MICOM P-632
TOPICS TO BE COVERED
1.INTRODUCTION
2.RELAY SPECIFICATION
3.PROTECTIONS AVAILABLE IN MICOM P-632
4.INPUT PARAMETERS REQUIRED FOR
CONFIGURATION.
5.STEPS TO CONFIGURE MICOM P-632.
6.PROTECTION SCHEME FOR 16 MVA MUUL X-MER AT
MRSS.
INTRODUCTION
The MiCOM P63x series differential protection devices are
intended for the fast and selective short circuit protection of
transformers, motors, generators and other installations with
two, three or four windings, respectively.
• P630C: Two-end/winding schemes (two 3 pole CT inputs)
• P631: Two-end/winding schemes (two 3 pole CT inputs)
• P632: Two-end/winding schemes (two 4 pole CT inputs, one VT input)
• P633: Three-end/winding schemes (three 4 pole CT inputs, one VT input)
• P634: Four-end/winding schemes (three 4 pole CT inputs, one 3 pole CT input, one
VT input)
RELAY SPECIFICATION
1.AUXILLARY VOLTAGE RANGE: 60 -250 VOLTS AC
OR DC
2.CT SECONDARY INPUT (In) : 1/5 AMP(EITHER OF
ONE AVAILABLE NOT BOTH ATA TIME)
3.VT SECONDARY INPUT (Vn) : 50-130 VOLTS
4.SYSTEM FREQUENCY (Fn) : 50/60 HZ
5.MOUNTING : Surface/Flush
KEY PAD & INDICATIONS
RELAY TERMINAL BOCK DETAIL
FROM 33 KV
PT INPUT(
R&Y PHASE)
TB: XO31
FROM 33 KV
SIDE CT
(PS CORE)
TB: XO32
FROM 6.6
KV SIDE CT
(PSCORE)
TB: XO52
OUTPUT RELAYS
8 CONFIGURABLE OUTPUT RELAYS
TB : XO91 & XO92
Aux Supply
PROTECTIONS AVAILABE
INPUT PARAMETERS REQUIRED
FOLLOWING PARAMETERS OF THE PROTECTED EQUIPMENT ARE REQUIRED
1. S ref : Nominal MVA rating of transformer.
2. I nom : Nominal CT ratio( both primary and secondary)
3. V nom : Nominal PT ratio.(both primary and secondary)
4. Vector Group : Vector group of the transformer
5. Phase Sequence : Phase sequence of the system
(a-b-c or a-c-b)
a-b-c : R Y B with 120 deg phase angle difference.
a-c-b : R Y B with (– 120 deg phase angle difference).
CALCULATION OF MATCHING FACTOR,REFERENCE CURRENT
AMPLITUDE MATCHING.jpg
AMPLITUDE MATCHING 1.jpg
EX: MRSS 16 MVA MUUL X-MER
SLD.jpg
OLD DIFF SCHEME (1).jpg
NOW THE ADVANTAGE WITH MICOM -P 632 IS THAT NO MORE NEED OF
ICT(INTERPOSING CURRENT TRANSFORMERS) FOR AMPLITUDE AND PHASE
MATCHING.
CAL.jpg
STEPS TO CONFIGURE MICOM P632
For configuring Micom P632, following
configurations are done:-
1.Date & Time.
2.System specifications (CT, PT & Power system
specifications).
3.Selecting parameter subset(GROUP)
4.Protection to be taken in line.
5.O/P Relay configuration for each fault & Logic.
6.LED configuration for Fault Identification.
7.Fault Recording.
8.Display Parameters.
NOTE: end A-primary side, end B-secondaryside
1- refers to protection related to end A,2- refers to related to end B . ex: DTOC 1,REF 2 etc.
3 BASIC SUB MENUS OF MICOM P 632
PARAMETERS.jpg
OPERATION.jpg
1.PARAMETER
2.OPERATION
3.EVENTS EVENTS.jpg
SETTING DATE AND TIME
Date & Time:-
For setting Date & Time, the procedure is:-
OperationCyclic MeasurementMeasured Operating data Main
Date
Time of Date
DATE.jpg
TIME.jpg
CHANGING DATE.jpg
SETTING SYSTEM SPECIFICATIONS
For setting system details, first we have to take Micom P632 in OFFLINE MODE (OUT OF
SERVICE). This is done by:-
ParameterFunction ParameterGlobalMain Device onLine
PRESS ENTER KEY AND THEN ENTER THE PASSWORD
THE PASSWORD IS -
THEN PRESS ENTER KEY. NOW THE RELAY COMES INTO EDIT
MODE AS WE CAN SEE THE RED COLOUR EDIT MODE LED
GLOWING.
NOW PRESS THE DOWN ARROW KEY-
Device on line NO(= OFF) appears on the screen.
Now when you press enter device becomes off line(red color
led disappears and yellow color out of service led glows)
ON LINE.jpg
ON LINEPWD.jpg
EDIT MODE.jpg
OUT OF SERVICE.jpg
Then for entering System Settings:-
ParameterFunction ParameterGlobalMain Nominal
Frequency (fnom) and so on.
System details which can be entered in this section are Nominal Frequency,
Phase sequence, CT Primary current (end A), CT primary current (end B), CT
Secondary Current (end A), CT Secondary current (end B), Neutral CT Primary
current(end A), Neutral CT Primary current(end B), Neutral CT secondary
current(end A), Neutral CT secondary
current(end B),PT primary voltage, PT secondary voltage.
