SlideShare a Scribd company logo
1 of 10
CURRICULUM VITAE
Personal Data
Name : Rangga Kadarusman, S.T.
Address : Perum GMP Blok K, No.8
Tanjung Sengkuang, Batam.
Place & Date of Birth : Kuningan (West Java), October 14th
1982
Email : rkadarusman@gmail.com
rangstea@yahoo.com
Education : Bachelor Degree as Industrial Engineering
Language : Indonesian, English, Malay.
Passport No : B4259887
Phone : Mobile +62 813 6437 3011
Gender : Male
Marital Status : Marriage
Position : Completions Management System/CMS Engineer/Administrator or
System Turnover.
Career Summary
More than 10 years, extensive experienced as CMS/Completions Management
System Engineer/Administrator and System Dossier Turnover Phase Mechanical
Completion, Pre Commissioning & Commissioning. Responsible to develop, maintain,
monitors and controls Inspection Test Records/Check Sheet, Punch list & Turnover
Certificate handover to Client/Operations, using Project Completions System or System
Completions Data Base like WinPCS, Zenator and PIMS.
Working as CMS & System Turnover have many challenges and it gives a good
sense of achievement and job satisfaction to have been a part of team that gets the job
done. Working with high standard of safe working practice, Quality and productivity as
well, as compliance with code of business conduct. I am well known as a team player and
have never left a project under bad conditions.
Computer Proficiency
• Excellent in MS Office, etc.
• ZENATOR- Project Completion Software by FALCON GLOBAL
• PIMS – Project Information Management System by OMEGA NORWAY
• WinPCS – Windows Project Certification Completion System by COMPLAN LLC USA.
Certificates are available if needed. 1 Of 8
CURRICULUM VITAE
Working Experience:
1. Project : Gathering Center GC- 31 Project, Kuwait Oil Company (K.S.C).
Duration : November 2016 to Pressent.
Location : Site GC-31 Project at Dodsal Engineering & Construction Pte. Ltd.
Position : CMS Engineer at WinPCS /Complan LLC, USA
Responsibilities:
- Collect all data to populated System, Subsystem, Sub Subsystem Tags, ITR Check
sheet, Turnover Certificate for Mechanical Completions & Commissioning Phase.
- Maintain and Updated System Group, System/Subsystem
- Coordinate with Mechanical Completions & Commissioning engineering to
Assigning ITR Check sheet Form into each tag type categories.
- Create, maintain and updated all Tags number, Test Pack, Punch list,
Preservations and other engineering data for all discipline.
- Coordinate with Mechanical Completion & Commissioning engineering team to
prepare for handover Subsystem & System Dossier to Client.
- Reporting Mechanical Completion (MC) ITR Status Index Report, Pre-
commissioning (PC) ITR Status Index Report, Punchlist Report and Certificate
handover status.
- High standard of safe working practice, quality and productivity as well as
compliance with code of business conduct.
2. Project : Banyu Urip EPC1 Production Processing Facilities, ExxonMobil Indonesia.
Duration : August 2013 to July 2016.
Location : PT. Tripatra - Samsung Consortium, Jakarta & Site Cepu - Bojonegoro.
Position : CMS Database Specialist/Engineer (Zenator Database).
Responsibilities:
- Zenator Database Development.
- Maintain and Updated System Group, System/Subsystem in Zenator.
- Maintain and updated Tags number, Test Pack, Punch list, Preservations and
other engineering data for all discipline.
- Interface with Completions Engineering to Set up and prepare templates MC & SC
Check sheet template for Inspections in field.
- Interface with Preservations Engineering to Set up and prepare templates
Preservations Check sheet template for Inspections in field.
- Coordinate with Mechanical Completions & Commissioning engineering to Create,
Populate and manage ITR/Check sheet, Punchlist, Completions Certificate to
handover from MC to SC and to Client/Operations ExxonMobil.
Certificates are available if needed. 2 Of 8
CURRICULUM VITAE
- Coordinate with Preservation engineer to Create, Manage, provide and closed the
check sheet based on their requirement frequency.
- Maintaining all Checksheet, Punchlist and Certificate.
- Provide Tags & Punchlist Index to TCP Group for handover.
- Install Zenator software for all people who require using, monitoring and
reporting.
- Prepare Management of Change to implement in Data Base Zenator.
- High standard of safe working practice, quality and productivity as well as
compliance with code of business conduct.
3. Project : Gorgon (PAR’s & PAU’s Module) LNG Plant KJVG Project, Chevron
Australia.
Duration : November 2011 to July 2013.
Location : PT. McDermott Indonesia Batam.
Position : CMS/PIMS Database Administrator & Completions Doc. Controller.
Responsibilities:
- PIMS Database Development
- Maintain All Completions Data in PIMS such as progress Inspection Test Records,
Punch list, all data Tag number all discipline.
- Comparison data between KJVG Database (Zenator) and McDermott Database
(PIMS).
- Producing Mechanical Completions Inspection Test Records (ITR’s) and hand over
to MC team.
- Updated all discipline tag number ITR’s Mechanical Completions and Pre-
Commissioning/Commissioning to PIMS data base.
- Interfaces with Engineering Team's, Mechanical Completions and Commissioning
Team to discuss regarding tag number/cheek sheet.
- Maintain and manage all discipline Tag Number and Punch list Item all discipline
in PIMS Database.
- Reporting daily and weekly the status of Progress ITR’s and Punch list Completions
and as required.
- Reporting monthly Progress ITR’s to Key Performance Indicator (KPI) to Yards
Management Team and as required.
- Implement Project Document Management requirements and Procedures.
