active service, the plant will not only be able to be operated safely
and as specified in the design criteria, but also ensure continued
safe and satisfactory operational performance at the design level
from then on.
“Operational Readiness is a continuum and at any point in
time throughout the life cycle of an asset, the asset must be in an
Operationally Ready mode to maximise returns to the shareholders
and to ensure safety and environmentally friendly operations,”
says Mr Autar.
The scope of Operational Readiness programs include putting in
place processes and procedures to sustain satisfactory performance
throughout the life of assets. So in essence, Operational Readiness
means achieving a configuration and/or state which will place the
right people in the right places at the right times working with
the right tools and equipment
according to the right
procedures and management
controls. If this state is in
place and adhered to, then
safe and proper operation
of the plant can reasonably
be assured. At a secondary
level, this implies that these
elements will be functioning
in a proper physical and
psychological environment.
“Rightness” in achieving
Operational Readiness
is based on two kinds of
criteria - namely functional
criteria and regulatory
criteria. Functional criteria
are concerned with the plant
operating and accomplishing
its functions in an acceptable
manner and operating at
acceptable risk levels in
relation to the requirements
imposed by the business
plan. Regulatory criteria, on the other hand, are concerned with
the plant and its operating capability meeting all the mandatory
requirements prior to and during its active service.
In a nutshell, Operational Readiness is a state where the three
P’s (Plant, People, Processes) are all deemed competent and
the interfaces between the three P’s are satisfactory for them
to function interactively. Mr Autar emphasises the distinction
between the Mintrex Operational Readiness model and the more
common models in industry, pointing out the importance that
Mintrex places on the interfaces between the three P’s, for it is at
these interfaces that detail generally is lacking when designing
processes for people to use, recruiting and training people to
work on specific plant, and ensuring that processes are designed
specifically for the correct plant.
THE CONTINUUMOF
MINTREX ASSISTED WITH OPERATIONAL READINESS WORKS
FOR THE PORT HEDLAND PORT AUTHORITY IN 2010
RAMAN AUTAR
MANAGER – ASSET MANAGEMENT AND RELIABILITY
MINTREX
‘OPERATIONAL READINESS’
The interface between people, plant and processes continues to be
one of the key imperatives in any mining project, and successful
modelling of their interplay is a vital ingredient to maximising
project viability and shareholder return. Mintrex’s Manager of Asset
Management and Reliability, Raman Autar, presents some of the
company’s insights into the importance of identifying where you are
on the Operational Readiness continuum, and what distinguishes
the Mintrex model from others in optimising that place.
With $170 billion worth of projects in the pipeline or currently
in progress in Western Australia, bringing these projects online
most effectively and efficiently requires careful planning and
resourcing. Project delivery, if not well planned, can cause
significant losses to operations, and it is therefore important to
apply the appropriate models when delivering projects.
Mintrex has been involved in Operational Readiness projects
and has gained significant expertise over the past 18 months to
configure and fine-tune its Operational Readiness model to ensure
expedient and successful deliveries.
What is Operational Readiness? Raman Autar at Mintrex
defines Operational Readiness as a state when, at the onset of the
hand-over of the plant to operations and maintenance teams for
MINESITE 2011 • 135
Page 1 of 1Page 137 - Minesite 2011
17/03/2017file:///C:/Users/Raman%20Autar/Personal/Minesite%202011%20Raman%20Autar%20Operational%20Readiness.html

More Related Content

What's hot

dfdfdfddfdfdfasdf answers to querries fgfg fg
dfdfdfddfdfdfasdf answers to querries fgfg fgdfdfdfddfdfdfasdf answers to querries fgfg fg
dfdfdfddfdfdfasdf answers to querries fgfg fgshahimulk Khattak
 
Report of vocational training in jspl
Report of vocational training in jsplReport of vocational training in jspl
Report of vocational training in jsplAashish Chaudhary
 
Sr. Utility Operator
Sr. Utility OperatorSr. Utility Operator
Sr. Utility OperatorRaees Aslam
 
Unleash Business Potential with ToolHound 5 Tool and Equipment Management System
Unleash Business Potential with ToolHound 5 Tool and Equipment Management SystemUnleash Business Potential with ToolHound 5 Tool and Equipment Management System
Unleash Business Potential with ToolHound 5 Tool and Equipment Management Systemcarterava89
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementRajeev Sharan
 
AMSEC Service - Project Management System 2 Data Sheet
AMSEC Service - Project Management System 2 Data SheetAMSEC Service - Project Management System 2 Data Sheet
AMSEC Service - Project Management System 2 Data SheetPaul Harrison J.P.
 

