KPCL POWER PROJECTS IN KARNATAKA
Sl.No Power Stations Units x MW
A. HYDRO PROJECTS
Cauvery River Basin
1
4x6
42.00
6x3
2 Shimsha Hydro Electric Station 2x8.6 17.20
Total 59.20
Sharavathy valley Project
3 Linganamakki Dam Power House 2 x 27.5 55.00
4
Mahathma Gandhi Hydro Electric Station
4x21.6
139.20
4x13.2
5 Sharavathi Generating Station 10 x 103.5 1035.00
Total 1229.20
Gerusoppa Hydro Electric Project
6 Gerusoppa Dam Powerhouse 4 x 60 240.00
Kali Hydro Electric Project
7 Supa Dam Powerhouse 2x50 100.00
8 Nagjari Powerhouse 5x150+1x135 885.00
9 Kadra Dam Powerhouse : 3 x 50 =150 3 x 50 150.00
10 Kodasalli Dam Powerhouse : 3 x 40=120 3 x 40 120.00
Total 1255.00
Varahi Hydro Electric Project
11 Mani Dam Powerhouse 2x4.5 9.00
12 Varahi UGPH :4 x 115 =460 4 x 115 460.00
Total 469.00
Krishna Basin Project
13
Almatti Dam Power House
1X15
290.00
5x55
Mini Hydro Electric Project
Bhadra Project
14
Bhadra Right Bank Canal Powerhouse
1x7.2
13.20
1x6
15
Bhadra Left Bank Canal Powerhouse
2 x12
26.00
1x2
16 2x9
28.00
1x10
17 Ghataprabha Dam Powerhouse 2 x 16 32.00
18 Mallapur Mini Hydel Scheme 2x4.5 9.00
19 Sirwar Mini Hydel Scheme 1x1 1.00
20 Kalmala Mini Hydel Scheme 1 x 0.40 0.40
21 Ganekal Mini Hydel Scheme 1 x 0.35 0.35
Total 109.95
Total Hydro 3652.35
B. THERMAL STATIONS
22 Raichur Thermal Power Station 1 to 7 Unit 7 x 210 1470.00
23 Raichur Thermal Power Station Unit-8 1x250 250.00
24 Bellary Thermal Power Station Unit-I 1x500 500.00
25 Bellary Thermal Power Station- Unit-II 1x500 500.00
Total Thermal 2720.00
C. DIESEL GENERATION STATION
26 Yelahanka Diesel Generating Station 6x18 108.00
D. WIND POWER STATION
27 Kappadagudda Wind Farm 4.56
E. SOLAR ENERGY
28 Yelesandra Solar PV Plant, Kolar Dist 3.00
29 Itnal Solar PV Plant, Belgaum District 3.00
30 Yapaldinni Solar PV Plant, Raichur District 3.00
31 Simsha Solar PV Plant, Shimshapur, Mandya District 5.00
Sub Total Solar 14.00
Installed capacity
Sir Sheshadri Iyer Hydro Electric Station
( Shivanasamudram)
Munirabad Power House(Thunga Bhadra Basin)
9 x 0.225 +11x0.230
GRAND TOTAL 6498.91
F. KPCL Ongoing Projects
32 Bellari Thermal Power Station Unit-III 1x700 700.00
33 Yermaras Thermal Power Station 2x800 1600.00
34 Munirabad 10.00
35 R M & U of NPH. Unit-6 1x15 15.00
GRAND TOTAL 2325.00
G. KPCL New Projects(Capacity in MW)
36
Bidadi Gas Based Combined Cycle Power Plant
1x700 700.00
37 2x800 1600.00
38 Edlapur Thermal Power Station 1x800 800.00
39 Ghataprabha 20.00
GRAND TOTAL 3120.00
H. KPCL Proposed New Projects(Capacity in MW)
Hydro Projects
40 Shivanasamudram Seasonal Scheme 3x100+1x45 345.00
42 Gundia Hydel Project 2x200 400.00
Gas Based Projects
43 Bidadi 2nd Stage 700.00
44 Yelahanka 350.00
45 Tadadi Gas Based Project 2100.00
Total 3895.00
Godhna Thermal Power Station Chhattishgarh
Thermal Plant(Pit Head)

More Related Content

What's hot

Wind energy car
Wind energy carWind energy car
Wind energy car
vivek6681
 
Steinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design reportSteinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design report
Shrikant Hiremath
 
Solar Energy India
Solar Energy IndiaSolar Energy India
Solar Energy India
firstgreen
 
projects list
projects listprojects list
projects list
Qiyan Mao
 

What's hot (20)

Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in India
 
Approximate estimation of thermal power plant
Approximate estimation of thermal power plantApproximate estimation of thermal power plant
Approximate estimation of thermal power plant
 
Wind energy car
Wind energy carWind energy car
Wind energy car
 
Solar Energy in India
Solar Energy in IndiaSolar Energy in India
Solar Energy in India
 
Solar Train power point presentation
Solar Train power point presentationSolar Train power point presentation
Solar Train power point presentation
 
Design of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV SystemDesign of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV System
 