Certificates are available if needed. 3 Of 8
CURRICULUM VITAE
- Maintaining a proper filling in documentation and engineering section.
- Preparing transmittals for issuing of documents to clients and
subcontractors/vendors
- Ensuring that System & Subsystem discipline dossiers are up to date at all times.
- Interfaces with Fabrication Team's Mechanical Completions Supervisor and
Fabrication Supervisors & Commissioning Team
- Keep up to date and Monitoring in and out going Project Document Registers
- Compiling all document such as ITR doc, procedure, McDermott & Client
drawing/document, transmittal doc, etc.
- Maintaining project documentation files consisting of technical data, engineering
and supplier drawings, technical specifications, purchase orders and other
project-required document.
- Maintain file hard copy & scan copy for our back up file.
- Prepare & Checked the Dossier for the handover of Project Final Documentation
and hand over to Client Construction/operations.
- High standard of safe working practice, quality and productivity as well as
compliance with code of business conduct.
4. Project : Platong Gas II Jacket, UD, LQM, CPP Top Side Project, Chevron Thailand.
Duration : August 2009 to November 2011
Location : PT. McDermott Indonesia Batam & Offshore Gulf of Thailand.
Position : Completion/Commissioning Doc. Cont. Focal Point/Coordinator & PIMS
Database.
Responsibilities:
- Liaise with Documents Control to implement and maintain a Project Document
control system consistent with Company / Project Requirements.
- Implement Project Document Management requirements and Procedures
- Coordinate Document control team on handling document control issues.
- Ensure that all team members have been introduced and trained on the
document management system in place, for documents in electronic format and
in hardcopy.
- Preparing comprehensive filling system and filling the project work progress.
Certificates are available if needed. 4 Of 8
CURRICULUM VITAE
- Preparing supports drawing for completion engineering related request of
documentation.
- Establish and keep updated the filling Structure of the Project (electronic and hard
copies)
- Preparing transmittals for issuing of documents to clients and
subcontractors/vendors
- Making Cover, Spines and Table Contents for System/Sub System Dossier.
- Preparation, Review and Submission Discipline Acceptance Certificate (DAC), Sub
System Mechanical Completion Certificate (SSMCC) Ready for Commissioning
Certificate (RFCC) to Client Acceptance.
- Preparation, Review and Submission Turnover System Dossier to Client
Construction & Operations.
- Maintain Soft copy Dossier per Subsystem & System same as actual Dossier for
backup to client in the future.
- Maintain All Mechanical Completions and Pre Commissioning Data in PIMS
- Producing Mechanical Completions ITR’s and hand over to MC team.
- Uploading and Compare data within engineering data and PIMS database.
- Update all discipline ITR’s Mechanical Completions & Pre Commissioning to PIMS
data base.
- Maintaining all discipline Tag Number and Punch list Item in PIMS Database.
- Maintain, Monitoring & Reporting Producing Discipline Acceptance Certificate,
Sub System Mechanical Completion Certificate and Ready for Commissioning
Certificate to all System Dossier.
- Preparing daily and weekly the status of Certificate, ITR’s and Punch list
Completions Progress report.
5. Project : North Belut Jacket & CPP top Side Project, Conoco Philips Indonesia.
Duration : October 2008 to July 2009
Location : PT. McDermott Indonesia Batam & Offshore Natuna Sea.
Position : Completion Doc. Control & PIMS Operator & HUC Barge Clerk offshore
Responsibilities:
Certificates are available if needed. 5 Of 8
CURRICULUM VITAE
- Implement and maintain a Project Document control system consistent with
Company / Project Requirements.
- Updates and maintains project document control record keeping system
- Mechanical completion and Pre- commissioning subsystem and System Handover.
- Maintain & Preparations Mechanical completion/Pre Commissioning
System/subsystem Handover.
- Preparing transmittals for issuing of documents to clients and
subcontractors/vendors.
- Receive and filling all disciplines ITR’s (inspection Test Record).
- Check all ITR’s and filling to Dossier as per Sub system and Index Report.
- Preparations Dossier, Compiled Inspection Test Record as per Sub system and per
Index.
- Check & Submit Dossier for acceptance and hand over to Client.
- Make a Soft copy Folder and arrange like actual folder.
- Maintain All Mechanical Completions and Pre Commissioning Data in PIMS
- Update all discipline ITR’s Mechanical Completions & Pre- commissioning to PIMS
data base.
- Create / Edit and deleted Punch list Item Discipline Structural, Mechanical, Piping,
Electrical and instruments in PIMS Data Base.
- Create edit and Delete Flange Joint data in PIMS Database.
- Preparation LUN (Livening up Notice) sheet, etc.
- Control, Estimate and update Task Sheet Booked Man Hours.
- Updated Daily and Monthly Time Sheet All Hook up & Commissioning crew
including Sub Contractor.
- Updated Total Personal On Board (in Coming and Out Going)
- Updated Task Sheet Daily Progress Report Engineering.
- Control & update Daily Summary Total and percentage task sheet progress.
6. Project : Sutuvang Jacket and CPP Top Side Project, CLJOC Vietnam.
Certificates are available if needed. 6 Of 8
CURRICULUM VITAE
Duration : September 2007 to October 2008
Location : PT. McDermott Indonesia Batam & Offshore Gulf of Vietnam.
Position : Assistance Engineer & Doc. Controller Flanges Management.
Responsibilities:
