Soured Finished Goods
Role Responsibilities:
• Use SAS to access Pending calls
• Contact Tech regarding Leak issue: Midea, Little Swan
• Send Over 900 emails (1/4 tech respond)
• Get field return Part, analyze return part, record data, and send part
back to supplier
• Finding: Gasket issue, calibration issue
• Supplier use data and if necessary implement change.
Prior Experience:
• Assistant manager for a restaurant
• Aquatic Hospitality Staff for Omni hotel
Future Co-Op Plans:
• 2nd rotation as BTL
Chen Qiu
Assignment Leader: Emily Simuel
Assignment Manager: Chris Fetner
Major: ISE
School: University of Florida
Expected Graduation: June 2016
Auditing: Vent Hoods
• Done 2 auditing (restaurant and taper hoods), over
140unit
• Lead a team of 4 workers, conduct 80 point inspection on
the each hood, these inspection includes: Quality, safety,
literature, electrical, appearance, and packaging.
• On restaurant hood, problem with shelf attachment screw,
too big, lead to a rework on all restaurant hood.
Current:
• Fall rotation 2013
Involvement: Co-op Executive board
• Supply Chain communication Leader
• Lead a team of 12 co-op
• Make weekly Newsletter, and disturbed to over 100co-
ops
• Coordinate meeting, assigned task, publish newsletter.
Project: QR Code Implementation
• Implement QR codes onto PRC, Carton Labels, and Rating Plates;
Elica, and Midea.
• Elica:
• 8 BPCR total: Monogram, café hood, etc.
• Did first piece for all these BPCR
• Pitch out BPCR 114604 in CIB, got final approval
• Help closed all these BPCR
• Midea:
• BPCR 115373
• Dishwasher, Compactor, Disposal
• Personally Lead this BPCR, work with Midea, and
communicate with CIB team to Implement QR code.
Samsung Rotary Switch Project
• Samsung have 2 type of rotary switch, standardize to 1
• Worked with Samsung and my CIB team to get BPCR
approve.
• Obtained and Submitted Service part change form,
Technical Spec form, reliability test, Tox, and RoHS.
• Created presentation, and presented in CIB, waiting for
final approval to closed BPCR.

Chen Qiu Round Table Pitch Out

  • 1.
    Soured Finished Goods RoleResponsibilities: • Use SAS to access Pending calls • Contact Tech regarding Leak issue: Midea, Little Swan • Send Over 900 emails (1/4 tech respond) • Get field return Part, analyze return part, record data, and send part back to supplier • Finding: Gasket issue, calibration issue • Supplier use data and if necessary implement change. Prior Experience: • Assistant manager for a restaurant • Aquatic Hospitality Staff for Omni hotel Future Co-Op Plans: • 2nd rotation as BTL Chen Qiu Assignment Leader: Emily Simuel Assignment Manager: Chris Fetner Major: ISE School: University of Florida Expected Graduation: June 2016 Auditing: Vent Hoods • Done 2 auditing (restaurant and taper hoods), over 140unit • Lead a team of 4 workers, conduct 80 point inspection on the each hood, these inspection includes: Quality, safety, literature, electrical, appearance, and packaging. • On restaurant hood, problem with shelf attachment screw, too big, lead to a rework on all restaurant hood. Current: • Fall rotation 2013 Involvement: Co-op Executive board • Supply Chain communication Leader • Lead a team of 12 co-op • Make weekly Newsletter, and disturbed to over 100co- ops • Coordinate meeting, assigned task, publish newsletter. Project: QR Code Implementation • Implement QR codes onto PRC, Carton Labels, and Rating Plates; Elica, and Midea. • Elica: • 8 BPCR total: Monogram, café hood, etc. • Did first piece for all these BPCR • Pitch out BPCR 114604 in CIB, got final approval • Help closed all these BPCR • Midea: • BPCR 115373 • Dishwasher, Compactor, Disposal • Personally Lead this BPCR, work with Midea, and communicate with CIB team to Implement QR code. Samsung Rotary Switch Project • Samsung have 2 type of rotary switch, standardize to 1 • Worked with Samsung and my CIB team to get BPCR approve. • Obtained and Submitted Service part change form, Technical Spec form, reliability test, Tox, and RoHS. • Created presentation, and presented in CIB, waiting for final approval to closed BPCR.

Editor's Notes

  • #2 Installed 3 Hood vent Help get translation for label to close BPCR Update Quality Control report for Manning Full Laundry Analysis, disassemble and record parts. LG Coordinate Safety Review, LG Model. Help Microwave Rework Help Hood Vent Rework Hood Vent Blower comparison Analysis Create Service Bulletin for rework Purposes, Hood Vent. Test Units in Autopsy lab to answer costumers Question Create LG MWO Concession report/template for Manning