COST DATA SHEET - 61
Particulars Unit Qty
25 KVA
Material Cost Labour Cost
Rate Amt Rate Amt
1 Part-A: TRANSFORMER
No 1 20074 20074 4115 4115
No 1 3560 3560
2 Sets 3 194 582 0 0
3 11KV 45 KN Polymeric Insulator Sets 3 170 510 0 0
4 Nos 4 752 3008 354 1416
5 No 1 51684 51684 682 682
6 3 1279 3837 573 1719
7 No 1 146 146 48 48
8 Kgs 2 64 128 25 50
9 Concreting for Guy sets without cement Nos 4 158 632 0 0
10 GI Wire 8 SWG Kgs 5 54.68 273.4 0 0
11 Guy wire 7/10 SWG Kgs 10 56.28 563 0 0
Total using 9 mtr PSCC Poles of 300Kg WL 81437 8030
Total using 8 mtr PSC Poles 200kg WL 7475
12 Labour Charges
Total using 9 mtr PSCC Poles of 300Kg WL
a) Casual 8030
b) Regular 1606
Total using 8 mtr PSC Poles 200kg WL
a) Casual 7475
b) Regular 1495
13 Total for Part-A
Total using 9 mtr PSCC Poles of 300Kg WL 91073
Total using 8 mtr PSC Poles 200kg WL
Part-B:
14 Set of 3 Nos 1 2058 2058 71 71
15 Labour Charges
a) Casual 71
Erection of 3 Phase, 11kV/433V, 25kVA BEE – 3 Star Rated Distribution Transformer Centre Using
DPTS With 9 Mtrs PSCC Pole 300Kg WL
Sl
No
a) 9 Mtr PSCC DP Transformer Structure (Using 9
Mtr PSCC Poles of 300Kg WL)
b) 8 Mtr PSC DP Transformer Structure (Using 8
Mtr PSC Poles 200kg WL)
will be
intimated
will be
intimated
11 KV, 5KN Polymeric Pin Insulator (24mm Dia
FRP Rod)
Guy Set Complete with No.15 strain insulator &
Concreting materials
11kV/433V, 25KVA, 3 Phase, 50 Cys Distribution
Transformer BEE-3 Star Rated with Oil
Earthing materials pipe type for grounding as per
Drawing No. BESCOM/GM/CP/15 & 34/ Dt:
24.10.07
Single
Electrode
with
accessories
Caution/Danger Board as per Drawing No.
BESCOM/GM/CP/40/ Dt: 24.10.07
Anti Climbing Device (12mtrs/1Kg GI Barbed
Wire) Lumpsum
will be
intimated
will be
intimated
11kV Lightning Arester, Metal oxide,
9kV, 5kA
b) Regular 14
16 Total for Part-B 2143
Part-C: SWITCH GEAR
17
a) LT Protection Kit for 25 kVA No 1 1651 1651 205 205
No 1
i. Al Lead Wire - 50 Sqmm Mtrs 25 44 1100
568 568
ii. Copper Lugs - 50 Sqmm Nos 4 27 108
iii. PG Clamps - Rabbit to 50 Sqmm Nos 4 60 240
iv. Spacers for DTC Wiring Nos 8 39 312
Nos 2 161 322
No 1 5185 5185 514 514
No 1 2061 2061 631 631
18 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 852 852 423 423
19 11kV, 200Amps, Single Break GOS No 1 7163 7163 636 636
Total Cost (Material) for Part-C 18994
20 Labour Charges
a) Casual 2977
b) Regular 595
21 Total for Part-C 22566
22 Total (A+B+C)
Total using 9 mtr PSCC Poles of 300Kg WL 115783
a) Casual 11078
b) Regular 2216
Total using 8 mtr PSC Poles 200kg WL
a) Casual 10523
b) Regular 2105
b) LT Wiring (From DTC to LT Line Through
Metering Box & LT Protection Kit) SINGLE
CIRCUIT
v. Fish Plate with necessary Clamps,bolts & nuts
etc complete (Galvanised)
c) LT Metering box with CTs and necessary wiring
for housing ETV Meter (Please see CDS-42)
d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0
accuracy
Labour Charges:
will be
intimated
Labour Charges:
Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA Conductor,
Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate
separately for
COST DATA SHEET - 62
Particulars Unit Qty
63 KVA
Material Cost Labour Cost
Rate Amt Rate Amt
1 Part-A: TRANSFORMER
No 1 20074 20074 4115 4115
No 1 3560 3560
2 Sets 3 194 582 0 0
3 11KV 45 KN Polymeric Insulator Sets 3 170 510 0 0
4 Nos 4 752 3008 354 1416
5 No 1 93810 93810 682 682
6 3 1279 3837 573 1719
7 No 1 146 146 48 48
8 Kgs 2 64 128 25 50
9 Concreting for Guy sets without cement Nos 4 158 632 0 0
10 GI Wire 8 SWG Kgs 5 54.68 273 0 0
11 Guy wire 7/10 SWG Kgs 10 56.28 563 0 0
Total using 9 mtr PSCC Poles of 300Kg WL 123563 8030
Total using 8 mtr PSC Poles 200kg WL 7475
12 Labour Charges
Total using 9 mtr PSCC Poles of 300Kg WL
a) Casual 8030
b) Regular 1606
Total using 8 mtr PSC Poles 200kg WL
a) Casual 7475
b) Regular 1495
13 Total for Part-A
Total using 9 mtr PSCC Poles of 300Kg WL 133199
Total using 8 mtr PSC Poles 200kg WL
Part-B:
14 Set of 3 Nos 1 2058 2058 71 71
15 Labour Charges
a) Casual 71
b) Regular 14
Erection of 3 Phase, 11kV/433V, 63kVA BEE – 3 Star Rated Distribution Transformer Centre Using
DPTS With 9 Mtrs PSCC Pole 300Kg WL
Sl
No
a) 9 Mtr PSCC DP Transformer Structure (Using 9
Mtr PSCC Poles of 300Kg WL)
b) 8 Mtr PSC DP Transformer Structure (Using 8
Mtr PSC Poles 200kg WL)
Will be
intimated
Will be
intimated
11 KV, 5KN Polymeric Pin Insulator (24mm Dia
FRP Rod)
Guy Set Complete with No.15 strain insulator &
Concreting materials
11kV/433V, 63kVA, 3 Phase, 50 Cys Distribution
Transformer BEE - 3 Star Rated with Oil
Earthing materials pipe type for grounding as per
Drawing No. BESCOM/GM/CP/15 & 34/ Dt:
24.10.07
Single
Electrode
with
accessories
Caution/Danger Board as per Drawing No.
BESCOM/GM/CP/40/ Dt: 24.10.07
Anti Climbing Device (12mtrs/1Kg GI Barbed
Wire) Lumpsum
Will be
intimated
Will be
intimated
11kV Lightning Arester, Metal Oxide
9kV, 5kA
16 Total for Part-B 2143
Part-C: SWITCH GEAR
17
a) LT Protection Kit for 63 kVA Nos 2 1651 3302 205 Amt
No 1
i. Al Lead Wire - 95 Sqmm Mtrs 40 82 3280
568 568
ii. Copper Lugs - 95 Sqmm Nos 4 65 260
iii. PG Clamps - Rabbit to 95 Sqmm Nos 4 96 384
iv. Spacers for DTC Wiring Nos 8 39 312
Nos 2 161 322
No 1 4786 4786 514 514
No 1 2061 2061 631 631
18 11kV Solid Core Type HG Fuse Unit Set/ 3 nos 1 852 852 423 423
19 11kV, 200Amps, Single Break GOS No 1 7163 7163 636 636
Total Cost (Material) for Part-C 22722
20 Labour Charges
a) Casual 2772
b) Regular 554
21 Total for Part-C 26048
22 Total (A+B+C)
Total using 9 mtr PSCC Poles of 300Kg WL 161391
a) Casual 10873
b) Regular 2175
Total using 8 mtr PSC Poles 200kg WL
a) Casual 10318
b) Regular 2064
b) LT Wiring (From DTC to LT Line Through
Metering Box & LT Protection Kit) SINGLE
CIRCUIT
v. Fish Plate with necessary Clamps,bolts & nuts
etc complete (Galvanised)
c) LT Metering box with CTs and necessary wiring
for housing ETV Meter (Please see CDS-42)
d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0
accuracy
Labour Charges:
Will be
intimated
Labour Charges:
Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA Conductor,
Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate separately
for
COST DATA SHEET - 63
Sl No Particulars Unit Qty
100 KVA
Material cost Labour Cost
Rate Amt Rate Amt
1 Part-A: TRANSFORMER
No 1 22179 22179 4238 4238
No 1 3816 3816
2 Sets 3 194 582 0 0
3 11KV 45 KN Polymeric Insulator Sets 3 170 510 0 0
4 Nos 4 752 3008 354 1416
5 No 1 121776 121776 910 910
6 3 1279 3837 573 1719
7 No 1 146 146 48 48
8 Kgs 2 64 128 25 50
9 Concreting for Guy sets without cement Nos 4 158 632 0 0
10 GI Wire 8 SWG Kgs 5 54.68 273 0 0
11 Guy wire 7/10 SWG Kgs 10 56.28 563 0 0
Total using 9 mtr PSCC Poles of 300Kg WL 153634 8381
Total using 8 mtr PSC Poles 200kg WL 7959
12 Labour Charges
Total using 9 mtr PSCC Poles of 300Kg WL
a) Casual 8381
b) Regular 1676
Total using 8 mtr PSC Poles 200kg WL
a) Casual 7959
b) Regular 1592
13 Total for Part-A
Total using 9 mtr PSCC Poles of 300Kg WL 163691
Total using 8 mtr PSC Poles 200kg WL
Part-B:
14 Set of 3 Nos 1 2058 2058 71 71
15 Labour Charges
a) Casual 71
b) Regular 14
Erection of 3 Phase, 11kV/433V, 100kVA BEE – 3 Star Rated Distribution Transformer Centre Using
DPTS With 9 Mtrs PSCC Pole 300Kg WL
a) 9 Mtr PSCC DP Transformer Structure (Using 9
Mtr PSCC Poles of 300Kg WL)
b) 8 Mtr PSC DP Transformer Structure (Using 8
Mtr PSC Poles 200kg WL)
Will be
intimated
Will be
intimated
11 KV, 5KN Polymeric Pin Insulator (24mm Dia
FRP Rod)
Guy Set Complete with No.15 strain insulator &
Concreting materials
11kV/433V, 100kVA, 3 Phase 50 Cys Distribution
Transformer BEE - 3 Star Rated with Oil
Earthing materials pipe type for grounding as per
Drawing No. BESCOM/GM/CP/15 & 34/ Dt:
24.10.07
Single
Electrode
with
accessories
Caution/Danger Board as per Drawing No.
BESCOM/GM/CP/40/ Dt: 24.10.07
Anti Climbing Device (12mtrs/1Kg GI Barbed
Wire) Lumpsum
Will be
