CKG Architects Porfolio

  1. 1. Lennox A Caruth Sr AIA NCARB Francis Cuthbertson Jr RA 36 + Years Experience NCARB 26 + Years Experience
  2. 2. CKG ARCHITECTS STAFF (3) REGISTRED ARCHITECTS/(3) PROJECT ARCHITECTS/(1) Cadd Drafter/(1) ADMINISTRATIVE ASSISTANT Lennox A Caruth Sr AIA-NCARB Principal Francis C Cuthbertson Jr RA-NCARB Principal Peggy Merry Administrative Assistant Joseph McCarthy Douglas Poole Construction Cynthia Ayarza Ola Alhaffar Joseph Crumlish Senior Project Administration Project Architect Project Architect Auto Cadd Drafter Architect RA 2
  3. 3. CKG SERVICES NAICS Codes Architectural Services-541310 Interior Design Services -541410 3
  4. 4. CKG SERVICES Architectural Design/Planning Interior Design Interior Space Planning Building Assessment Studies Resolve Zoning Code Issues Construction Management 4
  5. 5. CKG FEDERAL CERTIFICATIONS CCR Cage Code No. 3DJN2 (Valid to 11-19-2010) Small Business 8(a)-Pending GSA Schedule-Pending 5
  6. 6. PROJECTS by TYPE Office/Commercial/Government Sports/Entertainment Mass Transit Multi-Family/Residential Educational/Institutional/Daycare Religious 6
  7. 7. CKG PERFORMED IN THE FOLLOWING ROLES: Prime Architect=Performed all Architectural Duties directly for the Client Sole Architect=Teamed with an Engineering Firm, Performing all Architectural Duties directly for the Client Sub-Consultant Architect=Under contract by an Engineering or Architectural Firm, sharing Architectural Duties 7
  8. 8. OFFICE/COMMERCIAL/GOVERNMENT Greater Philadelphia Health Action – Construction Value = $1.5 million – CKG Design Fee=$50,000.00 – Design Schedule-July 2009-May 2010 – Project Responsibility-Architectural Design for an existing 10,500 square foot building into a full service Healthcare Facility. – Design Team Role-Prime Architect 8
  9. 9. OFFICE/COMMERCIAL/GOVERNMENT Bristol-Meyers-Squibb Computer Room Entry – Construction Value = $125,000.00 – CKG Design Fee=$22,000.00 – Design Schedule-June-September 2009 – Project Responsibility-Architectural Design for the upgrade of an existing minimum security computer room entry area – Design Team Role-Sole Architect No Photos or Drawings Allowed due to Security Guidelines by the Owner 9
  10. 10. OFFICE/COMMERCIAL/GOVERNMENT Williamsport Readiness Center – Construction Value = $18 million – CKG Design Fee=$40,000.00 – Design Schedule-March-September 2009 – Project Responsibility-Assisted with the Architectural Design for the Toilet, Locker & Shower Rooms for two new Air National Guard Readiness Centers – Design Team Role-Sub-Consultant Architect 10
  11. 11. OFFICE/COMMERCIAL/GOVERNMENT City of Philadelphia Firehouse and Police Roof Renovation Project – Construction Value = $1.2 million – CKG Design Fee=$30,000.00 – Design Schedule-February-June 2009 – Project Responsibility-Field surveys and assistance with Architectural Design – Design Team Role-Sub-Consultant Architect 11
  12. 12. OFFICE/COMMERCIAL/GOVERNMENT PRWT Services, Inc. - Interior Office Renovations – Construction Value = $275,000.00 – CKG Design Fee=$35,000.00 – Design Schedule-July-October 2007 – Project Responsibility-Architectural Design for a 4500 square foot interior office and Elevator Lobby renovation – Design Team Role-Prime Architect 12
  13. 13. OFFICE/COMMERCIAL/GOVERNMENT Renovations to Philadelphia City Hall Room 153 – Construction Value = $1.1 million – CKG Design Fee=$38,000.00 – Design Schedule-November 2007 June-2009 – Project Responsibility-Construction documents for a 5600 square foot interior renovation – Design Team Role-Sole Architect 13
