SlideShare a Scribd company logo
1 of 3
Download to read offline
P r i o d e e p C h o w d h u r y , L e c t u r e r , D e p t . o f C E E , U t t a r a U n i v e r s i t y . / /P r i o d e e p C h o w d h u r y , L e c t u r e r , D e p t . o f C E E , U t t a r a U n i v e r s i t y . / /
F l o o d M i t i g a t i o nF l o o d M i t i g a t i o n & M a n a g e m e n t .& M a n a g e m e n t .
LLL EEE VVV AAA TTT III NNN GGG AAA SSS TTT RRR UUU CCC TTT UUU RRR EEE
CCC HHH AAA PPP TTT EEE RRR 05i05i05i
EElleevvaattiioonn involves raising a building in place so that the finished living
space is located above the anticipated height of flood waters. The building is
separated from its foundation, lifted with hydraulic jacks, and placed on a new or
extended foundation. The building can be elevated on solid perimeter foundation
walls, fill, or an open foundation system that supports the structure at key points.
AA pp pp ll iicc aa bbii llii ttyy
Almost any structurally-sound building can be elevated.
FFLLOOOODD HHAAZZAARRDD:: Building elevation is practical for almost any flood
situation. The flooding conditions must be taken into account to select an
elevation technique that will withstand the expected water depths, velocities,
debris impacts, and scour (as well as other hazards).
BBUUIILLDDIINNGG CCOONNDDIITTIIOONN:: A building must be in sound structural condition in
order to be elevated. Lighter wood-frame structures are easier and often cheaper to
raise than masonry. In addition to being more expensive to elevate, masonry
structures are also susceptible to cracks.
Multistory houses are more difficult to stabilize during the lifting process. It
may be necessary to lift attached garages, porches, wings, or additions separately,
especially if they are built on separate foundations.
SSUUBBSSTTAANNTTIIAALL DDAAMMAAGGEE//IIMMPPRROOVVEEMMEENNTT:: If the cost of repairs or
improvements to a floodplain structure exceeds 50% of the market value of the
building before the damage or improvement, then the entire structure must be
brought up to current floodplain development standards. Elevation is generally the
most feasible technique for achieving compliance.
AACCCCEESSSS:: New staircases, elevators, or ramps are generally required to
provide access. Functional and attractive solutions can usually be developed.
When an attached garage is elevated, an elevated driveway is needed for access.
When the amount of elevation reaches 4 or more feet, consider elevating the
building a full story so that the lower level can be used for parking.
EE
P r i o d e e p C h o w d h u r y , L e c t u r e r , D e p t . o f C E E , U t t a r a U n i v e r s i t y . / /P r i o d e e p C h o w d h u r y , L e c t u r e r , D e p t . o f C E E , U t t a r a U n i v e r s i t y . / /
F l o o d M i t i g a t i o nF l o o d M i t i g a t i o n & M a n a g e m e n t .& M a n a g e m e n t .
CCOOSSTTSS:: The cost to lift the building on steel beams and extend or replace the
foundation will depend on the size of the structure, type of construction, and
amount of elevation. Additional project costs include: disconnection/reconnection
of utility lines, elevation of service equipment, temporary housing during
construction, and removing/storing belongings. Additional expenditures may be
required to bring the building into compliance with building codes. If the structure
has been substantially damaged by flooding, part of the cost may be eligible for
Increased Cost of Compliance flood insurance coverage.
FFIGIG--1:1: OONN GGOINGOING SSTRUCTURETRUCTURE EELEVATIONLEVATION WWORKORK..
EE LL EE VV AA TT II OO NN TT EE CC HH NN II QQ UU EE SS
A key decision is the type of foundation on which the building will be
elevated.
Extended foundation walls: In areas of low to moderate water depth and
velocity, the current foundation can be extended vertically and the structure set
down on the extended walls. Flood vents must be installed in the foundation walls
to allow water to enter and exit the structure, which protects the walls from
collapse. New and larger footings may be needed. It may also be necessary to
reinforce both the footings and the walls using steel reinforcing bars to provide
structural stability.
Abandoning the lower enclosed area: An alternative for a masonry
building on a slab-on-grade foundation is to abandon the existing lower enclosed
area and convert it to a flood-prone area below the first floor that is used only for
parking, storage, and building access. An existing upper floor can be used for
living space. For a one-story building, the roof and roof framing can be removed to
build a new second story living area.
P r i o d e e p C h o w d h u r y , L e c t u r e r , D e p t . o f C E E , U t t a r a U n i v e r s i t y . / /P r i o d e e p C h o w d h u r y , L e c t u r e r , D e p t . o f C E E , U t t a r a U n i v e r s i t y . / /
F l o o d M i t i g a t i o nF l o o d M i t i g a t i o n & M a n a g e m e n t .& M a n a g e m e n t .
Fill: In order to elevate an existing building on fill, the structure must be
temporarily relocated while fill is brought in and compacted.
Open foundation: Elevating a building on an open foundation involves
raising it onto piers, posts (columns), or piles and allowing water to flow beneath
the building. The foundation type depends on the flood and site characteristics.
Piers are designed primarily for vertical loading and are thus most appropriate for
shallow depth and low velocity flood conditions where they will not be subjected
to significant horizontal forces. Posts and columns are generally cross braced for
added stability and can be used when the anticipated flood conditions involve
moderate depths and velocities. Piles (which are driven or jetted deep into the
ground) are less susceptible to the effects of high-velocity floodwaters, scouring,
and debris impact and are often used to elevate coastal buildings.
AA DD VV AA NN TT AA GG EE SS AA NN DD DD II SS AA DD VV AA NN TT AA GG EE SS OO FF EE LL EE VV AA TT II OO NN

