SlideShare a Scribd company logo
Current profile
 ShaileshKumarH. Makwana
Contact (M)//91- 9737146862 //91- 9429303235//
Email: makwanashailesh.er@gmail.com
mak_shail@yahoo.co.in
Profile Headings: 11.9Yrs. Of richexperience in watertreatments-WTP, ETP, STP and
waterplant, Pumping station , currently working in PMC & As consulting engineer in
electrical.InvolvedinElectrical-mechanical /instrumentation Project packages(EPC) &
process of watertreatments at various stages for Boilerwater / Drinking water / STP/ ETP.
Preparingvarious Documents of records & monitoring progress with qualityof work during
project.
Work experience in Installation,testing &commissioning and operation &maintenance of
various Electrical, Instrumentation& Mechanical equipment and process of water
treatmentsincluding pre-treatments,post treatmentsfor boiler feed water and Effluent
water treatments& sewage water treatments.
Workexperienceat glance -Technicaland Administrative.
Electrical – Installation,Inspection, Testing, commissioning and O&M of Electrical
equipment like – Switch yard equipment- LA/Isolator/CB/CT_PT/Power & Aux.
Transformer- RTCC-OLTC.HT & LTMCC panels, VFD, HT andLT Motors,HT Capacitors,
FCMA, Overheadline,Two pole – 4 pole structure,Softstarters,ACB,VCB,VC ,HT-LT and
control Cable laying & termination, Generator set (DG set), Equipment /Grid and
Protective Earthing laying,Illumination system with wiring,Battery & Battery charger
(110VDC-controlsupply),AirCompressor,Air conditioner,cable Tray fabrication&
layingEtc.
Instruments–Installation,Inspection, Testing, commissioning of Instrumentslike–
MPR/OLR/UVR-OVR/Energymeter/Relays. Transmitters –Flow/level/Gas/silica
/sodium/concentration/pH/Conductivity/ORP/Turbidity/temperature/Pressure.PLC -
SCADA system, valveActuators,PID control valve,Pressuregauge, level switch, Diff.
pressureswitch. UV, Control cablingetc.
Mechanical –Installation&commissioning of mechanical equipment like various Industrial
Pumps-dosing/screw/HSCF/Submersible/Sludge/Verticalturbine. Turbo charger, Air
Blower, Air compressor, Air diffuser, MS/HDPE/SS tanks& Vessels, EOT Crane, Valves-
knife/sluice/BFV/Globe/Gate/NRV/ Diaphragm/auto valve/check valve/air valve/safety
valve/PRV/ball.Gear box – Agitator.SurgeVessels System,pipe laying
MS/CS/SS/CI/DI/PVC/CPVC/UPVC/PP/HDPE. Hydro testing.
Process –Clarifier/Actiflow, MGF/Softener/PSF/DMF/RGSF, UF, RO, DG, SAC/SBA/MB,
CEDIof Water treatmentplant, OWS,Thickener & Centrifuge, Gas Chlorinationsystem &
CW dosing system.
Administrative -Schedule of Planning,billing , payment collection, DPR,PPR preparation&
monitoring project status& completion Material management,manpower management,
safety Awareness, client and vendorcoordination, Preventive maintenance schedule and
monitoring.
Projects handle with following process 1) Boiler feed water & Drinking water – Clarifier
(Actiflow/ HRCC/Tube settler/lamellaEtc.) – Media Filters (PSF-MGF-DMF-ACF-RGSF-GSF
etc.) - UF- RO (SW/BW) – MB - DM plants,EDI system. 2) Effluent water & Sewage plants
– MBR (Torray make) & MBBR base plants.
Presently workingwithM/s TataConsultancy Engineers LimitedthroughM/s
ANIInstruments Pvt Ltd, Mumbaias Electricalengineer (Since September
2015) – GWSSB project, Gandhinagar.
Past workingwithfollowingcompany:
1) M/s Lyka engineering services, Ahmadabadin Water plant field from DEC 2004 to
AUG 2009 (4 Yrs & 8 months) as site in chargefor 90 MLD water plant for
O&M,erection, commissioning and 33kv switchyard, manpower handingup to 36
person includingengineer, technician and labor.
Responsibility handled:Project Execution, Installationtesting & commissioning of