intimated
Will be
intimated
11kV Lightning Arester, Metal Oxide
9kV, 5kA
16 Total for Part-B 2143
Part-C: SWITCH GEAR
17
a) LT Protection Kit Nos 2 1651 3302 205 410
b) LT Distribution box for 100 kVA with MCB No 1 16600 16600 455 455
No 1
i. Al Lead Wire - 120 Sqmm Mtrs 45 107 4815
568 568
ii. Copper lugs - 120 Sqmm Nos 12 71 852
iii. PG Clamps - Rabbit to 120 Sqmm Nos 4 187 748
iv. Spacers for DTC Wiring Nos 8 39 312
Nos 2 161 322
No 1 4504 4504 514 514
Nos 1 2061 2061 631 631
18 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 852 852 423 423
19 11kV, 200Amps, Single Break GOS No 1 7163 7163 636 636
With Distribution Box
Total Cost (Material) 24931 38229
20 Labour Charges
a) Casual 3182 3227
b) Regular 636 645
21 Total for Part-C 28749 42101
22 Total (A+B+C)
Total using 9 mtr PSCC Poles of 300Kg WL 194584 207936
a) Casual 11634 11679
b) Regular 2327 2336
Total using 8 mtr PSC Poles 200kg WL
a) Casual 11212 11257
b) Regular 2242 2251
c) LT Wiring (From DTC to LT Line Through
Merering Box & LT Protection Kit/LT Distribution
Box) SINGLE CIRCUIT
v. Fish Plate with necessary Clamps,bolts & nuts
etc complete (Galvanised)
d) LT Metering box with CTs and necessary wiring
for housing ETV Meter (Please see CDS-42)
e) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0
accuracy
With LT Protection
kit
Labour Charges:
Will be
intimated
Will be
intimated
Labour Charges:
Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA Conductor,
Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate separately
for
COST DATA SHEET - 64
Sl.No Particulars Unit Qty
250 KVA
Material cost Labour Cost
Rate Amt Rate Amt
1 Part-A: TRANSFORMER
No 1 22179 22179 4238 2999
No 1 3816 2703
2 Sets 3 194 582 0 0
3 11KV 45 KN Polymeric Insulator Sets 3 170 510 0 0
4 Nos 4 752 3008 354 1416
5 No 1 254285 254285 1365 1365
6 3 1279 3837 573 1719
7 No 1 146 146 48 48
8 Kgs 2 64 128 25 50
9 Concreting for Guy sets without cement Nos 4 158 632 0 0
10 GI Wire 8 SWG Kgs 5 54.68 273 0 0
11 Guy wire 7/10 SWG Kgs 10 56.28 563 0 0
Total using 9 mtr PSCC Poles of 300Kg WL 286143 7597
Total using 8 mtr PSC Poles 200kg WL 263964 7301
12 Labour Charges
Total using 9 mtr PSCC Poles of 300Kg WL
a) Casual 7597
b) Regular 1519
ii) using 8 mtr poles
a) Casual 7301
b) Regular 1460
13 Total for Part-A
Total using 9 mtr PSCC Poles of 300Kg WL 295260
Total using 8 mtr PSC Poles 200kg WL
Erection of 3 Phase, 11kV/433V, 250kVA BEE – 3 Star Rated Distribution Transformer Centre Using
DPTS With 9 Mtrs PSCC Pole 300Kg WL
a) 9 Mtr PSCC DP Transformer Structure (Using 9
Mtr PSCC Poles of 300Kg WL)
b) 8 Mtr PSC DP Transformer Structure (Using 8
Mtr PSC Poles 200kg WL)
Will be
intimated
Will be
intimated
11 KV, 5KN Polymeric Pin Insulator (24mm Dia
FRP Rod)
Guy Set Complete with No.15 strain insulator &
Concreting materials
11kV/433V, 250kVA, 3 Phase, 50 Cys
Distribution Transformer with oil
Earthing materials pipe type for grounding as per
Drawing No. BESCOM/GM/CP/15 & 34/ Dt:
24.10.07
Single
Electrode
with
accessories
Caution/Danger Board as per Drawing No.
BESCOM/GM/CP/40/ Dt: 24.10.07
Anti Climbing Device (12mtrs/1Kg GI Barbed
Wire) Lumpsum
Will be
intimated
Part-B:
14 Set of 3 Nos 1 2058 2058 71 71
15 Labour Charges
a) Casual 71
b) Regular 14
16 Total for Part-B 2143
Part-C: SWITCH GEAR
17
a) LT Distribution box for 250kVA with MCCB No 1 16600 16600 455 455
No 1
i. Al Lead Wire - 240 Sqmm Mtrs 45 199 8955
644 644
ii. Copper lugs - 240 Sqmm Nos 12 169 2028
iii. PG Clamps - Rabbit to 240 Sqmm Nos 4 281 1124
iv. Spacers for DTC Wiring Nos 8 39 312
Nos 2 161 322
No 1 4654 4654 514 514
Nos 1 2061 2061 631 631
18 11kV Solid Core Type HG Fuse Unit Set/ 3 Nos 1 852 852 423 423
19 11kV, 200Amps, Single Break GOS No 1 7163 7163 636 636
Total Cost (Material) 44071
20 Labour Charges
a) Casual 3303
b) Regular 661
21 Total for Part-C 48035
22 Total (A+B+C)
Total using 9 mtr PSCC Poles of 300Kg WL 345437
a) Casual 10971
b) Regular 2194
Total using 8 mtr PSC Poles 200kg WL
a) Casual 10675
b) Regular 2135
11kV Lightning Arester, Metal Oxide
9kV, 5kA
b) LT Wiring (From DTC to LT Line via Metering
Box & LT Protection Kit) SINGLE CIRCUIT
v. Fish Plate with necessary Clamps,bolts & nuts
etc complete (Galvanised)
c) LT Metering box with CTs and necessary wiring
for housing ETV Meter (Please see CDS-42)
d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0
accuracy
Labour Charges:
Will be
intimated
Labour Charges:
Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11 kV Pin Insulators ACSR/AAA Conductor,
Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate
separately for
While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General Guidelines vide a to .... in
Page No. ...........
COST DATA SHEET - 65
Sl. No Materials Unit Qty
Material cost Labour Cost
Rate Amt Rate Amt
1 9 Mtr long PSCC pole of 300kg WL No 1 4549 4549 1060 1060
2 Nos 3 194 582 0 0
3 11KV 45 KN Polymeric Insulator Nos 3 170 510 0 0
4 Set 1 752 752 354 354
5 Single pole TC set suitable for 25 kVA Transformer Set 1 6356 6356 1016 1016
5 No 1 51684 51684 682 682
7 3 1279 3837 573 1719
8 Concreting materials for 9 mtr PSCC Pole
a) Base concreting 1:4:8, 500x650x150 mm Each 1 229 229 0 0
b) Pole concreting 1:2:4, 650x500x1700 Each 1 2566 2566 0 0
c) Coping 1:2:4 (as per actuals) Each 1 444 444 0 0
9 Concreting materials for Guy sets (without cement) No 1 158 158 0 0
10 GI Wire 8 SWG Kgs 5 54.68 273.4 0 0
11 Guy Wire 7/10 SWG Kgs 10 56.28 563 0 0
12 Set/3 Nos 1 2058 2058 71 71
13
a) LT Protection Kit for 25 kVA No 1 1651 1651 205 205
No 1
i. Al Lead Wire - 50 Sqmm Mtrs 25 44 1100
568 568
ii. Copper lugs - 50 Sqmm Nos 4 27 108
iii. PG Clamps - Rabbit to 50 Sqmm Nos 4 60 240
iv. Spacers for DTC Wiring Nos 8 39 312
Nos 2 161 322
No 1 5185 5185 514 514
No 1 2061 2061 631 631
14 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 852 852 423 423
15 11kV, 200Amps, Single Break GOS Nos 1 7163 7163 636 636
16 No 1 146 146 48 48
17 Kg 1 64 64 25 25
18 Total Material Cost 93765.2
Labour Charges
a) Casual 7952
b) Regular 1590
Total cost for erection of a single pole mounted 25kVA Transformer in Rs 103308
Erection of 3 Phase, 11kV/433V, 25kVA BEE 3 Star Rated Single Pole Mounted Transformer Centre on
9 Mtrs PSCC Pole 300kg WL
11 KV, 5KN Polymeric Pin Insulator (24mm Dia
FRP Rod)
Guy Set Complete with No.15 strain insulator &
Concreting materials
11kV/433V, 25kVA, 3 Phase, 50 Cys Distribution
Transformer BEE-3 Star Rated with Oil
Earthing materials pipe type for grounding as per
Drawing No. BESCOM/GM/CP/15 & 34/ Dt:
24.10.07
Single
Electrode with
accessories
11kV Lightning Arester, Metal Oxide
9kV, 5kA
b) LT Wiring (From DTC to LT Line Through
Metering Box & LT Protection Kit) SINGLE
CIRCUIT
v. Fish Plate with necessary Clamps,bolts & nuts
etc complete (Galvanised)
c) LT Metering box with CTs and necessary wiring
for housing ETV Meter (Please see CDS-42)
d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0
accuracy
Caution/Danger Board as per Drawing No.
BESCOM/GM/CP/40/ Dt: 24.10.07
Anti Climbing Device (12mtrs/1Kg GI Barbed
Wire) Lumpsum
COST DATA SHEET - 66
Sl. No Materials Unit Qty
Material cost Labour Cost
Rate Amt Rate Amt
1 9 Mtr long PSCC pole of 300kg WL No 1 4549 4549 1060 1060
2 Nos 3 194 582 0 0
3 11KV 45 KN Polymeric Insulator Nos 3 170 510 0 0
4 Set 1 752 752 354 354
5 Single pole TC set suitable for 63 kVA Transformer Set 1 6356 6356 1016 1016
6 No 1 93810 93810 682 682
7 3 1279 3837 573 1719
8 Concreting materials for 9 mtr RCC Pole
a) Base concreting 1:4:8, 500x650x150 mm Each 1 229 229 0 0
b) Pole concreting 1:2:4, 650x500x1700 Each 1 2566 2566 0 0
c) Coping 1:2:4 (as per actuals) Each 1 444 444 0 0
9 No 1 158 158 0 0
10 GI Wire 8 SWG Kgs 5 54.68 273.4 0 0
11 Guy Wire 7/10 SWG Kgs 10 56.28 563 0 0
12 Set/3 Nos 1 2058 2058 71 71
13
a) LT Protection Kit for 63 kVA Nos 2 1651 3302 205 410
No 1