FREQ.jpg
END A CT PRIMARY.jpg
END B CT PRIMARY .jpg
(The procedure for taking Micom in ONLINE Mode is the same as
that of the OFFLINE Mode.)
SELECTING PARAMETER SUBSET
Parameter subset selection is done as follows:
ParameterFunction GlobalPSS
PSS.jpg
CHANGE PSS.jpg
Within this we can select the parameter subset we want to makeactive(out
of the four parameter subset 1,2,3,4)
CREATING PROTECTION BLOCK
STEP-1 Take Micom in OFFLINE mode. Out of Service LED should
be glowing. Then in the “Configuration Parameters” of the
Parameter section, select the protection which is to be created.
ParameterConfiguration Parameter
Diff
REF 1
REF 2
DTOC 1
IDMT 1 & SO ON…
The protection to be taken is selected here by “WITH” and not to
be taken is discarded by “WITHOUT”.
Ex. For selecting Differential Protection:-
ParameterConfiguration Parameter DIFF
Function group DIFF “WITH”
“WITH” or “WITHOUT” can be selected by first entering password & then making
selection by pressing either or
REF WITHOUT.jpg
DIFF WITH ..jpg
STEP-2 The protections which are selected in the above section are
now also available in “General Function” of “Function Parameter”.
Here system details related for the respective Protections are
provided. For example:-
Parameter Function Parameter General Function
DIFF General Enable User “YES”
Reference Power Sref (to be entered)
Reference Current Iref,a ( Internally Calculated)
Reference Current Iref,b ( Internally Calculated)
Matching Factor, Kam,a (internally calculated)
Matching Factor, Kam,b (internally calculated)
Measured value Rel. Id (internally calculated)
Measured value Rel. IR(internally calculated)
REF_2 DIFF SET 1.jpg DIFF SET 2.jpg DIFF SET 3.jpg DIFF SET 4.jpg
DIFF SET 5.jpg DIFF SET 6.jpg DIFF SET 7.jpg
DTOC1
… And so on if other protections are enabled.
STEP 3 Settings of the protection taken in line. The settings are
done in ‘Parameter Subset 1’. Parameter subset 1 is also enabled in
this section.
Settings are entered in:-
Parameter Function Parameter PSS1Main
DIFF Enable PS1 Yes DIFF PS1 .jpg
Vector Group End a, bDIFF PS 1 2.jpg
Idiff> DIFF PS1 3.jpg
Idiff>> DIFF PS1 4.jpg
Idiff>>> DIFF PS1 5.jpg
Idiff>(CTS) DIFF PS1 6.jpg
m1 DIFF SET 7.jpg
m2 DIFF PS1 8.jpg
and so on...
Settings to be
done
accordingly
IDMT 1
REF 2
REF 1
.
.
.
AND SO ON…
Settings to be done
accordingly
OUTPUT RELAY CONFIGURATION
K 901.jpg K 902.jpg K 903 WITHOUT.jpg
There are 8 output relays in Micom P632. The number of output
relays may differ from one model number to other.
The output relays are configured As follows –
First ,take Micom in OFF Line mode.Now,
ParameterConfiguration ParameterOutput
Fct. Assigm. K901 ( Enter, Put Password &
Select the tripping from the variousoptions
Fct. Assigm. K902
Fct. Assigm. K903
Fct. Assigm. K904
Fct. Assigm. K905
Fct. Assigm. K906
Fct. Assigm. K907
LED CONFIGURATION
LED indicators are provided for signal displays. 5 LED indicators
are permanently assigned to Signals which are- Trip, Alarm, Out
of service, Healthy & Edit Mode.
The remaining 12 LED indicators are available for free
assignment by the user. A separate adhesive label is provided for
user defined labelling of these LED indicators according to the
chosen configuration.
Each led can be selected for two indication colours RED and
GREEN. The configuration of LEDs are done as follows.
ParameterConfiguration Parameter LED
Fct. Assigm. H5 red ( Enter, Put Password & Select from the various options).
Fct. Assigm. H5 green
Fct. Assigm. H6 red
Fct. Assigm. H6 green
.
.
.
.
And so on (LED H1 to H4 are pre-assigned.) LED H1.jpg LED H2.jpg
LED H 3.jpg LED H 4.jpg
LED H4 RED.jpg
NOTE:- Changes to the settings can be prepared and
confirmed by the means of ENTER Key.
In the event of erroneous entries, exit from the
EDIT mode or OFFLINE Mode with rejection of
entries is possible at any times by means of CLEAR
key.
When relay is not in OFFLINE mode, pressing CLEAR
Key has the effect of restoring the indicators.
Pressing the READ key provides direct access to a
preselected point in the menu.

