Katriya
 
sprinkler irrigation system
sprinkler irrigation systemsprinkler irrigation system
sprinkler irrigation systemmehmet demir
 
Conjunctive use of water and water budgeting
Conjunctive use of water and water budgetingConjunctive use of water and water budgeting
Conjunctive use of water and water budgetingDelince Samuel
 
Unit 3 INFILTRATION
Unit 3 INFILTRATIONUnit 3 INFILTRATION
Unit 3 INFILTRATIONParimal Jha
 
Prioritizing watersheds
Prioritizing watershedsPrioritizing watersheds
Prioritizing watershedsMeer Raashid
 
Terraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structureTerraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structureMoudud Hasan
 
Bunds and their design
Bunds and their designBunds and their design
Bunds and their designUtkarsh Jain
 
Mass and Flow duration curves
Mass and Flow duration curvesMass and Flow duration curves
Mass and Flow duration curvesVignesh Sekar
 
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14Ambo University (Ethiopia)
 
Surface and Subsurface Tile Drainage
Surface and Subsurface Tile Drainage Surface and Subsurface Tile Drainage
Surface and Subsurface Tile Drainage Charanjiv Singh
 
Soil water plant relationship
Soil water  plant relationshipSoil water  plant relationship
Soil water plant relationshipMOHIT MAYOOR
 
Principles of solar radiation
Principles of solar radiation Principles of solar radiation
Principles of solar radiation SARAN RAJ I
 
Hydraulic Design of Sprinkler System,
Hydraulic Design of Sprinkler System, Hydraulic Design of Sprinkler System,
Hydraulic Design of Sprinkler System, Suyog Khose
 
Depth&frequency of irrigation,consumptive use(irrigation management)
Depth&frequency of irrigation,consumptive use(irrigation management)Depth&frequency of irrigation,consumptive use(irrigation management)
Depth&frequency of irrigation,consumptive use(irrigation management)siva ch
 
Watershed management
Watershed  managementWatershed  management
Watershed managementPramoda Raj
 
effective rain fall
effective rain falleffective rain fall
effective rain fallBhanu Dangi
 

What's hot (20)

Drip irrigation............
Drip irrigation............Drip irrigation............
Drip irrigation............
 
lysimeters
 lysimeters lysimeters
lysimeters
 
sprinkler irrigation system
sprinkler irrigation systemsprinkler irrigation system
sprinkler irrigation system
 
Conjunctive use of water and water budgeting
Conjunctive use of water and water budgetingConjunctive use of water and water budgeting
Conjunctive use of water and water budgeting
 
Unit 3 INFILTRATION
Unit 3 INFILTRATIONUnit 3 INFILTRATION
Unit 3 INFILTRATION
 
Prioritizing watersheds
Prioritizing watershedsPrioritizing watersheds
Prioritizing watersheds
 
Evapotranspiration
EvapotranspirationEvapotranspiration
Evapotranspiration
 
Terraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structureTerraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structure
 
Measurement of rainfall
Measurement of rainfallMeasurement of rainfall
Measurement of rainfall
 
Updating the curve number method for rainfall runoff estimation
Updating the curve number method for rainfall runoff estimationUpdating the curve number method for rainfall runoff estimation
Updating the curve number method for rainfall runoff estimation
 
Bunds and their design
Bunds and their designBunds and their design
Bunds and their design
 
Mass and Flow duration curves
Mass and Flow duration curvesMass and Flow duration curves
Mass and Flow duration curves
 
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14
 
Surface and Subsurface Tile Drainage
Surface and Subsurface Tile Drainage Surface and Subsurface Tile Drainage
Surface and Subsurface Tile Drainage
 
Soil water plant relationship
Soil water  plant relationshipSoil water  plant relationship
Soil water plant relationship
 
Principles of solar radiation
Principles of solar radiation Principles of solar radiation
Principles of solar radiation
 
Hydraulic Design of Sprinkler System,
Hydraulic Design of Sprinkler System, Hydraulic Design of Sprinkler System,
Hydraulic Design of Sprinkler System,
 
Depth&frequency of irrigation,consumptive use(irrigation management)
Depth&frequency of irrigation,consumptive use(irrigation management)Depth&frequency of irrigation,consumptive use(irrigation management)
Depth&frequency of irrigation,consumptive use(irrigation management)
 