following equipment in water plants.Pumps-motors,pipingsystem,valves,EOT
crane ,Surge protection system, Air compressor,Vessels, MCC,Switchyard
equipment,capacitors,Soft starters,Equipment earthing,Illuminationetc.
2) M/s Hydrotech enterprise Pvt.Ltd, Delhi in Water treatmentplant field from AUG
2009 to MAY 2010 (9 months) as project engineer for 200 MLD water treatment
plantnear Ahmadabad.
Responsibility handled:200MLD WTP Project Execution, Installationtesting &
commissioning of following equipment in water plants
3) M/s Doshion Veolia water solutionsPvt ltd,Ahmedabad. From May 2010 to June
2014 (4 yrs& 2 months) as Electrical Engineer.
Responsibility handled:ProjectExecution, Installationtesting & commissioning of
following equipment in water treatment plants& ETP. Process -Clarifier, allMedia
filter,Gas chlorination,Roplants, Ultra filtration, MB & DM plants,EDI system,
Actiflow ,ETP plants,Pumps-motors,pipingsystem,valves, MCC &
PLC,Instruments,Autovalves,PLC system, Equipment earthing,Illuminationetc.
4) M/s PennarEnviroLtd, Hyderabad. From July 2014 to Sept 2015(1years & 2
months) as Engineer.
Responsibility handled:Project Execution, Installationtesting & commissioning of
following equipment in water treatment plants& ETP - STP. Process -Clarifier, all
Media filter, Ro plants, Ultrafiltration, MBR & MBBR based ETP- STP plants,
Pumps-motors,piping system, valves,MCC & PLC, Instruments,Auto valves,PLC
system, Equipment earthing,Illumination etc.
Personal Profile
Father'sName : Harising K. Makwana
Sex : Male
Maritalstatus : Married.
Nationality : Indian
LanguagesKnown : English, Hindi, andGujarati
PAN : BEMPM3400B
PASSPORT : N2058755valid 12.08.25
Hobbies : Reading books, listen music.
Educational Qualification : 1) Diploma in Electrical Engineering (68 %)
from
GovernmentPolytechnic, Palanpur,Gujarat
(N.G).Passedout:Nov-2004.
2) Diploma in IndustrialEngineering
management From APPC,Hyderabad.
3) SSC (77.43%)Pass out: March2000.
Present Address : Flat no A/401,Aum Enclave,
OppPodarInternationalschool,Opp Pratik mall road,
Kudasan-Gandhinagar-382421.
Permanente Address : Flat no B/402, Ved Residency II, old bipod
Naka,
Near RangVatika Temple, Vadodara-390019.
Phone No : +919737146862/+919429303235
Date of Birth : 01-06-1985
CurrentCTC : 6.48lacs
Location : Gandhinagar
Expected CTC : 7.5 lacs
Notice period : 30 day
Computerliteracy : M.S. office, AutoCAD(2D).
Declaration:I hereby declare that the above-mentioned information is correct up to my
knowledge and I bear the responsibility for the correctnessof the above-mentioned
particulars.
Place: (SHAILESH MAKWANA)
List of client working with their variousprojects.
1) Apollo TyresLtd –Waghodia, Vadodara.– WTP
2) AhmedabadMunicipalCorporation. (sewagepumping station & 200 MLD WTP)
3) AdaniPower Ltd -Tiroda(MAH.)& Kawai(Raj.) - WTP
4) CaveryPower gen. – Chennai -WTP
5) GNFC –TDI Plant – Dahej. -
6) HemarusIndustries Ltd -Maharastra
7) IndiabullsPower Ltd –Amravati –WTP-ETP-Chlorination – CW dosing system.
8) IndbharatPower –Tuticorin - RO-EDI
9) Jyoti Ltd – Vadodara.WS- pumpingstation.
10) KirloskarBrothers ltd.Pune. – GWSSB –Baroda, HMWSSB, SSNNL Project.
11) Lanco – KondapalliAP- DM plant
12) SiemensEnergy ltd-DGEN-TorrentPower –Dahej – DM + PT
13) Shreyans Industries –Punjab. – Actiflow.
14) Hetro drugs Ltd –Desalination.
15) NSL sugar Ltd- UF RO system.
16) JSW steelltd, Dolvi (MAH.) - STP
17) Unitedspirit Ltd, Baramati,Komulugodu ETP+STP
18) PARK industries, Tirrupur.RO system.
19) GWSSB – UGD /WS/WTP
20)SSNNL – SHP
21) TATA consultingengineers ltd

