ENERGY OPTIONS FOR SAUDI ARABIA
BY
K.PERIASAMY
REF : KA CARE
WINTER SUMMER
TOTAL HEAT ENERGY SPENT ON POWER GENERATION = 604 TWh
TOTAL ELECTRICITY (UNITS) PRODUCED = 204 TWh
EFFICIENCY = 34%
OUT OF THIS TOTAL ELECTRICITY PRODCUED,
A) 40% IS USED FOR HEATING IN WINTER 4 MONTHS &
B) 70% IS USED FOR COOLING IN SUMMER 8 MONTHS
Note : 1 KWHr = 860 KCal
WHAT IS BEING DONE NOW ?
1. GENERATING ELECTRICITY FROM HEAT @
34% EFFICIENCY AND USING IT BACK FOR
HEATING IS NOT THE RIGHT WAY.
2. IN COOLING ALSO, ELECTRICITY USAGE IS
VERY POOR.
THERE ARE OTHER MEANS OF COOLING.
(HEAT ITSELF CAN BE USED FOR COOLING).
IS THIS THE RIGHT WAY OF ENERGY
USAGE?
WHAT IS THE RIGHT ENERGY GENERATION &
USAGE COMBINATION FOR SAUDI ARABIA ?
50GW
10GW
OFF PEAK PERIOD
PEAK DEMAND IN SUMMER (WORKING DAY) = 120 GW
PEAK DEMAND IN WINTER (HOLIDAY) = 70 GW
WE NEED TO PLAN FOR MEETING THE PEAK DEMAND IN
SUMMER ( WORKING DAY ) i.e 120 GW
HENCE, WE NEED TO ADD A CAPACITY OF 60 GW TO THE
EXISTING CAPACITY OF 60 GW.
2032 : DEMAND PATERN
1. TOTAL INCREASE FROM 2014 = 60 GW
2. INCREASE FROM HVAC ALONE = 40 to 50 GW
3. DIFF BETWEEN DAY & NIGHT
PEAK DEMAND ( SUMMER) = 10 GW
( EXCEPTING THE MORNING OFF PEAK PERIOD )
THIS DAY & NIGHT DIFFERENCE IS LOWER COMPARED TO THE
PRESENT LEVEL OF ABOUT 20 GW DUE TO EXPECTED INCREASE
IN OTHER LOADS DURING NIGHT TIME, IN THE NEXT 20 YEARS.
2032 : DEMAND INCREASE
WHAT SHOULD BE THE PLAN ?
1. HVAC DEMAND IS HIGH IN SUMMER MONTHS
2. HVAC DEMAND IS HIGH IN DAY TIME
( BOTH IN SUMMER AND WINTER )
HENCE, IT IS BETTER TO USE SOLAR ENERGY FOR HVAC.
SOLAR PERFECTLY COINCIDES WITH THE HVAC DEMAND,
EXCEPT FOR ABOUT 8 HOURS IN THE NIGHT.
DO NOT USE OIL / GAS TO PRODUCE ELECTRICITY FOR HVAC
PURPOSE.
USE OF SOLAR ENERGY FOR HVAC
THERE ARE TWO WAYS OF USING SOLAR ENERGY FOR
HVAC :
1. USE SOLAR ENERGY TO GENERATE ELECTRICITY THROUGH
PHOTOVOLTOIC (PV) CELLS or
CONCENTRATED SOLAR THERMAL POWER PLANT ( CSP)
AND USE IT IN CONVENTIONAL AC MACHINES.
2. USE THE SOLAR HEAT DIRECTLY IN
VACUUM ABSORPTION CHILLER(VAC) BASED AC MACHINES.
COMPARISON OF CONVENTIONAL AC &
VAC MACHINES
1. INVESTMENTS REQUIRED
CONVENTIONAL AC
MACHINES
a) POWER PLANT
b) TRANSMISSION
c) AC MACHINES
VAC
MACHINES
a) VAC MACHINE ONLY
COMPARISON OF CONVENTIONAL AC &
VAC MACHINES
2. UTILISATION OF INVESTMENT
CONVENTIONAL AC
MACHINES
a) ONLY IN SUMMER
b) MOST WINDOW AC MACHINES
HAVE NO HEATING PROVISION.
HENCE SEPARATE HEATER IS
REQUIRED.
VAC
MACHINES
a) VAC CAN BE USED AS A HEATER
ALSO WITH HOT WATER FLOWING
IN THE SAME COIL.
