CONSTRUCTION OF KASSIA RESIDENTIAL BUILDING
A PROJECT REPORT
Submitted by
DUBEY SHIVAM AKHILESH
Enrollment Number: 190060106005
Summer Internship (3170001) Semester VII
In partial fulfillment for the award of the degree of
BACHELOR OF ENGINEERING
in
Civil Engineering
Bhagwan Mahavir College of Engineering & Technology, Surat.
Gujarat Technology University, Ahmadabad
July, 2022
190060106005
Gujarat Technological University
BMCET
Bhagwan Mahavir college of Engineering & Technology
BMEF Campus, Bharthana Road, Vesu, Surat- 395017
CERTIFICATE
This is to certify that the project report submitted along with the project
entitled A Role of site engineering has been carried out by DUBEY
SHIVAM under my guidance in partial fulfillment for the degree of
Bachelor of Engineering in Civil Engineering, 7th
semester of Gujarat
Technological University, during the academic year 2022-2023.
Mr. Jasmin Tandel Mr. Dixit Chauhan
(Internal Guide) (Head Of The Department)
Assistant Professor
Civil department BMCET
I
II
190060106005
Gujarat Technological University III BMCET
Bhagwan Mahavir College Of Engineering & Teachnology
BMEF Campus, Bharthana Road, Vesu, Surat- 395017
DECLARATION
I under signed DUBEY SHIVAM AKHILESH a student of BMCET, CIVIL, 7th
semester, declare that summer internship project titled “CONSTRUCTION OF
KASSIA RESIDENTIAL BUILDING”
is a result of my own work and our indebtedness to other work publications,
references, if any, have been duly acknowledged.
If I am found guilty of copying any other report or published information and
showing as my/our original work, I understand that I shall be liable and punishable
by Institute or University, which may include ‘Fail’ in examination, ‘Repeat study
& re-submission of the report’ or any other punishment that Institute or University
may decide.
Name of Student: DUBEY SHIVAM
Enrollment Number: 190060106005
190060106005
Gujarat Technological University IV BMCET
ACKNOWLEDGEMENT
I would like to highly acknowledge and pay respect to all associates with project at
different stages in presenting the report of my project on “Construction of kassia
Residential ”.
Our sincere thanks to Head of Civil Engineering Department, for his kind help in
project .I am also thankful to Prof. Jasmin Tandel for their valuable tips during the
course of this study.
The project work is most practical and existing of our learning experience which could
be assets for me and my team in our future career.It is my sincere duty to thanks all
those people who helped me directly and indirectly in this project.
190060106005
Gujarat Technological University V BMCET
ABSTRACT
This study presents the compendious of the observation made during the two week
of our internship. During this period I observed the construction of masonry wall,
lintel, column, slab, beam and staircase and precautions to be taken during the
work. I also learned about how to deal with engineers, labour and other staffs at
site which had improved my communication skills and management of work also.
This opportunity helped me to apply my theoretical knowledge gained during the
university academic program into the real world industrial based execution and
experience. It helped me to develop my skill and industrial knowledge.
This report document contains the knowledge and experience I have gained
throughout my internship period.
190060106005
Gujarat Technological University VI BMCET
TABLE OF CONTENTS
Certificate of Completion (by College) I
Certificate of Completion (by Organization) II
Student’s declaration III
Acknowledgement IV
Abstract V
Table of contents VI
List of figures IX
Chapter 1 Introduction 1
1.1 Aim 1
1.2 Objective 1
1.3 Introduction of the site 1
1.4 Site images 2
1.5 Plan of the building 4
1.6 General nomenclature used at site 7
1.8 Methodology 8
Chapter 2 Components of the building 9
2.1 Substructure 9
2.1.1 Foundation 9
2.1.1.1 Shallow foundation 10
2.1.1.2 Deep foundation 10
2.2 Superstructure 12
2.2.1 Roof 13
2.2.2 Parapet 13
2.2.3 Lintels 13
2.2.4 Slabs 13
190060106005
Gujarat Technological University VII BMCET
2.2.5 Beams 13
2.2.6 Columns 14
2.2.7 Walls 14
2.2.8 Floor 14
2.2.9 Stair 14
Chapter 3 Site execution, supervision and monitoring 15
3.1 Brick masonary work 15
3.1.1 Construction procedure 15
3.1.2 Points considered while brick masonary construction 16
3.1.3 Types of bonds in brick masonry 16
3.2 Lintels 18
3.3 Column construction 19
3.3.1 Construction process of RCC column 19
3.4 Stair construction 24
3.4.1 Formwork 24
3.4.2 Reinforcement 24
3.4.3 Pouring of concrete 25
3.5 Beam construction 26
3.6 Slab construction 28
Chapter 4 Materials and equipments 32
4.1 Materials used at construction site 32
4.1.1 Cement 32
4.1.2 Aggregates 32
190063106012 A Summer Internship At “VDG”
4.1.3 Bricks
4.1.4 Reinforcement
4.1.5 Water
4.2 Equipments used at construction site
4.2.1 Concrete mixer 4.2.2 Compactors
Chapter 5 Concluding remarks
5.1 Conclusion References
Training schedule
33
34
34
35
35
35
37
37
38
38
190063106012
A Summer Internship At “VDG”
BMCET
Gujarat Technological University VIII BMCET
LIST OF FIGURES
Figure Figure Description Pg. No.
No.
1.1 Location of site 2
1.2 Site image at the start of the internship 3
1.3 Site image at the end of the internship 3
1.4 First floor 4
1.5 Second floor 5
1.6 Terrace floor 6
2.1 Foundation plan 11
2.2 Foundation schedule 12
3.1 Brick masonry with cement mortar 15
3.2 Flemish bond 17
3.3 Stretcher bond 17
3.4 Formwork for lintel 18
3.5 Casted lintel 19
3.6 Column face line plan 20
3.7 Reinforcement details 21
3.8 Column bars extension 21
3.9 Steel shuttering 22
3.10 Plywood shuttering 22
3.11 Column starter 23
3.12 Formwork of column 23
Gujarat Technological University IX
190063106012 A Summer Internship At “VDG”
190063106012
A Summer Internship At “VDG”
BMCET
3.13
3.14
3.15
3.16
3.17
3.18
3.19
3.20
3.21
3.22
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
Concrete pouring
Column after removal of formwork
Stairs construction
Formwork of beam using plywood
Reinforcement cutting machine
Placing of reinforcement
Shuttering of slab
Bending and binding of reinforcement
Curing of slab by ponding
Removal of slab formwork
Cement
Fine aggregate
Course aggregate
Bricks
Concrete mixer
Needle vibrator
Bars cutter
Wood cutter
24
24 25
26
26 27
28 29
30 31
32
33 33
34 35
36 36
36
Gujarat Technological University X BMCET
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 1 BMCET
CHAPTER 1
INTRODUCTION
1.1 AIM
 The internship aim to develop our skills to implement theoretical knowledge into practical field.
1.2 OBJECTIVES
 To orient us with the different construction activities.
 To gain practical experience and familiarize with field operations.
 To understand and analyze the planning, design and drawing of construction.
 To get the exposure with the management and communication functions performed within a
construction project.
1.3 INTRODUCTION OF THE SITE
The project was to construct G+2 story bungalow at Piplod, Surat for residential purpose.
1. Contractor name:Mr. Nilesh parmar
2. Contractor’s office location: T.P. 43, Behind Sankalp Row House, Canal Road, Near CNG
pump, Jhangirabad, Surat-395005
3. Client name: Mr. Kenilbhai Shah
4. Overall cost of the project: the overall cost of the building is around 2 Cr.
5. Site location: 120-121, Saraswat Nagar Society, Piplod, Surat
6. Architect name: Ar. Chetan H. Mistry
7. Site engineer: Er. Hemant J. Chauhan
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 2 BMCET
1.4 SITE IMAGES
Figure 1.1 Location of site
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 3 BMCET
Figure 1.3 Site image at the end of internship
Figure 1.2 Site image at the starting of the internship
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 4 BMCET
1.5 PLAN OF THE BUILDING
Figure 1.4 First Floor
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 5 BMCET
Figure 1.5 Second Floor
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 6 BMCET
Figure 1.6 Terrace Floor
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 7 BMCET
1.6 GENERAL NOMENCLATURE USED AT SITE
Sand – Reti
Course aggregates – Khadi, Kapchi
Plumb bob – Olumbo
Concrete cover – Cover
Reinforcement of top and bottom steel – Jali
Concrete – Mal
Ladder – Sidi
Formwork – Peti
Hatching – Thacha
Stirrups – Ring
Brick – Itt
Mixer – Handi
Props – Teka  Joist – Chavi
1.7 MEMBERS AT SITE
 Client
 Architect
 Engineer
 Contractor
 Supervisor
 Mason  Mistry
 Carpenter
 Foreman
 Labour
 Bhisti
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 8 BMCET
1.8 METHODOLOGY
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 9 BMCET
Step 1: Site Clearance
Step 2: Excavation
Step 3: Plinth beam
Step 4: Superstructure Column and beam
Step 5: Brick masonary work
Step 6: Door and window frame
Step 7: Lintel over door and windows
Step 8: Floor slab or roof structure
Step 9: Plastering
Step 10: Door and window fixation
Step 11: Water supply and sanitary fixture and fittings
Step 12: Mechanical and electrical work
Step 13: Floor tiles
Step 14: Painting, interior and exterior finishing
Step 15: Interior and furniture
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 10 BMCET
CHAPTER 2
COMPOPNENTS OF THE BUILDING
Construction of the building is done in two steps, which are as follows:
 Substructure 
Superstructure
2.1 SUBSTRUCTURE
The sub-structure of the building transfers the load of the building to the ground and isolates it
horizontally from the ground. This includes foundation and basemen retaining wall. It is
differentiated from the super-structure. It safeguards the building against the forces of wind uplift,
soil pressure etc. It provides a level and firm surface for the construction of super- structure. It also
prevents unequal or differential settlement and ensures stability of the building against sliding,
overturning, undermine due to floodwater or borrowing animals.
The function of the substructure is to transfer the load of the building to the ground and to isolate
it horizontally from the ground.
The substructure includes,
 Foundations up to and including damp proof course.
 Lowest floor assembly below the undesirable of the screed or the lowest floor finish.
 Basement excavation.  Basement retaining walls up to and including the damp proof course.
2.1.1 FOUNDATION
Foundation, part of a structural system that supports and anchors the superstructure of a building
and transmits its loads directly to the earth. Foundation provide the structure’s stability from the
ground to distribute the weight of the structure over a large area in order to avoid overloading the
underlying soil. At my site, shallow foundation was constructed.
Types of foundation are:
 Shallow foundation
 Deep foundation
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 11 BMCET
2.1.1.1 SHALLOW FOUNDATION
A shallow foundation is a type of building foundation that transfers building loads to the earth very
near to the surface, rather than to a subsurface layer or a range of depths as does a deep foundation.
Shallow foundation includes spread footing foundation, mat-slab foundation, slab- on-grade
foundation, pad foundation, rubble trench foundation and earthbag foundation.
At my site, spread footing foundation was constructed.
A spread footing foundation, which is common in residential building, the shape of the spread
footing may be circular, square and rectangular in plan. This wider part “spreads the weight of the
structure over more area for greater stability”.
The design and layout of spread footings is controlled by several factors, foremost of which is the
weight (load) of the structure it must support, penetration of soft near-surface layers likely to change
volume due to frost heave or shrink-swell.