More Related Content

What's hot

Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineer
Srivenkatesh Padmanaban
 
01.Nedumaran Instrument Engineer
01.Nedumaran Instrument Engineer01.Nedumaran Instrument Engineer
01.Nedumaran Instrument Engineer
T. Nedumaran
 
Control Engineer-CV
Control Engineer-CVControl Engineer-CV
Control Engineer-CV
Ahmed Samir
 
Resume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineerResume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineer
Srivenkatesh Padmanaban
 
Calibration Engineer 2016
Calibration Engineer   2016Calibration Engineer   2016
Calibration Engineer 2016
Prasanna kumar
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experience
DHRUVA MISHRA
 
Gorga Silalahi (CV)
Gorga Silalahi (CV)Gorga Silalahi (CV)
Gorga Silalahi (CV)
gorga juliabner
 
instrument and control cv (1)
instrument and control cv (1)instrument and control cv (1)
instrument and control cv (1)
Marlowe Salenga
 
Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-Resume
Manoj Ahire
 
Instrumentation Engineer.
Instrumentation Engineer.Instrumentation Engineer.
Instrumentation Engineer.
guest3235c24
 
Sr. Instrument Commissioning & Maintenance Technician
Sr. Instrument Commissioning & Maintenance TechnicianSr. Instrument Commissioning & Maintenance Technician
Sr. Instrument Commissioning & Maintenance Technician
Jignesh P. Patel
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
Mukhtar Ahmad
 
cv Instrument Commissioning Engineer
cv Instrument Commissioning Engineercv Instrument Commissioning Engineer
cv Instrument Commissioning Engineer
Bijustanly Chittayagam
 
CV Elect
CV ElectCV Elect
CV Elect
Prashant Bane
 
Electrical Engineer 2
Electrical Engineer 2Electrical Engineer 2
Electrical Engineer 2
Syed Salman Hussain
 
Metering Engineer_Resume
Metering Engineer_ResumeMetering Engineer_Resume
Metering Engineer_Resume
Sachin Mahale
 
Saurabh Singh - CV.DOC
Saurabh Singh - CV.DOCSaurabh Singh - CV.DOC
Saurabh Singh - CV.DOC
saurabh singh
 
CV of Viswanathan KK
CV of Viswanathan KKCV of Viswanathan KK
CV of Viswanathan KK
Viswanathan KK
 
Sr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & controlSr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & control
Bathrinath mangalamoorthi
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar Patel
 

What's hot (20)

Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineer
 
01.Nedumaran Instrument Engineer
01.Nedumaran Instrument Engineer01.Nedumaran Instrument Engineer
01.Nedumaran Instrument Engineer
 
Control Engineer-CV
Control Engineer-CVControl Engineer-CV
Control Engineer-CV
 
Resume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineerResume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineer
 
Calibration Engineer 2016
Calibration Engineer   2016Calibration Engineer   2016
Calibration Engineer 2016
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experience
 
Gorga Silalahi (CV)
Gorga Silalahi (CV)Gorga Silalahi (CV)
Gorga Silalahi (CV)
 
instrument and control cv (1)
instrument and control cv (1)instrument and control cv (1)
instrument and control cv (1)
 
Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-Resume
 
Instrumentation Engineer.
Instrumentation Engineer.Instrumentation Engineer.
Instrumentation Engineer.
 