Watershed management
Watershed  managementWatershed  management
Watershed management
 
effective rain fall
effective rain falleffective rain fall
effective rain fall
 

Viewers also liked

Viewers also liked (20)

Surface Runoff Full Presentatiom
Surface Runoff Full PresentatiomSurface Runoff Full Presentatiom
Surface Runoff Full Presentatiom
 
Chapter 5 runoff
Chapter 5   runoffChapter 5   runoff
Chapter 5 runoff
 
Surface runoff
Surface runoffSurface runoff
Surface runoff
 
Methods of measuring rainfall
Methods of measuring rainfallMethods of measuring rainfall
Methods of measuring rainfall
 
Runoff and Hydrograph
Runoff and HydrographRunoff and Hydrograph
Runoff and Hydrograph
 
Rainfall measurement methods
Rainfall measurement methodsRainfall measurement methods
Rainfall measurement methods
 
Runoff final
Runoff finalRunoff final
Runoff final
 
Infiltration and runoff
Infiltration and runoffInfiltration and runoff
Infiltration and runoff
 
Hydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power PlantHydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power Plant
 
Runoff and Hydrograph
Runoff and HydrographRunoff and Hydrograph
Runoff and Hydrograph
 
open channel flow
open channel flowopen channel flow
open channel flow
 
Chap1 open channel flow
Chap1 open channel flowChap1 open channel flow
Chap1 open channel flow
 
Ch4 surface runoff
Ch4 surface runoffCh4 surface runoff
Ch4 surface runoff
 
Unit hydrograph by anwar
Unit hydrograph by anwarUnit hydrograph by anwar
Unit hydrograph by anwar
 
Flood routing
Flood routingFlood routing
Flood routing
 
Hydrograph
HydrographHydrograph
Hydrograph
 
Floods
FloodsFloods
Floods
 
Flood estimation
Flood estimation Flood estimation
Flood estimation
 
Armrijk klas4
Armrijk klas4Armrijk klas4
Armrijk klas4
 
Water resources and hydrology of california
Water resources and hydrology of californiaWater resources and hydrology of california
Water resources and hydrology of california
 

Similar to Hydrology, Runoff methods & instruments, Site selection

unit-4ivparta-171111103458.pdf
unit-4ivparta-171111103458.pdfunit-4ivparta-171111103458.pdf
unit-4ivparta-171111103458.pdfNareshKambala
 
Unit_IV-HYDRO ELECTRIC POWER PLANTS
Unit_IV-HYDRO ELECTRIC POWER PLANTSUnit_IV-HYDRO ELECTRIC POWER PLANTS
Unit_IV-HYDRO ELECTRIC POWER PLANTSS.Vijaya Bhaskar
 
Lecture 3-Water Resources Monitoring.ppt
Lecture 3-Water Resources Monitoring.pptLecture 3-Water Resources Monitoring.ppt
Lecture 3-Water Resources Monitoring.pptLawrence Omai
 
IRJET- Parameters Affecting the Clogging of Recharge Wells in Different Soil ...
IRJET- Parameters Affecting the Clogging of Recharge Wells in Different Soil ...IRJET- Parameters Affecting the Clogging of Recharge Wells in Different Soil ...
IRJET- Parameters Affecting the Clogging of Recharge Wells in Different Soil ...IRJET Journal
 
Sufficiency of water distributory(hlbc)
Sufficiency of water distributory(hlbc)Sufficiency of water distributory(hlbc)
Sufficiency of water distributory(hlbc)eSAT Journals
 
443047949-Rain-water-Harvesting-Project-Report-docx.docx
443047949-Rain-water-Harvesting-Project-Report-docx.docx443047949-Rain-water-Harvesting-Project-Report-docx.docx
443047949-Rain-water-Harvesting-Project-Report-docx.docxParthNanu
 
Irrigation_methods__96_slayt.ppt
Irrigation_methods__96_slayt.pptIrrigation_methods__96_slayt.ppt
Irrigation_methods__96_slayt.pptAhmedAdenAli
 