  14. 14. OFFICE/COMMERCIAL/GOVERNMENT Bristol-Meyers-Squibb Central Monitoring Room – Construction Value = $650,000.00 – CKG Design Fee=$30,000.00 – Design Schedule-August-December 2008 – Project Responsibility-Construction documents for a 1100 square foot Security Monitoring room in an existing building – Design Team Role-Sole Architect No Photos or Drawings Allowed due to Security Guidelines by the Owner 14
  15. 15. OFFICE/COMMERCIAL/GOVERNMENT Oxford Valley Mall Toilet Room – Construction Value = $200,000.00 – CKG Design Fee=$12,500.00 – Design Schedule-August-December 2008 – Project Responsibility-Construction documents for designing new Floor, Wall and Ceiling finishes in four public restrooms – Design Team Role-Prime Architect 15
  16. 16. OFFICE/COMMERCIAL/GOVERNMENT Dr. Warren E. Smith Health Centers - 2514-18 N. Broad Str. – Construction Value = $1.3 million – CKG Design Fee=$45,500.00 – Design Schedule-January-September 2006 – Project Responsibility-Construction documents for a 1400 square foot Behavioral Health Clinic – Design Team Role-Prime Architect 16
  17. 17. OFFICE/COMMERCIAL/GOVERNMENT Haddington Progress Plaza – Construction Value = $275,000.00 – CKG Design Fee=$22,500.00 – Design Schedule-July 2004-November 2005 – Project Responsibility-Construction documents for refurbishing an existing shopping center – Design Team Role-Prime Architect 17
  18. 18. OFFICE/COMMERCIAL/GOVERNMENT 21st Century Office Interior Fitout Project – Construction Value = $780,000.00 – CKG Design Fee=$35,500.00 – Design Schedule-January-May 2002 – Project Responsibility-Construction documents for the Interior design of a new 8500 square foot tenant space – Design Team Role-Prime Architect 18
  19. 19. SPORTS and ENTERTAINMENT New Meadowlands Stadium, East Rutherford, NJ – Construction Value = $850 million – CKG Design Fee=$162,000.00 – Design Schedule-April 2007-December 2009 – Project Responsibility-Exterior wall components and partial interior work – Design Team Role-Sub-Consultant Architect 19
  20. 20. SPORTS and ENTERTAINMENT Foxwoods Casino, Philadelphia, PA – Construction Value = $275 million – CKG Design Fee=$275,000.00 – Design Schedule-March 2007-June 2008 – Project Responsibility-Interior Rest Room Finishes, Stair Well layouts, Loading Dock design. – Design Team Role-Sub-Consultant Architect 20
  21. 21. SPORTS and ENTERTAINMENT – Example of CKG Work on Foxwoods Roof Core & Shell Column Enclosure Details 21
  22. 22. SPORTS and ENTERTAINMENT Citizens Bank Park, Philadelphia, PA – Construction Value = $335 million – CKG Design Fee=$390,000.00 – Design Schedule-April 2000-June 2001 – Project Responsibility-Interior Design support of Phillies Administrative Offices, Concourse and Luxury Suites – Design Team Role-Sub-Consultant Architect 22
  23. 23. SPORTS and ENTERTAINMENT Citizens Bank Park, Philadelphia, PA – Example of CKG Work on Citizens Bank Park Luxury Box Mock-Ups Ceiling Luxury Box Finishes Finishes Mock-Ups 23
  24. 24. MASS TRANSIT SEPTA: Margaret-Orthodox Station Renovations – Construction Value = $20 million – CKG Design Fee=$250,000.00 – Design Schedule-August 2008-March 2010 – Project Responsibility-Full Mass Transit Station Renovation including ADA upgrades. – Design Team Role-Sole Architect 24
  25. 25. MASS TRANSIT SEPTA: Berridge-Wyoming Roof Replacement – Construction Value = $10 million – CKG Design Fee=$130,000.00 – Design Schedule-August 2009-May 2010 – Project Responsibility-Construction Documents for a 100,000+ Square Foot Full Roof Replacement. – Design Team Role-Sole Architect 25
  26. 26. MASS TRANSIT SEPTA: Smart Stations Phase 1 – Construction Value = $25 million – CKG Design Fee=$569,000.00 – Design Schedule-September 2004-March 2006 – Project Responsibility-Construction Documents for 21 Mass Transit Smart Station Renovations – Design Team Role-Sole Architect 26
