SlideShare a Scribd company logo
1 of 7
Download to read offline
www.pulse-monitoring.com
Real-Time Drilling
Riser Monitoring
Systems (DRMS) –
For Operators
April 2015
www.pulse-monitoring.com
Industry Issues Faced by Operators
Real-Time DRMS for Operators
Wellhead & Conductor Integrity
•Wellhead and conductor system
subjected to cyclic lateral loads
from drilling riser and vessel
motions driven by environmental
conditions
•Fatigue damage generally
accumulates in “fatigue hotspots”
Implications
•Not having real-time data on
fatigue life consumption to allow
proactive actions to be taken can
lead to allowable damage being
used up too quickly thus causing
well abandonment and loss of
CAPEX
Operating Windows
•Drilling operations confined by
critical parameters such as Flex
Joint Angles, Telescopic Joint
Stroke, Tension, & BOP Motion
•Without real-time data proactive
measures cannot be taken
Implications
•When operating windows are
exceeded this causes
uncertainties regarding asset
integrity bringing a greater
likelihood of operational HSE
issues and Non-Profitable Time
Extreme Weather Events
•Environmental conditions can
slow or halt operations due to
uncertainty of effects on
equipment
•Loop Currents have been a
major cause of concern for our
clients
Implications
•Lack of real time data and/or KPI
traffic light system from a DRMS
leads to major Non-Profitable
Time (NPT) and Invisible Lost
Time (ILT) thus diminishing
shareholder value and ROI
www.pulse-monitoring.com
Typical Real-Time DRMS System for Wellhead Fatigue
Real-Time DRMS for Operators
Wireless or
Hardwired
communicationReal-time KPI’s ensure safe
and efficient drilling ops.
*Optional
*Optional
*Optional
*Optional
*Optional
*Required
(min. 3)
*Required
Wellhead and Conductor
fatigue life accumulation is
tracked for the life of field.
Track Riser,
LMRP, & BOP
Fatigue
Accumulation
www.pulse-monitoring.com
Situation Awareness through Real-Time Data and KPI’s
Real-Time DRMS for Operators
Real-Time Instrumentation Data Feed
• Allows an overall view of the system
structural response
• Allows trends and anomalies to be
visualized
• Data is stored and can be transmitted
to base
Real-Time KPI’s
• Pre-analysis of well, vessel, and
equipment performance specifications
are fed into software to enable
customized traffic light KPI indicators
• Rig crew can easily know when
something is wrong and proper risk
mitigation measures can be taken
www.pulse-monitoring.com
Increasing ROI by Reducing Non-Profitable Time (NPT)
Real-Time DRMS for Operators
Deepwater Well Costs vs. Real-Time DRMS
•Average deepwater rig costs are $500k/day*
•Real-Time DRMS have a per rig annualized cost of $400k
– $1 million per year to operate depending on complexity.
•Typical payback for the DRMS is achieved by saving as
few as 1 day of rig time.
Case Study
•Client without a real-time DRMS came to us in the midst
of high loop current events in which they shut down rig
ops and needed measured wellhead fatigue data to
resume operations or disconnect.
•We were only able to instrument the Telescopic Joint (TJ)
and could not deploy sensors subsea to gather measured
BOP motion data due to the high currents.
•The rig had 10+ days of NPT due to relying on overly
conservative analysis prior to our arrival. Actual time
saved was 4 days after analysis of our measured TJ data.
•If the Client had a real-time DRMS they could have known
the actual fatigue within minutes and resumed operations
based on further analysis. -150%
-100%
-50%
0%
50%
100%
150%
200%
250%
300%
350%
1 24 47 70 93
Rig Time Saved (Hours)
REAL TIME DRMS - RETURN
ON INVESTMENT
Payback achieved
with <1 day of rig
time saved.
* RigLogix April 2015
www.pulse-monitoring.com
Summary of Business Case for Real-Time DRMS
Real-Time DRMS for Operators
Business Objectives No Real-Time Monitoring
With DrillASSURE™ Real-Time
DRMS
Reduce Cost Per Well Drilled /
Decrease Number Of Days To Drill A
Well
Mitigation measures are REACTIVE
and often leads to NPT when
operation stops to assess situation
and perform analysis. Ex. “Loop
Currents”
Allows a PROACTIVE response to
integrity issues. KPI indicators give
quick visual “Go-No Go” to Rig Ops
Team.
No Harm To Environment, Personnel,
Or Company Reputation
No real time feedback to proactively
prevent an undesirable event such as
wellhead, riser, or conductor failure.
Real-Time feedback can be used to
proactively detect and mitigate
undesirable events. Helps to address
any regulatory scrutiny by showing
due diligence.
Asset Life Extension
No insight into wellhead fatigue life
utilization and risk/uncertainty
increases as asset ages.
Historical record of wellhead integrity
can be captured over its life cycle.
This can result in asset life
optimization and maximum return on
investment.
Every hour saved on an offshore operation is a savings of $20,000 to $50,000 per hour.
www.pulse-monitoring.com
Real-Time DRMS for Operators
Contact Us
Joey Rodriguez
Business Development Manager
D: +1 713-422-2670
M: +1 281-944-5763
joey.rodriguez@pulse-monitoring.com
http://www.pulse-monitoring.com
Questions?