These foundations are common in residential construction that includes a basement, and in many
commercial structure, but for high rise building they are sufficient.
A spread footing that changes elevation in a series of vertical steps so that it follows the contours of
a sloping site or accommodates changes in soil strata, is called stepped footing.
2.1.1.2 DEEP FOUNDATION
A deep foundation is a type of foundation that transfers building loads to the earth father down from
the surface than a shallow foundation does to a subsurface layer or a range of depths. A pile or
pilling is a vertical structural element of a deep foundation, driven or drilled deep into the ground
ate the building site.
Ground beam - The Ground Beam is the beam which is provided usually at the foundation level to
support building walls, joists, etc. Typically the ground beams are directly rested on the ground;
sometimes they can be supported by end piers.
 Typically ground beams are made of reinforced concrete.
 Ground beams are typically constructed at foundation level.
 Ground beads support wall, joists, etc.
 It is provided where the soil bearing capacity beneath the wall is poor.
Plinth beam - Plinth beam is a reinforced concrete beam constructed between the wall and its
foundation. Plinth beam is provided to prevent the extension or propagation of cracks from the
foundation into the wall above when the foundation suffers from settlement. Plinth beams distributes
the load of the wall over the foundation evenly.
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 12 BMCET
Figure 2.1 Foundation plan
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 13 BMCET
Figure 2.2 Foundation Schedule
2.2. SUPERSTRUCTURE
The superstructure is the portion of a building which is constructed above the ground level and it
serves the purpose of structure’s intended use.
It includes:
1. Roof
2. Parapet
3. Lintels
4. Slab
5. Beams
6. Columns
7. Walls
8. Floor
9. Stair
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 14 BMCET
2.2.1 ROOF
Roof is the exterior and the uppermost part of any building structure. This structure is a covering
that is provided to protect the building from rain, snow, wind, sun and other adverse effects.
Slopping roofs are generally considered better in mountain area. While, in plan areas flat roofs are
preferred.
2.2.2 PARAPET
A parapet wall is a low or dwarf wall built along the edge of the roof, terrace, walkway, balcony etc.
Parapet walls can be constructed using different materials like reinforced cement concrete, steel,
aluminum, glass etc. It is used:
 To prevent the entrance of dust through the air on the rooftop.
 To prevent the falling of debris gathered on the rooftop.
 To prevent high wind loads coming on to the rooftop.
2.2.3 LINTELS
A lintel is a type of beam structure constructed above all the wall openings to support the load
coming over it and transfers safely to the side walls. The width of the lintel is the same as that of
wall width and it ends into the masonry wall.
2.2.4 SLAB
Slabs are horizontal structural elements that serve the purpose of floor, roofs or ceilings. These are
flat surfaces with top and bottom face parallel to each other.
Slabs are supported mainly by columns, beams, walls or the ground. The depth of the slab is very
small when compared to its depth.
2.2.5 BEAMS
A beam is a horizontal structural element with a specific depth and width running with a span. It
withstands vertical loads, bending moments and shear forces.
The loads coming on the beams are transferred to the beam endpoints where it is supported. This is
then transferred to the columns or the beam supporting structural elements.
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 15 BMCET
2.2.6 COLUMNS
The column is a vertical structural element that carries compressive loads. This is one of the critical
structural elements in any building structure whose failure can result in progressive collapse.
The column transfers loads from the slab or the beam to the foundation below.
2.2.7 WALLS
Walls are vertical surfaces constructed in continuance that divide the enclosed spaced. Walls can be
constructed either by means of masonry or by means of concrete. Walls take up the load from the
beams, the slabs or the roof above.
2.2.8 FLOOR
The floor is defined as a finished horizontal surface of a building or a room where people walk. Any
floor has two main components- sub-floor and floor cover. The sub-floor is constructed to support
the imposed loads coming over it. This component imparts strength and stability for the floor
structure. A floor cover or flooring is a suitable floor finish provided in the form of tiles, granite,
marbles, concrete, etc.
2.2.9 STAIR
A stair is a series of steps or flight that is constructed to move from one floor to another in a building
structure. A staircase is a room or an enclosure where the stair is constructed. The space occupied
by the stair is called as a stairway. There are different types of stairs like continuous stairs, straight
stairs, turning stairs etc.
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 16 BMCET
CHAPTER 3
SITE EXCECUTION, SUPERVISION AND MONITORING
3.1.1 CONSTRUCTION PROCEDURE
 Initially, mix the mortar with water and blend it until a smooth and plastic mortar is produced.
 After that, place the mortar on foundation line evenly using trowel (25mm thickness and one brick
wide is recommended for laid mortar).
 Then, lay the first course of stretcher bricks in the mortar. Start with second brick, apply mortar to
the head joint end of each brick, after that shove the bricks into place firmly so that the mortar is
squeezed out of all side of the joints.
 Utilize a level to examine the course for correct height. Ensure that bricks are plumb and level.
Place another mortar line alongside the first course, and then begin laying the second course.
3.1 BRICK MASONARY WORK
Figure 3.1 Brick masonry with cement mortar
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 17 BMCET
 Use the two half bricks to begin the second to ensure that the first two courses are staggered for
structural purposes.
 To finish the second course of the lead, lay three header bricks and make sure that they are plumb
and level.
 The third and fifth courses consist of stretchers similar to the first course. The fourth course begins
with single header, followed by stretchers. Use the level to make sure that the lead is true on each
course. Lastly, this pattern of brick laying is used till the target height is reached.
3.1.2 Points Considered while Supervising Brick Masonry Construction
 The bricks used in a good work should be sound, hard and well burnt.
 The bricks should of uniform size, shape and colour.
 The bricks should be properly soaked in water for at least two hours before use.
 In the brick work, the bricks should be laid on their beds with the frogs pointing upwards.
 The brick courses should be laid truly horizontal and should have truly vertical joints.
 As far as possible the use of brick-bats should be discouraged.
 The brickwork should be carried out in proper bond, preferably in English bond.
 As far as possible, the brick work should be raised uniformly. Generally, the height of brick
masonry in a day should be less than 1.5 m
 When the mortar is green, the face joints should be racked to a depth of 12 to 19 mm in order
to have a proper key for plastering.
 Finished brick work should be cured for a period of 1 to 2 weeks.
 Single scaffolding should be adopted to carry out the brickwork at a higher level.
 In order to ensure continuous bond between the old and the new, the walls should be stopped
with a toothed end.
 The mortar to be used for brick work should be of quality and of proportion as specified.
3.1.3 Types of bonds in brick masonry
1. Stretcher bond
2. Header bond
3. English bond
4. Fleming bond
5. Facing bond
6. English cross bond
7. Brick on edge bond
8. Dutch bond
9. Raking bond
10. Zigzag bond
11. Garden wall
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 18 BMCET
Figure 3.3 Stretcher bond
Figure 3.2 Flemish bond
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 19 BMCET
3.2 LINTEL
A lintel is a beam placed across the openings like doors, windows etc. in buildings to support the
load from the structure above. The width of lintel beam is equal to the width of wall, and the ends
of it is built into the wall. Construction of the lintel can be done in a simple way just treat like as a
horizontal beam because overall coming load acts upon this horizontal member.
Figure 3.4 Formwork for lintel
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 20 BMCET
Figure 3.5 Casted Lintel
3.3 COLUMN CONSTRUCTION
3.3.1 CONSTRUCTION PROCESS OF RCC COLUMN
Constructing Concrete Column involves following four stages of works –
1. Column layout work
2. Column reinforcement work
3. Column formwork
4. Pouring concrete into column
1. Column layout work - In this stage of works the location of columns are determined practically
in field. It is done by laying rope according to grids shown in the drawing and then mark the location
of columns related to rope. In drawing, column locations are shown related to grid-line with
dimension. Practically, in field, ropes are our grid-line. So we place columns related to rope-line by
measuring dimension shown in the drawing.
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 21 BMCET
Figure 3.6 Column face line plan
2. Column reinforcement work - After marking the column locations, we then start to place
reinforcement as instructed in the structural drawing. This is normally described in the drawing like
–C1-12#16 mm⌀ and stirrup-10 mm⌀ @ 15 cm c/c.
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 22 BMCET
That means column C1 will have 12 numbers of 16 mm diameter bar as vertical bar and 10 mm
diameter steel should be placed 15 cm center to center as stirrup.
Figure 3.8 Column bars extension
Figure 3.7 Reinforcement details
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 23 BMCET
3. Column formwork - In building, floor height is normally kept 3 m. If the slab has beam then we
have to pour concrete up to beam bottom level. Suppose, beam height specified in drawing is 0.45 m.
So, the casting height of our column will be 2.65 m. And our formwork height will be 2.65 m. But
one thing should be considered here is that dropping concrete from above 1.5 m height isn’t suggested
during pouring. Because it leads concrete segregation. So we should make one-side of column
formwork within 1.5 m height range. After casting 1.5 m of column, we just lift the short side up to
full-casting height of column next day.
Figure 3.9 Steel shuttering Figure 3.10 Plywood shuttering
Column starter - Starter is generally a casting of concrete material with equivalent width and length
of column section and comparatively smaller height of around 10 cm. It is cast in such a manner
that equal cover is left encircling the reinforcement bars of column and then shuttering of column is
provided. The main purpose of starter is to fine-tune the form work of a column vertically to
maintain sufficient gap among column reinforcement and shuttering.
To retain the exact position of the columns in the below slab as well as retain the column lines in
number of floors easily, starter is marked.
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 24 BMCET
Figure 3.11 Column starter
Figure 3.12 Formwork of column
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 25 BMCET
4. Pouring of concrete into column - Casting column is easy. For small quantity of concrete volume
we normally depend on machine-mix or hand-mix concrete and for large concrete quantity we order
ready-mix concrete. Machine-mix or hand-mix is concrete is normally preferred. Because, if you