More Related Content

What's hot

PLC y Electroneumática: Autómatas programables
PLC y Electroneumática: Autómatas programablesPLC y Electroneumática: Autómatas programables
PLC y Electroneumática: Autómatas programables
SANTIAGO PABLO ALBERTO
 

What's hot (20)

PLC y Electroneumática: Autómatas programables
PLC y Electroneumática: Autómatas programablesPLC y Electroneumática: Autómatas programables
PLC y Electroneumática: Autómatas programables
 
Smart grid and micro grid
Smart grid and micro gridSmart grid and micro grid
Smart grid and micro grid
 
Problems in overhead transmission line
Problems in overhead transmission lineProblems in overhead transmission line
Problems in overhead transmission line
 
Protection basic
Protection basicProtection basic
Protection basic
 
Automatic temperature control
Automatic temperature control Automatic temperature control
Automatic temperature control
 
APAC/Uniflair Datacenter chiller plant control
APAC/Uniflair Datacenter chiller plant controlAPAC/Uniflair Datacenter chiller plant control
APAC/Uniflair Datacenter chiller plant control
 
Islanding
IslandingIslanding
Islanding
 
Lecture 16
Lecture 16Lecture 16
Lecture 16
 
Generator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsGenerator Protection Relay Setting Calculations
Generator Protection Relay Setting Calculations
 
Understanding DGA Techniques & Interpretations Presentation
Understanding DGA Techniques & Interpretations PresentationUnderstanding DGA Techniques & Interpretations Presentation
Understanding DGA Techniques & Interpretations Presentation
 
Invisible wire
Invisible wireInvisible wire
Invisible wire
 
Automatic fan controller based on room temperature
Automatic fan controller based on room temperatureAutomatic fan controller based on room temperature
Automatic fan controller based on room temperature
 
Power system protection_lecture_notes
Power system protection_lecture_notesPower system protection_lecture_notes
Power system protection_lecture_notes
 
Economic Dispatch of Generated Power Using Modified Lambda-Iteration Method
Economic Dispatch of Generated Power Using Modified Lambda-Iteration MethodEconomic Dispatch of Generated Power Using Modified Lambda-Iteration Method
Economic Dispatch of Generated Power Using Modified Lambda-Iteration Method
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protection
 
Protection primer
Protection primerProtection primer
Protection primer
 
Power System Protection Technique: A Review
Power System Protection Technique: A ReviewPower System Protection Technique: A Review
Power System Protection Technique: A Review
 