More Related Content

What's hot

Spillways & energy dissipator
Spillways & energy dissipatorSpillways & energy dissipator
Spillways & energy dissipatorSAGAR RAUT
 
Report of Project spillways (1)
Report of Project spillways (1)Report of Project spillways (1)
Report of Project spillways (1)Pawan Singh
 
Elements of dam engineering
Elements of dam engineeringElements of dam engineering
Elements of dam engineeringchala hailu
 
Spillway and its types
Spillway and its typesSpillway and its types
Spillway and its typesBilal Mirani
 
Chapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examplesChapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examplesMohsin Siddique
 
Hydraulic Structures
Hydraulic StructuresHydraulic Structures
Hydraulic StructuresPilar Torres
 
Hydraulic structures pdf
Hydraulic structures pdfHydraulic structures pdf
Hydraulic structures pdfSaqib Imran
 
Spillway and gates
Spillway and gatesSpillway and gates
Spillway and gatesholegajendra
 
Design of stilling basin and roughness devices
Design of stilling basin and roughness devices Design of stilling basin and roughness devices
Design of stilling basin and roughness devices Bilal Mirani
 
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
Ce154   lecture 3 reservoirs, spillways, & energy dissipatorsCe154   lecture 3 reservoirs, spillways, & energy dissipators
Ce154 lecture 3 reservoirs, spillways, & energy dissipatorsSudhir Jagtap
 
Flow diversion and storage
Flow diversion and storageFlow diversion and storage
Flow diversion and storageshaymaa17
 

What's hot (20)

Spillways & energy dissipator
Spillways & energy dissipatorSpillways & energy dissipator
Spillways & energy dissipator
 
Report of Project spillways (1)
Report of Project spillways (1)Report of Project spillways (1)
Report of Project spillways (1)
 
291 __0 (1)
291  __0 (1)291  __0 (1)
291 __0 (1)
 
Spillways
SpillwaysSpillways
Spillways
 
Elements of dam engineering
Elements of dam engineeringElements of dam engineering
Elements of dam engineering
 
Spillway and its types
Spillway and its typesSpillway and its types
Spillway and its types
 
Chapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examplesChapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examples
 
Spillways
SpillwaysSpillways
Spillways
 
Hydraulic Structures
Hydraulic StructuresHydraulic Structures
Hydraulic Structures
 
Hydraulic structures pdf
Hydraulic structures pdfHydraulic structures pdf
Hydraulic structures pdf
 
Spillways
SpillwaysSpillways
Spillways
 
Spillway and gates
Spillway and gatesSpillway and gates
Spillway and gates
 
Lecture 1 free overfall and ogee
Lecture 1 free overfall and ogeeLecture 1 free overfall and ogee
Lecture 1 free overfall and ogee
 