More Related Content

What's hot

D4 Combining Scada data and Lidar to recitfy under performance
D4 Combining Scada data and Lidar to recitfy under performanceD4 Combining Scada data and Lidar to recitfy under performance
D4 Combining Scada data and Lidar to recitfy under performance
Kelly Dallas, MBA
 
Automation of the Drilling System: What has been done, what is being done, an...
Automation of the Drilling System: What has been done, what is being done, an...Automation of the Drilling System: What has been done, what is being done, an...
Automation of the Drilling System: What has been done, what is being done, an...
Society of Petroleum Engineers
 

What's hot (20)

EESS 2018 Day 2 - Owen Barry
EESS 2018 Day 2 - Owen BarryEESS 2018 Day 2 - Owen Barry
EESS 2018 Day 2 - Owen Barry
 
Western Iowa Tech Community College Fluke Connect Student Contest Presentation
Western Iowa Tech Community College Fluke Connect Student Contest PresentationWestern Iowa Tech Community College Fluke Connect Student Contest Presentation
Western Iowa Tech Community College Fluke Connect Student Contest Presentation
 
AlLERT Life Cycle Sustainment.
AlLERT Life Cycle Sustainment.AlLERT Life Cycle Sustainment.
AlLERT Life Cycle Sustainment.
 
Vibration Analysis
Vibration AnalysisVibration Analysis
Vibration Analysis
 
EESS 2018 Day 1 - Tim Webster
EESS 2018 Day 1 - Tim WebsterEESS 2018 Day 1 - Tim Webster
EESS 2018 Day 1 - Tim Webster
 
Fluke contest entry
Fluke contest entryFluke contest entry
Fluke contest entry
 
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
Sensors Expo 2013: Condition Based Maintenance, Evigia SystemsSensors Expo 2013: Condition Based Maintenance, Evigia Systems
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
 
Implementation of Integrated Condition Based Maintenance
Implementation of Integrated Condition Based MaintenanceImplementation of Integrated Condition Based Maintenance
Implementation of Integrated Condition Based Maintenance
 
Climatik English Presentation
Climatik English PresentationClimatik English Presentation
Climatik English Presentation
 
EESS 2018 Day 2 - Brad Gradwell
EESS 2018 Day 2 - Brad GradwellEESS 2018 Day 2 - Brad Gradwell
EESS 2018 Day 2 - Brad Gradwell
 
D4 Combining Scada data and Lidar to recitfy under performance
D4 Combining Scada data and Lidar to recitfy under performanceD4 Combining Scada data and Lidar to recitfy under performance
D4 Combining Scada data and Lidar to recitfy under performance
 
General Pulse Structural Monitoring
General Pulse Structural MonitoringGeneral Pulse Structural Monitoring
General Pulse Structural Monitoring
 
SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...
SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...
SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...
 