Introduction to Embedded Systems I: Chapter 2 (1st portion)
Introduction to Embedded Systems I: Chapter 2 (1st portion)Introduction to Embedded Systems I: Chapter 2 (1st portion)
Introduction to Embedded Systems I: Chapter 2 (1st portion)
 
(7) overfluxing
(7) overfluxing(7) overfluxing
(7) overfluxing
 
AMI-Presentation
AMI-PresentationAMI-Presentation
AMI-Presentation
 

Similar to MICOM P 632

Applied motion products stac6 datasheet
Applied motion products stac6 datasheetApplied motion products stac6 datasheet
Applied motion products stac6 datasheet
Electromate
 
Laptop repairing course details
Laptop repairing course detailsLaptop repairing course details
Laptop repairing course details
jyotichhabra
 
Selection of PMU functionality
Selection of PMU functionalitySelection of PMU functionality
Selection of PMU functionality
Power System Operation
 
Applied motion products stac5 datasheet
Applied motion products stac5 datasheetApplied motion products stac5 datasheet
Applied motion products stac5 datasheet
Electromate
 

Similar to MICOM P 632 (20)

MICOM P 632
MICOM P 632MICOM P 632
MICOM P 632
 
CATV Optical Transmitter
CATV Optical TransmitterCATV Optical Transmitter
CATV Optical Transmitter
 
Ls catalog thiet bi tu dong gipam 2200-e
Ls catalog thiet bi tu dong gipam 2200-eLs catalog thiet bi tu dong gipam 2200-e
Ls catalog thiet bi tu dong gipam 2200-e
 
Ls catalog thiet bi tu dong gipam 2200-e
Ls catalog thiet bi tu dong gipam 2200-eLs catalog thiet bi tu dong gipam 2200-e
Ls catalog thiet bi tu dong gipam 2200-e
 
Mitsubishi ac servos melservo j4 solutions conveyor system utilizing safety o...
Mitsubishi ac servos melservo j4 solutions conveyor system utilizing safety o...Mitsubishi ac servos melservo j4 solutions conveyor system utilizing safety o...
Mitsubishi ac servos melservo j4 solutions conveyor system utilizing safety o...
 
Applied motion products stac6 datasheet
Applied motion products stac6 datasheetApplied motion products stac6 datasheet
Applied motion products stac6 datasheet
 
Gesmod
GesmodGesmod
Gesmod
 
Siemens MICRO VFD part 1
Siemens MICRO VFD part 1Siemens MICRO VFD part 1
Siemens MICRO VFD part 1
 
Laptop repairing course details
Laptop repairing course detailsLaptop repairing course details
Laptop repairing course details
 
QuickSilver Controls QCI-DS032 QCI-N2-MX
QuickSilver Controls QCI-DS032 QCI-N2-MXQuickSilver Controls QCI-DS032 QCI-N2-MX
QuickSilver Controls QCI-DS032 QCI-N2-MX
 
Selection of PMU functionality
Selection of PMU functionalitySelection of PMU functionality
Selection of PMU functionality
 
Applied motion products stac5 datasheet
Applied motion products stac5 datasheetApplied motion products stac5 datasheet
Applied motion products stac5 datasheet
 
Pdf tp3076 national
Pdf tp3076 nationalPdf tp3076 national
Pdf tp3076 national
 
ALSTOM – Micom
ALSTOM – MicomALSTOM – Micom
ALSTOM – Micom
 
Mitsubishi ac servos melservo j4 solutions pick and place robot-dienhathe.vn
Mitsubishi ac servos melservo j4 solutions pick and place robot-dienhathe.vnMitsubishi ac servos melservo j4 solutions pick and place robot-dienhathe.vn
Mitsubishi ac servos melservo j4 solutions pick and place robot-dienhathe.vn
 
Commisioning.pptx
Commisioning.pptxCommisioning.pptx
Commisioning.pptx
 
L78MS05
L78MS05L78MS05
L78MS05
 
A4988
A4988A4988
A4988
 
Bien tan ls gioi thieu bien tan i e5 series (new)-1-dienhathe.vn
Bien tan ls   gioi thieu bien tan i e5 series (new)-1-dienhathe.vnBien tan ls   gioi thieu bien tan i e5 series (new)-1-dienhathe.vn
Bien tan ls gioi thieu bien tan i e5 series (new)-1-dienhathe.vn
 