Sr. Instrument Commissioning & Maintenance Technician
Sr. Instrument Commissioning & Maintenance TechnicianSr. Instrument Commissioning & Maintenance Technician
Sr. Instrument Commissioning & Maintenance Technician
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
cv Instrument Commissioning Engineer
cv Instrument Commissioning Engineercv Instrument Commissioning Engineer
cv Instrument Commissioning Engineer
 
CV Elect
CV ElectCV Elect
CV Elect
 
Electrical Engineer 2
Electrical Engineer 2Electrical Engineer 2
Electrical Engineer 2
 
Metering Engineer_Resume
Metering Engineer_ResumeMetering Engineer_Resume
Metering Engineer_Resume
 
Saurabh Singh - CV.DOC
Saurabh Singh - CV.DOCSaurabh Singh - CV.DOC
Saurabh Singh - CV.DOC
 
CV of Viswanathan KK
CV of Viswanathan KKCV of Viswanathan KK
CV of Viswanathan KK
 
Sr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & controlSr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & control
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 

Viewers also liked

RAJENDRA JAIN CV+
RAJENDRA JAIN CV+RAJENDRA JAIN CV+
RAJENDRA JAIN CV+
RAJENDRA MALOO
 
new CV Rehan
new CV Rehannew CV Rehan
new CV Rehan
Ansari mohammad Rehan
 
Manuel E. Bautista Jr.(october 19, 2015)
Manuel E. Bautista  Jr.(october 19, 2015)Manuel E. Bautista  Jr.(october 19, 2015)
Manuel E. Bautista Jr.(october 19, 2015)
Manuel Bautista Jr.
 
updated_ashishmalhotra
updated_ashishmalhotraupdated_ashishmalhotra
updated_ashishmalhotra
Ashish Malhotra
 
Resume of Meramat Anak Tajak
Resume of Meramat Anak TajakResume of Meramat Anak Tajak
Resume of Meramat Anak Tajak
meramat tajak
 
resume_Mr_
resume_Mr_resume_Mr_
resume_Mr_
Sanjay Dhar
 
oooo
oooooooo
Eng_ Mahdy CV 8-2015
Eng_ Mahdy CV 8-2015Eng_ Mahdy CV 8-2015
Eng_ Mahdy CV 8-2015
Mahdy Hammad
 
cv
cvcv
السيره الذاتيه محدثه الى شهر أكتوبر _ 2016
السيره الذاتيه محدثه الى شهر أكتوبر  _  2016السيره الذاتيه محدثه الى شهر أكتوبر  _  2016
السيره الذاتيه محدثه الى شهر أكتوبر _ 2016
Mohamed Wanan
 
sherif saad cv
sherif saad cvsherif saad cv
sherif saad cv
sherif saad
 
Atique - Copy
Atique - CopyAtique - Copy
Atique - Copy
Attique rehman
 

Viewers also liked (12)

RAJENDRA JAIN CV+
RAJENDRA JAIN CV+RAJENDRA JAIN CV+
RAJENDRA JAIN CV+
 
new CV Rehan
new CV Rehannew CV Rehan
new CV Rehan
 
Manuel E. Bautista Jr.(october 19, 2015)
Manuel E. Bautista  Jr.(october 19, 2015)Manuel E. Bautista  Jr.(october 19, 2015)
Manuel E. Bautista Jr.(october 19, 2015)
 
updated_ashishmalhotra
updated_ashishmalhotraupdated_ashishmalhotra
updated_ashishmalhotra
 
Resume of Meramat Anak Tajak
Resume of Meramat Anak TajakResume of Meramat Anak Tajak
Resume of Meramat Anak Tajak
 
resume_Mr_
resume_Mr_resume_Mr_
resume_Mr_
 
oooo
oooooooo
oooo
 
Eng_ Mahdy CV 8-2015
Eng_ Mahdy CV 8-2015Eng_ Mahdy CV 8-2015
Eng_ Mahdy CV 8-2015
 
cv
cvcv
cv
 
السيره الذاتيه محدثه الى شهر أكتوبر _ 2016
السيره الذاتيه محدثه الى شهر أكتوبر  _  2016السيره الذاتيه محدثه الى شهر أكتوبر  _  2016
السيره الذاتيه محدثه الى شهر أكتوبر _ 2016
 
sherif saad cv
sherif saad cvsherif saad cv
sherif saad cv
 
Atique - Copy
Atique - CopyAtique - Copy
Atique - Copy
 

Similar to CURRENT PROFILE 1_2016

CURRENT PROFILE 1_2016
CURRENT PROFILE 1_2016CURRENT PROFILE 1_2016
CURRENT PROFILE 1_2016
shailesh makwana
 