use moving pump with ready-mix concrete and if you want not to exceed 1.5 m height range for
dropping concrete that would be difficult.
Figure 3.13 Concrete pouring Figure 3.14 Column after
removal of formwork
3.4 STAIR
3.4.1 FORMWORK
The angle of flight, dimensions of thread and riser are properly checked. Usually while constructing
a stairs attached to wall, the line of flight, thread and risers are marked on the wall for proper fixing
of shuttering or formwork. Supports have been provided with the help of props.
3.4.2 REINFORCEMENT
The concrete steps are to be reinforced with steel bars so as it carries the loads coming upon the
stairs and transfer them to the ground. These steel reinforcement bars are placed in the formwork
with minimum of 25 mm spacing and are tied together.
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 26 BMCET
3.4.3 POURING OF CONCRETE
The concrete mix plays an important role in strength and durability of stairs. The concrete mix is
designed by the structural engineer based on the strength, durability and other requirements. It is
recommended to use a concrete vibrator while pouring the concrete to completely fill the gaps of
the stairs and to avoid the honeycomb formation.
Figure 3.15 Stairs construction
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 27 BMCET
3.5 BEAM
Construction of RCC beam involves following stages of work:
1. Formwork - To sustain concrete properly, formwork or centering and shuttering is necessary.
Figure 3.16 Formwork of beam using plywood
2. Bending, binding and placing of steel bars - For making design of the slab, it is supposed that
the concrete contains sound compressive strength but it is poor in tensile strength. To make the
structure secure against the tensile stress, the steel bars are arranged.
Steel bars cut with the help of cutting machine into required length and stirrups were made manually
and then beams were casted as per given drawing and specifications.
Figure 3.17 Reinforcement cutting machine
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 28 BMCET
Figure 3.18 Placing of reinforcement
3.6 SLAB
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 29 BMCET
Construction of RCC slab involves following stages of work -
 Assemble and Erect Formwork
 Prepare and Place Reinforcement
 Pour, Compact and Finish Concrete
 Curing Concrete and Remove Formwork
1. Assemble and Erect Formwork - The formwork shall be designed to withstand construction
loads such as fresh concrete pressure and weight of workers and operators and their machines.
Figure 3.19 Shuttering of slab
1. Prepare and place reinforcement - Design drawings provides necessary reinforcement details,
so it only needs understanding to use designated bar size, cutting required length, and make
necessary hooks and bents. After preparation is completed, steel bars are placed into their positions
with the provision of specified spacing and concrete cover. The concrete cover and spacing for floor
slabs can be maintained by introducing spacers and bars supporters. Wires are used to tie main
reinforcement and shrinkage and temperature reinforcement (distribution reinforcement).
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 30 BMCET
Figure 3.20 Bending and placing of reinforcement
2. Pour, compact and finish concrete - Mixing, transporting, and handling of concrete shall be
properly coordinated with placing and finishing works. In floor slab, begin concrete placing along
the perimeter at one end of the work with each batch placed against previously dispatched concrete.
Concrete should be deposited at, or as close as possible to, it’s final position in order to prevent
segregation. Fresh concrete should be compacted adequately in order to mold it within the forms and
around embedded items and reinforcement and to eliminate stone pockets, honeycomb, and entrapped
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 31 BMCET
air. Vibration, either internal or external, is the most widely used method for consolidating concrete.
Lastly, slabs could be finished in many ways based on floor application.
3. Curing concrete and remove formwork - After finishing ended, suitable technique shall be
used to cure the concrete adequately. Slab curing methods such as
 Water curing
a. Immersion
b. Spraying
c. Ponding
d. Wet covering
 Membrane curing
 Application of heat
 Miscellaneous
Removal of form depends upon grade of concrete, type of member, weather conditions, winds,
strength attained; type of cement etc. forms shall not be struck until the concrete reaches strength at
twice the stress to which the concrete may be subjected at the time of removal of formwork. It is
recommended to remove formwork of slab after 7 days of concreting.
Figure 3.21 Curing of slab by ponding method
Figure 3.22 Removal of slab formwork
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 32 BMCET
CHAPTER 4
MATERIALS AND EQUIPMENTS
4.1 MATERIALS
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 33 BMCET
4.1.1 CEMENT
Cement is a finely milled mineral powder, usually grey in colour. The most important raw materials
for the production of cement are limestone, clay and marl. Mixed with water served as an adhesive
to bind sand, gravel and hard rock in concrete. Cement hardens both in the air and under water and
remains in its hardened state once reached.
Cements are classified according to their early and final strength as well as their composition. In
addition to cements that consists of 100% clinker, there are so called composite cements, in which
a portion of the clinker is replaced by alternative raw materials, such as flu ash, ground slag or
limestone. As the production of clinker is energy-intensive and releases large amount of CO2, the
use of alternative raw materials can conserve natural resources and reduce CO2 emissions.
Figure 4.1 Cement
4.1.2 AGGREGATES
Aggregates are inert granular materials such as sand, gravel, or crushed stone that, along with Water
and Portland cement, are an essential ingredient in concrete. For a good concrete mix, aggregates
need to be clean, hard, strong particles free of absorbed chemicals or coatings of clay and other fine
materials that could cause the deterioration of concrete. Aggregates, which account for 60 to 75
percent of the total volume of concrete, are divided into two distinct categories--fine and coarse.
Fine aggregates generally consist of natural sand or crushed stone with most particles passing
through a 3/8-inch sieve. Coarse aggregates are any particles greater than 0.19 inch, but generally
range between 3/8 and 1.5 inches in diameter. Gravels constitute the majority of coarse aggregate
used in concrete with crushed stone making up most of the remainder.
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 34 BMCET
Figure 4.3 Coarse aggregate
4.1.3 BRICKS
Bricks consist of fired ceramic, clay, or cement materials that are cut into specific shapes, such as a
rectangle, and used for building walls or furnaces or for paving surfaces. Bricks vary in material
makeup, size, and shape and include products for specific applications, such as firebricks or
refractory bricks, acid bricks for flooring, and bricks for masonry applications. Fly ash bricks are
just as strong as traditional clay bricks, but they may contain small amounts of pollutants such as
heavy metals.
Figure 4.2 Fine aggregate
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 35 BMCET
4.1.4 REINFORCEMENT
Reinforcing bars add tensile strength and stiffness to concrete and make up 44% of steel use in
buildings. Steel is used because it binds well to concrete, has a similar thermal expansion coefficient
and is strong and relatively cost-effective. Reinforced concrete is also used to provide deep
foundations and basements and is currently the world’s primary building material. It is reusable and
endlessly recyclable, earthquake resistant due to ductility, flexible in combination with other
materials.
4.1.5 WATER
Water is one of the most important elements in construction and is required for the preparation of
mortar, mixing of cement concrete and for curing work etc. The quality of water used has a direct
impact on the strength of the motor and cement concrete in the construction work. The water used
for curing and mixing must be free from high quantities of alkalis, acid, oils, salt, sugar, organic
materials, vegetable growth, etc that might be deleterious to bricks, concrete or iron. Impurities in
water can cause metal corrosion, introduce unwanted silt and clay into the concrete, adversely affect
the hardening process of concrete and also reduce the strength by even 25%. Thus the need to ensure
the quality of water used during construction is vital.
Figure 4.4 Bricks
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 36 BMCET
4.2 EQUIPMENTS USED AT CONSTRUCTION SITE
4.2.1 CONCRETE MIXER
It is used to mix the ingredient of concrete. It consist a hollow cylindrical part with inner side wings
in which cement, sand, aggregates and water is mix properly. For smaller volume works, portable
concrete mixers are often used so that the concrete can be made at the construction site, giving the
workers ample time to use the concrete before it hardens.
Figure 4.5 Concrete mixer
4.2.2 COMAPCTORS
After the transporting of concrete, it is in the loose structure. So for the better strength of the concrete
we used dense concrete for construction work. If the concrete is not dense and permeable, it will not
be watertight. It will be less able to withstand aggressive liquids. Moisture and air are more likely
to penetrate to the reinforcement causing it to rust. So compaction after placing of concrete is
necessary. Hence, it must be compacted to remove air bubbles and voids which are present in the
concrete and gain strength. There are two methods of compaction
1. Manual compaction
 Roding
 Ramming
 Tamping
2. Mechanical compaction
 Internal vibrator
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 37 BMCET
 External vibrator
 Formwork vibrator
 Table vibrator
 Platform vibrator
 Needle vibrator
 Surface vibrator
Figure 4.6 Needle vibrator
4.2.3 CUTTING MACHINE
Figure 4.7 Bars cutter Figure 4.8 Wood cutter
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 38 BMCET
CHAPTER 5
COCLUDING REMARKS
5.1 CONCLUSION
As an undergraduate of Gujarat Technological University, we would like to say this summer
internship training program is an excellent opportunity for us to get to ground level and experience
the things that we wouldn’t ever gained through going straight into a job. We are grateful to our
college CKPCET and GTU for giving us this wonderful opportunity.
The main objective of the summer internship is to provide an opportunity to undergraduate to
identify, observe and practice how civil engineering is applicable on real site it isn’t only limited to
get experience on technical practices, but also to observe management practices and to interact with
the field workers. Overall during this internship I got to learn about various things and aspects,
which wouldn’t possible in theory.
190063106012 A Summer
Internship At “VDG”
Gujarat Technological University 39 BMCET
References
Building Construction by B.C. Punmia, Ashok Kumar Jain, Arun Kumar Jain
Concrete technology, theory and practice by M. S. Shetty
IS 456: 2000 Plain and Reinforced Concrete – Code of Practice
Training Schedule
TRAINING SCHEDULE
Duration (Day) Work
1 Mansory work
2-3 Column reinforcement and shuttering
4 Column concreting
5-6 Column curing, Stairs shuttering and reinforcement
7 Removal of column formwork and Stairs
concreting
8-10 Stairs curing, beam and slab shuttering
11-12 Beam and slab reinforcement
13-14 Beam and slab Concreting
15 Beam and slab Curing