Hydropower
HydropowerHydropower
Hydropower
 
Design of stilling basin and roughness devices
Design of stilling basin and roughness devices Design of stilling basin and roughness devices
Design of stilling basin and roughness devices
 
SPILLWAYS
SPILLWAYSSPILLWAYS
SPILLWAYS
 
Flow diversion
Flow diversionFlow diversion
Flow diversion
 
Eg unit v
Eg unit vEg unit v
Eg unit v
 
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
Ce154   lecture 3 reservoirs, spillways, & energy dissipatorsCe154   lecture 3 reservoirs, spillways, & energy dissipators
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
 
Flow diversion and storage
Flow diversion and storageFlow diversion and storage
Flow diversion and storage
 

Viewers also liked

Joseph Duffy RESUME
Joseph Duffy RESUMEJoseph Duffy RESUME
Joseph Duffy RESUMEJoseph Duffy
 
Yo soy Gobierno Abierto - CICAP
Yo soy Gobierno Abierto - CICAPYo soy Gobierno Abierto - CICAP
Yo soy Gobierno Abierto - CICAPSusana Soto
 
Act7.Unidad1
Act7.Unidad1Act7.Unidad1
Act7.Unidad1iris nava
 
Press release for 7Nov2015__FINAL
Press release for 7Nov2015__FINALPress release for 7Nov2015__FINAL
Press release for 7Nov2015__FINALSam Smith
 
10 Busquedas Rapidas de Google
10 Busquedas Rapidas de Google10 Busquedas Rapidas de Google
10 Busquedas Rapidas de GoogleIsaias Sulvaran
 
The Banking Regulation Review - Poland - Chapter
The Banking Regulation Review - Poland - ChapterThe Banking Regulation Review - Poland - Chapter
The Banking Regulation Review - Poland - ChapterMedia SPCG
 
(DL hacks輪読) How to Train Deep Variational Autoencoders and Probabilistic Lad...
(DL hacks輪読) How to Train Deep Variational Autoencoders and Probabilistic Lad...(DL hacks輪読) How to Train Deep Variational Autoencoders and Probabilistic Lad...
(DL hacks輪読) How to Train Deep Variational Autoencoders and Probabilistic Lad...Masahiro Suzuki
 
Resume Of Sandip N Kulkarni
Resume Of Sandip N KulkarniResume Of Sandip N Kulkarni
Resume Of Sandip N KulkarniSandip Kulkarni
 
Tv production overview
Tv production overviewTv production overview
Tv production overviewMustak Ahmed
 
The Undateables presentation
The Undateables presentationThe Undateables presentation
The Undateables presentationMatt Hooper
 
EI Monthly Campaigns July-Sept 2015
EI Monthly Campaigns July-Sept 2015EI Monthly Campaigns July-Sept 2015
EI Monthly Campaigns July-Sept 2015Kristin Lauria
 
Medical health-benefits-of-strawberries
Medical health-benefits-of-strawberriesMedical health-benefits-of-strawberries
Medical health-benefits-of-strawberriesRaj Joshi
 

Viewers also liked (20)

Joseph Duffy RESUME
Joseph Duffy RESUMEJoseph Duffy RESUME
Joseph Duffy RESUME
 
CV Ronald Baric
CV Ronald BaricCV Ronald Baric
CV Ronald Baric
 
Yo soy Gobierno Abierto - CICAP
Yo soy Gobierno Abierto - CICAPYo soy Gobierno Abierto - CICAP
Yo soy Gobierno Abierto - CICAP
 
Act7.Unidad1
Act7.Unidad1Act7.Unidad1
Act7.Unidad1
 
Press release for 7Nov2015__FINAL
Press release for 7Nov2015__FINALPress release for 7Nov2015__FINAL
Press release for 7Nov2015__FINAL
 
La importancia de los nuevos pensamientos en el siglo XXI
La importancia de los nuevos pensamientos en el siglo XXILa importancia de los nuevos pensamientos en el siglo XXI
La importancia de los nuevos pensamientos en el siglo XXI
 