Irrigation Engg.(CE5G) Irrigation method.ppt
Irrigation Engg.(CE5G) Irrigation    method.pptIrrigation Engg.(CE5G) Irrigation    method.ppt
Irrigation Engg.(CE5G) Irrigation method.pptMounikaRangaraj
 
REMOTE SENSING DATA FOR HYDROLOGICAL MODELING
REMOTE SENSING DATA FOR HYDROLOGICAL MODELINGREMOTE SENSING DATA FOR HYDROLOGICAL MODELING
REMOTE SENSING DATA FOR HYDROLOGICAL MODELINGShyam Mohan Chaudhary
 
Irrigation water measurement technique
Irrigation water measurement techniqueIrrigation water measurement technique
Irrigation water measurement techniqueSuyog Khose
 
IRJET- Assessment of Environmental Impacts during Operational Phase of a T...
IRJET- 	  Assessment of Environmental Impacts during Operational Phase of a T...IRJET- 	  Assessment of Environmental Impacts during Operational Phase of a T...
IRJET- Assessment of Environmental Impacts during Operational Phase of a T...IRJET Journal
 
Design of Lift Irrigation System- Angar as A Case Study
Design of Lift Irrigation System- Angar as A Case StudyDesign of Lift Irrigation System- Angar as A Case Study
Design of Lift Irrigation System- Angar as A Case StudyIRJET Journal
 
IRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment PlantIRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment PlantIRJET Journal
 
Sprinkler Irrigation System
Sprinkler Irrigation System Sprinkler Irrigation System
Sprinkler Irrigation System BHU VARANASI
 
Water supply Engineering Notes by Sudip Khadka.pdf
Water supply Engineering Notes by Sudip Khadka.pdfWater supply Engineering Notes by Sudip Khadka.pdf
Water supply Engineering Notes by Sudip Khadka.pdfSudip khadka
 
Guidelines For Construction of Pipe Distribution Network (PDN) For Irrigation
Guidelines For Construction of Pipe Distribution Network (PDN) For IrrigationGuidelines For Construction of Pipe Distribution Network (PDN) For Irrigation
Guidelines For Construction of Pipe Distribution Network (PDN) For IrrigationIRJET Journal
 
Power and Energy Potential Study hydrology.pptx
Power and Energy Potential Study hydrology.pptxPower and Energy Potential Study hydrology.pptx
Power and Energy Potential Study hydrology.pptxMridu5
 

Similar to Hydrology, Runoff methods & instruments, Site selection (20)

unit-4ivparta-171111103458.pdf
unit-4ivparta-171111103458.pdfunit-4ivparta-171111103458.pdf
unit-4ivparta-171111103458.pdf
 
Unit_IV-HYDRO ELECTRIC POWER PLANTS
Unit_IV-HYDRO ELECTRIC POWER PLANTSUnit_IV-HYDRO ELECTRIC POWER PLANTS
Unit_IV-HYDRO ELECTRIC POWER PLANTS
 
Lecture 3-Water Resources Monitoring.ppt
Lecture 3-Water Resources Monitoring.pptLecture 3-Water Resources Monitoring.ppt
Lecture 3-Water Resources Monitoring.ppt
 
IRJET- Parameters Affecting the Clogging of Recharge Wells in Different Soil ...
IRJET- Parameters Affecting the Clogging of Recharge Wells in Different Soil ...IRJET- Parameters Affecting the Clogging of Recharge Wells in Different Soil ...
IRJET- Parameters Affecting the Clogging of Recharge Wells in Different Soil ...
 
Sufficiency of water distributory(hlbc)
Sufficiency of water distributory(hlbc)Sufficiency of water distributory(hlbc)
Sufficiency of water distributory(hlbc)
 
443047949-Rain-water-Harvesting-Project-Report-docx.docx
443047949-Rain-water-Harvesting-Project-Report-docx.docx443047949-Rain-water-Harvesting-Project-Report-docx.docx
443047949-Rain-water-Harvesting-Project-Report-docx.docx
 
Online Watershed Analysis Tool
Online Watershed Analysis Tool Online Watershed Analysis Tool
Online Watershed Analysis Tool
 
Irrigation_methods__96_slayt.ppt
Irrigation_methods__96_slayt.pptIrrigation_methods__96_slayt.ppt
Irrigation_methods__96_slayt.ppt
 
