IMPLEMENTATION
OF
ICBMINTEGRATED CONDITION BASED MAINTENANCE
INTEGRATED RELIABILITY TECHNOLOGY
Integrated Condition Based Monitoring
ICBM is a multi-disciplined
predictive technique that
has proven to provide
accurate diagnostics
towards maintenance
optimization.
ICBM
Manual consolidation of equipment information into database.
Sorting the data by type of maintenance – RM, PM, PdM & On-line.
Determine types of technologies to be employed for baseline survey.
Develop a maintenance plan
Identify equipment exhibiting incipient faults during this initial phase.
Establish benchmark status for future trending.
Provide engineering report containing analysis & recommendations.
Provide corrective maintenance & trouble shooting where necessary.
INTEGRATED RELIABILITY TECHNOLOGY
INTEGRATED RELIABILITY TECHNOLOGY
Integrated Condition-Based Monitoring
1. Vibration Analysis
2. Infrared Thermography
3. Motor Current Analysis
4. Partial Discharge Analysis
5. Corrective Actions
INTEGRATED RELIABILITY TECHNOLOGY
Vibration Monitoring
• Cornerstone of any condition monitoring system for
rotating equipment
• Key equipment – Dedicated vibration monitoring
system
• Normal equipment – Portable vibration monitoring
• Baseline Monitoring and Benchmark
• Vibration Training
• Expert Diagnostics at-site & report
INTEGRATED RELIABILITY TECHNOLOGY
Vibration Monitoring – Report Summary
INTEGRATED RELIABILITY TECHNOLOGY
Vibration Monitoring – Report Summary
INTEGRATED RELIABILITY TECHNOLOGY
Vibration Monitoring – Maintenance Action
INTEGRATED RELIABILITY TECHNOLOGY
Infrared Thermography
• Cornerstone of any condition monitoring system for
electrical equipment & switchgears.
• Shore-based thermographers
• Avoid routine tightening of connections and joints
• Electrical, Mechanical and Insulation purposes
• Cross-check vibration diagnostics
INTEGRATED PREDICTIVE TECHNOLOGY
Integrated Condition Based Monitoring program is a tailored approach towards
a comprehensive predictive maintenance package for our customers’ critical assets
that requires detail observation for any change in equipment health.
Initial database of equipment data has to be established. A feasibility study has
to be conducted in order to formulate a detail roadmap for effective predictive
and proactive maintenance program. The following program is what we
formulate for customers who wish to start and establish in their organization.
INTEGRATED PREDICTIVE TECHNOLOGY

More Related Content

What's hot

Changes to nfpa 70 e standard for electrical safety
Changes to nfpa 70 e standard for electrical safetyChanges to nfpa 70 e standard for electrical safety
Changes to nfpa 70 e standard for electrical safetyvtsiri
 
Key Considerations for Scoping Reinstrumentation Projects
Key Considerations for Scoping Reinstrumentation ProjectsKey Considerations for Scoping Reinstrumentation Projects
Key Considerations for Scoping Reinstrumentation ProjectsYokogawa1
 
Wellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case Study
Wellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case StudyWellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case Study
Wellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case StudyPulse Structural Monitoring
 
Modal Analysis and Condition Monitoring
Modal Analysis and Condition MonitoringModal Analysis and Condition Monitoring
Modal Analysis and Condition MonitoringAbhishek Turamandi
 
VIV monitoring enhancing the safety of drilling operations in high current en...
VIV monitoring enhancing the safety of drilling operations in high current en...VIV monitoring enhancing the safety of drilling operations in high current en...
VIV monitoring enhancing the safety of drilling operations in high current en...Pulse Structural Monitoring
 
Western Iowa Tech Community College Fluke Connect Student Contest Presentation
Western Iowa Tech Community College Fluke Connect Student Contest PresentationWestern Iowa Tech Community College Fluke Connect Student Contest Presentation
Western Iowa Tech Community College Fluke Connect Student Contest Presentationflukecontests
 
A condition monitoring system
A condition monitoring systemA condition monitoring system
A condition monitoring systemprj_publication
 
Trailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearTrailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearMarty Stevenson
 