EESS 2018 Day 2 - Bipin Parmar
EESS 2018 Day 2 - Bipin ParmarEESS 2018 Day 2 - Bipin Parmar
EESS 2018 Day 2 - Bipin Parmar
 
Automation of the Drilling System: What has been done, what is being done, an...
Automation of the Drilling System: What has been done, what is being done, an...Automation of the Drilling System: What has been done, what is being done, an...
Automation of the Drilling System: What has been done, what is being done, an...
 
How to ensure peak performance in my Gas Chromatograph
How to ensure peak performance in my Gas ChromatographHow to ensure peak performance in my Gas Chromatograph
How to ensure peak performance in my Gas Chromatograph
 
Dropped Objects (DROPS) Prevention
Dropped Objects (DROPS) PreventionDropped Objects (DROPS) Prevention
Dropped Objects (DROPS) Prevention
 
fpl resume
fpl resumefpl resume
fpl resume
 
The top 3 reasons to consider tdls
The top 3 reasons to consider tdlsThe top 3 reasons to consider tdls
The top 3 reasons to consider tdls
 
Understanding Transmitter Seals Webinar
Understanding Transmitter Seals WebinarUnderstanding Transmitter Seals Webinar
Understanding Transmitter Seals Webinar
 

Viewers also liked

FPSO Dynamic positioning
FPSO Dynamic positioningFPSO Dynamic positioning
FPSO Dynamic positioning
Sevilay Can
 
Breeching Inlet
Breeching InletBreeching Inlet
Breeching Inlet
bansalash
 

Viewers also liked (20)

FPSO: Perspectives from the equity market
FPSO: Perspectives from the equity marketFPSO: Perspectives from the equity market
FPSO: Perspectives from the equity market
 
FlexIQ - Executive Summary
FlexIQ - Executive Summary FlexIQ - Executive Summary
FlexIQ - Executive Summary
 
Computational fluid dynamics in water waste treatment plants
 Computational fluid dynamics in water waste treatment plants Computational fluid dynamics in water waste treatment plants
Computational fluid dynamics in water waste treatment plants
 
Gating and riser in casting
Gating  and riser in castingGating  and riser in casting
Gating and riser in casting
 
MCS Presentation
MCS PresentationMCS Presentation
MCS Presentation
 
FPSO Dynamic positioning
FPSO Dynamic positioningFPSO Dynamic positioning
FPSO Dynamic positioning
 
Rational Design of FPSO Hulls
Rational Design of FPSO Hulls Rational Design of FPSO Hulls
Rational Design of FPSO Hulls
 
SUC Brasil 2012 : Coupled Dynamic Analysis FPSO / Mooring / Risers
SUC Brasil 2012 : Coupled Dynamic Analysis FPSO / Mooring / RisersSUC Brasil 2012 : Coupled Dynamic Analysis FPSO / Mooring / Risers
SUC Brasil 2012 : Coupled Dynamic Analysis FPSO / Mooring / Risers
 
Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...
 
Offshore operation
Offshore operationOffshore operation
Offshore operation
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems
 
Computational fluid dynamics
Computational fluid dynamicsComputational fluid dynamics
Computational fluid dynamics
 
Breeching Inlet
Breeching InletBreeching Inlet
Breeching Inlet
 
Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildings
 
Floting Production Storage and Offloading
Floting Production Storage  and OffloadingFloting Production Storage  and Offloading
Floting Production Storage and Offloading
 
Dry riser system
Dry riser systemDry riser system
Dry riser system
 
Materials used in ship building
Materials used in ship building  Materials used in ship building
Materials used in ship building
 
Ship survey presentation
Ship survey presentationShip survey presentation
Ship survey presentation
 
Finite Element Methode (FEM) Notes
Finite Element Methode (FEM) NotesFinite Element Methode (FEM) Notes
Finite Element Methode (FEM) Notes
 