Irrigation Engg.(CE5G) Irrigation method.ppt
Irrigation Engg.(CE5G) Irrigation    method.pptIrrigation Engg.(CE5G) Irrigation    method.ppt
Irrigation Engg.(CE5G) Irrigation method.ppt
 
REMOTE SENSING DATA FOR HYDROLOGICAL MODELING
REMOTE SENSING DATA FOR HYDROLOGICAL MODELINGREMOTE SENSING DATA FOR HYDROLOGICAL MODELING
REMOTE SENSING DATA FOR HYDROLOGICAL MODELING
 
Irrigation water measurement technique
Irrigation water measurement techniqueIrrigation water measurement technique
Irrigation water measurement technique
 
IRJET- Assessment of Environmental Impacts during Operational Phase of a T...
IRJET- 	  Assessment of Environmental Impacts during Operational Phase of a T...IRJET- 	  Assessment of Environmental Impacts during Operational Phase of a T...
IRJET- Assessment of Environmental Impacts during Operational Phase of a T...
 
Design of Lift Irrigation System- Angar as A Case Study
Design of Lift Irrigation System- Angar as A Case StudyDesign of Lift Irrigation System- Angar as A Case Study
Design of Lift Irrigation System- Angar as A Case Study
 
IRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment PlantIRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment Plant
 
Sprinkler Irrigation System
Sprinkler Irrigation System Sprinkler Irrigation System
Sprinkler Irrigation System
 
Water supply Engineering Notes by Sudip Khadka.pdf
Water supply Engineering Notes by Sudip Khadka.pdfWater supply Engineering Notes by Sudip Khadka.pdf
Water supply Engineering Notes by Sudip Khadka.pdf
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 
Guidelines For Construction of Pipe Distribution Network (PDN) For Irrigation
Guidelines For Construction of Pipe Distribution Network (PDN) For IrrigationGuidelines For Construction of Pipe Distribution Network (PDN) For Irrigation
Guidelines For Construction of Pipe Distribution Network (PDN) For Irrigation
 
Power and Energy Potential Study hydrology.pptx
Power and Energy Potential Study hydrology.pptxPower and Energy Potential Study hydrology.pptx
Power and Energy Potential Study hydrology.pptx
 
H0372040043
H0372040043H0372040043
H0372040043
 

Recently uploaded

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 

Recently uploaded (20)