COMPARISON OF CONVENTIONAL AC &
VAC MACHINES
3. ENERGY STORAGE
CONVENTIONAL AC
MACHINES
a) PV BASED SOLAR – NOT POSSIBLE
b) CSP BASED SOLAR - ADDITIONAL
INVESTMENT REQUIRED
(MOLTEN SALT)
VAC
MACHINES
a) VAC CAN BE USED WITH LOCAL
STORAGE OPTION
( SIMPLE HOT / COLD WATER STORAGE)
COMPARISON OF CONVENTIONAL AC &
VAC MACHINES
4. ENERGY EFFICIENCY
CONVENTIONAL AC
MACHINES
a) ABOUT 1470 Kcal OF HEAT
ENERGY IS USED FOR EVERY 1000
Kcal COOLING
( COP = 2 &
ELECTRICITY GENERATION EFF = 34%)
b) 2940 Kcal HEAT ENERGY IS USED
FOR EVERY 1000 Kcal OF HEATING
c) THERE IS 12% TRANSMISSION
LOSS
VAC
MACHINES
a) 1450 Kcal HEAT IS USED FOR
EVERY 1000 Kcal COOLING
( COP= 0.7 )
b) 1000 Kcal HEAT ENERGY IS USED FOR
EVERY 1000 Kcal OF HEATING
VACUUM ABSORPTION CHILLERS ARE
BETTER FOR HVAC !
1. SO, IT IS BETTER TO GO FOR VAPOUR ABSORPTION CHILLER(VAC) BASED AC MACHINES.
PRODUCING ELECTRICITY WITH PV or CSP SOLAR POWER PLANTS AND THEN USING IT IN
CONVENTIONAL AC MACHINES IS NOT A RIGHT CHOICE.
2. VAC MACHINES CAN BE INSTALLED IN ALL BUILDINGS WHERE TOTAL AC LOAD IS MORE
THAN 50 Tons. TERRACE AND CAR PARK AREAS CAN BE USED FOR INSTALLING SOLAR
REFLECTORS.
3. OUT OF ABOUT 40 GW OF ADDITIONAL LOAD FROM HVAC IN 2032, WE CAN INSTALL
VAC FOR ABOUT 15 GW.
OLD BUILDINGS : 5 GW, NEW BUILDINGS : 10 GW.
4. THE BALANCE 25 GW CAN BE MET BY SOLAR CSP / PV & NUCLEAR.
SOLAR CSP or PV ?
1. SOLAR CSP WITH MOLTEN SALT STORAGE SHALL BE PREFERED OVER
SOLAR PV.
THIS IS BECAUSE, THE DIFFERENCE BETWEEN DAY AND NIGHT LOADS IS
GETTING NARROWED TO 10 GW ONLY, AND WE NEED TO STORE THE
SOLAR ENERGY FOR NIGHT USAGE, IF WE HAVE TO EFFECTIVLEY USE
SOLAR ENERGY.
2. FOR STORING LARGE QUANTITIES OF ENERGY, MOLTEN SALT IS THE
SECOND BEST OPTION AFTER PUMPED STORAGE HYDEL POWER PLANTS.
3. HENCE, OUT OF 25 GW OF SOLAR PV / CSP & NUCLEAR, 10 GW SHALL BE
FROM CSP, 5 GW FROM PV. BALANCE SHALL BE FROM NUCLEAR, ALONG
WITH OTHER BASE LOAD REQUIREMENTS.
WHAT ABOUT DESALINATION ?
PRESENT DESALINATION REQUIREMENT = 3 Mn M^3/ Day
PROJECTED DEMAND BY 2032 = 9 Mn M^3/ Day
ADDITIONAL DEMAND BY 2032 = 6 Mn M^3/ Day
ENERGY REQUIREMENT IN RO DESALINAITON = 4 KWh/ M^3
TOTAL ENERGY REQUIRED / Day = 24 Mn KWh
DESALINATION CAN BE PLANNED DURING 6 HOURS OF OFF PEAK
DEMAND PERIOD ( 04.00 to 10.00 AM )
WITH THIS, THE ELECTRICITY LOAD(GW)
FOR DESALINATION = 4 GW
THIS IS NOT MUCH. THIS CAN BE MANAGED FROM BASE LOAD
POWER PLANTS ( NUCLEAR) AND SOLAR CSP DURING OFF PEAK
PERIODS.