Offshore structures
Offshore structuresOffshore structures
Offshore structures
 

Similar to Wellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case Study

USING NEAR-REAL TIME MONITORING TO IMPROVE EQUIPMENT RELIABILITY
USING NEAR-REAL TIME MONITORING TO IMPROVE EQUIPMENT RELIABILITYUSING NEAR-REAL TIME MONITORING TO IMPROVE EQUIPMENT RELIABILITY
USING NEAR-REAL TIME MONITORING TO IMPROVE EQUIPMENT RELIABILITY
wle-ss
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
BhaveshShukla15
 

Similar to Wellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case Study (20)

USING NEAR-REAL TIME MONITORING TO IMPROVE EQUIPMENT RELIABILITY
USING NEAR-REAL TIME MONITORING TO IMPROVE EQUIPMENT RELIABILITYUSING NEAR-REAL TIME MONITORING TO IMPROVE EQUIPMENT RELIABILITY
USING NEAR-REAL TIME MONITORING TO IMPROVE EQUIPMENT RELIABILITY
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and Reliability
 
Cumulus overview
Cumulus overviewCumulus overview
Cumulus overview
 
PDO Predictive Analytics Share for the Annual Research Forum 2015
PDO Predictive Analytics Share for the Annual Research Forum 2015PDO Predictive Analytics Share for the Annual Research Forum 2015
PDO Predictive Analytics Share for the Annual Research Forum 2015
 
Unified Monitoring Webinar with Dustin Whittle
Unified Monitoring Webinar with Dustin WhittleUnified Monitoring Webinar with Dustin Whittle
Unified Monitoring Webinar with Dustin Whittle
 
Kloudq Conteknik presentation
Kloudq Conteknik presentationKloudq Conteknik presentation
Kloudq Conteknik presentation
 
Smart Manufacturing Suite for Power Industry
Smart Manufacturing Suite for Power IndustrySmart Manufacturing Suite for Power Industry
Smart Manufacturing Suite for Power Industry
 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)
 
PE230516_Flowserve_WC_presentation_FINAL.pdf
PE230516_Flowserve_WC_presentation_FINAL.pdfPE230516_Flowserve_WC_presentation_FINAL.pdf
PE230516_Flowserve_WC_presentation_FINAL.pdf
 
From Measurement to Insight: Putting DevOps Metrics To Work
From Measurement to Insight: Putting DevOps Metrics To WorkFrom Measurement to Insight: Putting DevOps Metrics To Work
From Measurement to Insight: Putting DevOps Metrics To Work
 
Feedback from 50 operators on digitalizing their business
Feedback from 50 operators on digitalizing their businessFeedback from 50 operators on digitalizing their business
Feedback from 50 operators on digitalizing their business
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
 
SysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentationSysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentation
 
Falkonry overview deck
Falkonry overview deckFalkonry overview deck
Falkonry overview deck
 
Process Wind Tunnel in Insurance
Process Wind Tunnel in InsuranceProcess Wind Tunnel in Insurance
Process Wind Tunnel in Insurance
 
Duke Energy - Case Study
Duke Energy - Case StudyDuke Energy - Case Study
Duke Energy - Case Study
 
Real time system
Real time systemReal time system
Real time system
 
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
 

Recently uploaded

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 

Recently uploaded (20)

Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 

Wellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case Study

  • 2. www.pulse-monitoring.com Industry Issues Faced by Operators Real-Time DRMS for Operators Wellhead & Conductor Integrity •Wellhead and conductor system subjected to cyclic lateral loads from drilling riser and vessel motions driven by environmental conditions •Fatigue damage generally accumulates in “fatigue hotspots” Implications •Not having real-time data on fatigue life consumption to allow proactive actions to be taken can lead to allowable damage being used up too quickly thus causing well abandonment and loss of CAPEX Operating Windows •Drilling operations confined by critical parameters such as Flex Joint Angles, Telescopic Joint Stroke, Tension, & BOP Motion •Without real-time data proactive measures cannot be taken Implications •When operating windows are exceeded this causes uncertainties regarding asset integrity bringing a greater likelihood of operational HSE issues and Non-Profitable Time Extreme Weather Events •Environmental conditions can slow or halt operations due to uncertainty of effects on equipment •Loop Currents have been a major cause of concern for our clients Implications •Lack of real time data and/or KPI traffic light system from a DRMS leads to major Non-Profitable Time (NPT) and Invisible Lost Time (ILT) thus diminishing shareholder value and ROI
  • 3. www.pulse-monitoring.com Typical Real-Time DRMS System for Wellhead Fatigue Real-Time DRMS for Operators Wireless or Hardwired communicationReal-time KPI’s ensure safe and efficient drilling ops. *Optional *Optional *Optional *Optional *Optional *Required (min. 3) *Required Wellhead and Conductor fatigue life accumulation is tracked for the life of field. Track Riser, LMRP, & BOP Fatigue Accumulation
  • 4. www.pulse-monitoring.com Situation Awareness through Real-Time Data and KPI’s Real-Time DRMS for Operators Real-Time Instrumentation Data Feed • Allows an overall view of the system structural response • Allows trends and anomalies to be visualized • Data is stored and can be transmitted to base Real-Time KPI’s • Pre-analysis of well, vessel, and equipment performance specifications are fed into software to enable customized traffic light KPI indicators • Rig crew can easily know when something is wrong and proper risk mitigation measures can be taken
  • 5. www.pulse-monitoring.com Increasing ROI by Reducing Non-Profitable Time (NPT) Real-Time DRMS for Operators Deepwater Well Costs vs. Real-Time DRMS •Average deepwater rig costs are $500k/day* •Real-Time DRMS have a per rig annualized cost of $400k – $1 million per year to operate depending on complexity. •Typical payback for the DRMS is achieved by saving as few as 1 day of rig time. Case Study •Client without a real-time DRMS came to us in the midst of high loop current events in which they shut down rig ops and needed measured wellhead fatigue data to resume operations or disconnect. •We were only able to instrument the Telescopic Joint (TJ) and could not deploy sensors subsea to gather measured BOP motion data due to the high currents. •The rig had 10+ days of NPT due to relying on overly conservative analysis prior to our arrival. Actual time saved was 4 days after analysis of our measured TJ data. •If the Client had a real-time DRMS they could have known the actual fatigue within minutes and resumed operations based on further analysis. -150% -100% -50% 0% 50% 100% 150% 200% 250% 300% 350% 1 24 47 70 93 Rig Time Saved (Hours) REAL TIME DRMS - RETURN ON INVESTMENT Payback achieved with <1 day of rig time saved. * RigLogix April 2015
  • 6. www.pulse-monitoring.com Summary of Business Case for Real-Time DRMS Real-Time DRMS for Operators Business Objectives No Real-Time Monitoring With DrillASSURE™ Real-Time DRMS Reduce Cost Per Well Drilled / Decrease Number Of Days To Drill A Well Mitigation measures are REACTIVE and often leads to NPT when operation stops to assess situation and perform analysis. Ex. “Loop Currents” Allows a PROACTIVE response to integrity issues. KPI indicators give quick visual “Go-No Go” to Rig Ops Team. No Harm To Environment, Personnel, Or Company Reputation No real time feedback to proactively prevent an undesirable event such as wellhead, riser, or conductor failure. Real-Time feedback can be used to proactively detect and mitigate undesirable events. Helps to address any regulatory scrutiny by showing due diligence. Asset Life Extension No insight into wellhead fatigue life utilization and risk/uncertainty increases as asset ages. Historical record of wellhead integrity can be captured over its life cycle. This can result in asset life optimization and maximum return on investment. Every hour saved on an offshore operation is a savings of $20,000 to $50,000 per hour.
  • 7. www.pulse-monitoring.com Real-Time DRMS for Operators Contact Us Joey Rodriguez Business Development Manager D: +1 713-422-2670 M: +1 281-944-5763 joey.rodriguez@pulse-monitoring.com http://www.pulse-monitoring.com Questions?