i. Al Lead Wire - 95 Sqmm Mtrs 40 82 3280
568 568
ii. Copper lugs - 95 Sqmm Nos 4 65 260
iii. PG Clamps - Rabbit to 95 Sqmm Nos 4 96 384
iv. Spacers for DTC Wiring Nos 8 39 312
Nos 2 161 322
No 1 4786 4786 514 514
No 1 2061 2061 631 631
14 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 852 852 423 423
15 11kV, 200Amps, Single Break GOS Nos 1 7163 7163 636 636
16 No 1 146 146 48 48
17 Kg 1 64 64 25 25
18 Total material cost 139619
19 Labour Charges
a) Casual 8157
b) Regular 1631
Total cost for Erection of a Single Pole Mounted 63kVA Transformer in Rs 149408
Erection of 3 Phase, 11kV/433V, 63kVA BEE 3 Star Rated Single Pole Mounted Transformer Centre
on 9 Mtrs PSCC Pole 300kg WL
11 KV, 5KN Polymeric Pin Insulator (24mm Dia
FRP Rod)
Guy Set Complete with No.15 strain insulator &
Concreting materials
11kV/433V, 63kVA, 3 Phase, 50 Cys Distribution
Transformer BEE-3 Star Rated with Oil
Earthing materials pipe type for grounding as per
Drawing No. BESCOM/GM/CP/15 & 34/ Dt:
24.10.07
Single
Electrode
with
accessories
Concreting materials for Guy sets (without cement
)
11kV Lightning Arester, Metal Oxide
9kV, 5kA
b) LT Wiring (From DTC to LT Line Through
Merering Box & LT Protection Kit) SINGLE
CIRCUIT
v. Fish Plate with necessary Clamps,bolts & nuts
etc complete (Galvanised)
c) LT Metering box with CTs and necessary wiring
for housing ETV Meter (Please see CDS-42)
d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0
accuracy
Caution/Danger Board as per Drawing No.
BESCOM/GM/CP/40/ Dt: 24.10.07
Anti Climbing Device (12mtrs/1Kg GI Barbed
Wire) Lumpsum
COST DATA SHEET - 67
Sl. No Materials Unit Qty
Material cost Labour Cost
Rate Amt Rate Amt
1 9 Mtr long PSCC pole of 300kg WL No 1 4549 4549 1060 1060
2 Nos 3 194 582 0 0
3 11KV 45 KN Polymeric Insulator Nos 3 170 510 0 0
4 Set 1 752 752 354 354
5 Set 1 6356 6356 1016 1016
6 No 1 121776 121776 910 910
7 3 1279 3837 573 1719
8 Providing Concreting for 9 mtr RCC Pole
a) Base concreting 1:4:8, 500x650x150 mm Each 1 229 229 0 0
b) Pole concreting 1:2:4, 650x500x1700 Each 1 2566 2566 0 0
c) Coping 1:2:4 (as per actuals) Each 1 444 444 0 0
9 No 1 158 158 0 0
10 GI Wire 8 SWG Kgs 5 54.68 273.4 0 0
11 Guy Wire 7/10 SWG Kgs 10 56.3 563 0 0
12 Set/3 Nos 1 2058 2058 71 71
13
a) LT Protection Kit No 2 1651 3302 205 410
b) LT Distribution Box for 100kVA with MCB No 1 16600 16600 455 455
No 1
i. Al Lead Wire - 120 Sqmm Mtrs 45 107 4815
568 568
ii. Copper lugs - 120 Sqmm Nos 12 71 852
iii. PG Clamps - Rabbit to 120 Sqmm Nos 4 187 748
iv. Spacers for DTC Wiring Nos 8 39 312
Nos 2 161 322
No 1 4504 4504 514 514
No 1 2061 2061 631 631
14 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 852 852 423 423
15 11kV, 200Amps, Single Break GOS Nos 1 7163 7163 636 636
16 No 1 146 146 48 48
17 Kg 1 64 64 25 25
18 Total Material Cost
a) With LT Distribution Box 183092
b) With LT Protection Kit 169794
19 Labour Charges for LT Distribution Box for LT Protection Kit
a) Casual 8430 8385
b) Regular 1686 1677
Total
193208
179856
Erection of 3 Phase, 11kV/433V, 100kVA BEE 3 Star Rated Single Pole Mounted Transformer Centre
on 9 Mtrs PSCC Pole 300kg WL
11 KV, 5KN Polymeric Pin Insulator (24mm Dia
FRP Rod)
Guy Set Complete with No.15 strain insulator &
Concreting materials
Single pole TC set suitable for 100 kVA
Transformer
11kV/433V, 100kVA, 3 Phase, 50 Cys Distribution
Transformer BEE-3 Star Rated with Oil
Earthing materials pipe type for grounding as per
Drawing No. BESCOM/GM/CP/15 & 34/Dt:
24.10.07.
Single
Electrode
with
accessories
Concreting materials for Guy sets (without cement
)
11kV Lightning Arester, Metal Oxide
9kV, 5kA
c) LT Wiring (From DTC to LT Line Through
Merering Box & LT Protection Kit/LT Distribution
Box) SINGLE CIRCUIT
v. Fish Plate with necessary Clamps, bolts & nuts
etc complete (Galvanised)
d) LT Metering box with CTs and necessary wiring
for housing ETV Meter (Please see CDS-42)
e) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0
accuracy
Caution/Danger Board as per Drawing No.
BESCOM/GM/CP/40/ Dt: 24.10.07
Anti Climbing Device (12mtrs/1Kg GI Barbed
Wire) Lumpsum
Total Cost for Erection of a Single Pole Mounted 100kVA Transformer with LT
Distribution Box in Rs
Total Cost for Erection of a Single Pole Mounted 100kVA Transformer with LT
Protection KIT in Rs
COST DATA SHEET - 68
Particulars Unit Qty
Material cost Labour Cost
Rate Amt Rate Amt
1 PSCC Poles 9 Mtr long with 300 Kg WL Nos 10 4549 45490 1060 10600
2 PSC Poles 9 Mtr long with 200 Kg WL Nos 24 3380 81120 1060 25440
3 Kms 1.015 680510 690718 20426 20732
4 Nos 6 5823 34938 828 4968
6 Nos 6 2164 12984 700 4200
7 Sets 30 196 5880 115 3450
Pole clamp for HT/LT AB cable Sets 30 103 3090 192 5760
8 Eye Hook (Flat type) for fixing Clamps Sets 30 93 2790 0 0
Sets 12 206 2472 115 1380
9 End Caps Nos 10 20 200 5 50
10 Set (3Nos) 2 2058 4116 107 214
11 Sets 6 752 4512 354 2124
12 Concreting for Guy sets (without cement) Sets 6 158 948 0 0
13 Grounding connection for messenger wire Nos 4 126 504 26 104
15 Spiral Earth Electrodes Nos 34 213 7242 55 1870
Total Cost of Material 897004
16 Labour Charges
a) Casual 80892
b) Regular 16178
17 Total Cost/Km in Rs. 994075
Running Single Circuit 11kV, 3 Phase Power Line on 9 Mtr Supports with an Average Span of 30 Mtrs Using 3x95
Sqmm + 1x70 Sqmm Aerial Bunched Cables (ABC) using 9mtr PSCC pole of 300kg WL for Dead Ends and Anchor Points
SL.
No
11kV Class 3 phase Aerial Bunched Cable 3x95 +
70 Sqmm
Cable Straight thru' joint kits suitable for 95
Sqmm
11 KV AB CableTermination Kits fo 95 to 120
Sqmm
Suspension Clamp Assembly 16 to 70 mm
( Excluding pole clamp & Eye Hook )
Dead End Clamp/Anchor Clamp Assembly 25 to
95 Sq mm (excluding pole clamps and Eye hook)
11kV Lightning Arrester, Metal Oxide
9kV, 5kA
Guy Set Complete with No.15 strain insulator &
Concreting materials
While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines vide
a to …. page No. ……. To ……..
COST DATA SHEET - 69
Particulars Unit Qty
Material cost Labour Cost
Rate Amt Rate Amt
1 PSCC Poles 9 Mtr long with 300 Kg WL Nos 10 4549 45490 1060 10600
2 PSC Poles 9 Mtr long with 200 Kg WL Nos 15 3380 50700 1060 15900
3 kms 1.015 442170 448803 20426 20732
4 Three Phase Distribution box for 6 Connections Nos 20 2128 42560 538 10760
5 Nos 60 235 14100 77 4620
6 Nos 25 165 4125 54 1350
7 Sets 20 196 3920 115 2300
8 Pole clamp for HT/LT AB cable Sets 20 103 2060 192 3840
Eye Hook (Flat type) for fixing Clamps Sets 20 93 1860 0 0
8 Sets 16 206 3296 115 1840
9 Universal Hook, Bolts & nuts Nos 16 314 5024 115 1840
10 T-connector KZ3 95 Nos 8 348 2784 130 1040
11 Sets 5 319 1595 192 960
12 Pre-Insulated lugs-CPTAU for 95 Sqmm Nos 8 348 2784 160 1280
13 End cap for 50/70 Sqmm Nos 50 20 1000 5 250
14 Sets 8 730 5840 354 2832
15 Concreting for Guy sets (without cement) Sets 8 158 1264 0 0
16 PVC Insulated wire 16/25 Sqmm Mtrs 400 23.41 9364 0 0
17 Spiral Earth Electrodes Nos 25 213 5325 55 1375
Total Cost of Materials 651894
18 Labour Charges
a) Casual 81519
b) Regular 16304
Total Cost/Km in Rs. 749717
Running Single Circuit 1.1 kV 3 Phase 5 Wire Power Line on 9 Mtr Supports with Average Span of 40 Mtrs Using 3x95
+ 1x16 + 1x70 Sqmm Aerial Bunched Cables (ABC) using 9mtr PSCC pole of 300kg WL for Dead Ends and Anchor
Points
SL.
No
1.1kV Class 3 Phase Aerial Bunched Cable of size
3x95+1x16+1x70 Sqmm
Piercing connector suitable for 16 Sqmm - 95
Sqmm AB Cable - Service Connections
Piercing connector suitable for 16 Sqmm - 95
Sqmm AB Cable - Street Light Connections
Suspension Clamp Assembly 16 to 70 mm
( Excluding pole clamp & Eye Hook )
Dead End Clamp/Anchor Clamp Assembly 25 to
95 Sq mm (excluding pole clamps and Eye hook)
Cable Straight thru' joint kits suitable for 95
Sqmm
Guy Set Complete with No.8 strain insulator &
Concreting materials
While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines
vide a to …. page No. ……. To ……..