- Checking all test packages from document control, received and forward to Sub
contractor.
- Identify joint detail from test pack/Isometric Drawing and up date to FM Map
Monitoring.
- Update FM Completions certificates to PIMS Data Base.
- Update and Edit Flanges management Summary from PIMS Database.
- Responsible for the everyday report to updated in KPI progress.
- Sending weekly report Progress KPI to management.
- Producing Flanges Management Summary to DMCC packages.
- Monitoring Flanges Joint Completions Certificate
- Monitoring Tools torque equipment to maintenance and calibration.
- Tightening Flanges Joint use Hand & Hydraulic Torque, Bolt tensioning.
7. Project : Kerisi Jacket & MSF Project, Conoco Philips Indonesia.
Duration : November 2006 to September 2007
Location : PT. McDermott Indonesia Batam.
Position : Assistance Engineer & MC Doc. Controller & PIMS Operator.
Responsibilities:
- Maintaining project documentation files consisting of technical data, engineering
and supplier drawings, technical specifications, purchase orders and other
project-required documents.
- Implement and maintain a Project Document control system consistent with
Company / Project Requirements.
- Updates and maintains project document control record keeping system
- Mechanical completion and Pre- commissioning subsystem and System Handover.
- Preparation and filling Document (P&ID, Isometric drawing, etc).
Certificates are available if needed. 7 Of 8
CURRICULUM VITAE
- Distributing project Drawings to all Discipline Engineering.
- Review and checking and filling of ITR’s (inspection Test Record).
- Making of Transmittal Certificate/ITR and Report to Client.
- Preparation Document per Sub system to submit and approve by Client.
- Input data Flanges Joint Detail from Isometric drawing to FM joint Completions
certificate.
- Producing Certificate of Flanges Management and Submit to Client for Approval.
- Identify all flanges Joint Detail from Isometric Drawing to Map monitoring.
- Updating FM certificate to PIMS Database.
- Reporting and Transmit the Certificate’s to client.
- Create Punch list Item Discipline Mechanical, Piping, Electrical and instruments in
PIMS Database.
- Create, edit and delete flange joint and Isometric data in PIMS database
- Ensure the total flange joint in every Test package and update into database.
Course & Training:
1. Zenator Power User Training from Falcon (certified).
2. PIMS Database Administrator Training at PT. Mc Dermott Indonesia.
3. Putra Batam Microsoft Access Programmer - English - Computer Course (Certified)
4. Travel Safely by Boat and Basic Offshore Safety Induction and Emergency Training
(BOSIET) including HUET by M&O/OPITO Indonesia (Certified)
5. Travel Safely by Boat and Basic Offshore Safety Induction and Emergency Training
(BOSIET) by MSTS Malaysia (Certified).
6. Incident Injury Free (IIF) Workshop Training by JMJ Safety consultancy Singapore.
7. KPI (Key Performance Indicator) Workshop & Quarantine Training by McDermott
& KJVG.
8. Fire Warden Training & FSI (Faults free Start up Initiative) Training PT. Mc Dermott
Indonesia.
9. Incident Injury Free Workshop Commitment Training PT. Mc Dermott Indonesia &
KJVG.
10. Offshore Safety Induction Training by Cu Long Joint Operating Company HSE,
Conoco Philips HSE and Chevron Thailand HSE.
Certificates are available if needed. 8 Of 8
CURRICULUM VITAE
11. Safety Procedure Training (PTW, HIT, JSA) by Chevron Thailand.
12. Competence Test from National Council Education. (Certified)
13. McDermott Code of Business Conduct, Ethics & Compliance Training.
14. BBSM Training (Behavior Based Safety Training) at PT. Mc Dermott Indonesia.
15. Quality Awareness Training Level 2 & HSE orientation at PT. Mc Dermott
Indonesia.
16. H2S Level 1 & SSHE Induction at Tripatra-Samsung Training center.
References:
1. Mukesh Kumar - Area Commissioning Manager Asia Pacific.
Email: MKumar2@mcdermott.com Phone : +65-66685540
2. Pablo H. Varona - Hook Up & Commissioning Manager.
Email: PVarona@mcdermott.com
3. Mark Hayes - Commissioning & OA Manager – (Chevron Project - former).
Email: Markhayes1962@hotmail.com
4. Jun A. Pedregosa - Completions Manager Batam Fabrications Yards.
Email: JAPedregosa@mcdermott.com Phone: +62-77840565.
5. Lance Medlin – System Completions Manager – ExxonMobil
Email: lance.medlin@exxonmobil.com Phone: +1.832.418.8940 US Cell
6. Seong wan Kim – System Completions Manager Samsung Engineering.
Email: seongwan.kim@samsung.com
Certificates are available if needed. 9 Of 8
CURRICULUM VITAE
11. Safety Procedure Training (PTW, HIT, JSA) by Chevron Thailand.
12. Competence Test from National Council Education. (Certified)
13. McDermott Code of Business Conduct, Ethics & Compliance Training.
14. BBSM Training (Behavior Based Safety Training) at PT. Mc Dermott Indonesia.
15. Quality Awareness Training Level 2 & HSE orientation at PT. Mc Dermott
Indonesia.
16. H2S Level 1 & SSHE Induction at Tripatra-Samsung Training center.
References:
1. Mukesh Kumar - Area Commissioning Manager Asia Pacific.
Email: MKumar2@mcdermott.com Phone : +65-66685540
2. Pablo H. Varona - Hook Up & Commissioning Manager.
Email: PVarona@mcdermott.com
3. Mark Hayes - Commissioning & OA Manager – (Chevron Project - former).
Email: Markhayes1962@hotmail.com
4. Jun A. Pedregosa - Completions Manager Batam Fabrications Yards.
Email: JAPedregosa@mcdermott.com Phone: +62-77840565.
5. Lance Medlin – System Completions Manager – ExxonMobil
Email: lance.medlin@exxonmobil.com Phone: +1.832.418.8940 US Cell
6. Seong wan Kim – System Completions Manager Samsung Engineering.
Email: seongwan.kim@samsung.com
Certificates are available if needed. 9 Of 8