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 

Hydrology, Runoff methods & instruments, Site selection

  • 1. Topic : Hydrology, Run-off Measurement Instruments & Site Analysis. GROUP MEMBERS : 1. SHANKAR SHEGADE 2. DINESH PATIL 3. RAVEEN RAMANAN 4. MAHESH YENNAM 5. ASHISH SINGH
  • 2. Contents  Introduction-Hydrology.  Hydrological Cycle.  Literature Review  Runoff (Definition, Needs & Factors).  Runoff Measurement Methods.  Runoff measuring instruments.  Factors considered for Site Analysis of Hydro-Electric power plants.  Case Study.
  • 3. Introduction • The science of hydrology deals with the occurrence and distribution of water over and above the earth’s surface. • Hydrology is that branch of physical science, which deals with the origin, distribution, and properties of water of the earth. • It deals with the transportation of water through the air, over the ground surface and through the earth strata. • The knowledge of hydrology is of basic importance in all walks of life that involve the use and supply of water for any purpose what so ever. • Therefore the knowledge of hydrology is not only useful in the field of engineering, but also in agriculture, forestry and other branches of natural sciences.
  • 5. A hydrological cycle involves the following processes :- 1) Precipitation (Rainfall, Snowfall, Dew & Mist). It Varies by :- a. Amount b. Intensity c. Form by Season d. Geographic Location. 2) Interception (precipitation that does not reach the soil, but is instead intercepted by the leaves and branches of plants and the forest floor). 3) Infiltration (It is the process by which water on the ground surface enters the soil). Depends on :- I. soil characteristics II. Rainfall intensity. 4) Transpiration (process of water movement through a plant and its evaporation from aerial parts, such as leaves, stems and flowers). 5) Evaporation 6) Condensation 7) Surface Run-off (flows over the land surface). 8) Sub-Surface Run-off (water that infiltrates in soil).
  • 6. Literature Review SR. NO Authors & Year Title Conclusion 1. R. D. Stewart1, Z. Liu2, D. E. Rupp3, C. W. Higgins2, and J. S. Selker2. (2015) Instrument to measure plot-scale runoff. The instrument is accurate low cost simple reliable and proper choice measuring runoff. 2. Bhoumika Sahu1, Sanjiv Kumar2 , Dhananjay Kumar Sahu3 ,Brijesh patel4,Kalpit P. Kaurase5. (2015) Performance of Gangrel Hydroelectric Power Plant. Should increase the use of renewable energy sources and reduce the use of non-renewable resources. 3. Imran Ahmed, Siraj Y. Abed. (2014) A SIMULATION MODEL FOR STAGE –IV KOYNA HYDROPOWER PLANT The model helped to identify the optimal values of different input parameters namely head, flow rate & turbine efficiency which are key elements to maximize power generation. 4. Meenakshi Lohani. (2014) Impact of Landuse Change on Hydrology: A Case Study of Gurgaon City. Groundwater harvesting is essential for the region. Rain water Harvesting should be made mandatory for new constructions. 5. T.S.Mehra1), N.I.Alvi1) , A.Rajasekhar1). (2007) Tawa Hydroelectric power plant. The encouraging performance shown by the Tawa project itself set an example for inviting private investment in the small Hydro Power Project sector.
  • 7. Runoff • The water available after hydrological process in the form of stream flows, rivers, lakes, etc is known as Runoff. Mathematical form, Runoff(R) = Precipitation(P) – Losses(L) Runoff(R) = Surface runoff + Subsurface runoff
  • 8. Need of Runoff  Design of drains, canals & other channels.  Prediction of water levels in streams & rivers.  Storage for irrigation, power generation, river transport.  Rainfall Pattern.  Character of catchment area.  Hill slope.  Vegetation.  Weather condition.  Geology of area. Factors affecting the runoff
  • 9. Run-Off Measurement Methods  It can be measured by the following methods- 1. From rainfall records 2. Empirical formulae a) Khosla’s formula R-Annual run-off in mm. P-Annual rainfall in mm. T-mean temperature in ˚C. b) Inglis formula for areas of Maharashtra For ghat region, For plain region, R = 0.88 P – 304.8 R = (P-177.8) x P / 2540 R = P - 4.811 T Run-off over the catchment = rainfall x coefficient
  • 10. c) Lacey’s formula R = monsoon run-off in mm. S = catchment area factor. F = monsoon duration factor. P = monsoon rainfall in mm. Type of catchment Value of S Flat, cultivated & black cotton soils 0.25 Flat, partly cultivated, various soils 0.6 Average catchment 1.0 Hills & place with little cultivation 1.70 Very hilly & steep, with hardly any cultivation 3.45 Class of monsoon Value of F Very short 0.50 Standard length 1.00 Very long 1.50 R = P / (1 + 3084 F / PS)
  • 11. 3. Run-off curves a. Hydrograph (Discharge v/s Time(months) Graph)  It indicates the power available from the stream at different times of day, week, month or year b. Flow duration curve (Discharge v/s Time(%) Graph)  Flow duration curves are most useful for preliminary studies and for comparison between streams.
  • 12. Mass Curve Cumulative discharge v/s Time Graph. 4. Discharge observation method  To find out the sub-surface run-off it is essential to separate the subsurface flow from the total flow. The separation can be on an approximate basis but with correct analysis.