KJVYAS_SCL
KJVYAS_SCLKJVYAS_SCL
KJVYAS_SCL
Kaustubh Vyas
 
Krunal bhatt
Krunal bhattKrunal bhatt
Krunal bhatt
Krunal Bhatt
 
RESUME of Md.Ibrahim Khalil
RESUME of Md.Ibrahim KhalilRESUME of Md.Ibrahim Khalil
RESUME of Md.Ibrahim Khalil
Md.Ibrahim Khalil
 
Sanjeev resume (1)
Sanjeev resume (1)Sanjeev resume (1)
Sanjeev resume (1)
Sanjeev Kumar
 
DEEPU CV O&G_2
DEEPU CV O&G_2DEEPU CV O&G_2
DEEPU CV O&G_2
DEEPU SURENDRAN
 
attachment
attachmentattachment
attachment
anil kumar
 
SASIdharan p CV
SASIdharan p CVSASIdharan p CV
SASIdharan p CV
sasi panniyodan
 
SOURABH SONI
SOURABH SONISOURABH SONI
SOURABH SONI
Sourabh Soni
 
Rahul Resume
Rahul ResumeRahul Resume
Rahul Resume
Rahul singh
 
Jose_resume 1
Jose_resume 1Jose_resume 1
Resume
ResumeResume
Resume
Satish Hande
 
T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
Chandramouli Tadepalli
 
T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
Chandramouli Tadepalli
 
Waqas CV
Waqas CVWaqas CV
Waqas CV
qandrani
 
Waqas Khan
Waqas KhanWaqas Khan
Waqas Khan
qandrani
 
lakhwinder_Singh_CV_
lakhwinder_Singh_CV_lakhwinder_Singh_CV_
lakhwinder_Singh_CV_
Lakhwinder Singh
 
CV_Parulkar
CV_ParulkarCV_Parulkar
CV_Parulkar
Rajan Parulkar
 
GOURAV_CHOUHAN_CV 120515.
GOURAV_CHOUHAN_CV 120515.GOURAV_CHOUHAN_CV 120515.
GOURAV_CHOUHAN_CV 120515.
GAURAV CHOUHAN
 
Final CV3 -
Final CV3 -Final CV3 -
Final CV3 -
prashant ponkshe
 

Similar to CURRENT PROFILE 1_2016 (20)

CURRENT PROFILE 1_2016
CURRENT PROFILE 1_2016CURRENT PROFILE 1_2016
CURRENT PROFILE 1_2016
 
KJVYAS_SCL
KJVYAS_SCLKJVYAS_SCL
KJVYAS_SCL
 
Krunal bhatt
Krunal bhattKrunal bhatt
Krunal bhatt
 
RESUME of Md.Ibrahim Khalil
RESUME of Md.Ibrahim KhalilRESUME of Md.Ibrahim Khalil
RESUME of Md.Ibrahim Khalil
 
Sanjeev resume (1)
Sanjeev resume (1)Sanjeev resume (1)
Sanjeev resume (1)
 
DEEPU CV O&G_2
DEEPU CV O&G_2DEEPU CV O&G_2
DEEPU CV O&G_2
 
attachment
attachmentattachment
attachment
 
SASIdharan p CV
SASIdharan p CVSASIdharan p CV
SASIdharan p CV
 
SOURABH SONI
SOURABH SONISOURABH SONI
SOURABH SONI
 
Rahul Resume
Rahul ResumeRahul Resume
Rahul Resume
 
Jose_resume 1
Jose_resume 1Jose_resume 1
Jose_resume 1
 
Resume
ResumeResume
Resume
 
T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
 
T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
 
Waqas CV
Waqas CVWaqas CV
Waqas CV
 
Waqas Khan
Waqas KhanWaqas Khan
Waqas Khan
 
lakhwinder_Singh_CV_
lakhwinder_Singh_CV_lakhwinder_Singh_CV_
lakhwinder_Singh_CV_
 
CV_Parulkar
CV_ParulkarCV_Parulkar
CV_Parulkar
 
GOURAV_CHOUHAN_CV 120515.
GOURAV_CHOUHAN_CV 120515.GOURAV_CHOUHAN_CV 120515.
GOURAV_CHOUHAN_CV 120515.
 