GranaryFuturePPT
GranaryFuturePPTGranaryFuturePPT
GranaryFuturePPT
 
En equipos
En equiposEn equipos
En equipos
 
10 Busquedas Rapidas de Google
10 Busquedas Rapidas de Google10 Busquedas Rapidas de Google
10 Busquedas Rapidas de Google
 
cisgenesis and intragenesis
cisgenesis and intragenesiscisgenesis and intragenesis
cisgenesis and intragenesis
 
The Banking Regulation Review - Poland - Chapter
The Banking Regulation Review - Poland - ChapterThe Banking Regulation Review - Poland - Chapter
The Banking Regulation Review - Poland - Chapter
 
TE Unidad 5 formas de estado
TE Unidad 5 formas de estadoTE Unidad 5 formas de estado
TE Unidad 5 formas de estado
 
Lecture earthquake-4
Lecture earthquake-4Lecture earthquake-4
Lecture earthquake-4
 
Transgenics
TransgenicsTransgenics
Transgenics
 
(DL hacks輪読) How to Train Deep Variational Autoencoders and Probabilistic Lad...
(DL hacks輪読) How to Train Deep Variational Autoencoders and Probabilistic Lad...(DL hacks輪読) How to Train Deep Variational Autoencoders and Probabilistic Lad...
(DL hacks輪読) How to Train Deep Variational Autoencoders and Probabilistic Lad...
 
Resume Of Sandip N Kulkarni
Resume Of Sandip N KulkarniResume Of Sandip N Kulkarni
Resume Of Sandip N Kulkarni
 
Tv production overview
Tv production overviewTv production overview
Tv production overview
 
The Undateables presentation
The Undateables presentationThe Undateables presentation
The Undateables presentation
 
EI Monthly Campaigns July-Sept 2015
EI Monthly Campaigns July-Sept 2015EI Monthly Campaigns July-Sept 2015
EI Monthly Campaigns July-Sept 2015
 
Medical health-benefits-of-strawberries
Medical health-benefits-of-strawberriesMedical health-benefits-of-strawberries
Medical health-benefits-of-strawberries
 

Similar to Elevating a structure

Structural flood control options
Structural flood control optionsStructural flood control options
Structural flood control optionsPriodeep Chowdhury
 
Multistorey building
Multistorey buildingMultistorey building
Multistorey buildingkrishna kanth
 
Advanced Type Civil Engineering Structures
Advanced Type  Civil Engineering StructuresAdvanced Type  Civil Engineering Structures
Advanced Type Civil Engineering StructuresMalay Talaviya
 
Chapter 4 design of hydropower plants.pdf
Chapter 4 design of hydropower plants.pdfChapter 4 design of hydropower plants.pdf
Chapter 4 design of hydropower plants.pdftameneaDemissie
 
Design Principles that are involved in the Design of Flow over an Ogee Crest ...
Design Principles that are involved in the Design of Flow over an Ogee Crest ...Design Principles that are involved in the Design of Flow over an Ogee Crest ...
Design Principles that are involved in the Design of Flow over an Ogee Crest ...Venkataraju Badanapuri
 
4.4 cyclone shelter design
4.4 cyclone shelter design4.4 cyclone shelter design
4.4 cyclone shelter designctlachu
 
Mitigation strategies for flooding pdf
Mitigation strategies for flooding pdfMitigation strategies for flooding pdf
Mitigation strategies for flooding pdfDhanashri Mirajkar
 
Dams and Reservoirs -Hydraulics engineering
Dams and Reservoirs -Hydraulics engineeringDams and Reservoirs -Hydraulics engineering
Dams and Reservoirs -Hydraulics engineeringCivil Zone
 
Unit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringUnit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringSahl Buhary
 
FLOATING AND MOVING HOUSES
FLOATING AND MOVING HOUSESFLOATING AND MOVING HOUSES
FLOATING AND MOVING HOUSESMalothHarish
 
H & d ppt 06 repair docks
H & d ppt 06 repair docksH & d ppt 06 repair docks
H & d ppt 06 repair docksHasna Hassan
 
Flood Proofing, Land-Watershed Management, Flood Hazard.pdf
Flood Proofing, Land-Watershed Management, Flood Hazard.pdfFlood Proofing, Land-Watershed Management, Flood Hazard.pdf
Flood Proofing, Land-Watershed Management, Flood Hazard.pdfSJAADHIWDW
 