More Related Content

What's hot

Tecnotion tl series_specsheet
Tecnotion tl series_specsheetTecnotion tl series_specsheet
Tecnotion tl series_specsheetElectromate
Β 
Torque systems 2100_series_specsheet
Torque systems 2100_series_specsheetTorque systems 2100_series_specsheet
Torque systems 2100_series_specsheetElectromate
Β 
Original IGBT STGF20H60DF GF20H60DF 20H60 600V 20A TO-220F New STMicroelectro...
Original IGBT STGF20H60DF GF20H60DF 20H60 600V 20A TO-220F New STMicroelectro...Original IGBT STGF20H60DF GF20H60DF 20H60 600V 20A TO-220F New STMicroelectro...
Original IGBT STGF20H60DF GF20H60DF 20H60 600V 20A TO-220F New STMicroelectro...AUTHELECTRONIC
Β 
Ellis Patents Varicleat - VC-AN1-AN0 - 21.0-24.0mm Cable Cleats
Ellis Patents Varicleat - VC-AN1-AN0 - 21.0-24.0mm Cable CleatsEllis Patents Varicleat - VC-AN1-AN0 - 21.0-24.0mm Cable Cleats
Ellis Patents Varicleat - VC-AN1-AN0 - 21.0-24.0mm Cable CleatsThorne & Derrick International
Β 
Torque systems 5300_series_specsheet
Torque systems 5300_series_specsheetTorque systems 5300_series_specsheet
Torque systems 5300_series_specsheetElectromate
Β 
Torque systems 4000_series_specsheet
Torque systems 4000_series_specsheetTorque systems 4000_series_specsheet
Torque systems 4000_series_specsheetElectromate
Β 
SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...
SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...
SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...Thorne & Derrick International
Β 
Original Opto HCPL-4504 A4504 4504 DIP-8 New
Original Opto HCPL-4504 A4504 4504 DIP-8 NewOriginal Opto HCPL-4504 A4504 4504 DIP-8 New
Original Opto HCPL-4504 A4504 4504 DIP-8 Newauthelectroniccom
Β 
Original N-CHANNEL MOSFET STF40NF20 40NF20 40N20 40A 200V TO-220 New ST
Original N-CHANNEL MOSFET STF40NF20 40NF20 40N20 40A 200V TO-220 New STOriginal N-CHANNEL MOSFET STF40NF20 40NF20 40N20 40A 200V TO-220 New ST
Original N-CHANNEL MOSFET STF40NF20 40NF20 40N20 40A 200V TO-220 New STAUTHELECTRONIC
Β 
Original MOSFET P20NM60 20NM60 20N60C3 20N60 New
Original MOSFET P20NM60 20NM60 20N60C3 20N60 NewOriginal MOSFET P20NM60 20NM60 20N60C3 20N60 New
Original MOSFET P20NM60 20NM60 20N60C3 20N60 NewAUTHELECTRONIC
Β 
Kollmorgen gearmotor series_servodisc_cat_catalog
Kollmorgen gearmotor series_servodisc_cat_catalogKollmorgen gearmotor series_servodisc_cat_catalog
Kollmorgen gearmotor series_servodisc_cat_catalogElectromate
Β 
Original Mosfet N 8N80C 8N80 FQPF8N80C FQPF8N80 8A 800V TO-220 New Fairchild
Original Mosfet N 8N80C 8N80 FQPF8N80C FQPF8N80 8A 800V TO-220 New FairchildOriginal Mosfet N 8N80C 8N80 FQPF8N80C FQPF8N80 8A 800V TO-220 New Fairchild
Original Mosfet N 8N80C 8N80 FQPF8N80C FQPF8N80 8A 800V TO-220 New FairchildAUTHELECTRONIC
Β 
MTM23223 LTspice Model (Free SPICE Model)
MTM23223 LTspice Model (Free SPICE Model)MTM23223 LTspice Model (Free SPICE Model)
MTM23223 LTspice Model (Free SPICE Model)Tsuyoshi Horigome
Β 
Ericson Pocket Guide-2014
Ericson Pocket Guide-2014Ericson Pocket Guide-2014
Ericson Pocket Guide-2014Nicole Mezic
Β 
2SK4017 (Professional Model) PSpice Model (Free SPICE Model)
2SK4017 (Professional Model) PSpice Model (Free SPICE Model)2SK4017 (Professional Model) PSpice Model (Free SPICE Model)
2SK4017 (Professional Model) PSpice Model (Free SPICE Model)Tsuyoshi Horigome
Β 
2SK4017 (Standard Model) PSpice Model (Free SPICE Model)
2SK4017 (Standard Model) PSpice Model  (Free SPICE Model)2SK4017 (Standard Model) PSpice Model  (Free SPICE Model)
2SK4017 (Standard Model) PSpice Model (Free SPICE Model)Tsuyoshi Horigome
Β 
Shimpo vrb series
Shimpo vrb seriesShimpo vrb series
Shimpo vrb seriesElectromate
Β 

What's hot (19)

Tecnotion tl series_specsheet
Tecnotion tl series_specsheetTecnotion tl series_specsheet
Tecnotion tl series_specsheet
Β 
Torque systems 2100_series_specsheet
Torque systems 2100_series_specsheetTorque systems 2100_series_specsheet
Torque systems 2100_series_specsheet
Β 
Original IGBT STGF20H60DF GF20H60DF 20H60 600V 20A TO-220F New STMicroelectro...
Original IGBT STGF20H60DF GF20H60DF 20H60 600V 20A TO-220F New STMicroelectro...Original IGBT STGF20H60DF GF20H60DF 20H60 600V 20A TO-220F New STMicroelectro...
Original IGBT STGF20H60DF GF20H60DF 20H60 600V 20A TO-220F New STMicroelectro...
Β 
Ellis Patents Varicleat - VC-AN1-AN0 - 21.0-24.0mm Cable Cleats
Ellis Patents Varicleat - VC-AN1-AN0 - 21.0-24.0mm Cable CleatsEllis Patents Varicleat - VC-AN1-AN0 - 21.0-24.0mm Cable Cleats
Ellis Patents Varicleat - VC-AN1-AN0 - 21.0-24.0mm Cable Cleats
Β 
Torque systems 5300_series_specsheet
Torque systems 5300_series_specsheetTorque systems 5300_series_specsheet
Torque systems 5300_series_specsheet
Β 
What happens when (47uF != 47uF)...
What happens when (47uF != 47uF)...What happens when (47uF != 47uF)...
What happens when (47uF != 47uF)...
Β 
Torque systems 4000_series_specsheet
Torque systems 4000_series_specsheetTorque systems 4000_series_specsheet
Torque systems 4000_series_specsheet
Β 
SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...
SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...
SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...
Β 
Original Opto HCPL-4504 A4504 4504 DIP-8 New
Original Opto HCPL-4504 A4504 4504 DIP-8 NewOriginal Opto HCPL-4504 A4504 4504 DIP-8 New
Original Opto HCPL-4504 A4504 4504 DIP-8 New
Β 
Original N-CHANNEL MOSFET STF40NF20 40NF20 40N20 40A 200V TO-220 New ST
Original N-CHANNEL MOSFET STF40NF20 40NF20 40N20 40A 200V TO-220 New STOriginal N-CHANNEL MOSFET STF40NF20 40NF20 40N20 40A 200V TO-220 New ST
Original N-CHANNEL MOSFET STF40NF20 40NF20 40N20 40A 200V TO-220 New ST
Β 
Original MOSFET P20NM60 20NM60 20N60C3 20N60 New
Original MOSFET P20NM60 20NM60 20N60C3 20N60 NewOriginal MOSFET P20NM60 20NM60 20N60C3 20N60 New
Original MOSFET P20NM60 20NM60 20N60C3 20N60 New
Β 
Kollmorgen gearmotor series_servodisc_cat_catalog
Kollmorgen gearmotor series_servodisc_cat_catalogKollmorgen gearmotor series_servodisc_cat_catalog
Kollmorgen gearmotor series_servodisc_cat_catalog
Β 
Original Mosfet N 8N80C 8N80 FQPF8N80C FQPF8N80 8A 800V TO-220 New Fairchild
Original Mosfet N 8N80C 8N80 FQPF8N80C FQPF8N80 8A 800V TO-220 New FairchildOriginal Mosfet N 8N80C 8N80 FQPF8N80C FQPF8N80 8A 800V TO-220 New Fairchild
Original Mosfet N 8N80C 8N80 FQPF8N80C FQPF8N80 8A 800V TO-220 New Fairchild
Β 
MTM23223 LTspice Model (Free SPICE Model)
MTM23223 LTspice Model (Free SPICE Model)MTM23223 LTspice Model (Free SPICE Model)
MTM23223 LTspice Model (Free SPICE Model)
Β 
BME C0G Ceramic DC Link Evaluation
BME C0G Ceramic DC Link EvaluationBME C0G Ceramic DC Link Evaluation
BME C0G Ceramic DC Link Evaluation
Β 
Ericson Pocket Guide-2014
Ericson Pocket Guide-2014Ericson Pocket Guide-2014
Ericson Pocket Guide-2014
Β 
2SK4017 (Professional Model) PSpice Model (Free SPICE Model)
2SK4017 (Professional Model) PSpice Model (Free SPICE Model)2SK4017 (Professional Model) PSpice Model (Free SPICE Model)
2SK4017 (Professional Model) PSpice Model (Free SPICE Model)
Β 
2SK4017 (Standard Model) PSpice Model (Free SPICE Model)
2SK4017 (Standard Model) PSpice Model  (Free SPICE Model)2SK4017 (Standard Model) PSpice Model  (Free SPICE Model)
2SK4017 (Standard Model) PSpice Model (Free SPICE Model)
Β 
Shimpo vrb series
Shimpo vrb seriesShimpo vrb series
Shimpo vrb series
Β 