What's hot (11)

dfdfdfddfdfdfasdf answers to querries fgfg fg
dfdfdfddfdfdfasdf answers to querries fgfg fgdfdfdfddfdfdfasdf answers to querries fgfg fg
dfdfdfddfdfdfasdf answers to querries fgfg fg
 
Amur2016
Amur2016Amur2016
Amur2016
 
Report of vocational training in jspl
Report of vocational training in jsplReport of vocational training in jspl
Report of vocational training in jspl
 
Jerry Willis Resume
Jerry Willis ResumeJerry Willis Resume
Jerry Willis Resume
 
Sr. Utility Operator
Sr. Utility OperatorSr. Utility Operator
Sr. Utility Operator
 
How to Optimize your CMMS viewer copy
How to Optimize your CMMS  viewer copyHow to Optimize your CMMS  viewer copy
How to Optimize your CMMS viewer copy
 
Conduct Of Operations
Conduct Of OperationsConduct Of Operations
Conduct Of Operations
 
Unleash Business Potential with ToolHound 5 Tool and Equipment Management System
Unleash Business Potential with ToolHound 5 Tool and Equipment Management SystemUnleash Business Potential with ToolHound 5 Tool and Equipment Management System
Unleash Business Potential with ToolHound 5 Tool and Equipment Management System
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
AMSEC Service - Project Management System 2 Data Sheet
AMSEC Service - Project Management System 2 Data SheetAMSEC Service - Project Management System 2 Data Sheet
AMSEC Service - Project Management System 2 Data Sheet
 
TISBrochure1
TISBrochure1TISBrochure1
TISBrochure1
 

Similar to Minesite 2011 Raman Aautar operational readiness

Analysis and optimization of maintenances management of instruments
Analysis and optimization of maintenances management of instrumentsAnalysis and optimization of maintenances management of instruments
Analysis and optimization of maintenances management of instrumentsProjects Kart
 
HPControl Renewal2010
HPControl Renewal2010HPControl Renewal2010
HPControl Renewal2010Pierre Latour
 
2016 Trends for Middle East Oil & Gas companies (Akhbar AlKhaleej - December ...
2016 Trends for Middle East Oil & Gas companies (Akhbar AlKhaleej - December ...2016 Trends for Middle East Oil & Gas companies (Akhbar AlKhaleej - December ...
2016 Trends for Middle East Oil & Gas companies (Akhbar AlKhaleej - December ...Ossama Tawfick
 
ConOps: A control system ...
ConOps: A control system ...ConOps: A control system ...
ConOps: A control system ...PMHaas
 
LinkeInCChesterfield Resume dcx version (1)
LinkeInCChesterfield Resume dcx version (1)LinkeInCChesterfield Resume dcx version (1)
LinkeInCChesterfield Resume dcx version (1)Charles Chesterfield
 
Asset Integrity Management, Apr 14
Asset Integrity Management, Apr 14Asset Integrity Management, Apr 14
Asset Integrity Management, Apr 14Cal Chapman, P. E.
 
01 facility management definition and scope opt
01   facility management definition and scope opt01   facility management definition and scope opt
01 facility management definition and scope optArya Wirabhuana
 
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in Industry
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in IndustryIRJET- Maintenance and Reliability Strategy of Mechanical Equipment in Industry
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in IndustryIRJET Journal
 
IRJET- Portfolio Management of Multiple Building Projects using EPPM
IRJET- 	  Portfolio Management of Multiple Building Projects using EPPMIRJET- 	  Portfolio Management of Multiple Building Projects using EPPM
IRJET- Portfolio Management of Multiple Building Projects using EPPMIRJET Journal
 