More Related Content

Similar to Shivam last.docx

PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDING
PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDINGPLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDING
PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDINGIRJET Journal
 
Effect of time delay in mixing on mix design of m30 grade concrete.
Effect of time delay in mixing on mix design of m30 grade concrete.Effect of time delay in mixing on mix design of m30 grade concrete.
Effect of time delay in mixing on mix design of m30 grade concrete.PankajKhanal1
 
internship review .pdf
internship review .pdfinternship review .pdf
internship review .pdfPAYALINAMDAR
 
IIT INDORE CUONSTRUCTION OVERVIEW
IIT INDORE CUONSTRUCTION OVERVIEWIIT INDORE CUONSTRUCTION OVERVIEW
IIT INDORE CUONSTRUCTION OVERVIEWdilip patidar
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)pranay kumar
 
Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)TeohPeiNi
 
Anis rahman khokan's internship paper
Anis rahman khokan's internship paperAnis rahman khokan's internship paper
Anis rahman khokan's internship paperAnis Rahman Khokan
 
Industrial report for civil engg. training
Industrial report for civil engg. trainingIndustrial report for civil engg. training
Industrial report for civil engg. trainingRam1239
 
field visit report at faculty of technology in rajarata university of srilanka.
field visit report at faculty of technology in rajarata university of srilanka.field visit report at faculty of technology in rajarata university of srilanka.
field visit report at faculty of technology in rajarata university of srilanka.AskafAhamed
 
404128086-mivan-ppt-0-pptx.pptx.................
404128086-mivan-ppt-0-pptx.pptx.................404128086-mivan-ppt-0-pptx.pptx.................
404128086-mivan-ppt-0-pptx.pptx.................KeshavaPrajwal
 
well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...Arman Hashmi
 
Report on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL PatnaReport on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL PatnaNarayan Gupta
 
Industrial training Report
Industrial training ReportIndustrial training Report
Industrial training ReportJaspreet singh
 