Design Calculations for Solar Water Heating System
Design Calculations for Solar Water Heating SystemDesign Calculations for Solar Water Heating System
Design Calculations for Solar Water Heating System
 
Steinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design reportSteinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design report
 
RE 2022
RE 2022RE 2022
RE 2022
 
Solar Energy India
Solar Energy IndiaSolar Energy India
Solar Energy India
 
Power generation through solar trains
Power generation through solar trainsPower generation through solar trains
Power generation through solar trains
 
Adani power
Adani powerAdani power
Adani power
 
Solar energy
Solar energy Solar energy
Solar energy
 
Nl energy aug 29 - sept 4, 2015
Nl energy aug 29 - sept 4, 2015Nl energy aug 29 - sept 4, 2015
Nl energy aug 29 - sept 4, 2015
 
Financial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantFinancial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plant
 
Market Research India - Solar Energy Market in India 2009
Market Research India - Solar Energy Market in India 2009Market Research India - Solar Energy Market in India 2009
Market Research India - Solar Energy Market in India 2009
 
Potential Difference Inc. Innovation One Page Summary 9/11 – 2021
Potential Difference Inc. Innovation One Page Summary 9/11 – 2021Potential Difference Inc. Innovation One Page Summary 9/11 – 2021
Potential Difference Inc. Innovation One Page Summary 9/11 – 2021
 
projects list
projects listprojects list
projects list
 
IMPROVING ELECTRIC VEHICLE PERFORMANCE USING PHOTOVOLTAIC CELLS
IMPROVING ELECTRIC VEHICLE PERFORMANCE USING PHOTOVOLTAIC CELLSIMPROVING ELECTRIC VEHICLE PERFORMANCE USING PHOTOVOLTAIC CELLS
IMPROVING ELECTRIC VEHICLE PERFORMANCE USING PHOTOVOLTAIC CELLS
 
power generation through speed breaker
power generation through speed breaker power generation through speed breaker
power generation through speed breaker
 

Similar to Gulbrga history

Similar to Gulbrga history (6)

Design of solar pv grid connected system based on load requirement and also a...
Design of solar pv grid connected system based on load requirement and also a...Design of solar pv grid connected system based on load requirement and also a...
Design of solar pv grid connected system based on load requirement and also a...
 
Solar Cell & Module Supplier - India (01.02.17)
Solar Cell & Module Supplier - India (01.02.17)Solar Cell & Module Supplier - India (01.02.17)
Solar Cell & Module Supplier - India (01.02.17)
 
121 MW Allai Khwar Hydel Power Station Presentation
121 MW Allai Khwar Hydel Power Station Presentation121 MW Allai Khwar Hydel Power Station Presentation
121 MW Allai Khwar Hydel Power Station Presentation
 
Design of 50 MW CSP - parabolic trough power plant.
Design of 50 MW CSP - parabolic trough power plant.Design of 50 MW CSP - parabolic trough power plant.
Design of 50 MW CSP - parabolic trough power plant.
 
Solar power stirling energy for sef generating electricity seminar ppt
Solar power stirling energy for sef generating electricity seminar pptSolar power stirling energy for sef generating electricity seminar ppt
Solar power stirling energy for sef generating electricity seminar ppt
 
Proposal for Installation of Solar PV system and Steam Cooking System.
Proposal for Installation of Solar PV system and Steam Cooking System.Proposal for Installation of Solar PV system and Steam Cooking System.
Proposal for Installation of Solar PV system and Steam Cooking System.
 

More from Ramesh Meti

More from Ramesh Meti (20)

Motors and motor starters
Motors and motor startersMotors and motor starters
Motors and motor starters
 
Dc motor
Dc motorDc motor
Dc motor
 
Dc gen
Dc genDc gen
Dc gen
 
Dc gen
Dc genDc gen
Dc gen
 
04 universal motor
04 universal motor04 universal motor
04 universal motor
 
03 presentation 01 dc motors
03 presentation 01 dc motors03 presentation 01 dc motors
03 presentation 01 dc motors
 
01 dc motors
01 dc motors01 dc motors
01 dc motors
 
Excell%20basic%20training(3) 143
Excell%20basic%20training(3) 143Excell%20basic%20training(3) 143
Excell%20basic%20training(3) 143
 
Excel%20basic%202 123
Excel%20basic%202 123Excel%20basic%202 123
Excel%20basic%202 123
 
Gulbrga history
Gulbrga historyGulbrga history
Gulbrga history
 
Gulbarga dist details
Gulbarga dist detailsGulbarga dist details
Gulbarga dist details
 
70 village-accountant-posts-advt-details-mysore-district (1)
70 village-accountant-posts-advt-details-mysore-district (1)70 village-accountant-posts-advt-details-mysore-district (1)
70 village-accountant-posts-advt-details-mysore-district (1)
 
Vihan mcb-pricelist
Vihan mcb-pricelistVihan mcb-pricelist
Vihan mcb-pricelist
 
Schnieder mccb li st
Schnieder mccb li stSchnieder mccb li st
Schnieder mccb li st
 
Schneider electrical mcb ,mccb ..
Schneider electrical mcb ,mccb ..Schneider electrical mcb ,mccb ..
Schneider electrical mcb ,mccb ..
 