  27. 27. MASS TRANSIT SEPTA: Smart Stations Phase 2 – Construction Value = $36 million – CKG Design Fee=$890,000.00 – Design Schedule-June 2006-December 2007 – Project Responsibility-Construction Documents for 36 Mass Transit Smart Station Renovations – Design Team Role-Sole Architect 27
  28. 28. MASS TRANSIT SEPTA: 69th Street Station Motor Shop Window Replacements – Construction Value = $500,000.00 – CKG Design Fee=$31,000.00 – Design Schedule-January-May 2009 – Project Responsibility-Construction Documents for the Replacement of Windows for a Motor Shop Building – Design Team Role-Sole Architect 28
  29. 29. MASS TRANSIT SEPTA: Midvale Yard Site Improvements – Construction Value = $45 million – CKG Design Fee=$40,000.00 – Design Schedule-October-January 2009 – Project Description-Schematic Design Documents for a 46,000 and 105,000 square foot Maintenance and Storage Facility buildings – Design Team Role-Sole Architect 29
  30. 30. MASS TRANSIT PATCO: Walnut-Locust Stations Interior Renovations – Construction Value = $450,000.00 – CKG Design Fee=$35,000.00 – Design Schedule-September 1996-March 1997 – Project Responsibility-Construction Administration services for the Platform Floor, Wall & Ceiling Finishes and Railing installation – Design Team Role-Sole Architect 30
  31. 31. MASS TRANSIT SEPTA: York-Dauphin-Tioga & Somerset Station Renovations – Construction Value = $25 million – CKG Design Fee=$225,000.00 – Design Schedule-June 1993-January 1995 – Project Responsibility-Construction Administration services for three Mass Transit Station Renovations including ADA upgrades. – Design Team Role-Sole Architect 31
  32. 32. RESIDENTIAL/MULTI-FAMILY 5135 Judson Drive – Construction Value = $75,000.00 – CKG Design Fee=$6,000.00 – Design Schedule-July-December 2009 – Project Responsibility-Zoning and construction documentation for adding 800 square feet with existing interior renovations to an existing single family home – Design Team Role-Prime Architect 32
  33. 33. RESIDENTIAL/MULTI-FAMILY Manor Heights Housing Complex – Construction Value = $8,000,000.00 – CKG Design Fee=$55,000.00 – Design Schedule-December 2005-July 2006 – Project Responsibility-Construction Administration services – Design Team Role-Sub-Consultant Architect 33
  34. 34. RESIDENTIAL/MULTI-FAMILY Philadelphia Housing Authority -Blumberg Apartments – Construction Value = $675,000.00 – CKG Design Fee=$25,000.00 – Design Schedule-October-December 2006 – Project Responsibility-Schematic documentation and cost estimate for replacing three existing Guard Booths with one central Guard Booth – Design Team Role-Sole Architect 34
  35. 35. RESIDENTIAL/MULTI-FAMILY 1221-23 Shackamaxon Court – Construction Value = $875,000.00 – CKG Design Fee=$35,000.00 – Design Schedule-January 2005-December 2006 – Project Responsibility-Zoning and construction documentation for six townhome style condominiums – Design Team Role-Prime Architect 35
  36. 36. RESIDENTIAL/MULTI-FAMILY Trenton Housing Authority -Scattered Renovations to 39 Units – Construction Value = $560,000.00 – CKG Design Fee=$51,000.00 – Design Schedule-September 2004-May 2005 – Project Responsibility-Construction documentation for renovating the kitchens, bathrooms and living spaces for 39 units – Design Team Role-Prime Architect 36
  37. 37. RESIDENTIAL/MULTI-FAMILY Philadelphia Housing Authority -Westpark Apartments – Construction Value = $1.2 million – CKG Design Fee=$55,000.00 – Design Schedule-August 2004-February 2005 – Project Responsibility-Schematic documentation and cost estimate for renovating three entry area Elevator Lobbies – Design Team Role-Sole Architect 37