Final CV3 -
Final CV3 -Final CV3 -
Final CV3 -
 

CURRENT PROFILE 1_2016

  • 1. Current profile ShaileshKumarH. Makwana Contact (M)//91- 9737146862 //91- 9429303235// Email: makwanashailesh.er@gmail.com mak_shail@yahoo.co.in Profile Headings: 11.9Yrs. Of richexperience in watertreatments-WTP, ETP, STP and waterplant, Pumping station , currently working in PMC & As consulting engineer in electrical.InvolvedinElectrical-mechanical /instrumentation Project packages(EPC) & process of watertreatments at various stages for Boilerwater / Drinking water / STP/ ETP. Preparingvarious Documents of records & monitoring progress with qualityof work during project. Work experience in Installation,testing &commissioning and operation &maintenance of various Electrical, Instrumentation& Mechanical equipment and process of water treatmentsincluding pre-treatments,post treatmentsfor boiler feed water and Effluent water treatments& sewage water treatments. Workexperienceat glance -Technicaland Administrative. Electrical – Installation,Inspection, Testing, commissioning and O&M of Electrical equipment like – Switch yard equipment- LA/Isolator/CB/CT_PT/Power & Aux. Transformer- RTCC-OLTC.HT & LTMCC panels, VFD, HT andLT Motors,HT Capacitors, FCMA, Overheadline,Two pole – 4 pole structure,Softstarters,ACB,VCB,VC ,HT-LT and control Cable laying & termination, Generator set (DG set), Equipment /Grid and Protective Earthing laying,Illumination system with wiring,Battery & Battery charger (110VDC-controlsupply),AirCompressor,Air conditioner,cable Tray fabrication& layingEtc. Instruments–Installation,Inspection, Testing, commissioning of Instrumentslike– MPR/OLR/UVR-OVR/Energymeter/Relays. Transmitters –Flow/level/Gas/silica /sodium/concentration/pH/Conductivity/ORP/Turbidity/temperature/Pressure.PLC - SCADA system, valveActuators,PID control valve,Pressuregauge, level switch, Diff. pressureswitch. UV, Control cablingetc. Mechanical –Installation&commissioning of mechanical equipment like various Industrial Pumps-dosing/screw/HSCF/Submersible/Sludge/Verticalturbine. Turbo charger, Air Blower, Air compressor, Air diffuser, MS/HDPE/SS tanks& Vessels, EOT Crane, Valves- knife/sluice/BFV/Globe/Gate/NRV/ Diaphragm/auto valve/check valve/air valve/safety valve/PRV/ball.Gear box – Agitator.SurgeVessels System,pipe laying MS/CS/SS/CI/DI/PVC/CPVC/UPVC/PP/HDPE. Hydro testing. Process –Clarifier/Actiflow, MGF/Softener/PSF/DMF/RGSF, UF, RO, DG, SAC/SBA/MB, CEDIof Water treatmentplant, OWS,Thickener & Centrifuge, Gas Chlorinationsystem & CW dosing system.
  • 2. Administrative -Schedule of Planning,billing , payment collection, DPR,PPR preparation& monitoring project status& completion Material management,manpower management, safety Awareness, client and vendorcoordination, Preventive maintenance schedule and monitoring. Projects handle with following process 1) Boiler feed water & Drinking water – Clarifier (Actiflow/ HRCC/Tube settler/lamellaEtc.) – Media Filters (PSF-MGF-DMF-ACF-RGSF-GSF etc.) - UF- RO (SW/BW) – MB - DM plants,EDI system. 2) Effluent water & Sewage plants – MBR (Torray make) & MBBR base plants. Presently workingwithM/s TataConsultancy Engineers LimitedthroughM/s ANIInstruments Pvt Ltd, Mumbaias Electricalengineer (Since September 2015) – GWSSB project, Gandhinagar. Past workingwithfollowingcompany: 1) M/s Lyka engineering services, Ahmadabadin Water plant field from DEC 2004 to AUG 2009 (4 Yrs & 8 months) as site in chargefor 90 MLD water plant for O&M,erection, commissioning and 33kv switchyard, manpower handingup to 36 person includingengineer, technician and labor. Responsibility handled:Project Execution, Installationtesting & commissioning of following equipment in water plants.Pumps-motors,pipingsystem,valves,EOT crane ,Surge protection system, Air compressor,Vessels, MCC,Switchyard equipment,capacitors,Soft starters,Equipment earthing,Illuminationetc. 