Understanding Transmitter Seals Webinar
Understanding Transmitter Seals WebinarUnderstanding Transmitter Seals Webinar
Understanding Transmitter Seals WebinarYokogawa1
 
SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...
SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...
SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...Emerson Exchange
 
Condition Based Monitoring Solution_Rockwell Automation
Condition Based Monitoring Solution_Rockwell Automation Condition Based Monitoring Solution_Rockwell Automation
Condition Based Monitoring Solution_Rockwell Automation Shawn Lim
 
Tim Jordan 2017 Gate
Tim Jordan 2017 GateTim Jordan 2017 Gate
Tim Jordan 2017 GateTim Jordan
 
Adeon R&D Projects
Adeon R&D ProjectsAdeon R&D Projects
Adeon R&D Projectsumutmuratgok
 
{76d7e191 801e-4032-8c0f-2e0e374a94fc} short-circuit_current_rating_wp033001_en
{76d7e191 801e-4032-8c0f-2e0e374a94fc} short-circuit_current_rating_wp033001_en{76d7e191 801e-4032-8c0f-2e0e374a94fc} short-circuit_current_rating_wp033001_en
{76d7e191 801e-4032-8c0f-2e0e374a94fc} short-circuit_current_rating_wp033001_enLuis Antonio González Mederos
 
Climatik English Presentation
Climatik English PresentationClimatik English Presentation
Climatik English Presentationiqmatv
 

What's hot (20)

Changes to nfpa 70 e standard for electrical safety
Changes to nfpa 70 e standard for electrical safetyChanges to nfpa 70 e standard for electrical safety
Changes to nfpa 70 e standard for electrical safety
 
Key Considerations for Scoping Reinstrumentation Projects
Key Considerations for Scoping Reinstrumentation ProjectsKey Considerations for Scoping Reinstrumentation Projects
Key Considerations for Scoping Reinstrumentation Projects
 
Moog Case Study
Moog Case StudyMoog Case Study
Moog Case Study
 
Wellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case Study
Wellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case StudyWellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case Study
Wellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case Study
 
Modal Analysis and Condition Monitoring
Modal Analysis and Condition MonitoringModal Analysis and Condition Monitoring
Modal Analysis and Condition Monitoring
 
VIV monitoring enhancing the safety of drilling operations in high current en...
VIV monitoring enhancing the safety of drilling operations in high current en...VIV monitoring enhancing the safety of drilling operations in high current en...
VIV monitoring enhancing the safety of drilling operations in high current en...
 
EESS 2018 Day 2 - Mark Spinks
EESS 2018 Day 2 - Mark SpinksEESS 2018 Day 2 - Mark Spinks
EESS 2018 Day 2 - Mark Spinks
 
Western Iowa Tech Community College Fluke Connect Student Contest Presentation
Western Iowa Tech Community College Fluke Connect Student Contest PresentationWestern Iowa Tech Community College Fluke Connect Student Contest Presentation
Western Iowa Tech Community College Fluke Connect Student Contest Presentation
 
A condition monitoring system
A condition monitoring systemA condition monitoring system
A condition monitoring system
 
Trailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearTrailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation Switchgear
 
Understanding Transmitter Seals Webinar
Understanding Transmitter Seals WebinarUnderstanding Transmitter Seals Webinar
Understanding Transmitter Seals Webinar
 
EESS 2018 Day 2 - Owen Barry
EESS 2018 Day 2 - Owen BarryEESS 2018 Day 2 - Owen Barry
EESS 2018 Day 2 - Owen Barry
 
SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...
SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...
SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...
 