  38. 38. RESIDENTIAL/MULTI-FAMILY Trenton Housing Authority -Campus Utility Study – Construction Value = $750,000.00 – CKG Design Fee=$28,000.00 – Design Schedule-May 2004-September 2004 – Project Responsibility-Coordination for a report of the existing utility distribution for a Public Housing Complex – Design Team Role-Prime Architect 38
  39. 39. RESIDENTIAL/MULTI-FAMILY 1302-12 West Cumberland Street – Construction Value = $850,000.00 – CKG Design Fee=$40,000.00 – Design Schedule-January 2004-September 2004 – Project Responsibility-Zoning and construction documentation for renovating an existing warehouse into 17 condominium units – Design Team Role-Prime Architect 39
  40. 40. RESIDENTIAL/MULTI-FAMILY Philadelphia Housing Authority -Germantown House Apartments – Construction Value = $13 million – CKG Design Fee=$56,000.00 – Design Schedule-April-August 2003 – Project Responsibility-Schematic documentation and cost estimate for upgrading 240 studio units into 141 ADA compliant units – Design Team Role-Sole Architect 40
  41. 41. RESIDENTIAL/MULTI-FAMILY University of Pennsylvania-Kings Court Apartments – Construction Value = $275,000.00 – CKG Design Fee=$25,000.00 – Design Schedule-May-September 2002 – Project Responsibility-Construction documentation for the renovation of a one bedroom apartment – Design Team Role-Sole Architect 41
  42. 42. RESIDENTIAL/MULTI-FAMILY Neighborhood Transformation Initiative (NTI), Philadelphia, PA – Construction Value = $125 million – CKG Design Fee=$225,000.00 – Design Schedule-August 2001-November 2005 – Project Responsibility-On-Call Architect for supporting General Contractor in the field demolition and clearing of vacant properties – Design Team Role-Sub-Consultant Architect 42
  43. 43. EDUCATIONAL/INSTITUTIONAL/DAYCARE Pennsylvania Hospital On-Call Services – Construction Value = $275,000.00 – CKG Design Fee=$25,000.00 – Design Schedule-May-September 2002 – Project Responsibility-Maintain base plans for all buildings on the Hospital Campus – Design Team Role-Sub-Consultant Architect 43
  44. 44. EDUCATIONAL/INSTITUTIONAL/DAYCARE African-American Museum – Construction Value = $750,000.00 – CKG Design Fee=$45,000.00 – Design Schedule-November 2009-May 2010 – Project Responsibility-Construction documentation for a full Museum Renovation – Design Team Role-Sole Architect 44
  45. 45. EDUCATIONAL/INSTITUTIONAL/DAYCARE Temple University Bio-Life Sciences Library – Construction Value = $450,000.00 – CKG Design Fee=$25,000.00 – Design Schedule-August 2005-January 2006 – Project Responsibility-Construction documentation for full re- design of a Main Entry Lobby – Design Team Role-Prime Architect 45
  46. 46. EDUCATIONAL/INSTITUTIONAL/DAYCARE West Grove Daycare Center – Construction Value = $385,000.00 – CKG Design Fee=$25,000.00 – Design Schedule-January-July 2006 – Project Responsibility-Construction documentation for renovation of a Church into a Daycare Center – Design Team Role-Prime Architect 46
  47. 47. EDUCATIONAL/INSTITUTIONAL/DAYCARE Philadelphia School District Buildings Assessment Study – Construction Value = $94 million – CKG Design Fee=$97,000.00 – Design Schedule-January-November 2004 – Project Responsibility- Participated in the general construction assessment for all City of Philadelphia Public Schools – Design Team Role-Sub-Consultant Architect 47
  48. 48. EDUCATIONAL/INSTITUTIONAL/DAYCARE Philadelphia School District Renaissance Charter School – Construction Value = $1.5 million – CKG Design Fee=$65,000.00 – Design Schedule-March-September 2002 – Project Responsibility-Construction Documents for an interior fitout of converting for a private Charter School – Design Team Role-Prime Architect 48