Report on HIGH RISE
Report on HIGH RISE Report on HIGH RISE
Report on HIGH RISE Isratul Shaon
 
Ppt report on offshore Platform Designs
Ppt report on offshore Platform DesignsPpt report on offshore Platform Designs
Ppt report on offshore Platform DesignsSUBHAM DEY
 
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing EffectDesign , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing EffectIRJET Journal
 
Ct 1 report
Ct 1 reportCt 1 report
Ct 1 reportAh Lai
 

Similar to Elevating a structure (20)

Structural flood control options
Structural flood control optionsStructural flood control options
Structural flood control options
 
Multistorey building
Multistorey buildingMultistorey building
Multistorey building
 
Advanced Type Civil Engineering Structures
Advanced Type  Civil Engineering StructuresAdvanced Type  Civil Engineering Structures
Advanced Type Civil Engineering Structures
 
Mod. 1.pptx
Mod. 1.pptxMod. 1.pptx
Mod. 1.pptx
 
Chapter 4 design of hydropower plants.pdf
Chapter 4 design of hydropower plants.pdfChapter 4 design of hydropower plants.pdf
Chapter 4 design of hydropower plants.pdf
 
Design Principles that are involved in the Design of Flow over an Ogee Crest ...
Design Principles that are involved in the Design of Flow over an Ogee Crest ...Design Principles that are involved in the Design of Flow over an Ogee Crest ...
Design Principles that are involved in the Design of Flow over an Ogee Crest ...
 
4.4 cyclone shelter design
4.4 cyclone shelter design4.4 cyclone shelter design
4.4 cyclone shelter design
 
Mitigation strategies for flooding pdf
Mitigation strategies for flooding pdfMitigation strategies for flooding pdf
Mitigation strategies for flooding pdf
 
Dams and Reservoirs -Hydraulics engineering
Dams and Reservoirs -Hydraulics engineeringDams and Reservoirs -Hydraulics engineering
Dams and Reservoirs -Hydraulics engineering
 
Possible flood adaptation strategies for Catskill, NY
Possible flood adaptation strategies for Catskill, NYPossible flood adaptation strategies for Catskill, NY
Possible flood adaptation strategies for Catskill, NY
 
Unit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringUnit 37: Advanced Civil Engineering
Unit 37: Advanced Civil Engineering
 
FLOATING AND MOVING HOUSES
FLOATING AND MOVING HOUSESFLOATING AND MOVING HOUSES
FLOATING AND MOVING HOUSES
 
H & d ppt 06 repair docks
H & d ppt 06 repair docksH & d ppt 06 repair docks
H & d ppt 06 repair docks
 
Flood Proofing, Land-Watershed Management, Flood Hazard.pdf
Flood Proofing, Land-Watershed Management, Flood Hazard.pdfFlood Proofing, Land-Watershed Management, Flood Hazard.pdf
Flood Proofing, Land-Watershed Management, Flood Hazard.pdf
 
Report on HIGH RISE
Report on HIGH RISE Report on HIGH RISE
Report on HIGH RISE
 
Ppt report on offshore Platform Designs
Ppt report on offshore Platform DesignsPpt report on offshore Platform Designs
Ppt report on offshore Platform Designs
 
UNderpinning.pptx.pdf
UNderpinning.pptx.pdfUNderpinning.pptx.pdf
UNderpinning.pptx.pdf
 
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing EffectDesign , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
 
Ct 1 report
Ct 1 reportCt 1 report
Ct 1 report
 
Ct report
Ct reportCt report
Ct report
 

More from Priodeep Chowdhury

Alternative water supply technologies
Alternative water supply technologiesAlternative water supply technologies
Alternative water supply technologiesPriodeep Chowdhury
 
precast driven pile 450x450-350x350
precast driven pile 450x450-350x350precast driven pile 450x450-350x350
precast driven pile 450x450-350x350Priodeep Chowdhury
 
Transportation engineering iii
Transportation engineering iiiTransportation engineering iii
Transportation engineering iiiPriodeep Chowdhury
 
Structural analysis & design iii
Structural analysis & design iiiStructural analysis & design iii
Structural analysis & design iiiPriodeep Chowdhury
 