More Related Content

What's hot

aaronparkerresume (5)
aaronparkerresume (5)aaronparkerresume (5)
aaronparkerresume (5)Aaron Parker
 
Resume_Atulnjadhav
Resume_AtulnjadhavResume_Atulnjadhav
Resume_AtulnjadhavAtul Jadhav
 
Thomas Yates Resume
Thomas Yates ResumeThomas Yates Resume
Thomas Yates ResumeThomas Yates
 
Lionell-Portis. resume update 10-2015
Lionell-Portis. resume update 10-2015Lionell-Portis. resume update 10-2015
Lionell-Portis. resume update 10-2015Lionell Portis
 
Ward, George Resume
Ward, George ResumeWard, George Resume
Ward, George ResumeGeorge Ward
 
Alfred Chikunichawa New Complete CV (1)
Alfred Chikunichawa New Complete CV (1)Alfred Chikunichawa New Complete CV (1)
Alfred Chikunichawa New Complete CV (1)Alfred Chikunichawa
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument EngineerMukhtar Ahmad
 
David Maintenance Resume 2016
David Maintenance Resume 2016David Maintenance Resume 2016
David Maintenance Resume 2016David Kline
 
Hajeera Ahamed_profile.ocx
Hajeera Ahamed_profile.ocxHajeera Ahamed_profile.ocx
Hajeera Ahamed_profile.ocxHajeera Basheer
 
Mark Wood Principal-engineer December 2013 resume
Mark Wood Principal-engineer December 2013 resumeMark Wood Principal-engineer December 2013 resume
Mark Wood Principal-engineer December 2013 resumeMark Wood
 

What's hot (19)

Duane lee martin
Duane lee martinDuane lee martin
Duane lee martin
 
aaronparkerresume (5)
aaronparkerresume (5)aaronparkerresume (5)
aaronparkerresume (5)
 
Resume_Atulnjadhav
Resume_AtulnjadhavResume_Atulnjadhav
Resume_Atulnjadhav
 
Thomas Yates Resume
Thomas Yates ResumeThomas Yates Resume
Thomas Yates Resume
 
Akinloye olanrewaju
Akinloye olanrewajuAkinloye olanrewaju
Akinloye olanrewaju
 
Lionell-Portis. resume update 10-2015
Lionell-Portis. resume update 10-2015Lionell-Portis. resume update 10-2015
Lionell-Portis. resume update 10-2015
 
Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn
 
Ward, George Resume
Ward, George ResumeWard, George Resume
Ward, George Resume
 
Sachin.Pimplikar
Sachin.PimplikarSachin.Pimplikar
Sachin.Pimplikar
 
CV_Duran_NBM
CV_Duran_NBMCV_Duran_NBM
CV_Duran_NBM
 
Alfred Chikunichawa New Complete CV (1)
Alfred Chikunichawa New Complete CV (1)Alfred Chikunichawa New Complete CV (1)
Alfred Chikunichawa New Complete CV (1)
 
mpita20_CV_Amec
mpita20_CV_Amecmpita20_CV_Amec
mpita20_CV_Amec
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
Siddhartha_Saxena_25_Feb_2016
Siddhartha_Saxena_25_Feb_2016Siddhartha_Saxena_25_Feb_2016
Siddhartha_Saxena_25_Feb_2016
 
Resume_1
Resume_1Resume_1
Resume_1
 
David Maintenance Resume 2016
David Maintenance Resume 2016David Maintenance Resume 2016
David Maintenance Resume 2016
 
AMIT (1)
AMIT (1)AMIT (1)
AMIT (1)
 