Similar to G. csr-16-17-cds-61-69-gst-1

M. standard-stock-materials-for-33k v-system
M. standard-stock-materials-for-33k v-systemM. standard-stock-materials-for-33k v-system
M. standard-stock-materials-for-33k v-systemRamesh Meti
Β 
Nexans Euromold Interface C 400 Compact Series Cable Connectors
Nexans Euromold Interface C 400 Compact Series Cable Connectors Nexans Euromold Interface C 400 Compact Series Cable Connectors
Nexans Euromold Interface C 400 Compact Series Cable Connectors Thorne & Derrick International
Β 
Nexans Euromold MV Separable Connectors & Bushings - Interface C Compact
Nexans Euromold MV Separable Connectors & Bushings - Interface C CompactNexans Euromold MV Separable Connectors & Bushings - Interface C Compact
Nexans Euromold MV Separable Connectors & Bushings - Interface C CompactThorne & Derrick International
Β 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Gensol Engineering Limited
Β 
Nexans MV Medium Voltage Compact Separable Connectors - Interface C
Nexans MV Medium Voltage Compact Separable Connectors - Interface CNexans MV Medium Voltage Compact Separable Connectors - Interface C
Nexans MV Medium Voltage Compact Separable Connectors - Interface CThorne & Derrick International
Β 
400 Series Interface C Compact Nexans Euromold Cable Connectors HV
400 Series Interface C Compact Nexans Euromold Cable Connectors HV400 Series Interface C Compact Nexans Euromold Cable Connectors HV
400 Series Interface C Compact Nexans Euromold Cable Connectors HVThorne & Derrick International
Β 
Nexans Euromold Connectors 400 Series Interface C Compact Cable Connectors HV
Nexans Euromold Connectors 400 Series Interface C Compact Cable Connectors HVNexans Euromold Connectors 400 Series Interface C Compact Cable Connectors HV
Nexans Euromold Connectors 400 Series Interface C Compact Cable Connectors HVThorne & Derrick International
Β 
Nexans Euromold - Medium Voltage Compact Separable Connectors Interface C.
Nexans Euromold - Medium Voltage Compact Separable Connectors Interface C.Nexans Euromold - Medium Voltage Compact Separable Connectors Interface C.
Nexans Euromold - Medium Voltage Compact Separable Connectors Interface C.Thorne & Derrick International
Β 
Euromold Connectors 400 Series Elbows 430TB - Interface Type C Bushing
Euromold Connectors 400 Series Elbows 430TB - Interface Type C BushingEuromold Connectors 400 Series Elbows 430TB - Interface Type C Bushing
Euromold Connectors 400 Series Elbows 430TB - Interface Type C BushingThorne & Derrick International
Β 
Catalog CB tΓ©p MCB 2P 3P 4P BKN BKH LS
Catalog CB tΓ©p MCB 2P 3P 4P BKN BKH LSCatalog CB tΓ©p MCB 2P 3P 4P BKN BKH LS
Catalog CB tΓ©p MCB 2P 3P 4P BKN BKH LSBeeteco
Β 
Nexans Euromold Connectors - 400LB Elbow, 400TB & 440TB Tee Connectors (Inter...
Nexans Euromold Connectors - 400LB Elbow, 400TB & 440TB Tee Connectors (Inter...Nexans Euromold Connectors - 400LB Elbow, 400TB & 440TB Tee Connectors (Inter...
Nexans Euromold Connectors - 400LB Elbow, 400TB & 440TB Tee Connectors (Inter...Thorne & Derrick International
Β 
Nexans Euromold Connectors 400 Series Interface C Symmetrical Cable Connector...
Nexans Euromold Connectors 400 Series Interface C Symmetrical Cable Connector...Nexans Euromold Connectors 400 Series Interface C Symmetrical Cable Connector...
Nexans Euromold Connectors 400 Series Interface C Symmetrical Cable Connector...Thorne & Derrick International
Β 
UNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONSUNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONSPremanandDesai
Β 
ABB Price List -2019..pdf
ABB Price List -2019..pdfABB Price List -2019..pdf
ABB Price List -2019..pdfssuser3f62a8
Β 
Nexans Euromold MV Separable Connectors & Bushings - Interface E
Nexans Euromold MV Separable Connectors & Bushings - Interface ENexans Euromold MV Separable Connectors & Bushings - Interface E
Nexans Euromold MV Separable Connectors & Bushings - Interface EThorne & Derrick International
Β 
Nexans Euromold Interface E 5/8" 700 Series Cable Connectors
Nexans Euromold Interface E 5/8" 700 Series Cable Connectors Nexans Euromold Interface E 5/8" 700 Series Cable Connectors
Nexans Euromold Interface E 5/8" 700 Series Cable Connectors Thorne & Derrick International
Β 
Nexans Euromold Interface C 400 Symmetrical Series Cable Connectors
Nexans Euromold Interface C 400 Symmetrical Series Cable Connectors Nexans Euromold Interface C 400 Symmetrical Series Cable Connectors
Nexans Euromold Interface C 400 Symmetrical Series Cable Connectors Thorne & Derrick International
Β 
Nexans Euromold MV Separable Connectors & Bushings - Interface C Symmetrical
Nexans Euromold MV Separable Connectors & Bushings - Interface C SymmetricalNexans Euromold MV Separable Connectors & Bushings - Interface C Symmetrical
Nexans Euromold MV Separable Connectors & Bushings - Interface C SymmetricalThorne & Derrick International
Β 
Nexans Euromold 430TB Screened Separable Connectors 400 Series, up to 630A 33...
Nexans Euromold 430TB Screened Separable Connectors 400 Series, up to 630A 33...Nexans Euromold 430TB Screened Separable Connectors 400 Series, up to 630A 33...
Nexans Euromold 430TB Screened Separable Connectors 400 Series, up to 630A 33...Thorne & Derrick International
Β 

Similar to G. csr-16-17-cds-61-69-gst-1 (20)

M. standard-stock-materials-for-33k v-system
M. standard-stock-materials-for-33k v-systemM. standard-stock-materials-for-33k v-system
M. standard-stock-materials-for-33k v-system
Β 
Nexans Euromold Interface C 400 Compact Series Cable Connectors
Nexans Euromold Interface C 400 Compact Series Cable Connectors Nexans Euromold Interface C 400 Compact Series Cable Connectors
Nexans Euromold Interface C 400 Compact Series Cable Connectors
Β 
Nexans Euromold MV Separable Connectors & Bushings - Interface C Compact
Nexans Euromold MV Separable Connectors & Bushings - Interface C CompactNexans Euromold MV Separable Connectors & Bushings - Interface C Compact
Nexans Euromold MV Separable Connectors & Bushings - Interface C Compact
Β 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Β 
Nexans MV Medium Voltage Compact Separable Connectors - Interface C
Nexans MV Medium Voltage Compact Separable Connectors - Interface CNexans MV Medium Voltage Compact Separable Connectors - Interface C
Nexans MV Medium Voltage Compact Separable Connectors - Interface C
Β 
400 Series Interface C Compact Nexans Euromold Cable Connectors HV
400 Series Interface C Compact Nexans Euromold Cable Connectors HV400 Series Interface C Compact Nexans Euromold Cable Connectors HV
400 Series Interface C Compact Nexans Euromold Cable Connectors HV
Β 
Nexans Euromold Connectors 400 Series Interface C Compact Cable Connectors HV
Nexans Euromold Connectors 400 Series Interface C Compact Cable Connectors HVNexans Euromold Connectors 400 Series Interface C Compact Cable Connectors HV
Nexans Euromold Connectors 400 Series Interface C Compact Cable Connectors HV
Β 
Nexans Euromold - Medium Voltage Compact Separable Connectors Interface C.
Nexans Euromold - Medium Voltage Compact Separable Connectors Interface C.Nexans Euromold - Medium Voltage Compact Separable Connectors Interface C.
Nexans Euromold - Medium Voltage Compact Separable Connectors Interface C.
Β 
Euromold Connectors 400 Series Elbows 430TB - Interface Type C Bushing
Euromold Connectors 400 Series Elbows 430TB - Interface Type C BushingEuromold Connectors 400 Series Elbows 430TB - Interface Type C Bushing
Euromold Connectors 400 Series Elbows 430TB - Interface Type C Bushing
Β 
Catalog CB tΓ©p MCB 2P 3P 4P BKN BKH LS
Catalog CB tΓ©p MCB 2P 3P 4P BKN BKH LSCatalog CB tΓ©p MCB 2P 3P 4P BKN BKH LS
Catalog CB tΓ©p MCB 2P 3P 4P BKN BKH LS
Β 
ThΓ΄ng sα»‘ MCB LS
ThΓ΄ng sα»‘ MCB LSThΓ΄ng sα»‘ MCB LS
ThΓ΄ng sα»‘ MCB LS
Β 
Nexans Euromold Connectors - 400LB Elbow, 400TB & 440TB Tee Connectors (Inter...
Nexans Euromold Connectors - 400LB Elbow, 400TB & 440TB Tee Connectors (Inter...Nexans Euromold Connectors - 400LB Elbow, 400TB & 440TB Tee Connectors (Inter...
Nexans Euromold Connectors - 400LB Elbow, 400TB & 440TB Tee Connectors (Inter...
Β 
Nexans Euromold Connectors 400 Series Interface C Symmetrical Cable Connector...
Nexans Euromold Connectors 400 Series Interface C Symmetrical Cable Connector...Nexans Euromold Connectors 400 Series Interface C Symmetrical Cable Connector...
Nexans Euromold Connectors 400 Series Interface C Symmetrical Cable Connector...
Β 
UNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONSUNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONS
Β 
ABB Price List -2019..pdf
ABB Price List -2019..pdfABB Price List -2019..pdf
ABB Price List -2019..pdf
Β 
Nexans Euromold MV Separable Connectors & Bushings - Interface E
Nexans Euromold MV Separable Connectors & Bushings - Interface ENexans Euromold MV Separable Connectors & Bushings - Interface E
Nexans Euromold MV Separable Connectors & Bushings - Interface E
Β 
Nexans Euromold Interface E 5/8" 700 Series Cable Connectors
Nexans Euromold Interface E 5/8" 700 Series Cable Connectors Nexans Euromold Interface E 5/8" 700 Series Cable Connectors
Nexans Euromold Interface E 5/8" 700 Series Cable Connectors
Β 
Nexans Euromold Interface C 400 Symmetrical Series Cable Connectors
Nexans Euromold Interface C 400 Symmetrical Series Cable Connectors Nexans Euromold Interface C 400 Symmetrical Series Cable Connectors
Nexans Euromold Interface C 400 Symmetrical Series Cable Connectors
Β 
Nexans Euromold MV Separable Connectors & Bushings - Interface C Symmetrical
Nexans Euromold MV Separable Connectors & Bushings - Interface C SymmetricalNexans Euromold MV Separable Connectors & Bushings - Interface C Symmetrical
Nexans Euromold MV Separable Connectors & Bushings - Interface C Symmetrical
Β 
Nexans Euromold 430TB Screened Separable Connectors 400 Series, up to 630A 33...
Nexans Euromold 430TB Screened Separable Connectors 400 Series, up to 630A 33...Nexans Euromold 430TB Screened Separable Connectors 400 Series, up to 630A 33...
Nexans Euromold 430TB Screened Separable Connectors 400 Series, up to 630A 33...
Β 

More from Ramesh Meti

Motors and motor starters
Motors and motor startersMotors and motor starters
Motors and motor startersRamesh Meti
Β 
04 universal motor
04 universal motor04 universal motor
04 universal motorRamesh Meti
Β 
03 presentation 01 dc motors
03 presentation 01 dc motors03 presentation 01 dc motors
03 presentation 01 dc motorsRamesh Meti
Β 
01 dc motors
01 dc motors01 dc motors
01 dc motorsRamesh Meti
Β 
Excell%20basic%20training(3) 143
Excell%20basic%20training(3) 143Excell%20basic%20training(3) 143
Excell%20basic%20training(3) 143Ramesh Meti
Β 
Excel%20basic%202 123
Excel%20basic%202 123Excel%20basic%202 123
Excel%20basic%202 123Ramesh Meti
Β 
Gulbrga history
Gulbrga historyGulbrga history
Gulbrga historyRamesh Meti
Β 
Gulbrga history
Gulbrga historyGulbrga history
Gulbrga historyRamesh Meti
Β 
Gulbarga dist details
Gulbarga dist detailsGulbarga dist details
Gulbarga dist detailsRamesh Meti
Β 
70 village-accountant-posts-advt-details-mysore-district (1)
70 village-accountant-posts-advt-details-mysore-district (1)70 village-accountant-posts-advt-details-mysore-district (1)
70 village-accountant-posts-advt-details-mysore-district (1)Ramesh Meti
Β 
Vihan mcb-pricelist
Vihan mcb-pricelistVihan mcb-pricelist
Vihan mcb-pricelistRamesh Meti
Β 
Schnieder mccb li st
Schnieder mccb li stSchnieder mccb li st
Schnieder mccb li stRamesh Meti
Β 
Schneider electrical mcb ,mccb ..
Schneider electrical mcb ,mccb ..Schneider electrical mcb ,mccb ..
Schneider electrical mcb ,mccb ..Ramesh Meti
Β 
Maru electrical mcb, mccb..
Maru electrical mcb, mccb..Maru electrical mcb, mccb..
Maru electrical mcb, mccb..Ramesh Meti
Β 
Tips to save energy
Tips to save energyTips to save energy
Tips to save energyRamesh Meti
Β 
7.reflective embroidery-on-linemen-shirts
7.reflective embroidery-on-linemen-shirts7.reflective embroidery-on-linemen-shirts
7.reflective embroidery-on-linemen-shirtsRamesh Meti
Β 
1.guidelines
1.guidelines1.guidelines
1.guidelinesRamesh Meti
Β 