  49. 49. Religious Institutions Williams Temple CME Church – Construction Value = $2 million – CKG Design Fee=$120,000.00 – Design Schedule-May-August-2010 – Project Responsibility-Architectural Design for a new 12,500 square foot Church with a Worship Space, Offices, Meeting Room, and Classrooms all meeting current ADA guidelines. – Design Team Role-Prime Architect 49
  50. 50. Religious Institutions Zion Baptist Church – Construction Value = $155,000.00 – CKG Design Fee=$22,000.00 – Design Schedule-May-August-2009 – Project Responsibility-Architectural Design for a 5000 square foot Roof Renovation. – Design Team Role-Prime Architect 50
  51. 51. Religious Institutions Mt. Airy Presbyterian Church – Construction Value = $40,000.00 – CKG Design Fee=$10,000.00 – Design Schedule-October-November-2009 – Project Responsibility-Architectural Design for the replacement of an existing railing on an ADA compliant Ramp. – Design Team Role-Prime Architect ` 51
  52. 52. Religious Institutions Mt. Calvary Church – Construction Value = $150,000.00 – CKG Design Fee=$20,000.00 – Design Schedule-February-June-2008 – Project Responsibility-Architectural Design for the replacement of an existing railing on an ADA compliant Ramp. – Design Team Role-Prime Architect 52
  53. 53. Religious Institutions Buddhist Temple – Construction Value = $750,000.00 – CKG Design Fee=$41,000.00 – Design Schedule-November-2005-August-2006 – Project Responsibility-Architectural Design for the renovation of an existing Church into a Buddhist Temple. – Design Team Role-Prime Architect 53
  54. 54. Religious Institutions Hope Church Christian School – Construction Value = $50,000.00 – CKG Design Fee=$27,000.00 – Design Schedule-November-2004-September-2005 – Project Responsibility-Architectural Report for the legalization of the School Certificate of Occupancy. – Design Team Role-Prime Architect 54
  55. 55. Religious Institutions Zion Baptist Church Bell Tower Renovation – Construction Value = $60,000.00 – CKG Design Fee=$8,000.00 – Design Schedule-November-2009-Febraury-2010 – Project Responsibility-Architectural Report and Design for the stabilization of roof top Stone Bell Tower. – Design Team Role-Prime Architect 55
  56. 56. CKG HAS TEAMED WITH THE FOLLOWING FIRMS Ewing Cole Maida Engineers – Citizens Bank Park – Bristol-Meyers-Squibb; – Foxwoods Casino Central Monitoring Room – New York Giants Stadium Computer Entry Gillian & Hartmann Parsons Transportation Group – Room 153 City Hall – SEPTA Phase 1 & 2 Projects – Phila. Prison Multi-Purpose Center – SEPTA Margaret-Orthodox Station – Phila. Prison Mezzanine The Ingermann Group CSA Group – Manor Heights Project – AMTRAK Coatesville Station The Burns Group – SEPTA York-Dauphin, Tioga & – Midvale Somerset Stations – 69th Street Motor Shop – Philadelphia Housing Authority; – Berridge Roof Germantown House L. Robert Kimball & Associates Blumberg Apartments – Williamsport Readiness Center West Park Apartments NTH Consultants Group – Trenton Housing Authority; – Nine (9) Firehouse & Police Roof 39 Scattered Units Renovations Utility Study Highland Associates Hill International – Philadelphia School District-Field – Neighborhood Transformation Survey of existing Buildings 56 Initiative
  57. 57. MEASURE of SUCCESS CKG Architects measures its success by: – Recurring alliances it has established with reputable Engineering firms and Architectural firms – Repeat business – Referrals 57
  58. 58. THANK YOU CKG ARCHITECTS 5443 Germantown Avenue First Floor Philadelphia, PA 19144-2215 215-844-5191 (ph) 215-844-5196 (fax) archphily@aol.com (email) 58

×