Hajeera Ahamed_profile.ocx
Hajeera Ahamed_profile.ocxHajeera Ahamed_profile.ocx
Hajeera Ahamed_profile.ocx
 
Mark Wood Principal-engineer December 2013 resume
Mark Wood Principal-engineer December 2013 resumeMark Wood Principal-engineer December 2013 resume
Mark Wood Principal-engineer December 2013 resume
 

Similar to Rangga Kadarusman - CV

Updated Umang resume
Updated Umang resumeUpdated Umang resume
Updated Umang resumeUmang Tailor
 
Nazaqat Ali-Updated CV
Nazaqat Ali-Updated CVNazaqat Ali-Updated CV
Nazaqat Ali-Updated CVNazaqat Ali
 
Antony-CURRICULAM VITAE-15
Antony-CURRICULAM VITAE-15Antony-CURRICULAM VITAE-15
Antony-CURRICULAM VITAE-15antony paul
 
UNAEGBU CHRISTIANA 2015 NEW RESUME
UNAEGBU CHRISTIANA 2015 NEW RESUMEUNAEGBU CHRISTIANA 2015 NEW RESUME
UNAEGBU CHRISTIANA 2015 NEW RESUMEChristie Unaegbu
 
Vinoth.s qa qc-ims (qms&ehs)
Vinoth.s   qa qc-ims (qms&ehs)Vinoth.s   qa qc-ims (qms&ehs)
Vinoth.s qa qc-ims (qms&ehs)VINOTH S
 
Ken Wong Resume
Ken Wong ResumeKen Wong Resume
Ken Wong ResumeKen Wong
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceDHRUVA MISHRA
 
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsResume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsSanjeeth Thekkada
 
Resume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceResume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceDHRUVA MISHRA
 
Munish_Updated Resume
Munish_Updated ResumeMunish_Updated Resume
Munish_Updated Resumemunish raj
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan
 
AMIT KR BASU
AMIT KR BASUAMIT KR BASU
AMIT KR BASUAmit Basu
 

Similar to Rangga Kadarusman - CV (20)

Updated Umang resume
Updated Umang resumeUpdated Umang resume
Updated Umang resume
 
Nazaqat Ali-Updated CV
Nazaqat Ali-Updated CVNazaqat Ali-Updated CV
Nazaqat Ali-Updated CV
 
Antony-CURRICULAM VITAE-15
Antony-CURRICULAM VITAE-15Antony-CURRICULAM VITAE-15
Antony-CURRICULAM VITAE-15
 
UNAEGBU CHRISTIANA 2015 NEW RESUME
UNAEGBU CHRISTIANA 2015 NEW RESUMEUNAEGBU CHRISTIANA 2015 NEW RESUME
UNAEGBU CHRISTIANA 2015 NEW RESUME
 
Vinoth.s qa qc-ims (qms&ehs)
Vinoth.s   qa qc-ims (qms&ehs)Vinoth.s   qa qc-ims (qms&ehs)
Vinoth.s qa qc-ims (qms&ehs)
 
CV
CVCV
CV
 
Ken Wong Resume
Ken Wong ResumeKen Wong Resume
Ken Wong Resume
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experience
 
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsResume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
 
Resume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceResume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experience
 
FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014
 
Ram resume
Ram resumeRam resume
Ram resume
 
RESUME_PARAMASWARY_New2016
RESUME_PARAMASWARY_New2016RESUME_PARAMASWARY_New2016
RESUME_PARAMASWARY_New2016
 
CHARINA_Guinto
CHARINA_GuintoCHARINA_Guinto
CHARINA_Guinto
 
Chia Shin Fatt CV
Chia Shin Fatt CVChia Shin Fatt CV
Chia Shin Fatt CV
 
RamPravesh_Kumar
RamPravesh_KumarRamPravesh_Kumar
RamPravesh_Kumar
 
Munish_Updated Resume
Munish_Updated ResumeMunish_Updated Resume
Munish_Updated Resume
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
AMIT KR BASU
AMIT KR BASUAMIT KR BASU
AMIT KR BASU
 
Saif Resume Aug 2018
Saif Resume Aug 2018 Saif Resume Aug 2018
Saif Resume Aug 2018
 