More from Ramesh Meti (20)

Motors and motor starters
Motors and motor startersMotors and motor starters
Motors and motor starters
Β 
Dc motor
Dc motorDc motor
Dc motor
Β 
Dc gen
Dc genDc gen
Dc gen
Β 
Dc gen
Dc genDc gen
Dc gen
Β 
04 universal motor
04 universal motor04 universal motor
04 universal motor
Β 
03 presentation 01 dc motors
03 presentation 01 dc motors03 presentation 01 dc motors
03 presentation 01 dc motors
Β 
01 dc motors
01 dc motors01 dc motors
01 dc motors
Β 
Excell%20basic%20training(3) 143
Excell%20basic%20training(3) 143Excell%20basic%20training(3) 143
Excell%20basic%20training(3) 143
Β 
Excel%20basic%202 123
Excel%20basic%202 123Excel%20basic%202 123
Excel%20basic%202 123
Β 
Gulbrga history
Gulbrga historyGulbrga history
Gulbrga history
Β 
Gulbrga history
Gulbrga historyGulbrga history
Gulbrga history
Β 
Gulbarga dist details
Gulbarga dist detailsGulbarga dist details
Gulbarga dist details
Β 
70 village-accountant-posts-advt-details-mysore-district (1)
70 village-accountant-posts-advt-details-mysore-district (1)70 village-accountant-posts-advt-details-mysore-district (1)
70 village-accountant-posts-advt-details-mysore-district (1)
Β 
Vihan mcb-pricelist
Vihan mcb-pricelistVihan mcb-pricelist
Vihan mcb-pricelist
Β 
Schnieder mccb li st
Schnieder mccb li stSchnieder mccb li st
Schnieder mccb li st
Β 
Schneider electrical mcb ,mccb ..
Schneider electrical mcb ,mccb ..Schneider electrical mcb ,mccb ..
Schneider electrical mcb ,mccb ..
Β 
Maru electrical mcb, mccb..
Maru electrical mcb, mccb..Maru electrical mcb, mccb..
Maru electrical mcb, mccb..
Β 
Tips to save energy
Tips to save energyTips to save energy
Tips to save energy
Β 
7.reflective embroidery-on-linemen-shirts
7.reflective embroidery-on-linemen-shirts7.reflective embroidery-on-linemen-shirts
7.reflective embroidery-on-linemen-shirts
Β 
1.guidelines
1.guidelines1.guidelines
1.guidelines
Β 

Recently uploaded

Model Call Girl in Narela Delhi reach out to us at πŸ”8264348440πŸ”
Model Call Girl in Narela Delhi reach out to us at πŸ”8264348440πŸ”Model Call Girl in Narela Delhi reach out to us at πŸ”8264348440πŸ”
Model Call Girl in Narela Delhi reach out to us at πŸ”8264348440πŸ”soniya singh
Β 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
Β 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
Β 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
Β 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
Β 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
Β 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
Β 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
Β 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
Β 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
Β 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
Β 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
Β 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
Β 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
Β 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
Β 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
Β 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
Β 

Recently uploaded (20)

Model Call Girl in Narela Delhi reach out to us at πŸ”8264348440πŸ”
Model Call Girl in Narela Delhi reach out to us at πŸ”8264348440πŸ”Model Call Girl in Narela Delhi reach out to us at πŸ”8264348440πŸ”
Model Call Girl in Narela Delhi reach out to us at πŸ”8264348440πŸ”
Β 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
Β 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
Β 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
Β 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Β 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
Β 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
Β 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
Β 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
Β 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Β 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Β 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
Β 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Β 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
Β 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Β 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
Β 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
Β 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
Β 
β˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
β˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCRβ˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
β˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
Β 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
Β 