Condition Based Monitoring Solution_Rockwell Automation
Condition Based Monitoring Solution_Rockwell Automation Condition Based Monitoring Solution_Rockwell Automation
Condition Based Monitoring Solution_Rockwell Automation
 
EESS 2018 Day 1 - Tim Gray
EESS 2018 Day 1 - Tim GrayEESS 2018 Day 1 - Tim Gray
EESS 2018 Day 1 - Tim Gray
 
Tim Jordan 2017 Gate
Tim Jordan 2017 GateTim Jordan 2017 Gate
Tim Jordan 2017 Gate
 
Adeon R&D Projects
Adeon R&D ProjectsAdeon R&D Projects
Adeon R&D Projects
 
Brochure bridges
Brochure bridgesBrochure bridges
Brochure bridges
 
{76d7e191 801e-4032-8c0f-2e0e374a94fc} short-circuit_current_rating_wp033001_en
{76d7e191 801e-4032-8c0f-2e0e374a94fc} short-circuit_current_rating_wp033001_en{76d7e191 801e-4032-8c0f-2e0e374a94fc} short-circuit_current_rating_wp033001_en
{76d7e191 801e-4032-8c0f-2e0e374a94fc} short-circuit_current_rating_wp033001_en
 
Climatik English Presentation
Climatik English PresentationClimatik English Presentation
Climatik English Presentation
 

Similar to Implementation of Integrated Condition Based Maintenance

Asset Insight Manager Introduction 2014 (2)
Asset Insight Manager Introduction 2014 (2)Asset Insight Manager Introduction 2014 (2)
Asset Insight Manager Introduction 2014 (2)Dean Bishop
 
F.O.Enemuoh (1).pdf
F.O.Enemuoh (1).pdfF.O.Enemuoh (1).pdf
F.O.Enemuoh (1).pdfBalaBalaji45
 
Importence of Vibration Transmitters.pptx
Importence of Vibration Transmitters.pptxImportence of Vibration Transmitters.pptx
Importence of Vibration Transmitters.pptxCentum Controls
 
Additional vibration analysis with accelerometer.pptx
Additional vibration analysis with accelerometer.pptxAdditional vibration analysis with accelerometer.pptx
Additional vibration analysis with accelerometer.pptxPrakashDuraisamyCIT
 
Automated Fault Analysis - IVPower for Transmission System Operators and Dist...
Automated Fault Analysis - IVPower for Transmission System Operators and Dist...Automated Fault Analysis - IVPower for Transmission System Operators and Dist...
Automated Fault Analysis - IVPower for Transmission System Operators and Dist...AFAS - Automated Fault Analysis NetCeler
 
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...Parker Hannifin Corporation
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenanceSHIVAJI CHOUDHURY
 
Csi 2130 machinery health analyzer
Csi 2130 machinery health analyzerCsi 2130 machinery health analyzer
Csi 2130 machinery health analyzerAhmed Gamal
 
Power-MI Overview
Power-MI OverviewPower-MI Overview
Power-MI OverviewInma Navia
 
Ifm efector octavis brochure England 2013
Ifm efector octavis brochure England 2013Ifm efector octavis brochure England 2013
Ifm efector octavis brochure England 2013ifm electronic gmbh
 
Plant Maintenance & Condition Monitoring
Plant Maintenance & Condition MonitoringPlant Maintenance & Condition Monitoring
Plant Maintenance & Condition MonitoringElena Maria Vaccher
 
TCMS Presentation (Train Control & Monitoring Systems)
TCMS Presentation (Train Control & Monitoring Systems)TCMS Presentation (Train Control & Monitoring Systems)
TCMS Presentation (Train Control & Monitoring Systems)Ingeteam Automation Devices
 

Similar to Implementation of Integrated Condition Based Maintenance (20)

Asset Insight Manager Introduction 2014 (2)
Asset Insight Manager Introduction 2014 (2)Asset Insight Manager Introduction 2014 (2)
Asset Insight Manager Introduction 2014 (2)
 
F.O.Enemuoh (1).pdf
F.O.Enemuoh (1).pdfF.O.Enemuoh (1).pdf
F.O.Enemuoh (1).pdf
 
Condition monitoring
Condition monitoringCondition monitoring
Condition monitoring
 
Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenance
 
Vibration monitoring
Vibration monitoringVibration monitoring
Vibration monitoring
 
Power grid monitoring solution
Power grid monitoring solutionPower grid monitoring solution
Power grid monitoring solution
 
Importence of Vibration Transmitters.pptx
Importence of Vibration Transmitters.pptxImportence of Vibration Transmitters.pptx
Importence of Vibration Transmitters.pptx
 
Additional vibration analysis with accelerometer.pptx
Additional vibration analysis with accelerometer.pptxAdditional vibration analysis with accelerometer.pptx
Additional vibration analysis with accelerometer.pptx
 
Automated Fault Analysis - IVPower for Transmission System Operators and Dist...
Automated Fault Analysis - IVPower for Transmission System Operators and Dist...Automated Fault Analysis - IVPower for Transmission System Operators and Dist...
Automated Fault Analysis - IVPower for Transmission System Operators and Dist...
 