  • 13. Runoff Measuring Instruments • In field most commonly used devices for measuring water runoff are- 1. Weirs 2. Pre shall flumes 3. Orifices 4. Meter gates.
  • 14. 1. Weirs: Weirs are used to measure the flow of runoff; an irrigation channel or discharged of a well or channel outlet at the source. Discharge can be Summarised as: where Q = flow rate of fluid C = constant for structure L = width of the crest H = height of head of water over the crest n = varies with structure. Types of weirs :- 1. Sharp Crested: A. Rectangular weir (comparatively large discharge). Q = CLHn
  • 15. 2. Broad crested. Broad crested weirs are robust structures that are generally constructed from reinforced concrete and which usually span the full width of the channel. B. Cipolletti weir (medium discharge). C. V-notch weir (small discharge).
  • 16. 2. Pre shall flumes 3. Orifices
  • 17. Factors considered for Site Analysis of Hydro-Electric power plants 1. Availability of water – All other designs are based on it. – Estimate should be made about the average quantity of water available throughout the year and also about maximum and minimum quantity of water available during the year. – These details are necessary to decide the capacity of the hydropower plant, and – It also provide adequate spillways or gate relief during flood period. 2. Water storage – Since there a is wide variation in rainfall during the year, therefore it is necessary to store the water for continuous generation of power. The storage capacity can be calculated with the help of mass curve. – The two types of storages in use are 1. The storage is so constructed that it can make water available for power generation for one year only. 2. Water is available in sufficient quantity even during the worst dry periods.
  • 18. 3. Water head – In order to generate a requisite quantity of power it is necessary that a large quantity of water at sufficient head should be available. – An increase in effective head for a given output, reduces the quantity of water required to be supplied to the turbines. 4. Accessibility of site – The site where hydro-electric plant is to be constructed should be easy accessible. This is important if the electric power generated is to be utilized at or near the plant site. – The site selected should have transportation facilities of rail and road. 5. Distance from the load centre – Power plant should be set up near the load centre, this will reduce the cost of maintenance of transmission line. 6. Type of the land of the site – The land to be selected for the site should be cheap and rocky. – The ideal site will be one where the dam will have largest catchment area to store water at high head and will be economical in construction. – Necessary requirement of the foundation rocks for masonry dam are- • The rock should be strong enough to withstand the stresses transmitted from the dam structure as well as the thrust of the water when the reservoir is full. • The rock in the foundation of the dam should be reasonably impervious. • The rock should remain stable under all conditions.
  • 19. Case Study A new instrument to measure the plot scale runoff R.D.Stewart1, Z.Liu2,D.E.Rupp3,C.W.Higgins2,and J.S.Selker2 Upwelling Bernoulli Tube (UBeTube). Limitation of previous methods 1) Not useful in long term monitoring studies. 2) Expensive installation like tipping bucket, flume/weir systems. 3) Not accurate. 4) Cannot measure high flow and errors are large. UBeTube Instrument 1) It is a pipe with slots machined in its side that is installed vertically at the base of the runoff. 2) Flow is measured by deducing the water height within the pipe. 3) Measurements both depends on the geometry of slot and accuracy of water level measurements. 4) It is similar in function to V notch weir, instrument is self empting, no moving parts.
  • 21. Construction and working 1) Consists of vertical 10cm diameter pipe, with slot machine at one end. 2) Material Used :- schedule 40 aluminum pipe (relatively low cost and rigidity ,strength , resistance to corrosion. 3) The tube is attached to the bottom of the runoff plot. 4) Runoff system piping can be buried below grade which secures the system. 5) Instrument can have variation in slots. 6) By finding the water height , inside pipe , flow rate is measured. Measuring water height 1) Use here vented pressure transducer system. 2) 10 cm tube has range 0.3 to 300 L/min. 3) With correction factor the error are reduced less than 14. Conclusion :- The instrument is accurate low cost simple reliable and proper choice measuring runoff.
  • 22. References • Blair, A., Sanger, D., White, D., Holland, A. F., Vandiver, L.,Bowker, C., and White, S. Quantifying and simulating storm water runoff in watersheds, Hydro. Process., 28, 559–569, 2014. • Blume, T., Zehe, E., Reusser, D. E., Iroumé, A., and Bronstert, A.:Investigation of runoff generation in a pristine, poorly gauged catchment in the Chilean Andes I: A multi-method experimental study, Hydro. Process., 22, 3661–3675, 2008. • Biswas, A.K.,History of Hydrology,Amer.Elsevier, New York,348 pp.,1970. • Nehls, T., Nam Rim, Y., and Wessolek, G.: Technical note on measuring run- off dynamics from pavements using a new device: the weighable tipping bucket, Hydro. Earth Syst. Sci., 15, 1379–1386, doi:10.5194/hess-15-1379- 2011, 2011. • Power System Engineering By R.K. Rajput