G. csr-16-17-cds-61-69-gst-1

  • 1. COST DATA SHEET - 61 Particulars Unit Qty 25 KVA Material Cost Labour Cost Rate Amt Rate Amt 1 Part-A: TRANSFORMER No 1 20074 20074 4115 4115 No 1 3560 3560 2 Sets 3 194 582 0 0 3 11KV 45 KN Polymeric Insulator Sets 3 170 510 0 0 4 Nos 4 752 3008 354 1416 5 No 1 51684 51684 682 682 6 3 1279 3837 573 1719 7 No 1 146 146 48 48 8 Kgs 2 64 128 25 50 9 Concreting for Guy sets without cement Nos 4 158 632 0 0 10 GI Wire 8 SWG Kgs 5 54.68 273.4 0 0 11 Guy wire 7/10 SWG Kgs 10 56.28 563 0 0 Total using 9 mtr PSCC Poles of 300Kg WL 81437 8030 Total using 8 mtr PSC Poles 200kg WL 7475 12 Labour Charges Total using 9 mtr PSCC Poles of 300Kg WL a) Casual 8030 b) Regular 1606 Total using 8 mtr PSC Poles 200kg WL a) Casual 7475 b) Regular 1495 13 Total for Part-A Total using 9 mtr PSCC Poles of 300Kg WL 91073 Total using 8 mtr PSC Poles 200kg WL Part-B: 14 Set of 3 Nos 1 2058 2058 71 71 15 Labour Charges a) Casual 71 Erection of 3 Phase, 11kV/433V, 25kVA BEE – 3 Star Rated Distribution Transformer Centre Using DPTS With 9 Mtrs PSCC Pole 300Kg WL Sl No a) 9 Mtr PSCC DP Transformer Structure (Using 9 Mtr PSCC Poles of 300Kg WL) b) 8 Mtr PSC DP Transformer Structure (Using 8 Mtr PSC Poles 200kg WL) will be intimated will be intimated 11 KV, 5KN Polymeric Pin Insulator (24mm Dia FRP Rod) Guy Set Complete with No.15 strain insulator & Concreting materials 11kV/433V, 25KVA, 3 Phase, 50 Cys Distribution Transformer BEE-3 Star Rated with Oil Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07 Single Electrode with accessories Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum will be intimated will be intimated 11kV Lightning Arester, Metal oxide, 9kV, 5kA
  • 2. b) Regular 14 16 Total for Part-B 2143 Part-C: SWITCH GEAR 17 a) LT Protection Kit for 25 kVA No 1 1651 1651 205 205 No 1 i. Al Lead Wire - 50 Sqmm Mtrs 25 44 1100 568 568 ii. Copper Lugs - 50 Sqmm Nos 4 27 108 iii. PG Clamps - Rabbit to 50 Sqmm Nos 4 60 240 iv. Spacers for DTC Wiring Nos 8 39 312 Nos 2 161 322 No 1 5185 5185 514 514 No 1 2061 2061 631 631 18 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 852 852 423 423 19 11kV, 200Amps, Single Break GOS No 1 7163 7163 636 636 Total Cost (Material) for Part-C 18994 20 Labour Charges a) Casual 2977 b) Regular 595 21 Total for Part-C 22566 22 Total (A+B+C) Total using 9 mtr PSCC Poles of 300Kg WL 115783 a) Casual 11078 b) Regular 2216 Total using 8 mtr PSC Poles 200kg WL a) Casual 10523 b) Regular 2105 b) LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) SINGLE CIRCUIT v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised) c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42) d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy Labour Charges: will be intimated Labour Charges: Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA Conductor, Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate separately for
  • 3. COST DATA SHEET - 62 Particulars Unit Qty 63 KVA Material Cost Labour Cost Rate Amt Rate Amt 1 Part-A: TRANSFORMER No 1 20074 20074 4115 4115 No 1 3560 3560 2 Sets 3 194 582 0 0 3 11KV 45 KN Polymeric Insulator Sets 3 170 510 0 0 4 Nos 4 752 3008 354 1416 5 No 1 93810 93810 682 682 6 3 1279 3837 573 1719 7 No 1 146 146 48 48 8 Kgs 2 64 128 25 50 9 Concreting for Guy sets without cement Nos 4 158 632 0 0 10 GI Wire 8 SWG Kgs 5 54.68 273 0 0 11 Guy wire 7/10 SWG Kgs 10 56.28 563 0 0 Total using 9 mtr PSCC Poles of 300Kg WL 123563 8030 Total using 8 mtr PSC Poles 200kg WL 7475 12 Labour Charges Total using 9 mtr PSCC Poles of 300Kg WL a) Casual 8030 b) Regular 1606 Total using 8 mtr PSC Poles 200kg WL a) Casual 7475 b) Regular 1495 13 Total for Part-A Total using 9 mtr PSCC Poles of 300Kg WL 133199 Total using 8 mtr PSC Poles 200kg WL Part-B: 14 Set of 3 Nos 1 2058 2058 71 71 15 Labour Charges a) Casual 71 b) Regular 14 Erection of 3 Phase, 11kV/433V, 63kVA BEE – 3 Star Rated Distribution Transformer Centre Using DPTS With 9 Mtrs PSCC Pole 300Kg WL Sl No a) 9 Mtr PSCC DP Transformer Structure (Using 9 Mtr PSCC Poles of 300Kg WL) b) 8 Mtr PSC DP Transformer Structure (Using 8 Mtr PSC Poles 200kg WL) Will be intimated Will be intimated 11 KV, 5KN Polymeric Pin Insulator (24mm Dia FRP Rod) Guy Set Complete with No.15 strain insulator & Concreting materials 11kV/433V, 63kVA, 3 Phase, 50 Cys Distribution Transformer BEE - 3 Star Rated with Oil Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07 Single Electrode with accessories Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum Will be intimated Will be intimated 11kV Lightning Arester, Metal Oxide 9kV, 5kA
  • 4. 16 Total for Part-B 2143 Part-C: SWITCH GEAR 17 a) LT Protection Kit for 63 kVA Nos 2 1651 3302 205 Amt No 1 i. Al Lead Wire - 95 Sqmm Mtrs 40 82 3280 568 568 ii. Copper Lugs - 95 Sqmm Nos 4 65 260 iii. PG Clamps - Rabbit to 95 Sqmm Nos 4 96 384 iv. Spacers for DTC Wiring Nos 8 39 312 Nos 2 161 322 No 1 4786 4786 514 514 No 1 2061 2061 631 631 18 11kV Solid Core Type HG Fuse Unit Set/ 3 nos 1 852 852 423 423 19 11kV, 200Amps, Single Break GOS No 1 7163 7163 636 636 Total Cost (Material) for Part-C 22722 20 Labour Charges a) Casual 2772 b) Regular 554 21 Total for Part-C 26048 22 Total (A+B+C) Total using 9 mtr PSCC Poles of 300Kg WL 161391 a) Casual 10873 b) Regular 2175 Total using 8 mtr PSC Poles 200kg WL a) Casual 10318 b) Regular 2064 b) LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) SINGLE CIRCUIT v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised) c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42) d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy Labour Charges: Will be intimated Labour Charges: Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA Conductor, Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate separately for
  • 5. COST DATA SHEET - 63 Sl No Particulars Unit Qty 100 KVA Material cost Labour Cost Rate Amt Rate Amt 1 Part-A: TRANSFORMER No 1 22179 22179 4238 4238 No 1 3816 3816 2 Sets 3 194 582 0 0 3 11KV 45 KN Polymeric Insulator Sets 3 170 510 0 0 4 Nos 4 752 3008 354 1416 5 No 1 121776 121776 910 910 6 3 1279 3837 573 1719 7 No 1 146 146 48 48 8 Kgs 2 64 128 25 50 9 Concreting for Guy sets without cement Nos 4 158 632 0 0 10 GI Wire 8 SWG Kgs 5 54.68 273 0 0 11 Guy wire 7/10 SWG Kgs 10 56.28 563 0 0 Total using 9 mtr PSCC Poles of 300Kg WL 153634 8381 Total using 8 mtr PSC Poles 200kg WL 7959 12 Labour Charges Total using 9 mtr PSCC Poles of 300Kg WL a) Casual 8381 b) Regular 1676 Total using 8 mtr PSC Poles 200kg WL a) Casual 7959 b) Regular 1592 13 Total for Part-A Total using 9 mtr PSCC Poles of 300Kg WL 163691 Total using 8 mtr PSC Poles 200kg WL Part-B: 14 Set of 3 Nos 1 2058 2058 71 71 15 Labour Charges a) Casual 71 b) Regular 14 Erection of 3 Phase, 11kV/433V, 100kVA BEE – 3 Star Rated Distribution Transformer Centre Using DPTS With 9 Mtrs PSCC Pole 300Kg WL a) 9 Mtr PSCC DP Transformer Structure (Using 9 Mtr PSCC Poles of 300Kg WL) b) 8 Mtr PSC DP Transformer Structure (Using 8 Mtr PSC Poles 200kg WL) Will be intimated Will be intimated 11 KV, 5KN Polymeric Pin Insulator (24mm Dia FRP Rod) Guy Set Complete with No.15 strain insulator & Concreting materials 11kV/433V, 100kVA, 3 Phase 50 Cys Distribution Transformer BEE - 3 Star Rated with Oil Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07 Single Electrode with accessories Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum Will be intimated Will be intimated 11kV Lightning Arester, Metal Oxide 9kV, 5kA
  • 6. 16 Total for Part-B 2143 Part-C: SWITCH GEAR 17 a) LT Protection Kit Nos 2 1651 3302 205 410 b) LT Distribution box for 100 kVA with MCB No 1 16600 16600 455 455 No 1 i. Al Lead Wire - 120 Sqmm Mtrs 45 107 4815 568 568 ii. Copper lugs - 120 Sqmm Nos 12 71 852 iii. PG Clamps - Rabbit to 120 Sqmm Nos 4 187 748 iv. Spacers for DTC Wiring Nos 8 39 312 Nos 2 161 322 No 1 4504 4504 514 514 Nos 1 2061 2061 631 631 18 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 852 852 423 423 19 11kV, 200Amps, Single Break GOS No 1 7163 7163 636 636 With Distribution Box Total Cost (Material) 24931 38229 20 Labour Charges a) Casual 3182 3227 b) Regular 636 645 21 Total for Part-C 28749 42101 22 Total (A+B+C) Total using 9 mtr PSCC Poles of 300Kg WL 194584 207936 a) Casual 11634 11679 b) Regular 2327 2336 Total using 8 mtr PSC Poles 200kg WL a) Casual 11212 11257 b) Regular 2242 2251 c) LT Wiring (From DTC to LT Line Through Merering Box & LT Protection Kit/LT Distribution Box) SINGLE CIRCUIT v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised) d) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42) e) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy With LT Protection kit Labour Charges: Will be intimated Will be intimated Labour Charges: Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA Conductor, Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate separately for
  • 7. COST DATA SHEET - 64 Sl.No Particulars Unit Qty 250 KVA Material cost Labour Cost Rate Amt Rate Amt 1 Part-A: TRANSFORMER No 1 22179 22179 4238 2999 No 1 3816 2703 2 Sets 3 194 582 0 0 3 11KV 45 KN Polymeric Insulator Sets 3 170 510 0 0 4 Nos 4 752 3008 354 1416 5 No 1 254285 254285 1365 1365 6 3 1279 3837 573 1719 7 No 1 146 146 48 48 8 Kgs 2 64 128 25 50 9 Concreting for Guy sets without cement Nos 4 158 632 0 0 10 GI Wire 8 SWG Kgs 5 54.68 273 0 0 11 Guy wire 7/10 SWG Kgs 10 56.28 563 0 0 Total using 9 mtr PSCC Poles of 300Kg WL 286143 7597 Total using 8 mtr PSC Poles 200kg WL 263964 7301 12 Labour Charges Total using 9 mtr PSCC Poles of 300Kg WL a) Casual 7597 b) Regular 1519 ii) using 8 mtr poles a) Casual 7301 b) Regular 1460 13 Total for Part-A Total using 9 mtr PSCC Poles of 300Kg WL 295260 Total using 8 mtr PSC Poles 200kg WL Erection of 3 Phase, 11kV/433V, 250kVA BEE – 3 Star Rated Distribution Transformer Centre Using DPTS With 9 Mtrs PSCC Pole 300Kg WL a) 9 Mtr PSCC DP Transformer Structure (Using 9 Mtr PSCC Poles of 300Kg WL) b) 8 Mtr PSC DP Transformer Structure (Using 8 Mtr PSC Poles 200kg WL) Will be intimated Will be intimated 11 KV, 5KN Polymeric Pin Insulator (24mm Dia FRP Rod) Guy Set Complete with No.15 strain insulator & Concreting materials 11kV/433V, 250kVA, 3 Phase, 50 Cys Distribution Transformer with oil Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07 Single Electrode with accessories Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum Will be intimated