Arrelic Services | TRF
Arrelic Services | TRFArrelic Services | TRF
Arrelic Services | TRFArrelic
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementramduttkholia
 
Understanding the impact and value of enterprise asset management
Understanding the impact and value of enterprise asset managementUnderstanding the impact and value of enterprise asset management
Understanding the impact and value of enterprise asset managementIrsan Suryadi Saputra
 
Application of Lean Tools in the Oil Field Safety Management
Application of Lean Tools in the Oil Field Safety ManagementApplication of Lean Tools in the Oil Field Safety Management
Application of Lean Tools in the Oil Field Safety ManagementIJERA Editor
 
Risk Management in Industry 4.0 Maintenance: Identifying and Addressing Hazards
Risk Management in Industry 4.0 Maintenance: Identifying and Addressing HazardsRisk Management in Industry 4.0 Maintenance: Identifying and Addressing Hazards
Risk Management in Industry 4.0 Maintenance: Identifying and Addressing HazardsIRJET Journal
 

Similar to Minesite 2011 Raman Aautar operational readiness (20)

Viziya
ViziyaViziya
Viziya
 
Analysis and optimization of maintenances management of instruments
Analysis and optimization of maintenances management of instrumentsAnalysis and optimization of maintenances management of instruments
Analysis and optimization of maintenances management of instruments
 
HPControl Renewal2010
HPControl Renewal2010HPControl Renewal2010
HPControl Renewal2010
 
2016 Trends for Middle East Oil & Gas companies (Akhbar AlKhaleej - December ...
2016 Trends for Middle East Oil & Gas companies (Akhbar AlKhaleej - December ...2016 Trends for Middle East Oil & Gas companies (Akhbar AlKhaleej - December ...
2016 Trends for Middle East Oil & Gas companies (Akhbar AlKhaleej - December ...
 
ConOps: A control system ...
ConOps: A control system ...ConOps: A control system ...
ConOps: A control system ...
 
LinkeInCChesterfield Resume dcx version (1)
LinkeInCChesterfield Resume dcx version (1)LinkeInCChesterfield Resume dcx version (1)
LinkeInCChesterfield Resume dcx version (1)
 
Asset Integrity Management, Apr 14
Asset Integrity Management, Apr 14Asset Integrity Management, Apr 14
Asset Integrity Management, Apr 14
 
01 facility management definition and scope opt
01   facility management definition and scope opt01   facility management definition and scope opt
01 facility management definition and scope opt
 
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in Industry
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in IndustryIRJET- Maintenance and Reliability Strategy of Mechanical Equipment in Industry
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in Industry
 
IRJET- Portfolio Management of Multiple Building Projects using EPPM
IRJET- 	  Portfolio Management of Multiple Building Projects using EPPMIRJET- 	  Portfolio Management of Multiple Building Projects using EPPM
IRJET- Portfolio Management of Multiple Building Projects using EPPM
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
 
Arrelic Services | TRF
Arrelic Services | TRFArrelic Services | TRF
Arrelic Services | TRF
 
Importance of O&M
Importance of O&MImportance of O&M
Importance of O&M
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Understanding the impact and value of enterprise asset management
Understanding the impact and value of enterprise asset managementUnderstanding the impact and value of enterprise asset management
Understanding the impact and value of enterprise asset management
 
Application of Lean Tools in the Oil Field Safety Management
Application of Lean Tools in the Oil Field Safety ManagementApplication of Lean Tools in the Oil Field Safety Management
Application of Lean Tools in the Oil Field Safety Management
 
Risk Management in Industry 4.0 Maintenance: Identifying and Addressing Hazards
Risk Management in Industry 4.0 Maintenance: Identifying and Addressing HazardsRisk Management in Industry 4.0 Maintenance: Identifying and Addressing Hazards
Risk Management in Industry 4.0 Maintenance: Identifying and Addressing Hazards
 
James L Harris CV
James L Harris CVJames L Harris CV
James L Harris CV
 
FINAL PROJECT-MBA
FINAL PROJECT-MBAFINAL PROJECT-MBA
FINAL PROJECT-MBA
 
CV-Ruad Adwan
CV-Ruad AdwanCV-Ruad Adwan
CV-Ruad Adwan
 

Recently uploaded

一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样A
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisDr.Costas Sachpazis
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptjigup7320
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfKira Dess
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptamrabdallah9
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsVIEW
 