Structural analysis &; design ii
Structural analysis &; design iiStructural analysis &; design ii
Structural analysis &; design iiPriodeep Chowdhury
 
Structural analysis & design i
Structural analysis & design iStructural analysis & design i
Structural analysis & design iPriodeep Chowdhury
 
Reinforced concrete structures ii
Reinforced concrete structures iiReinforced concrete structures ii
Reinforced concrete structures iiPriodeep Chowdhury
 
Reinforced concrete structures i
Reinforced concrete structures iReinforced concrete structures i
Reinforced concrete structures iPriodeep Chowdhury
 
Project planning & construction management
Project planning & construction managementProject planning & construction management
Project planning & construction managementPriodeep Chowdhury
 
Numerical analysis & computer programming
Numerical analysis & computer programmingNumerical analysis & computer programming
Numerical analysis & computer programmingPriodeep Chowdhury
 

More from Priodeep Chowdhury (20)

Water distribution system
Water distribution systemWater distribution system
Water distribution system
 
Alternative water supply technologies
Alternative water supply technologiesAlternative water supply technologies
Alternative water supply technologies
 
Water quality
Water qualityWater quality
Water quality
 
Design of pile foundation
Design of pile foundationDesign of pile foundation
Design of pile foundation
 
Precast driven pile 450 x450
Precast driven pile 450 x450Precast driven pile 450 x450
Precast driven pile 450 x450
 
precast driven pile 450x450-350x350
precast driven pile 450x450-350x350precast driven pile 450x450-350x350
precast driven pile 450x450-350x350
 
Transportation engineering iii
Transportation engineering iiiTransportation engineering iii
Transportation engineering iii
 
Transportation engineering ii
Transportation engineering iiTransportation engineering ii
Transportation engineering ii
 
Transportation engineering i
Transportation engineering iTransportation engineering i
Transportation engineering i
 
Surveying
SurveyingSurveying
Surveying
 
Structural analysis & design iii
Structural analysis & design iiiStructural analysis & design iii
Structural analysis & design iii
 
Structural analysis &; design ii
Structural analysis &; design iiStructural analysis &; design ii
Structural analysis &; design ii
 
Structural analysis & design i
Structural analysis & design iStructural analysis & design i
Structural analysis & design i
 
Solid waste management
Solid waste managementSolid waste management
Solid waste management
 
River engineering
River engineeringRiver engineering
River engineering
 
Reinforced concrete structures ii
Reinforced concrete structures iiReinforced concrete structures ii
Reinforced concrete structures ii
 
Reinforced concrete structures i
Reinforced concrete structures iReinforced concrete structures i
Reinforced concrete structures i
 
Project planning & construction management
Project planning & construction managementProject planning & construction management
Project planning & construction management
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Numerical analysis & computer programming
Numerical analysis & computer programmingNumerical analysis & computer programming
Numerical analysis & computer programming
 

Recently uploaded

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 

Recently uploaded (20)