TRAINING REPORT A PROJECT ON ROAD WIDENI...
                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...
TRAINING REPORT A PROJECT ON ROAD WIDENI...Pradeep Yadav
 

Similar to Shivam last.docx (20)

PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDING
PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDINGPLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDING
PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDING
 
Effect of time delay in mixing on mix design of m30 grade concrete.
Effect of time delay in mixing on mix design of m30 grade concrete.Effect of time delay in mixing on mix design of m30 grade concrete.
Effect of time delay in mixing on mix design of m30 grade concrete.
 
internship review .pdf
internship review .pdfinternship review .pdf
internship review .pdf
 
IIT INDORE CUONSTRUCTION OVERVIEW
IIT INDORE CUONSTRUCTION OVERVIEWIIT INDORE CUONSTRUCTION OVERVIEW
IIT INDORE CUONSTRUCTION OVERVIEW
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)
 
Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)
 
Anis rahman khokan's internship paper
Anis rahman khokan's internship paperAnis rahman khokan's internship paper
Anis rahman khokan's internship paper
 
induarial trainin report
induarial trainin reportinduarial trainin report
induarial trainin report
 
Industrial report for civil engg. training
Industrial report for civil engg. trainingIndustrial report for civil engg. training
Industrial report for civil engg. training
 
Whole Report (2)
Whole Report (2)Whole Report (2)
Whole Report (2)
 
field visit report at faculty of technology in rajarata university of srilanka.
field visit report at faculty of technology in rajarata university of srilanka.field visit report at faculty of technology in rajarata university of srilanka.
field visit report at faculty of technology in rajarata university of srilanka.
 
INDEX
INDEXINDEX
INDEX
 
404128086-mivan-ppt-0-pptx.pptx.................
404128086-mivan-ppt-0-pptx.pptx.................404128086-mivan-ppt-0-pptx.pptx.................
404128086-mivan-ppt-0-pptx.pptx.................
 
Full Report
Full ReportFull Report
Full Report
 
well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...
 
Report on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL PatnaReport on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL Patna
 
Industrial training Report
Industrial training ReportIndustrial training Report
Industrial training Report
 
Sadab
SadabSadab
Sadab
 
TRAINING REPORT A PROJECT ON ROAD WIDENI...
                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...
TRAINING REPORT A PROJECT ON ROAD WIDENI...
 
madhu
madhumadhu
madhu
 

Recently uploaded

Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxnuruddin69
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 

Recently uploaded (20)

Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 

Shivam last.docx

  • 1. CONSTRUCTION OF KASSIA RESIDENTIAL BUILDING A PROJECT REPORT Submitted by DUBEY SHIVAM AKHILESH Enrollment Number: 190060106005 Summer Internship (3170001) Semester VII In partial fulfillment for the award of the degree of BACHELOR OF ENGINEERING in Civil Engineering Bhagwan Mahavir College of Engineering & Technology, Surat. Gujarat Technology University, Ahmadabad July, 2022
  • 2. 190060106005 Gujarat Technological University BMCET Bhagwan Mahavir college of Engineering & Technology BMEF Campus, Bharthana Road, Vesu, Surat- 395017 CERTIFICATE This is to certify that the project report submitted along with the project entitled A Role of site engineering has been carried out by DUBEY SHIVAM under my guidance in partial fulfillment for the degree of Bachelor of Engineering in Civil Engineering, 7th semester of Gujarat Technological University, during the academic year 2022-2023. Mr. Jasmin Tandel Mr. Dixit Chauhan (Internal Guide) (Head Of The Department) Assistant Professor Civil department BMCET I
  • 3. II
  • 4.
  • 5. 190060106005 Gujarat Technological University III BMCET Bhagwan Mahavir College Of Engineering & Teachnology BMEF Campus, Bharthana Road, Vesu, Surat- 395017 DECLARATION I under signed DUBEY SHIVAM AKHILESH a student of BMCET, CIVIL, 7th semester, declare that summer internship project titled “CONSTRUCTION OF KASSIA RESIDENTIAL BUILDING” is a result of my own work and our indebtedness to other work publications, references, if any, have been duly acknowledged. If I am found guilty of copying any other report or published information and showing as my/our original work, I understand that I shall be liable and punishable by Institute or University, which may include ‘Fail’ in examination, ‘Repeat study & re-submission of the report’ or any other punishment that Institute or University may decide. Name of Student: DUBEY SHIVAM Enrollment Number: 190060106005
  • 6. 190060106005 Gujarat Technological University IV BMCET ACKNOWLEDGEMENT I would like to highly acknowledge and pay respect to all associates with project at different stages in presenting the report of my project on “Construction of kassia Residential ”. Our sincere thanks to Head of Civil Engineering Department, for his kind help in project .I am also thankful to Prof. Jasmin Tandel for their valuable tips during the course of this study. The project work is most practical and existing of our learning experience which could be assets for me and my team in our future career.It is my sincere duty to thanks all those people who helped me directly and indirectly in this project.
  • 7. 190060106005 Gujarat Technological University V BMCET ABSTRACT This study presents the compendious of the observation made during the two week of our internship. During this period I observed the construction of masonry wall, lintel, column, slab, beam and staircase and precautions to be taken during the work. I also learned about how to deal with engineers, labour and other staffs at site which had improved my communication skills and management of work also. This opportunity helped me to apply my theoretical knowledge gained during the university academic program into the real world industrial based execution and experience. It helped me to develop my skill and industrial knowledge. This report document contains the knowledge and experience I have gained throughout my internship period.
  • 8. 190060106005 Gujarat Technological University VI BMCET TABLE OF CONTENTS Certificate of Completion (by College) I Certificate of Completion (by Organization) II Student’s declaration III Acknowledgement IV Abstract V Table of contents VI List of figures IX Chapter 1 Introduction 1 1.1 Aim 1 1.2 Objective 1 1.3 Introduction of the site 1 1.4 Site images 2 1.5 Plan of the building 4 1.6 General nomenclature used at site 7 1.8 Methodology 8 Chapter 2 Components of the building 9 2.1 Substructure 9 2.1.1 Foundation 9 2.1.1.1 Shallow foundation 10 2.1.1.2 Deep foundation 10 2.2 Superstructure 12 2.2.1 Roof 13 2.2.2 Parapet 13 2.2.3 Lintels 13 2.2.4 Slabs 13
  • 9. 190060106005 Gujarat Technological University VII BMCET 2.2.5 Beams 13 2.2.6 Columns 14 2.2.7 Walls 14 2.2.8 Floor 14 2.2.9 Stair 14 Chapter 3 Site execution, supervision and monitoring 15 3.1 Brick masonary work 15 3.1.1 Construction procedure 15 3.1.2 Points considered while brick masonary construction 16 3.1.3 Types of bonds in brick masonry 16 3.2 Lintels 18 3.3 Column construction 19 3.3.1 Construction process of RCC column 19 3.4 Stair construction 24 3.4.1 Formwork 24 3.4.2 Reinforcement 24 3.4.3 Pouring of concrete 25 3.5 Beam construction 26 3.6 Slab construction 28 Chapter 4 Materials and equipments 32 4.1 Materials used at construction site 32 4.1.1 Cement 32 4.1.2 Aggregates 32
  • 10. 190063106012 A Summer Internship At “VDG” 4.1.3 Bricks 4.1.4 Reinforcement 4.1.5 Water 4.2 Equipments used at construction site 4.2.1 Concrete mixer 4.2.2 Compactors Chapter 5 Concluding remarks 5.1 Conclusion References Training schedule 33 34 34 35 35 35 37 37 38 38
  • 11. 190063106012 A Summer Internship At “VDG” BMCET Gujarat Technological University VIII BMCET LIST OF FIGURES Figure Figure Description Pg. No. No. 1.1 Location of site 2 1.2 Site image at the start of the internship 3 1.3 Site image at the end of the internship 3 1.4 First floor 4 1.5 Second floor 5 1.6 Terrace floor 6 2.1 Foundation plan 11 2.2 Foundation schedule 12 3.1 Brick masonry with cement mortar 15 3.2 Flemish bond 17 3.3 Stretcher bond 17 3.4 Formwork for lintel 18
  • 12. 3.5 Casted lintel 19 3.6 Column face line plan 20 3.7 Reinforcement details 21 3.8 Column bars extension 21 3.9 Steel shuttering 22 3.10 Plywood shuttering 22 3.11 Column starter 23 3.12 Formwork of column 23 Gujarat Technological University IX 190063106012 A Summer Internship At “VDG”
  • 13. 190063106012 A Summer Internship At “VDG” BMCET 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 Concrete pouring Column after removal of formwork Stairs construction Formwork of beam using plywood Reinforcement cutting machine Placing of reinforcement Shuttering of slab Bending and binding of reinforcement Curing of slab by ponding Removal of slab formwork Cement Fine aggregate Course aggregate Bricks Concrete mixer Needle vibrator Bars cutter Wood cutter 24 24 25 26 26 27 28 29 30 31 32 33 33 34 35 36 36 36
  • 15. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 1 BMCET CHAPTER 1 INTRODUCTION 1.1 AIM  The internship aim to develop our skills to implement theoretical knowledge into practical field. 1.2 OBJECTIVES  To orient us with the different construction activities.  To gain practical experience and familiarize with field operations.  To understand and analyze the planning, design and drawing of construction.  To get the exposure with the management and communication functions performed within a construction project. 1.3 INTRODUCTION OF THE SITE The project was to construct G+2 story bungalow at Piplod, Surat for residential purpose. 1. Contractor name:Mr. Nilesh parmar 2. Contractor’s office location: T.P. 43, Behind Sankalp Row House, Canal Road, Near CNG pump, Jhangirabad, Surat-395005 3. Client name: Mr. Kenilbhai Shah 4. Overall cost of the project: the overall cost of the building is around 2 Cr. 5. Site location: 120-121, Saraswat Nagar Society, Piplod, Surat 6. Architect name: Ar. Chetan H. Mistry 7. Site engineer: Er. Hemant J. Chauhan
  • 16. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 2 BMCET 1.4 SITE IMAGES Figure 1.1 Location of site
  • 17. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 3 BMCET Figure 1.3 Site image at the end of internship Figure 1.2 Site image at the starting of the internship
  • 18. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 4 BMCET 1.5 PLAN OF THE BUILDING Figure 1.4 First Floor
  • 19. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 5 BMCET Figure 1.5 Second Floor
  • 20. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 6 BMCET Figure 1.6 Terrace Floor
  • 21. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 7 BMCET 1.6 GENERAL NOMENCLATURE USED AT SITE Sand – Reti Course aggregates – Khadi, Kapchi Plumb bob – Olumbo Concrete cover – Cover Reinforcement of top and bottom steel – Jali Concrete – Mal Ladder – Sidi Formwork – Peti Hatching – Thacha Stirrups – Ring Brick – Itt Mixer – Handi Props – Teka  Joist – Chavi 1.7 MEMBERS AT SITE  Client  Architect  Engineer  Contractor  Supervisor  Mason  Mistry  Carpenter  Foreman  Labour  Bhisti
  • 22. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 8 BMCET 1.8 METHODOLOGY
  • 23. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 9 BMCET Step 1: Site Clearance Step 2: Excavation Step 3: Plinth beam Step 4: Superstructure Column and beam Step 5: Brick masonary work Step 6: Door and window frame Step 7: Lintel over door and windows Step 8: Floor slab or roof structure Step 9: Plastering Step 10: Door and window fixation Step 11: Water supply and sanitary fixture and fittings Step 12: Mechanical and electrical work Step 13: Floor tiles Step 14: Painting, interior and exterior finishing Step 15: Interior and furniture
  • 24. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 10 BMCET CHAPTER 2 COMPOPNENTS OF THE BUILDING Construction of the building is done in two steps, which are as follows:  Substructure  Superstructure 2.1 SUBSTRUCTURE The sub-structure of the building transfers the load of the building to the ground and isolates it horizontally from the ground. This includes foundation and basemen retaining wall. It is differentiated from the super-structure. It safeguards the building against the forces of wind uplift, soil pressure etc. It provides a level and firm surface for the construction of super- structure. It also prevents unequal or differential settlement and ensures stability of the building against sliding, overturning, undermine due to floodwater or borrowing animals. The function of the substructure is to transfer the load of the building to the ground and to isolate it horizontally from the ground. The substructure includes,  Foundations up to and including damp proof course.  Lowest floor assembly below the undesirable of the screed or the lowest floor finish.  Basement excavation.  Basement retaining walls up to and including the damp proof course. 2.1.1 FOUNDATION Foundation, part of a structural system that supports and anchors the superstructure of a building and transmits its loads directly to the earth. Foundation provide the structure’s stability from the ground to distribute the weight of the structure over a large area in order to avoid overloading the underlying soil. At my site, shallow foundation was constructed. Types of foundation are:  Shallow foundation  Deep foundation