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书c3384a92eb32
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...IJECEIAES
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Toolssoginsider
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...Amil baba
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligencemahaffeycheryld
 
DBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxDBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxrajjais1221
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Studentskannan348865
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfEr.Sonali Nasikkar
 
Databricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfDatabricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfVinayVadlagattu
 
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...mikehavy0
 
Introduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptxIntroduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptxProfASKolap
 

Recently uploaded (20)

一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) ppt
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, Functions
 
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
DBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxDBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptx
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
Databricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfDatabricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdf
 
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
 
Introduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptxIntroduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptx
 

Minesite 2011 Raman Aautar operational readiness

  • 1. Page 137 - Minesite 2011 Basic HTML Version View Full VersionTable of Contents Page 136 Page 138 active service, the plant will not only be able to be operated safely and as specified in the design criteria, but also ensure continued safe and satisfactory operational performance at the design level from then on. “Operational Readiness is a continuum and at any point in time throughout the life cycle of an asset, the asset must be in an Operationally Ready mode to maximise returns to the shareholders and to ensure safety and environmentally friendly operations,” says Mr Autar. The scope of Operational Readiness programs include putting in place processes and procedures to sustain satisfactory performance throughout the life of assets. So in essence, Operational Readiness means achieving a configuration and/or state which will place the right people in the right places at the right times working with the right tools and equipment according to the right procedures and management controls. If this state is in place and adhered to, then safe and proper operation of the plant can reasonably be assured. At a secondary level, this implies that these elements will be functioning in a proper physical and psychological environment. “Rightness” in achieving Operational Readiness is based on two kinds of criteria - namely functional criteria and regulatory criteria. Functional criteria are concerned with the plant operating and accomplishing its functions in an acceptable manner and operating at acceptable risk levels in relation to the requirements imposed by the business plan. Regulatory criteria, on the other hand, are concerned with the plant and its operating capability meeting all the mandatory requirements prior to and during its active service. In a nutshell, Operational Readiness is a state where the three P’s (Plant, People, Processes) are all deemed competent and the interfaces between the three P’s are satisfactory for them to function interactively. Mr Autar emphasises the distinction between the Mintrex Operational Readiness model and the more common models in industry, pointing out the importance that Mintrex places on the interfaces between the three P’s, for it is at these interfaces that detail generally is lacking when designing processes for people to use, recruiting and training people to work on specific plant, and ensuring that processes are designed specifically for the correct plant. THE CONTINUUMOF MINTREX ASSISTED WITH OPERATIONAL READINESS WORKS FOR THE PORT HEDLAND PORT AUTHORITY IN 2010 RAMAN AUTAR MANAGER – ASSET MANAGEMENT AND RELIABILITY MINTREX ‘OPERATIONAL READINESS’ The interface between people, plant and processes continues to be one of the key imperatives in any mining project, and successful modelling of their interplay is a vital ingredient to maximising project viability and shareholder return. Mintrex’s Manager of Asset Management and Reliability, Raman Autar, presents some of the company’s insights into the importance of identifying where you are on the Operational Readiness continuum, and what distinguishes the Mintrex model from others in optimising that place. With $170 billion worth of projects in the pipeline or currently in progress in Western Australia, bringing these projects online most effectively and efficiently requires careful planning and resourcing. Project delivery, if not well planned, can cause significant losses to operations, and it is therefore important to apply the appropriate models when delivering projects. Mintrex has been involved in Operational Readiness projects and has gained significant expertise over the past 18 months to configure and fine-tune its Operational Readiness model to ensure expedient and successful deliveries. What is Operational Readiness? Raman Autar at Mintrex defines Operational Readiness as a state when, at the onset of the hand-over of the plant to operations and maintenance teams for MINESITE 2011 • 135 Page 1 of 1Page 137 - Minesite 2011 17/03/2017file:///C:/Users/Raman%20Autar/Personal/Minesite%202011%20Raman%20Autar%20Operational%20Readiness.html