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 

Elevating a structure

  • 1. P r i o d e e p C h o w d h u r y , L e c t u r e r , D e p t . o f C E E , U t t a r a U n i v e r s i t y . / /P r i o d e e p C h o w d h u r y , L e c t u r e r , D e p t . o f C E E , U t t a r a U n i v e r s i t y . / / F l o o d M i t i g a t i o nF l o o d M i t i g a t i o n & M a n a g e m e n t .& M a n a g e m e n t . LLL EEE VVV AAA TTT III NNN GGG AAA SSS TTT RRR UUU CCC TTT UUU RRR EEE CCC HHH AAA PPP TTT EEE RRR 05i05i05i EElleevvaattiioonn involves raising a building in place so that the finished living space is located above the anticipated height of flood waters. The building is separated from its foundation, lifted with hydraulic jacks, and placed on a new or extended foundation. The building can be elevated on solid perimeter foundation walls, fill, or an open foundation system that supports the structure at key points. AA pp pp ll iicc aa bbii llii ttyy Almost any structurally-sound building can be elevated. FFLLOOOODD HHAAZZAARRDD:: Building elevation is practical for almost any flood situation. The flooding conditions must be taken into account to select an elevation technique that will withstand the expected water depths, velocities, debris impacts, and scour (as well as other hazards). BBUUIILLDDIINNGG CCOONNDDIITTIIOONN:: A building must be in sound structural condition in order to be elevated. Lighter wood-frame structures are easier and often cheaper to raise than masonry. In addition to being more expensive to elevate, masonry structures are also susceptible to cracks. Multistory houses are more difficult to stabilize during the lifting process. It may be necessary to lift attached garages, porches, wings, or additions separately, especially if they are built on separate foundations. SSUUBBSSTTAANNTTIIAALL DDAAMMAAGGEE//IIMMPPRROOVVEEMMEENNTT:: If the cost of repairs or improvements to a floodplain structure exceeds 50% of the market value of the building before the damage or improvement, then the entire structure must be brought up to current floodplain development standards. Elevation is generally the most feasible technique for achieving compliance. AACCCCEESSSS:: New staircases, elevators, or ramps are generally required to provide access. Functional and attractive solutions can usually be developed. When an attached garage is elevated, an elevated driveway is needed for access. When the amount of elevation reaches 4 or more feet, consider elevating the building a full story so that the lower level can be used for parking. EE
  • 2. P r i o d e e p C h o w d h u r y , L e c t u r e r , D e p t . o f C E E , U t t a r a U n i v e r s i t y . / /P r i o d e e p C h o w d h u r y , L e c t u r e r , D e p t . o f C E E , U t t a r a U n i v e r s i t y . / / F l o o d M i t i g a t i o nF l o o d M i t i g a t i o n & M a n a g e m e n t .& M a n a g e m e n t . CCOOSSTTSS:: The cost to lift the building on steel beams and extend or replace the foundation will depend on the size of the structure, type of construction, and amount of elevation. Additional project costs include: disconnection/reconnection of utility lines, elevation of service equipment, temporary housing during construction, and removing/storing belongings. Additional expenditures may be required to bring the building into compliance with building codes. If the structure has been substantially damaged by flooding, part of the cost may be eligible for Increased Cost of Compliance flood insurance coverage. FFIGIG--1:1: OONN GGOINGOING SSTRUCTURETRUCTURE EELEVATIONLEVATION WWORKORK.. EE LL EE VV AA TT II OO NN TT EE CC HH NN II QQ UU EE SS A key decision is the type of foundation on which the building will be elevated. Extended foundation walls: In areas of low to moderate water depth and velocity, the current foundation can be extended vertically and the structure set down on the extended walls. Flood vents must be installed in the foundation walls to allow water to enter and exit the structure, which protects the walls from collapse. New and larger footings may be needed. It may also be necessary to reinforce both the footings and the walls using steel reinforcing bars to provide structural stability. Abandoning the lower enclosed area: An alternative for a masonry building on a slab-on-grade foundation is to abandon the existing lower enclosed area and convert it to a flood-prone area below the first floor that is used only for parking, storage, and building access. An existing upper floor can be used for living space. For a one-story building, the roof and roof framing can be removed to build a new second story living area.
  • 3. P r i o d e e p C h o w d h u r y , L e c t u r e r , D e p t . o f C E E , U t t a r a U n i v e r s i t y . / /P r i o d e e p C h o w d h u r y , L e c t u r e r , D e p t . o f C E E , U t t a r a U n i v e r s i t y . / / F l o o d M i t i g a t i o nF l o o d M i t i g a t i o n & M a n a g e m e n t .& M a n a g e m e n t . Fill: In order to elevate an existing building on fill, the structure must be temporarily relocated while fill is brought in and compacted. Open foundation: Elevating a building on an open foundation involves raising it onto piers, posts (columns), or piles and allowing water to flow beneath the building. The foundation type depends on the flood and site characteristics. Piers are designed primarily for vertical loading and are thus most appropriate for shallow depth and low velocity flood conditions where they will not be subjected to significant horizontal forces. Posts and columns are generally cross braced for added stability and can be used when the anticipated flood conditions involve moderate depths and velocities. Piles (which are driven or jetted deep into the ground) are less susceptible to the effects of high-velocity floodwaters, scouring, and debris impact and are often used to elevate coastal buildings. AA DD VV AA NN TT AA GG EE SS AA NN DD DD II SS AA DD VV AA NN TT AA GG EE SS OO FF EE LL EE VV AA TT II OO NN