Maru electrical mcb, mccb..
Maru electrical mcb, mccb..Maru electrical mcb, mccb..
Maru electrical mcb, mccb..
 
Tips to save energy
Tips to save energyTips to save energy
Tips to save energy
 
7.reflective embroidery-on-linemen-shirts
7.reflective embroidery-on-linemen-shirts7.reflective embroidery-on-linemen-shirts
7.reflective embroidery-on-linemen-shirts
 
1.guidelines
1.guidelines1.guidelines
1.guidelines
 
Safety manual-.compressed
Safety manual-.compressedSafety manual-.compressed
Safety manual-.compressed
 

Recently uploaded

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Recently uploaded (20)

On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 

Gulbrga history

  • 1. KPCL POWER PROJECTS IN KARNATAKA Sl.No Power Stations Units x MW A. HYDRO PROJECTS Cauvery River Basin 1 4x6 42.00 6x3 2 Shimsha Hydro Electric Station 2x8.6 17.20 Total 59.20 Sharavathy valley Project 3 Linganamakki Dam Power House 2 x 27.5 55.00 4 Mahathma Gandhi Hydro Electric Station 4x21.6 139.20 4x13.2 5 Sharavathi Generating Station 10 x 103.5 1035.00 Total 1229.20 Gerusoppa Hydro Electric Project 6 Gerusoppa Dam Powerhouse 4 x 60 240.00 Kali Hydro Electric Project 7 Supa Dam Powerhouse 2x50 100.00 8 Nagjari Powerhouse 5x150+1x135 885.00 9 Kadra Dam Powerhouse : 3 x 50 =150 3 x 50 150.00 10 Kodasalli Dam Powerhouse : 3 x 40=120 3 x 40 120.00 Total 1255.00 Varahi Hydro Electric Project 11 Mani Dam Powerhouse 2x4.5 9.00 12 Varahi UGPH :4 x 115 =460 4 x 115 460.00 Total 469.00 Krishna Basin Project 13 Almatti Dam Power House 1X15 290.00 5x55 Mini Hydro Electric Project Bhadra Project 14 Bhadra Right Bank Canal Powerhouse 1x7.2 13.20 1x6 15 Bhadra Left Bank Canal Powerhouse 2 x12 26.00 1x2 16 2x9 28.00 1x10 17 Ghataprabha Dam Powerhouse 2 x 16 32.00 18 Mallapur Mini Hydel Scheme 2x4.5 9.00 19 Sirwar Mini Hydel Scheme 1x1 1.00 20 Kalmala Mini Hydel Scheme 1 x 0.40 0.40 21 Ganekal Mini Hydel Scheme 1 x 0.35 0.35 Total 109.95 Total Hydro 3652.35 B. THERMAL STATIONS 22 Raichur Thermal Power Station 1 to 7 Unit 7 x 210 1470.00 23 Raichur Thermal Power Station Unit-8 1x250 250.00 24 Bellary Thermal Power Station Unit-I 1x500 500.00 25 Bellary Thermal Power Station- Unit-II 1x500 500.00 Total Thermal 2720.00 C. DIESEL GENERATION STATION 26 Yelahanka Diesel Generating Station 6x18 108.00 D. WIND POWER STATION 27 Kappadagudda Wind Farm 4.56 E. SOLAR ENERGY 28 Yelesandra Solar PV Plant, Kolar Dist 3.00 29 Itnal Solar PV Plant, Belgaum District 3.00 30 Yapaldinni Solar PV Plant, Raichur District 3.00 31 Simsha Solar PV Plant, Shimshapur, Mandya District 5.00 Sub Total Solar 14.00 Installed capacity Sir Sheshadri Iyer Hydro Electric Station ( Shivanasamudram) Munirabad Power House(Thunga Bhadra Basin) 9 x 0.225 +11x0.230
  • 2. GRAND TOTAL 6498.91 F. KPCL Ongoing Projects 32 Bellari Thermal Power Station Unit-III 1x700 700.00 33 Yermaras Thermal Power Station 2x800 1600.00 34 Munirabad 10.00 35 R M & U of NPH. Unit-6 1x15 15.00 GRAND TOTAL 2325.00 G. KPCL New Projects(Capacity in MW) 36 Bidadi Gas Based Combined Cycle Power Plant 1x700 700.00 37 2x800 1600.00 38 Edlapur Thermal Power Station 1x800 800.00 39 Ghataprabha 20.00 GRAND TOTAL 3120.00 H. KPCL Proposed New Projects(Capacity in MW) Hydro Projects 40 Shivanasamudram Seasonal Scheme 3x100+1x45 345.00 42 Gundia Hydel Project 2x200 400.00 Gas Based Projects 43 Bidadi 2nd Stage 700.00 44 Yelahanka 350.00 45 Tadadi Gas Based Project 2100.00 Total 3895.00 Godhna Thermal Power Station Chhattishgarh Thermal Plant(Pit Head)