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
 
SitrackVibes - Hydro
SitrackVibes - HydroSitrackVibes - Hydro
SitrackVibes - Hydro
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
 
Csi 2130 machinery health analyzer
Csi 2130 machinery health analyzerCsi 2130 machinery health analyzer
Csi 2130 machinery health analyzer
 
Condition monitoring part 1
Condition monitoring part 1Condition monitoring part 1
Condition monitoring part 1
 
Power-MI Overview
Power-MI OverviewPower-MI Overview
Power-MI Overview
 
Ifm efector octavis brochure England 2013
Ifm efector octavis brochure England 2013Ifm efector octavis brochure England 2013
Ifm efector octavis brochure England 2013
 
Plant Maintenance & Condition Monitoring
Plant Maintenance & Condition MonitoringPlant Maintenance & Condition Monitoring
Plant Maintenance & Condition Monitoring
 
TCMS Presentation (Train Control & Monitoring Systems)
TCMS Presentation (Train Control & Monitoring Systems)TCMS Presentation (Train Control & Monitoring Systems)
TCMS Presentation (Train Control & Monitoring Systems)
 
Vibration monitoring
Vibration monitoringVibration monitoring
Vibration monitoring
 
J046015861
J046015861J046015861
J046015861
 

Recently uploaded

College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Implementation of Integrated Condition Based Maintenance

  • 2. INTEGRATED RELIABILITY TECHNOLOGY Integrated Condition Based Monitoring ICBM is a multi-disciplined predictive technique that has proven to provide accurate diagnostics towards maintenance optimization.
  • 3. ICBM Manual consolidation of equipment information into database. Sorting the data by type of maintenance – RM, PM, PdM & On-line. Determine types of technologies to be employed for baseline survey. Develop a maintenance plan Identify equipment exhibiting incipient faults during this initial phase. Establish benchmark status for future trending. Provide engineering report containing analysis & recommendations. Provide corrective maintenance & trouble shooting where necessary. INTEGRATED RELIABILITY TECHNOLOGY
  • 4. INTEGRATED RELIABILITY TECHNOLOGY Integrated Condition-Based Monitoring 1. Vibration Analysis 2. Infrared Thermography 3. Motor Current Analysis 4. Partial Discharge Analysis 5. Corrective Actions
  • 5. INTEGRATED RELIABILITY TECHNOLOGY Vibration Monitoring • Cornerstone of any condition monitoring system for rotating equipment • Key equipment – Dedicated vibration monitoring system • Normal equipment – Portable vibration monitoring • Baseline Monitoring and Benchmark • Vibration Training • Expert Diagnostics at-site & report
  • 6. INTEGRATED RELIABILITY TECHNOLOGY Vibration Monitoring – Report Summary
  • 7. INTEGRATED RELIABILITY TECHNOLOGY Vibration Monitoring – Report Summary
  • 8. INTEGRATED RELIABILITY TECHNOLOGY Vibration Monitoring – Maintenance Action
  • 9. INTEGRATED RELIABILITY TECHNOLOGY Infrared Thermography • Cornerstone of any condition monitoring system for electrical equipment & switchgears. • Shore-based thermographers • Avoid routine tightening of connections and joints • Electrical, Mechanical and Insulation purposes • Cross-check vibration diagnostics
  • 10. INTEGRATED PREDICTIVE TECHNOLOGY Integrated Condition Based Monitoring program is a tailored approach towards a comprehensive predictive maintenance package for our customers’ critical assets that requires detail observation for any change in equipment health. Initial database of equipment data has to be established. A feasibility study has to be conducted in order to formulate a detail roadmap for effective predictive and proactive maintenance program. The following program is what we formulate for customers who wish to start and establish in their organization.