Rangga Kadarusman - CV

  • 1. CURRICULUM VITAE Personal Data Name : Rangga Kadarusman, S.T. Address : Perum GMP Blok K, No.8 Tanjung Sengkuang, Batam. Place & Date of Birth : Kuningan (West Java), October 14th 1982 Email : rkadarusman@gmail.com rangstea@yahoo.com Education : Bachelor Degree as Industrial Engineering Language : Indonesian, English, Malay. Passport No : B4259887 Phone : Mobile +62 813 6437 3011 Gender : Male Marital Status : Marriage Position : Completions Management System/CMS Engineer/Administrator or System Turnover. Career Summary More than 10 years, extensive experienced as CMS/Completions Management System Engineer/Administrator and System Dossier Turnover Phase Mechanical Completion, Pre Commissioning & Commissioning. Responsible to develop, maintain, monitors and controls Inspection Test Records/Check Sheet, Punch list & Turnover Certificate handover to Client/Operations, using Project Completions System or System Completions Data Base like WinPCS, Zenator and PIMS. Working as CMS & System Turnover have many challenges and it gives a good sense of achievement and job satisfaction to have been a part of team that gets the job done. Working with high standard of safe working practice, Quality and productivity as well, as compliance with code of business conduct. I am well known as a team player and have never left a project under bad conditions. Computer Proficiency • Excellent in MS Office, etc. • ZENATOR- Project Completion Software by FALCON GLOBAL • PIMS – Project Information Management System by OMEGA NORWAY • WinPCS – Windows Project Certification Completion System by COMPLAN LLC USA. Certificates are available if needed. 1 Of 8
  • 2. CURRICULUM VITAE Working Experience: 1. Project : Gathering Center GC- 31 Project, Kuwait Oil Company (K.S.C). Duration : November 2016 to Pressent. Location : Site GC-31 Project at Dodsal Engineering & Construction Pte. Ltd. Position : CMS Engineer at WinPCS /Complan LLC, USA Responsibilities: - Collect all data to populated System, Subsystem, Sub Subsystem Tags, ITR Check sheet, Turnover Certificate for Mechanical Completions & Commissioning Phase. - Maintain and Updated System Group, System/Subsystem - Coordinate with Mechanical Completions & Commissioning engineering to Assigning ITR Check sheet Form into each tag type categories. - Create, maintain and updated all Tags number, Test Pack, Punch list, Preservations and other engineering data for all discipline. - Coordinate with Mechanical Completion & Commissioning engineering team to prepare for handover Subsystem & System Dossier to Client. - Reporting Mechanical Completion (MC) ITR Status Index Report, Pre- commissioning (PC) ITR Status Index Report, Punchlist Report and Certificate handover status. - High standard of safe working practice, quality and productivity as well as compliance with code of business conduct. 2. Project : Banyu Urip EPC1 Production Processing Facilities, ExxonMobil Indonesia. Duration : August 2013 to July 2016. Location : PT. Tripatra - Samsung Consortium, Jakarta & Site Cepu - Bojonegoro. Position : CMS Database Specialist/Engineer (Zenator Database). Responsibilities: - Zenator Database Development. - Maintain and Updated System Group, System/Subsystem in Zenator. - Maintain and updated Tags number, Test Pack, Punch list, Preservations and other engineering data for all discipline. - Interface with Completions Engineering to Set up and prepare templates MC & SC Check sheet template for Inspections in field. - Interface with Preservations Engineering to Set up and prepare templates Preservations Check sheet template for Inspections in field. - Coordinate with Mechanical Completions & Commissioning engineering to Create, Populate and manage ITR/Check sheet, Punchlist, Completions Certificate to handover from MC to SC and to Client/Operations ExxonMobil. Certificates are available if needed. 2 Of 8
  • 3. CURRICULUM VITAE - Coordinate with Preservation engineer to Create, Manage, provide and closed the check sheet based on their requirement frequency. - Maintaining all Checksheet, Punchlist and Certificate. - Provide Tags & Punchlist Index to TCP Group for handover. - Install Zenator software for all people who require using, monitoring and reporting. - Prepare Management of Change to implement in Data Base Zenator. - High standard of safe working practice, quality and productivity as well as compliance with code of business conduct. 3. Project : Gorgon (PAR’s & PAU’s Module) LNG Plant KJVG Project, Chevron Australia. Duration : November 2011 to July 2013. Location : PT. McDermott Indonesia Batam. Position : CMS/PIMS Database Administrator & Completions Doc. Controller. Responsibilities: - PIMS Database Development - Maintain All Completions Data in PIMS such as progress Inspection Test Records, Punch list, all data Tag number all discipline. - Comparison data between KJVG Database (Zenator) and McDermott Database (PIMS). - Producing Mechanical Completions Inspection Test Records (ITR’s) and hand over to MC team. - Updated all discipline tag number ITR’s Mechanical Completions and Pre- Commissioning/Commissioning to PIMS data base. - Interfaces with Engineering Team's, Mechanical Completions and Commissioning Team to discuss regarding tag number/cheek sheet. - Maintain and manage all discipline Tag Number and Punch list Item all discipline in PIMS Database. - Reporting daily and weekly the status of Progress ITR’s and Punch list Completions and as required. - Reporting monthly Progress ITR’s to Key Performance Indicator (KPI) to Yards Management Team and as required. - Implement Project Document Management requirements and Procedures. Certificates are available if needed. 3 Of 8