2) M/s Hydrotech enterprise Pvt.Ltd, Delhi in Water treatmentplant field from AUG 2009 to MAY 2010 (9 months) as project engineer for 200 MLD water treatment plantnear Ahmadabad. Responsibility handled:200MLD WTP Project Execution, Installationtesting & commissioning of following equipment in water plants 3) M/s Doshion Veolia water solutionsPvt ltd,Ahmedabad. From May 2010 to June 2014 (4 yrs& 2 months) as Electrical Engineer. Responsibility handled:ProjectExecution, Installationtesting & commissioning of following equipment in water treatment plants& ETP. Process -Clarifier, allMedia filter,Gas chlorination,Roplants, Ultra filtration, MB & DM plants,EDI system, Actiflow ,ETP plants,Pumps-motors,pipingsystem,valves, MCC & PLC,Instruments,Autovalves,PLC system, Equipment earthing,Illuminationetc. 4) M/s PennarEnviroLtd, Hyderabad. From July 2014 to Sept 2015(1years & 2 months) as Engineer. Responsibility handled:Project Execution, Installationtesting & commissioning of following equipment in water treatment plants& ETP - STP. Process -Clarifier, all Media filter, Ro plants, Ultrafiltration, MBR & MBBR based ETP- STP plants, Pumps-motors,piping system, valves,MCC & PLC, Instruments,Auto valves,PLC system, Equipment earthing,Illumination etc.
  • 3. Personal Profile Father'sName : Harising K. Makwana Sex : Male Maritalstatus : Married. Nationality : Indian LanguagesKnown : English, Hindi, andGujarati PAN : BEMPM3400B PASSPORT : N2058755valid 12.08.25 Hobbies : Reading books, listen music. Educational Qualification : 1) Diploma in Electrical Engineering (68 %) from GovernmentPolytechnic, Palanpur,Gujarat (N.G).Passedout:Nov-2004. 2) Diploma in IndustrialEngineering management From APPC,Hyderabad. 3) SSC (77.43%)Pass out: March2000. Present Address : Flat no A/401,Aum Enclave, OppPodarInternationalschool,Opp Pratik mall road, Kudasan-Gandhinagar-382421. Permanente Address : Flat no B/402, Ved Residency II, old bipod Naka, Near RangVatika Temple, Vadodara-390019. Phone No : +919737146862/+919429303235 Date of Birth : 01-06-1985 CurrentCTC : 6.48lacs Location : Gandhinagar Expected CTC : 7.5 lacs Notice period : 30 day Computerliteracy : M.S. office, AutoCAD(2D).
  • 4. Declaration:I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctnessof the above-mentioned particulars. Place: (SHAILESH MAKWANA) List of client working with their variousprojects. 1) Apollo TyresLtd –Waghodia, Vadodara.– WTP 2) AhmedabadMunicipalCorporation. (sewagepumping station & 200 MLD WTP) 3) AdaniPower Ltd -Tiroda(MAH.)& Kawai(Raj.) - WTP 4) CaveryPower gen. – Chennai -WTP 5) GNFC –TDI Plant – Dahej. - 6) HemarusIndustries Ltd -Maharastra 7) IndiabullsPower Ltd –Amravati –WTP-ETP-Chlorination – CW dosing system. 8) IndbharatPower –Tuticorin - RO-EDI 9) Jyoti Ltd – Vadodara.WS- pumpingstation. 10) KirloskarBrothers ltd.Pune. – GWSSB –Baroda, HMWSSB, SSNNL Project. 11) Lanco – KondapalliAP- DM plant 12) SiemensEnergy ltd-DGEN-TorrentPower –Dahej – DM + PT 13) Shreyans Industries –Punjab. – Actiflow. 14) Hetro drugs Ltd –Desalination. 15) NSL sugar Ltd- UF RO system. 16) JSW steelltd, Dolvi (MAH.) - STP 17) Unitedspirit Ltd, Baramati,Komulugodu ETP+STP 18) PARK industries, Tirrupur.RO system. 19) GWSSB – UGD /WS/WTP
  • 5. 20)SSNNL – SHP 21) TATA consultingengineers ltd