  • 25. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 11 BMCET 2.1.1.1 SHALLOW FOUNDATION A shallow foundation is a type of building foundation that transfers building loads to the earth very near to the surface, rather than to a subsurface layer or a range of depths as does a deep foundation. Shallow foundation includes spread footing foundation, mat-slab foundation, slab- on-grade foundation, pad foundation, rubble trench foundation and earthbag foundation. At my site, spread footing foundation was constructed. A spread footing foundation, which is common in residential building, the shape of the spread footing may be circular, square and rectangular in plan. This wider part “spreads the weight of the structure over more area for greater stability”. The design and layout of spread footings is controlled by several factors, foremost of which is the weight (load) of the structure it must support, penetration of soft near-surface layers likely to change volume due to frost heave or shrink-swell. These foundations are common in residential construction that includes a basement, and in many commercial structure, but for high rise building they are sufficient. A spread footing that changes elevation in a series of vertical steps so that it follows the contours of a sloping site or accommodates changes in soil strata, is called stepped footing. 2.1.1.2 DEEP FOUNDATION A deep foundation is a type of foundation that transfers building loads to the earth father down from the surface than a shallow foundation does to a subsurface layer or a range of depths. A pile or pilling is a vertical structural element of a deep foundation, driven or drilled deep into the ground ate the building site. Ground beam - The Ground Beam is the beam which is provided usually at the foundation level to support building walls, joists, etc. Typically the ground beams are directly rested on the ground; sometimes they can be supported by end piers.  Typically ground beams are made of reinforced concrete.  Ground beams are typically constructed at foundation level.  Ground beads support wall, joists, etc.  It is provided where the soil bearing capacity beneath the wall is poor. Plinth beam - Plinth beam is a reinforced concrete beam constructed between the wall and its foundation. Plinth beam is provided to prevent the extension or propagation of cracks from the foundation into the wall above when the foundation suffers from settlement. Plinth beams distributes the load of the wall over the foundation evenly.
  • 26. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 12 BMCET Figure 2.1 Foundation plan
  • 27. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 13 BMCET Figure 2.2 Foundation Schedule 2.2. SUPERSTRUCTURE The superstructure is the portion of a building which is constructed above the ground level and it serves the purpose of structure’s intended use. It includes: 1. Roof 2. Parapet 3. Lintels 4. Slab 5. Beams 6. Columns 7. Walls 8. Floor 9. Stair
  • 28. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 14 BMCET 2.2.1 ROOF Roof is the exterior and the uppermost part of any building structure. This structure is a covering that is provided to protect the building from rain, snow, wind, sun and other adverse effects. Slopping roofs are generally considered better in mountain area. While, in plan areas flat roofs are preferred. 2.2.2 PARAPET A parapet wall is a low or dwarf wall built along the edge of the roof, terrace, walkway, balcony etc. Parapet walls can be constructed using different materials like reinforced cement concrete, steel, aluminum, glass etc. It is used:  To prevent the entrance of dust through the air on the rooftop.  To prevent the falling of debris gathered on the rooftop.  To prevent high wind loads coming on to the rooftop. 2.2.3 LINTELS A lintel is a type of beam structure constructed above all the wall openings to support the load coming over it and transfers safely to the side walls. The width of the lintel is the same as that of wall width and it ends into the masonry wall. 2.2.4 SLAB Slabs are horizontal structural elements that serve the purpose of floor, roofs or ceilings. These are flat surfaces with top and bottom face parallel to each other. Slabs are supported mainly by columns, beams, walls or the ground. The depth of the slab is very small when compared to its depth. 2.2.5 BEAMS A beam is a horizontal structural element with a specific depth and width running with a span. It withstands vertical loads, bending moments and shear forces. The loads coming on the beams are transferred to the beam endpoints where it is supported. This is then transferred to the columns or the beam supporting structural elements.
  • 29. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 15 BMCET 2.2.6 COLUMNS The column is a vertical structural element that carries compressive loads. This is one of the critical structural elements in any building structure whose failure can result in progressive collapse. The column transfers loads from the slab or the beam to the foundation below. 2.2.7 WALLS Walls are vertical surfaces constructed in continuance that divide the enclosed spaced. Walls can be constructed either by means of masonry or by means of concrete. Walls take up the load from the beams, the slabs or the roof above. 2.2.8 FLOOR The floor is defined as a finished horizontal surface of a building or a room where people walk. Any floor has two main components- sub-floor and floor cover. The sub-floor is constructed to support the imposed loads coming over it. This component imparts strength and stability for the floor structure. A floor cover or flooring is a suitable floor finish provided in the form of tiles, granite, marbles, concrete, etc. 2.2.9 STAIR A stair is a series of steps or flight that is constructed to move from one floor to another in a building structure. A staircase is a room or an enclosure where the stair is constructed. The space occupied by the stair is called as a stairway. There are different types of stairs like continuous stairs, straight stairs, turning stairs etc.
  • 30. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 16 BMCET CHAPTER 3 SITE EXCECUTION, SUPERVISION AND MONITORING 3.1.1 CONSTRUCTION PROCEDURE  Initially, mix the mortar with water and blend it until a smooth and plastic mortar is produced.  After that, place the mortar on foundation line evenly using trowel (25mm thickness and one brick wide is recommended for laid mortar).  Then, lay the first course of stretcher bricks in the mortar. Start with second brick, apply mortar to the head joint end of each brick, after that shove the bricks into place firmly so that the mortar is squeezed out of all side of the joints.  Utilize a level to examine the course for correct height. Ensure that bricks are plumb and level. Place another mortar line alongside the first course, and then begin laying the second course. 3.1 BRICK MASONARY WORK Figure 3.1 Brick masonry with cement mortar
  • 31. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 17 BMCET  Use the two half bricks to begin the second to ensure that the first two courses are staggered for structural purposes.  To finish the second course of the lead, lay three header bricks and make sure that they are plumb and level.  The third and fifth courses consist of stretchers similar to the first course. The fourth course begins with single header, followed by stretchers. Use the level to make sure that the lead is true on each course. Lastly, this pattern of brick laying is used till the target height is reached. 3.1.2 Points Considered while Supervising Brick Masonry Construction  The bricks used in a good work should be sound, hard and well burnt.  The bricks should of uniform size, shape and colour.  The bricks should be properly soaked in water for at least two hours before use.  In the brick work, the bricks should be laid on their beds with the frogs pointing upwards.  The brick courses should be laid truly horizontal and should have truly vertical joints.  As far as possible the use of brick-bats should be discouraged.  The brickwork should be carried out in proper bond, preferably in English bond.  As far as possible, the brick work should be raised uniformly. Generally, the height of brick masonry in a day should be less than 1.5 m  When the mortar is green, the face joints should be racked to a depth of 12 to 19 mm in order to have a proper key for plastering.  Finished brick work should be cured for a period of 1 to 2 weeks.  Single scaffolding should be adopted to carry out the brickwork at a higher level.  In order to ensure continuous bond between the old and the new, the walls should be stopped with a toothed end.  The mortar to be used for brick work should be of quality and of proportion as specified. 3.1.3 Types of bonds in brick masonry 1. Stretcher bond 2. Header bond 3. English bond 4. Fleming bond 5. Facing bond 6. English cross bond 7. Brick on edge bond 8. Dutch bond 9. Raking bond 10. Zigzag bond 11. Garden wall
  • 32. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 18 BMCET Figure 3.3 Stretcher bond Figure 3.2 Flemish bond
  • 33. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 19 BMCET 3.2 LINTEL A lintel is a beam placed across the openings like doors, windows etc. in buildings to support the load from the structure above. The width of lintel beam is equal to the width of wall, and the ends of it is built into the wall. Construction of the lintel can be done in a simple way just treat like as a horizontal beam because overall coming load acts upon this horizontal member. Figure 3.4 Formwork for lintel
  • 34. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 20 BMCET Figure 3.5 Casted Lintel 3.3 COLUMN CONSTRUCTION 3.3.1 CONSTRUCTION PROCESS OF RCC COLUMN Constructing Concrete Column involves following four stages of works – 1. Column layout work 2. Column reinforcement work 3. Column formwork 4. Pouring concrete into column 1. Column layout work - In this stage of works the location of columns are determined practically in field. It is done by laying rope according to grids shown in the drawing and then mark the location of columns related to rope. In drawing, column locations are shown related to grid-line with dimension. Practically, in field, ropes are our grid-line. So we place columns related to rope-line by measuring dimension shown in the drawing.
  • 35. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 21 BMCET Figure 3.6 Column face line plan 2. Column reinforcement work - After marking the column locations, we then start to place reinforcement as instructed in the structural drawing. This is normally described in the drawing like –C1-12#16 mm⌀ and stirrup-10 mm⌀ @ 15 cm c/c.
  • 36. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 22 BMCET That means column C1 will have 12 numbers of 16 mm diameter bar as vertical bar and 10 mm diameter steel should be placed 15 cm center to center as stirrup. Figure 3.8 Column bars extension Figure 3.7 Reinforcement details
  • 37. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 23 BMCET 3. Column formwork - In building, floor height is normally kept 3 m. If the slab has beam then we have to pour concrete up to beam bottom level. Suppose, beam height specified in drawing is 0.45 m. So, the casting height of our column will be 2.65 m. And our formwork height will be 2.65 m. But one thing should be considered here is that dropping concrete from above 1.5 m height isn’t suggested during pouring. Because it leads concrete segregation. So we should make one-side of column formwork within 1.5 m height range. After casting 1.5 m of column, we just lift the short side up to full-casting height of column next day. Figure 3.9 Steel shuttering Figure 3.10 Plywood shuttering Column starter - Starter is generally a casting of concrete material with equivalent width and length of column section and comparatively smaller height of around 10 cm. It is cast in such a manner that equal cover is left encircling the reinforcement bars of column and then shuttering of column is provided. The main purpose of starter is to fine-tune the form work of a column vertically to maintain sufficient gap among column reinforcement and shuttering. To retain the exact position of the columns in the below slab as well as retain the column lines in number of floors easily, starter is marked.
  • 38. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 24 BMCET Figure 3.11 Column starter Figure 3.12 Formwork of column