  • 4. CURRICULUM VITAE - Maintaining a proper filling in documentation and engineering section. - Preparing transmittals for issuing of documents to clients and subcontractors/vendors - Ensuring that System & Subsystem discipline dossiers are up to date at all times. - Interfaces with Fabrication Team's Mechanical Completions Supervisor and Fabrication Supervisors & Commissioning Team - Keep up to date and Monitoring in and out going Project Document Registers - Compiling all document such as ITR doc, procedure, McDermott & Client drawing/document, transmittal doc, etc. - Maintaining project documentation files consisting of technical data, engineering and supplier drawings, technical specifications, purchase orders and other project-required document. - Maintain file hard copy & scan copy for our back up file. - Prepare & Checked the Dossier for the handover of Project Final Documentation and hand over to Client Construction/operations. - High standard of safe working practice, quality and productivity as well as compliance with code of business conduct. 4. Project : Platong Gas II Jacket, UD, LQM, CPP Top Side Project, Chevron Thailand. Duration : August 2009 to November 2011 Location : PT. McDermott Indonesia Batam & Offshore Gulf of Thailand. Position : Completion/Commissioning Doc. Cont. Focal Point/Coordinator & PIMS Database. Responsibilities: - Liaise with Documents Control to implement and maintain a Project Document control system consistent with Company / Project Requirements. - Implement Project Document Management requirements and Procedures - Coordinate Document control team on handling document control issues. - Ensure that all team members have been introduced and trained on the document management system in place, for documents in electronic format and in hardcopy. - Preparing comprehensive filling system and filling the project work progress. Certificates are available if needed. 4 Of 8
  • 5. CURRICULUM VITAE - Preparing supports drawing for completion engineering related request of documentation. - Establish and keep updated the filling Structure of the Project (electronic and hard copies) - Preparing transmittals for issuing of documents to clients and subcontractors/vendors - Making Cover, Spines and Table Contents for System/Sub System Dossier. - Preparation, Review and Submission Discipline Acceptance Certificate (DAC), Sub System Mechanical Completion Certificate (SSMCC) Ready for Commissioning Certificate (RFCC) to Client Acceptance. - Preparation, Review and Submission Turnover System Dossier to Client Construction & Operations. - Maintain Soft copy Dossier per Subsystem & System same as actual Dossier for backup to client in the future. - Maintain All Mechanical Completions and Pre Commissioning Data in PIMS - Producing Mechanical Completions ITR’s and hand over to MC team. - Uploading and Compare data within engineering data and PIMS database. - Update all discipline ITR’s Mechanical Completions & Pre Commissioning to PIMS data base. - Maintaining all discipline Tag Number and Punch list Item in PIMS Database. - Maintain, Monitoring & Reporting Producing Discipline Acceptance Certificate, Sub System Mechanical Completion Certificate and Ready for Commissioning Certificate to all System Dossier. - Preparing daily and weekly the status of Certificate, ITR’s and Punch list Completions Progress report. 5. Project : North Belut Jacket & CPP top Side Project, Conoco Philips Indonesia. Duration : October 2008 to July 2009 Location : PT. McDermott Indonesia Batam & Offshore Natuna Sea. Position : Completion Doc. Control & PIMS Operator & HUC Barge Clerk offshore Responsibilities: Certificates are available if needed. 5 Of 8
  • 6. CURRICULUM VITAE - Implement and maintain a Project Document control system consistent with Company / Project Requirements. - Updates and maintains project document control record keeping system - Mechanical completion and Pre- commissioning subsystem and System Handover. - Maintain & Preparations Mechanical completion/Pre Commissioning System/subsystem Handover. - Preparing transmittals for issuing of documents to clients and subcontractors/vendors. - Receive and filling all disciplines ITR’s (inspection Test Record). - Check all ITR’s and filling to Dossier as per Sub system and Index Report. - Preparations Dossier, Compiled Inspection Test Record as per Sub system and per Index. - Check & Submit Dossier for acceptance and hand over to Client. - Make a Soft copy Folder and arrange like actual folder. - Maintain All Mechanical Completions and Pre Commissioning Data in PIMS - Update all discipline ITR’s Mechanical Completions & Pre- commissioning to PIMS data base. - Create / Edit and deleted Punch list Item Discipline Structural, Mechanical, Piping, Electrical and instruments in PIMS Data Base. - Create edit and Delete Flange Joint data in PIMS Database. - Preparation LUN (Livening up Notice) sheet, etc. - Control, Estimate and update Task Sheet Booked Man Hours. - Updated Daily and Monthly Time Sheet All Hook up & Commissioning crew including Sub Contractor. - Updated Total Personal On Board (in Coming and Out Going) - Updated Task Sheet Daily Progress Report Engineering. - Control & update Daily Summary Total and percentage task sheet progress. 6. Project : Sutuvang Jacket and CPP Top Side Project, CLJOC Vietnam. Certificates are available if needed. 6 Of 8