Bien tan ls gioi thieu bien tan i e5 series (new)-1-dienhathe.vn
Bien tan ls   gioi thieu bien tan i e5 series (new)-1-dienhathe.vnBien tan ls   gioi thieu bien tan i e5 series (new)-1-dienhathe.vn
Bien tan ls gioi thieu bien tan i e5 series (new)-1-dienhathe.vn
 

More from Power System Operation

SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action Scheme
Power System Operation
 
Harmonic study and analysis
Harmonic study and analysisHarmonic study and analysis
Harmonic study and analysis
Power System Operation
 
What is leakage current testing
What is leakage current testingWhat is leakage current testing
What is leakage current testing
Power System Operation
 

More from Power System Operation (20)

ENERGY TRANSITION OUTLOOK 2021
ENERGY TRANSITION OUTLOOK  2021ENERGY TRANSITION OUTLOOK  2021
ENERGY TRANSITION OUTLOOK 2021
 
Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panels
 
What does peak shaving mean
What does peak shaving meanWhat does peak shaving mean
What does peak shaving mean
 
What's short circuit level
What's short circuit levelWhat's short circuit level
What's short circuit level
 
Power System Restoration Guide
Power System Restoration Guide  Power System Restoration Guide
Power System Restoration Guide
 
Big Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsBig Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid Operations
 
SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action Scheme
 
Substation Neutral Earthing
Substation Neutral EarthingSubstation Neutral Earthing
Substation Neutral Earthing
 
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground Resistance
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & Parts
 
What is load management
What is load managementWhat is load management
What is load management
 
What does merit order mean
What does merit order meanWhat does merit order mean
What does merit order mean
 
What are Balancing Services ?
What are  Balancing Services ?What are  Balancing Services ?
What are Balancing Services ?
 
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
 
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power Quality  Trends in the Transition to  Carbon-Free Electrical Energy SystemPower Quality  Trends in the Transition to  Carbon-Free Electrical Energy System
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
 
Power Purchase Agreement PPA
Power Purchase Agreement PPA Power Purchase Agreement PPA
Power Purchase Agreement PPA
 
Harmonic study and analysis
Harmonic study and analysisHarmonic study and analysis
Harmonic study and analysis
 
What is leakage current testing
What is leakage current testingWhat is leakage current testing
What is leakage current testing
 

Recently uploaded

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 

Recently uploaded (20)

Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 

MICOM P 632

  • 2. TOPICS TO BE COVERED 1.INTRODUCTION 2.RELAY SPECIFICATION 3.PROTECTIONS AVAILABLE IN MICOM P-632 4.INPUT PARAMETERS REQUIRED FOR CONFIGURATION. 5.STEPS TO CONFIGURE MICOM P-632. 6.PROTECTION SCHEME FOR 16 MVA MUUL X-MER AT MRSS.
  • 3. INTRODUCTION The MiCOM P63x series differential protection devices are intended for the fast and selective short circuit protection of transformers, motors, generators and other installations with two, three or four windings, respectively. • P630C: Two-end/winding schemes (two 3 pole CT inputs) • P631: Two-end/winding schemes (two 3 pole CT inputs) • P632: Two-end/winding schemes (two 4 pole CT inputs, one VT input) • P633: Three-end/winding schemes (three 4 pole CT inputs, one VT input) • P634: Four-end/winding schemes (three 4 pole CT inputs, one 3 pole CT input, one VT input)
  • 4. RELAY SPECIFICATION 1.AUXILLARY VOLTAGE RANGE: 60 -250 VOLTS AC OR DC 2.CT SECONDARY INPUT (In) : 1/5 AMP(EITHER OF ONE AVAILABLE NOT BOTH ATA TIME) 3.VT SECONDARY INPUT (Vn) : 50-130 VOLTS 4.SYSTEM FREQUENCY (Fn) : 50/60 HZ 5.MOUNTING : Surface/Flush
  • 5. KEY PAD & INDICATIONS
  • 6. RELAY TERMINAL BOCK DETAIL FROM 33 KV PT INPUT( R&Y PHASE) TB: XO31 FROM 33 KV SIDE CT (PS CORE) TB: XO32 FROM 6.6 KV SIDE CT (PSCORE) TB: XO52
  • 7. OUTPUT RELAYS 8 CONFIGURABLE OUTPUT RELAYS TB : XO91 & XO92 Aux Supply
  • 9. INPUT PARAMETERS REQUIRED FOLLOWING PARAMETERS OF THE PROTECTED EQUIPMENT ARE REQUIRED 1. S ref : Nominal MVA rating of transformer. 2. I nom : Nominal CT ratio( both primary and secondary) 3. V nom : Nominal PT ratio.(both primary and secondary) 4. Vector Group : Vector group of the transformer 5. Phase Sequence : Phase sequence of the system (a-b-c or a-c-b) a-b-c : R Y B with 120 deg phase angle difference. a-c-b : R Y B with (– 120 deg phase angle difference).
  • 10. CALCULATION OF MATCHING FACTOR,REFERENCE CURRENT AMPLITUDE MATCHING.jpg AMPLITUDE MATCHING 1.jpg EX: MRSS 16 MVA MUUL X-MER SLD.jpg OLD DIFF SCHEME (1).jpg NOW THE ADVANTAGE WITH MICOM -P 632 IS THAT NO MORE NEED OF ICT(INTERPOSING CURRENT TRANSFORMERS) FOR AMPLITUDE AND PHASE MATCHING. CAL.jpg
  • 11. STEPS TO CONFIGURE MICOM P632 For configuring Micom P632, following configurations are done:- 1.Date & Time. 2.System specifications (CT, PT & Power system specifications). 3.Selecting parameter subset(GROUP) 4.Protection to be taken in line. 5.O/P Relay configuration for each fault & Logic. 6.LED configuration for Fault Identification. 7.Fault Recording. 8.Display Parameters. NOTE: end A-primary side, end B-secondaryside 1- refers to protection related to end A,2- refers to related to end B . ex: DTOC 1,REF 2 etc.
  • 12. 3 BASIC SUB MENUS OF MICOM P 632 PARAMETERS.jpg OPERATION.jpg 1.PARAMETER 2.OPERATION 3.EVENTS EVENTS.jpg
  • 13. SETTING DATE AND TIME Date & Time:- For setting Date & Time, the procedure is:- OperationCyclic MeasurementMeasured Operating data Main Date Time of Date DATE.jpg TIME.jpg CHANGING DATE.jpg
  • 14. SETTING SYSTEM SPECIFICATIONS For setting system details, first we have to take Micom P632 in OFFLINE MODE (OUT OF SERVICE). This is done by:- ParameterFunction ParameterGlobalMain Device onLine PRESS ENTER KEY AND THEN ENTER THE PASSWORD THE PASSWORD IS - THEN PRESS ENTER KEY. NOW THE RELAY COMES INTO EDIT MODE AS WE CAN SEE THE RED COLOUR EDIT MODE LED GLOWING. NOW PRESS THE DOWN ARROW KEY- Device on line NO(= OFF) appears on the screen. Now when you press enter device becomes off line(red color led disappears and yellow color out of service led glows) ON LINE.jpg ON LINEPWD.jpg EDIT MODE.jpg OUT OF SERVICE.jpg
  • 15. Then for entering System Settings:- ParameterFunction ParameterGlobalMain Nominal Frequency (fnom) and so on. System details which can be entered in this section are Nominal Frequency, Phase sequence, CT Primary current (end A), CT primary current (end B), CT Secondary Current (end A), CT Secondary current (end B), Neutral CT Primary current(end A), Neutral CT Primary current(end B), Neutral CT secondary current(end A), Neutral CT secondary current(end B),PT primary voltage, PT secondary voltage. FREQ.jpg END A CT PRIMARY.jpg END B CT PRIMARY .jpg (The procedure for taking Micom in ONLINE Mode is the same as that of the OFFLINE Mode.)