  • 8. Part-B: 14 Set of 3 Nos 1 2058 2058 71 71 15 Labour Charges a) Casual 71 b) Regular 14 16 Total for Part-B 2143 Part-C: SWITCH GEAR 17 a) LT Distribution box for 250kVA with MCCB No 1 16600 16600 455 455 No 1 i. Al Lead Wire - 240 Sqmm Mtrs 45 199 8955 644 644 ii. Copper lugs - 240 Sqmm Nos 12 169 2028 iii. PG Clamps - Rabbit to 240 Sqmm Nos 4 281 1124 iv. Spacers for DTC Wiring Nos 8 39 312 Nos 2 161 322 No 1 4654 4654 514 514 Nos 1 2061 2061 631 631 18 11kV Solid Core Type HG Fuse Unit Set/ 3 Nos 1 852 852 423 423 19 11kV, 200Amps, Single Break GOS No 1 7163 7163 636 636 Total Cost (Material) 44071 20 Labour Charges a) Casual 3303 b) Regular 661 21 Total for Part-C 48035 22 Total (A+B+C) Total using 9 mtr PSCC Poles of 300Kg WL 345437 a) Casual 10971 b) Regular 2194 Total using 8 mtr PSC Poles 200kg WL a) Casual 10675 b) Regular 2135 11kV Lightning Arester, Metal Oxide 9kV, 5kA b) LT Wiring (From DTC to LT Line via Metering Box & LT Protection Kit) SINGLE CIRCUIT v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised) c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42) d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy Labour Charges: Will be intimated Labour Charges: Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11 kV Pin Insulators ACSR/AAA Conductor, Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate separately for While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General Guidelines vide a to .... in Page No. ...........
  • 9. COST DATA SHEET - 65 Sl. No Materials Unit Qty Material cost Labour Cost Rate Amt Rate Amt 1 9 Mtr long PSCC pole of 300kg WL No 1 4549 4549 1060 1060 2 Nos 3 194 582 0 0 3 11KV 45 KN Polymeric Insulator Nos 3 170 510 0 0 4 Set 1 752 752 354 354 5 Single pole TC set suitable for 25 kVA Transformer Set 1 6356 6356 1016 1016 5 No 1 51684 51684 682 682 7 3 1279 3837 573 1719 8 Concreting materials for 9 mtr PSCC Pole a) Base concreting 1:4:8, 500x650x150 mm Each 1 229 229 0 0 b) Pole concreting 1:2:4, 650x500x1700 Each 1 2566 2566 0 0 c) Coping 1:2:4 (as per actuals) Each 1 444 444 0 0 9 Concreting materials for Guy sets (without cement) No 1 158 158 0 0 10 GI Wire 8 SWG Kgs 5 54.68 273.4 0 0 11 Guy Wire 7/10 SWG Kgs 10 56.28 563 0 0 12 Set/3 Nos 1 2058 2058 71 71 13 a) LT Protection Kit for 25 kVA No 1 1651 1651 205 205 No 1 i. Al Lead Wire - 50 Sqmm Mtrs 25 44 1100 568 568 ii. Copper lugs - 50 Sqmm Nos 4 27 108 iii. PG Clamps - Rabbit to 50 Sqmm Nos 4 60 240 iv. Spacers for DTC Wiring Nos 8 39 312 Nos 2 161 322 No 1 5185 5185 514 514 No 1 2061 2061 631 631 14 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 852 852 423 423 15 11kV, 200Amps, Single Break GOS Nos 1 7163 7163 636 636 16 No 1 146 146 48 48 17 Kg 1 64 64 25 25 18 Total Material Cost 93765.2 Labour Charges a) Casual 7952 b) Regular 1590 Total cost for erection of a single pole mounted 25kVA Transformer in Rs 103308 Erection of 3 Phase, 11kV/433V, 25kVA BEE 3 Star Rated Single Pole Mounted Transformer Centre on 9 Mtrs PSCC Pole 300kg WL 11 KV, 5KN Polymeric Pin Insulator (24mm Dia FRP Rod) Guy Set Complete with No.15 strain insulator & Concreting materials 11kV/433V, 25kVA, 3 Phase, 50 Cys Distribution Transformer BEE-3 Star Rated with Oil Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07 Single Electrode with accessories 11kV Lightning Arester, Metal Oxide 9kV, 5kA b) LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) SINGLE CIRCUIT v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised) c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42) d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum
  • 10. COST DATA SHEET - 66 Sl. No Materials Unit Qty Material cost Labour Cost Rate Amt Rate Amt 1 9 Mtr long PSCC pole of 300kg WL No 1 4549 4549 1060 1060 2 Nos 3 194 582 0 0 3 11KV 45 KN Polymeric Insulator Nos 3 170 510 0 0 4 Set 1 752 752 354 354 5 Single pole TC set suitable for 63 kVA Transformer Set 1 6356 6356 1016 1016 6 No 1 93810 93810 682 682 7 3 1279 3837 573 1719 8 Concreting materials for 9 mtr RCC Pole a) Base concreting 1:4:8, 500x650x150 mm Each 1 229 229 0 0 b) Pole concreting 1:2:4, 650x500x1700 Each 1 2566 2566 0 0 c) Coping 1:2:4 (as per actuals) Each 1 444 444 0 0 9 No 1 158 158 0 0 10 GI Wire 8 SWG Kgs 5 54.68 273.4 0 0 11 Guy Wire 7/10 SWG Kgs 10 56.28 563 0 0 12 Set/3 Nos 1 2058 2058 71 71 13 a) LT Protection Kit for 63 kVA Nos 2 1651 3302 205 410 No 1 i. Al Lead Wire - 95 Sqmm Mtrs 40 82 3280 568 568 ii. Copper lugs - 95 Sqmm Nos 4 65 260 iii. PG Clamps - Rabbit to 95 Sqmm Nos 4 96 384 iv. Spacers for DTC Wiring Nos 8 39 312 Nos 2 161 322 No 1 4786 4786 514 514 No 1 2061 2061 631 631 14 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 852 852 423 423 15 11kV, 200Amps, Single Break GOS Nos 1 7163 7163 636 636 16 No 1 146 146 48 48 17 Kg 1 64 64 25 25 18 Total material cost 139619 19 Labour Charges a) Casual 8157 b) Regular 1631 Total cost for Erection of a Single Pole Mounted 63kVA Transformer in Rs 149408 Erection of 3 Phase, 11kV/433V, 63kVA BEE 3 Star Rated Single Pole Mounted Transformer Centre on 9 Mtrs PSCC Pole 300kg WL 11 KV, 5KN Polymeric Pin Insulator (24mm Dia FRP Rod) Guy Set Complete with No.15 strain insulator & Concreting materials 11kV/433V, 63kVA, 3 Phase, 50 Cys Distribution Transformer BEE-3 Star Rated with Oil Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07 Single Electrode with accessories Concreting materials for Guy sets (without cement ) 11kV Lightning Arester, Metal Oxide 9kV, 5kA b) LT Wiring (From DTC to LT Line Through Merering Box & LT Protection Kit) SINGLE CIRCUIT v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised) c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42) d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum
  • 11. COST DATA SHEET - 67 Sl. No Materials Unit Qty Material cost Labour Cost Rate Amt Rate Amt 1 9 Mtr long PSCC pole of 300kg WL No 1 4549 4549 1060 1060 2 Nos 3 194 582 0 0 3 11KV 45 KN Polymeric Insulator Nos 3 170 510 0 0 4 Set 1 752 752 354 354 5 Set 1 6356 6356 1016 1016 6 No 1 121776 121776 910 910 7 3 1279 3837 573 1719 8 Providing Concreting for 9 mtr RCC Pole a) Base concreting 1:4:8, 500x650x150 mm Each 1 229 229 0 0 b) Pole concreting 1:2:4, 650x500x1700 Each 1 2566 2566 0 0 c) Coping 1:2:4 (as per actuals) Each 1 444 444 0 0 9 No 1 158 158 0 0 10 GI Wire 8 SWG Kgs 5 54.68 273.4 0 0 11 Guy Wire 7/10 SWG Kgs 10 56.3 563 0 0 12 Set/3 Nos 1 2058 2058 71 71 13 a) LT Protection Kit No 2 1651 3302 205 410 b) LT Distribution Box for 100kVA with MCB No 1 16600 16600 455 455 No 1 i. Al Lead Wire - 120 Sqmm Mtrs 45 107 4815 568 568 ii. Copper lugs - 120 Sqmm Nos 12 71 852 iii. PG Clamps - Rabbit to 120 Sqmm Nos 4 187 748 iv. Spacers for DTC Wiring Nos 8 39 312 Nos 2 161 322 No 1 4504 4504 514 514 No 1 2061 2061 631 631 14 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 852 852 423 423 15 11kV, 200Amps, Single Break GOS Nos 1 7163 7163 636 636 16 No 1 146 146 48 48 17 Kg 1 64 64 25 25 18 Total Material Cost a) With LT Distribution Box 183092 b) With LT Protection Kit 169794 19 Labour Charges for LT Distribution Box for LT Protection Kit a) Casual 8430 8385 b) Regular 1686 1677 Total 193208 179856 Erection of 3 Phase, 11kV/433V, 100kVA BEE 3 Star Rated Single Pole Mounted Transformer Centre on 9 Mtrs PSCC Pole 300kg WL 11 KV, 5KN Polymeric Pin Insulator (24mm Dia FRP Rod) Guy Set Complete with No.15 strain insulator & Concreting materials Single pole TC set suitable for 100 kVA Transformer 11kV/433V, 100kVA, 3 Phase, 50 Cys Distribution Transformer BEE-3 Star Rated with Oil Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/Dt: 24.10.07. Single Electrode with accessories Concreting materials for Guy sets (without cement ) 11kV Lightning Arester, Metal Oxide 9kV, 5kA c) LT Wiring (From DTC to LT Line Through Merering Box & LT Protection Kit/LT Distribution Box) SINGLE CIRCUIT v. Fish Plate with necessary Clamps, bolts & nuts etc complete (Galvanised) d) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42) e) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum Total Cost for Erection of a Single Pole Mounted 100kVA Transformer with LT Distribution Box in Rs Total Cost for Erection of a Single Pole Mounted 100kVA Transformer with LT Protection KIT in Rs
  • 12. COST DATA SHEET - 68 Particulars Unit Qty Material cost Labour Cost Rate Amt Rate Amt 1 PSCC Poles 9 Mtr long with 300 Kg WL Nos 10 4549 45490 1060 10600 2 PSC Poles 9 Mtr long with 200 Kg WL Nos 24 3380 81120 1060 25440 3 Kms 1.015 680510 690718 20426 20732 4 Nos 6 5823 34938 828 4968 6 Nos 6 2164 12984 700 4200 7 Sets 30 196 5880 115 3450 Pole clamp for HT/LT AB cable Sets 30 103 3090 192 5760 8 Eye Hook (Flat type) for fixing Clamps Sets 30 93 2790 0 0 Sets 12 206 2472 115 1380 9 End Caps Nos 10 20 200 5 50 10 Set (3Nos) 2 2058 4116 107 214 11 Sets 6 752 4512 354 2124 12 Concreting for Guy sets (without cement) Sets 6 158 948 0 0 13 Grounding connection for messenger wire Nos 4 126 504 26 104 15 Spiral Earth Electrodes Nos 34 213 7242 55 1870 Total Cost of Material 897004 16 Labour Charges a) Casual 80892 b) Regular 16178 17 Total Cost/Km in Rs. 994075 Running Single Circuit 11kV, 3 Phase Power Line on 9 Mtr Supports with an Average Span of 30 Mtrs Using 3x95 Sqmm + 1x70 Sqmm Aerial Bunched Cables (ABC) using 9mtr PSCC pole of 300kg WL for Dead Ends and Anchor Points SL. No 11kV Class 3 phase Aerial Bunched Cable 3x95 + 70 Sqmm Cable Straight thru' joint kits suitable for 95 Sqmm 11 KV AB CableTermination Kits fo 95 to 120 Sqmm Suspension Clamp Assembly 16 to 70 mm ( Excluding pole clamp & Eye Hook ) Dead End Clamp/Anchor Clamp Assembly 25 to 95 Sq mm (excluding pole clamps and Eye hook) 11kV Lightning Arrester, Metal Oxide 9kV, 5kA Guy Set Complete with No.15 strain insulator & Concreting materials While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines vide a to …. page No. ……. To ……..
  • 13. COST DATA SHEET - 69 Particulars Unit Qty Material cost Labour Cost Rate Amt Rate Amt 1 PSCC Poles 9 Mtr long with 300 Kg WL Nos 10 4549 45490 1060 10600 2 PSC Poles 9 Mtr long with 200 Kg WL Nos 15 3380 50700 1060 15900 3 kms 1.015 442170 448803 20426 20732 4 Three Phase Distribution box for 6 Connections Nos 20 2128 42560 538 10760 5 Nos 60 235 14100 77 4620 6 Nos 25 165 4125 54 1350 7 Sets 20 196 3920 115 2300 8 Pole clamp for HT/LT AB cable Sets 20 103 2060 192 3840 Eye Hook (Flat type) for fixing Clamps Sets 20 93 1860 0 0 8 Sets 16 206 3296 115 1840 9 Universal Hook, Bolts & nuts Nos 16 314 5024 115 1840 10 T-connector KZ3 95 Nos 8 348 2784 130 1040 11 Sets 5 319 1595 192 960 12 Pre-Insulated lugs-CPTAU for 95 Sqmm Nos 8 348 2784 160 1280 13 End cap for 50/70 Sqmm Nos 50 20 1000 5 250 14 Sets 8 730 5840 354 2832 15 Concreting for Guy sets (without cement) Sets 8 158 1264 0 0 16 PVC Insulated wire 16/25 Sqmm Mtrs 400 23.41 9364 0 0 17 Spiral Earth Electrodes Nos 25 213 5325 55 1375 Total Cost of Materials 651894 18 Labour Charges a) Casual 81519 b) Regular 16304 Total Cost/Km in Rs. 749717 Running Single Circuit 1.1 kV 3 Phase 5 Wire Power Line on 9 Mtr Supports with Average Span of 40 Mtrs Using 3x95 + 1x16 + 1x70 Sqmm Aerial Bunched Cables (ABC) using 9mtr PSCC pole of 300kg WL for Dead Ends and Anchor Points SL. No 1.1kV Class 3 Phase Aerial Bunched Cable of size 3x95+1x16+1x70 Sqmm Piercing connector suitable for 16 Sqmm - 95 Sqmm AB Cable - Service Connections Piercing connector suitable for 16 Sqmm - 95 Sqmm AB Cable - Street Light Connections Suspension Clamp Assembly 16 to 70 mm ( Excluding pole clamp & Eye Hook ) Dead End Clamp/Anchor Clamp Assembly 25 to 95 Sq mm (excluding pole clamps and Eye hook) Cable Straight thru' joint kits suitable for 95 Sqmm Guy Set Complete with No.8 strain insulator & Concreting materials While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines vide a to …. page No. ……. To ……..