  • 7. CURRICULUM VITAE Duration : September 2007 to October 2008 Location : PT. McDermott Indonesia Batam & Offshore Gulf of Vietnam. Position : Assistance Engineer & Doc. Controller Flanges Management. Responsibilities: - Checking all test packages from document control, received and forward to Sub contractor. - Identify joint detail from test pack/Isometric Drawing and up date to FM Map Monitoring. - Update FM Completions certificates to PIMS Data Base. - Update and Edit Flanges management Summary from PIMS Database. - Responsible for the everyday report to updated in KPI progress. - Sending weekly report Progress KPI to management. - Producing Flanges Management Summary to DMCC packages. - Monitoring Flanges Joint Completions Certificate - Monitoring Tools torque equipment to maintenance and calibration. - Tightening Flanges Joint use Hand & Hydraulic Torque, Bolt tensioning. 7. Project : Kerisi Jacket & MSF Project, Conoco Philips Indonesia. Duration : November 2006 to September 2007 Location : PT. McDermott Indonesia Batam. Position : Assistance Engineer & MC Doc. Controller & PIMS Operator. Responsibilities: - Maintaining project documentation files consisting of technical data, engineering and supplier drawings, technical specifications, purchase orders and other project-required documents. - Implement and maintain a Project Document control system consistent with Company / Project Requirements. - Updates and maintains project document control record keeping system - Mechanical completion and Pre- commissioning subsystem and System Handover. - Preparation and filling Document (P&ID, Isometric drawing, etc). Certificates are available if needed. 7 Of 8
  • 8. CURRICULUM VITAE - Distributing project Drawings to all Discipline Engineering. - Review and checking and filling of ITR’s (inspection Test Record). - Making of Transmittal Certificate/ITR and Report to Client. - Preparation Document per Sub system to submit and approve by Client. - Input data Flanges Joint Detail from Isometric drawing to FM joint Completions certificate. - Producing Certificate of Flanges Management and Submit to Client for Approval. - Identify all flanges Joint Detail from Isometric Drawing to Map monitoring. - Updating FM certificate to PIMS Database. - Reporting and Transmit the Certificate’s to client. - Create Punch list Item Discipline Mechanical, Piping, Electrical and instruments in PIMS Database. - Create, edit and delete flange joint and Isometric data in PIMS database - Ensure the total flange joint in every Test package and update into database. Course & Training: 1. Zenator Power User Training from Falcon (certified). 2. PIMS Database Administrator Training at PT. Mc Dermott Indonesia. 3. Putra Batam Microsoft Access Programmer - English - Computer Course (Certified) 4. Travel Safely by Boat and Basic Offshore Safety Induction and Emergency Training (BOSIET) including HUET by M&O/OPITO Indonesia (Certified) 5. Travel Safely by Boat and Basic Offshore Safety Induction and Emergency Training (BOSIET) by MSTS Malaysia (Certified). 6. Incident Injury Free (IIF) Workshop Training by JMJ Safety consultancy Singapore. 7. KPI (Key Performance Indicator) Workshop & Quarantine Training by McDermott & KJVG. 8. Fire Warden Training & FSI (Faults free Start up Initiative) Training PT. Mc Dermott Indonesia. 9. Incident Injury Free Workshop Commitment Training PT. Mc Dermott Indonesia & KJVG. 10. Offshore Safety Induction Training by Cu Long Joint Operating Company HSE, Conoco Philips HSE and Chevron Thailand HSE. Certificates are available if needed. 8 Of 8
  • 9. CURRICULUM VITAE 11. Safety Procedure Training (PTW, HIT, JSA) by Chevron Thailand. 12. Competence Test from National Council Education. (Certified) 13. McDermott Code of Business Conduct, Ethics & Compliance Training. 14. BBSM Training (Behavior Based Safety Training) at PT. Mc Dermott Indonesia. 15. Quality Awareness Training Level 2 & HSE orientation at PT. Mc Dermott Indonesia. 16. H2S Level 1 & SSHE Induction at Tripatra-Samsung Training center. References: 1. Mukesh Kumar - Area Commissioning Manager Asia Pacific. Email: MKumar2@mcdermott.com Phone : +65-66685540 2. Pablo H. Varona - Hook Up & Commissioning Manager. Email: PVarona@mcdermott.com 3. Mark Hayes - Commissioning & OA Manager – (Chevron Project - former). Email: Markhayes1962@hotmail.com 4. Jun A. Pedregosa - Completions Manager Batam Fabrications Yards. Email: JAPedregosa@mcdermott.com Phone: +62-77840565. 5. Lance Medlin – System Completions Manager – ExxonMobil Email: lance.medlin@exxonmobil.com Phone: +1.832.418.8940 US Cell 6. Seong wan Kim – System Completions Manager Samsung Engineering. Email: seongwan.kim@samsung.com Certificates are available if needed. 9 Of 8
  • 10. CURRICULUM VITAE 11. Safety Procedure Training (PTW, HIT, JSA) by Chevron Thailand. 12. Competence Test from National Council Education. (Certified) 13. McDermott Code of Business Conduct, Ethics & Compliance Training. 14. BBSM Training (Behavior Based Safety Training) at PT. Mc Dermott Indonesia. 15. Quality Awareness Training Level 2 & HSE orientation at PT. Mc Dermott Indonesia. 16. H2S Level 1 & SSHE Induction at Tripatra-Samsung Training center. References: 1. Mukesh Kumar - Area Commissioning Manager Asia Pacific. Email: MKumar2@mcdermott.com Phone : +65-66685540 2. Pablo H. Varona - Hook Up & Commissioning Manager. Email: PVarona@mcdermott.com 3. Mark Hayes - Commissioning & OA Manager – (Chevron Project - former). Email: Markhayes1962@hotmail.com 4. Jun A. Pedregosa - Completions Manager Batam Fabrications Yards. Email: JAPedregosa@mcdermott.com Phone: +62-77840565. 5. Lance Medlin – System Completions Manager – ExxonMobil Email: lance.medlin@exxonmobil.com Phone: +1.832.418.8940 US Cell 6. Seong wan Kim – System Completions Manager Samsung Engineering. Email: seongwan.kim@samsung.com Certificates are available if needed. 9 Of 8