  • 39. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 25 BMCET 4. Pouring of concrete into column - Casting column is easy. For small quantity of concrete volume we normally depend on machine-mix or hand-mix concrete and for large concrete quantity we order ready-mix concrete. Machine-mix or hand-mix is concrete is normally preferred. Because, if you use moving pump with ready-mix concrete and if you want not to exceed 1.5 m height range for dropping concrete that would be difficult. Figure 3.13 Concrete pouring Figure 3.14 Column after removal of formwork 3.4 STAIR 3.4.1 FORMWORK The angle of flight, dimensions of thread and riser are properly checked. Usually while constructing a stairs attached to wall, the line of flight, thread and risers are marked on the wall for proper fixing of shuttering or formwork. Supports have been provided with the help of props. 3.4.2 REINFORCEMENT The concrete steps are to be reinforced with steel bars so as it carries the loads coming upon the stairs and transfer them to the ground. These steel reinforcement bars are placed in the formwork with minimum of 25 mm spacing and are tied together.
  • 40. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 26 BMCET 3.4.3 POURING OF CONCRETE The concrete mix plays an important role in strength and durability of stairs. The concrete mix is designed by the structural engineer based on the strength, durability and other requirements. It is recommended to use a concrete vibrator while pouring the concrete to completely fill the gaps of the stairs and to avoid the honeycomb formation. Figure 3.15 Stairs construction
  • 41. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 27 BMCET 3.5 BEAM Construction of RCC beam involves following stages of work: 1. Formwork - To sustain concrete properly, formwork or centering and shuttering is necessary. Figure 3.16 Formwork of beam using plywood 2. Bending, binding and placing of steel bars - For making design of the slab, it is supposed that the concrete contains sound compressive strength but it is poor in tensile strength. To make the structure secure against the tensile stress, the steel bars are arranged. Steel bars cut with the help of cutting machine into required length and stirrups were made manually and then beams were casted as per given drawing and specifications. Figure 3.17 Reinforcement cutting machine
  • 42. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 28 BMCET Figure 3.18 Placing of reinforcement 3.6 SLAB
  • 43. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 29 BMCET Construction of RCC slab involves following stages of work -  Assemble and Erect Formwork  Prepare and Place Reinforcement  Pour, Compact and Finish Concrete  Curing Concrete and Remove Formwork 1. Assemble and Erect Formwork - The formwork shall be designed to withstand construction loads such as fresh concrete pressure and weight of workers and operators and their machines. Figure 3.19 Shuttering of slab 1. Prepare and place reinforcement - Design drawings provides necessary reinforcement details, so it only needs understanding to use designated bar size, cutting required length, and make necessary hooks and bents. After preparation is completed, steel bars are placed into their positions with the provision of specified spacing and concrete cover. The concrete cover and spacing for floor slabs can be maintained by introducing spacers and bars supporters. Wires are used to tie main reinforcement and shrinkage and temperature reinforcement (distribution reinforcement).
  • 44. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 30 BMCET Figure 3.20 Bending and placing of reinforcement 2. Pour, compact and finish concrete - Mixing, transporting, and handling of concrete shall be properly coordinated with placing and finishing works. In floor slab, begin concrete placing along the perimeter at one end of the work with each batch placed against previously dispatched concrete. Concrete should be deposited at, or as close as possible to, it’s final position in order to prevent segregation. Fresh concrete should be compacted adequately in order to mold it within the forms and around embedded items and reinforcement and to eliminate stone pockets, honeycomb, and entrapped
  • 45. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 31 BMCET air. Vibration, either internal or external, is the most widely used method for consolidating concrete. Lastly, slabs could be finished in many ways based on floor application. 3. Curing concrete and remove formwork - After finishing ended, suitable technique shall be used to cure the concrete adequately. Slab curing methods such as  Water curing a. Immersion b. Spraying c. Ponding d. Wet covering  Membrane curing  Application of heat  Miscellaneous Removal of form depends upon grade of concrete, type of member, weather conditions, winds, strength attained; type of cement etc. forms shall not be struck until the concrete reaches strength at twice the stress to which the concrete may be subjected at the time of removal of formwork. It is recommended to remove formwork of slab after 7 days of concreting. Figure 3.21 Curing of slab by ponding method Figure 3.22 Removal of slab formwork
  • 46. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 32 BMCET CHAPTER 4 MATERIALS AND EQUIPMENTS 4.1 MATERIALS
  • 47. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 33 BMCET 4.1.1 CEMENT Cement is a finely milled mineral powder, usually grey in colour. The most important raw materials for the production of cement are limestone, clay and marl. Mixed with water served as an adhesive to bind sand, gravel and hard rock in concrete. Cement hardens both in the air and under water and remains in its hardened state once reached. Cements are classified according to their early and final strength as well as their composition. In addition to cements that consists of 100% clinker, there are so called composite cements, in which a portion of the clinker is replaced by alternative raw materials, such as flu ash, ground slag or limestone. As the production of clinker is energy-intensive and releases large amount of CO2, the use of alternative raw materials can conserve natural resources and reduce CO2 emissions. Figure 4.1 Cement 4.1.2 AGGREGATES Aggregates are inert granular materials such as sand, gravel, or crushed stone that, along with Water and Portland cement, are an essential ingredient in concrete. For a good concrete mix, aggregates need to be clean, hard, strong particles free of absorbed chemicals or coatings of clay and other fine materials that could cause the deterioration of concrete. Aggregates, which account for 60 to 75 percent of the total volume of concrete, are divided into two distinct categories--fine and coarse. Fine aggregates generally consist of natural sand or crushed stone with most particles passing through a 3/8-inch sieve. Coarse aggregates are any particles greater than 0.19 inch, but generally range between 3/8 and 1.5 inches in diameter. Gravels constitute the majority of coarse aggregate used in concrete with crushed stone making up most of the remainder.
  • 48. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 34 BMCET Figure 4.3 Coarse aggregate 4.1.3 BRICKS Bricks consist of fired ceramic, clay, or cement materials that are cut into specific shapes, such as a rectangle, and used for building walls or furnaces or for paving surfaces. Bricks vary in material makeup, size, and shape and include products for specific applications, such as firebricks or refractory bricks, acid bricks for flooring, and bricks for masonry applications. Fly ash bricks are just as strong as traditional clay bricks, but they may contain small amounts of pollutants such as heavy metals. Figure 4.2 Fine aggregate
  • 49. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 35 BMCET 4.1.4 REINFORCEMENT Reinforcing bars add tensile strength and stiffness to concrete and make up 44% of steel use in buildings. Steel is used because it binds well to concrete, has a similar thermal expansion coefficient and is strong and relatively cost-effective. Reinforced concrete is also used to provide deep foundations and basements and is currently the world’s primary building material. It is reusable and endlessly recyclable, earthquake resistant due to ductility, flexible in combination with other materials. 4.1.5 WATER Water is one of the most important elements in construction and is required for the preparation of mortar, mixing of cement concrete and for curing work etc. The quality of water used has a direct impact on the strength of the motor and cement concrete in the construction work. The water used for curing and mixing must be free from high quantities of alkalis, acid, oils, salt, sugar, organic materials, vegetable growth, etc that might be deleterious to bricks, concrete or iron. Impurities in water can cause metal corrosion, introduce unwanted silt and clay into the concrete, adversely affect the hardening process of concrete and also reduce the strength by even 25%. Thus the need to ensure the quality of water used during construction is vital. Figure 4.4 Bricks
  • 50. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 36 BMCET 4.2 EQUIPMENTS USED AT CONSTRUCTION SITE 4.2.1 CONCRETE MIXER It is used to mix the ingredient of concrete. It consist a hollow cylindrical part with inner side wings in which cement, sand, aggregates and water is mix properly. For smaller volume works, portable concrete mixers are often used so that the concrete can be made at the construction site, giving the workers ample time to use the concrete before it hardens. Figure 4.5 Concrete mixer 4.2.2 COMAPCTORS After the transporting of concrete, it is in the loose structure. So for the better strength of the concrete we used dense concrete for construction work. If the concrete is not dense and permeable, it will not be watertight. It will be less able to withstand aggressive liquids. Moisture and air are more likely to penetrate to the reinforcement causing it to rust. So compaction after placing of concrete is necessary. Hence, it must be compacted to remove air bubbles and voids which are present in the concrete and gain strength. There are two methods of compaction 1. Manual compaction  Roding  Ramming  Tamping 2. Mechanical compaction  Internal vibrator
  • 51. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 37 BMCET  External vibrator  Formwork vibrator  Table vibrator  Platform vibrator  Needle vibrator  Surface vibrator Figure 4.6 Needle vibrator 4.2.3 CUTTING MACHINE Figure 4.7 Bars cutter Figure 4.8 Wood cutter
  • 52. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 38 BMCET CHAPTER 5 COCLUDING REMARKS 5.1 CONCLUSION As an undergraduate of Gujarat Technological University, we would like to say this summer internship training program is an excellent opportunity for us to get to ground level and experience the things that we wouldn’t ever gained through going straight into a job. We are grateful to our college CKPCET and GTU for giving us this wonderful opportunity. The main objective of the summer internship is to provide an opportunity to undergraduate to identify, observe and practice how civil engineering is applicable on real site it isn’t only limited to get experience on technical practices, but also to observe management practices and to interact with the field workers. Overall during this internship I got to learn about various things and aspects, which wouldn’t possible in theory.
  • 53. 190063106012 A Summer Internship At “VDG” Gujarat Technological University 39 BMCET References Building Construction by B.C. Punmia, Ashok Kumar Jain, Arun Kumar Jain Concrete technology, theory and practice by M. S. Shetty IS 456: 2000 Plain and Reinforced Concrete – Code of Practice Training Schedule TRAINING SCHEDULE Duration (Day) Work 1 Mansory work 2-3 Column reinforcement and shuttering 4 Column concreting 5-6 Column curing, Stairs shuttering and reinforcement 7 Removal of column formwork and Stairs concreting 8-10 Stairs curing, beam and slab shuttering 11-12 Beam and slab reinforcement 13-14 Beam and slab Concreting 15 Beam and slab Curing