  • 16. SELECTING PARAMETER SUBSET Parameter subset selection is done as follows: ParameterFunction GlobalPSS PSS.jpg CHANGE PSS.jpg Within this we can select the parameter subset we want to makeactive(out of the four parameter subset 1,2,3,4)
  • 17. CREATING PROTECTION BLOCK STEP-1 Take Micom in OFFLINE mode. Out of Service LED should be glowing. Then in the “Configuration Parameters” of the Parameter section, select the protection which is to be created. ParameterConfiguration Parameter Diff REF 1 REF 2 DTOC 1 IDMT 1 & SO ON… The protection to be taken is selected here by “WITH” and not to be taken is discarded by “WITHOUT”.
  • 18. Ex. For selecting Differential Protection:- ParameterConfiguration Parameter DIFF Function group DIFF “WITH” “WITH” or “WITHOUT” can be selected by first entering password & then making selection by pressing either or REF WITHOUT.jpg DIFF WITH ..jpg STEP-2 The protections which are selected in the above section are now also available in “General Function” of “Function Parameter”. Here system details related for the respective Protections are provided. For example:-
  • 19. Parameter Function Parameter General Function DIFF General Enable User “YES” Reference Power Sref (to be entered) Reference Current Iref,a ( Internally Calculated) Reference Current Iref,b ( Internally Calculated) Matching Factor, Kam,a (internally calculated) Matching Factor, Kam,b (internally calculated) Measured value Rel. Id (internally calculated) Measured value Rel. IR(internally calculated) REF_2 DIFF SET 1.jpg DIFF SET 2.jpg DIFF SET 3.jpg DIFF SET 4.jpg DIFF SET 5.jpg DIFF SET 6.jpg DIFF SET 7.jpg DTOC1 … And so on if other protections are enabled.
  • 20. STEP 3 Settings of the protection taken in line. The settings are done in ‘Parameter Subset 1’. Parameter subset 1 is also enabled in this section. Settings are entered in:- Parameter Function Parameter PSS1Main DIFF Enable PS1 Yes DIFF PS1 .jpg Vector Group End a, bDIFF PS 1 2.jpg Idiff> DIFF PS1 3.jpg Idiff>> DIFF PS1 4.jpg Idiff>>> DIFF PS1 5.jpg Idiff>(CTS) DIFF PS1 6.jpg m1 DIFF SET 7.jpg m2 DIFF PS1 8.jpg and so on... Settings to be done accordingly
  • 21. IDMT 1 REF 2 REF 1 . . . AND SO ON… Settings to be done accordingly
  • 22. OUTPUT RELAY CONFIGURATION K 901.jpg K 902.jpg K 903 WITHOUT.jpg There are 8 output relays in Micom P632. The number of output relays may differ from one model number to other. The output relays are configured As follows – First ,take Micom in OFF Line mode.Now, ParameterConfiguration ParameterOutput Fct. Assigm. K901 ( Enter, Put Password & Select the tripping from the variousoptions Fct. Assigm. K902 Fct. Assigm. K903 Fct. Assigm. K904 Fct. Assigm. K905 Fct. Assigm. K906 Fct. Assigm. K907
  • 23. LED CONFIGURATION LED indicators are provided for signal displays. 5 LED indicators are permanently assigned to Signals which are- Trip, Alarm, Out of service, Healthy & Edit Mode. The remaining 12 LED indicators are available for free assignment by the user. A separate adhesive label is provided for user defined labelling of these LED indicators according to the chosen configuration. Each led can be selected for two indication colours RED and GREEN. The configuration of LEDs are done as follows.
  • 24. ParameterConfiguration Parameter LED Fct. Assigm. H5 red ( Enter, Put Password & Select from the various options). Fct. Assigm. H5 green Fct. Assigm. H6 red Fct. Assigm. H6 green . . . . And so on (LED H1 to H4 are pre-assigned.) LED H1.jpg LED H2.jpg LED H 3.jpg LED H 4.jpg LED H4 RED.jpg
  • 25. NOTE:- Changes to the settings can be prepared and confirmed by the means of ENTER Key. In the event of erroneous entries, exit from the EDIT mode or OFFLINE Mode with rejection of entries is possible at any times by means of CLEAR key. When relay is not in OFFLINE mode, pressing CLEAR Key has the effect of restoring the indicators. Pressing the READ key provides direct access to a preselected point in the menu.