2032 : MEETING THE DEMAND
NUCLEAR : 30 GW
SOLAR BASED VAC : 15 GW
SOLAR PV : 5 GW
SOLAR CSP : 10 GW
TOTAL : 60 GW
MEETING THE DEMAND
SOLAR PV
SOLAR CSP
SOLAR VAC
NUCLEAR
NEW COMMITTED
EXISTING DIESEL
EXISTING HFO
EXISTING CRUDE /
GAS
2032 : OPTIONS TO EXPLORE
1. NUCLEAR SHARE CAN BE INCREASED BEYOND 30 GW, IF PART OF THE COMMITTED
( OIL / GAS BASED ) POWER PLANTS CAN BE REVERSED.
- NUCLEAR IS CLEAN, SAFE AND CHEAPER.
- SPENT FUEL REPROCESSING AND WASTE MANAGEMENT ARE SIMPLE TECHNOLOGIES ALREADY
AVAILABLE IN MANY COUNTRIES.
- SPENT FUEL REPROCESSING AND RECOVERY OF PLUTONIUM FOR RECYCLE BACK INTO THE REACTORS
PROVIDES LONG TERM ENERGY SECURITY.
2. NUCLEAR POWER PLANTS CAN BE EASILY BUILT IN UNDER DEVELOPED COASTAL REGIONS.
PROXIMITY OF FUEL AVAILABILITY IS NOT APPLICABLE FOR NUCLEAR, LIKE IN OIL / GAS.
- INLAND NUCLEAR POWER PLANTS MAY BE AVOIDED IN KSA DUE TO LIMITED COOLING WATER AVAILABILITY.
3. ALL NEW DESALINATION PLANTS CAN BE MADE PART OF NUCLEAR POWER PLANTS FOR,
- EFFECTIVE UTILISATION OF NUCLEAR POWER PLANTS DURING OFF PEAK PERIODS.
- EFFECTIVE UTILISATION OF SEA WATER INTAKE / DISCHANRGE INFRASTRUCTURE CREATED FOR COOLING WATER.
- UTILIZING PART OF THE HOT WATER DISCHARGED FROM POWER PLANT FOR DESALINATION.
WHAT ABOUT WIND MILLS ?
1. IT IS INFIRM ( UNPREDICTABLE )
2. SAUDI WIND SITES HAVE JUST ABOUT 4 M/Sec to 6 M/Sec
WIND VELOCITY AS AGAINST THE RATED WIND SPEEDS OF
14 TO 15 M/Sec FOR THE WIND MILLS.
3. THE RESULT : PLANT LOAD FACTOR IS HARDLY 10-20%
( COMPARE IT WITH 80 TO 90% FOR NUCLEAR POWER !)
4. O&M MANPOWER REQUIREMENT IS HIGH.
HENCE, IT IS NOT ADVISABLE TO GO FOR WIND MILLS IN
SAUDI ARABIA.
REGION WISE DEMAND FORECAST
REGIONWSIE PLAN
1. EASTERN OPERATING AREA ( EOA) & CENTRAL OEPARATING AREA ( COA)
ACCOUNT FOR 50% LOAD INCREASE.
- SHARE OF HVAC LOAD IS LESSER. SOLAR IRRADIATION IS ALSO LOWER.
- HENCE, NUCLEAR POWER PLANTS CAN BE BUILT IN THE EASTERN REGION ALONG THE GULF
COAST.
2. SOUTHERN OPERATING AREA ( SOA) CAN HAVE NUCLEAR POWER PLANT
WITH DESALINATION ALONG RED SEA COAST, AS PART OF AREA DEVELOPEMNT
PLAN.
3. WESTERN OPERATING AREA ( WOA) CAN HAVE HIGHER PROPORTION OF
SOLAR SINCE,
- IT HAS GOOD SOLAR IRRADIANCE.
- HVAC LOAD IS ALSO HIGHER.
WHAT ABOUT IK PROCUREMENT &
EMPLOYMENT ?
1. VACUUM ABSORPTION CHILLERS :
These can be completely manufactured in Saudi Arabia, excepting a few
special pumps. Existing Market leaders will be more than willing to set up
In-Kingdom facilities if KSA announces a firm policy on VAC.
The Saudi Facilities will become a manufacturing hub for other Middle
East Countries.
Installation and servicing will be done by the Manufacturers / Service
providers.
2. PV SOLAR :
The Solar Cells can be imported and all other structural steel fabrication
and installation can be done by IK Vendors.
WHAT ABOUT IK PROCUREMENT &
EMPLOYMENT ?
3. CONCENTRATED SOLAR THERMAL POWER PLANTS :
These can be completely manufactured in Saudi Arabia, except the Turbines &
Generators. Existing Market leaders will be more than willing to set up In-Kingdom
facilities if KSA announces a firm policy on CSP.
The Saudi Facilities will become a manufacturing hub for other Middle East
Countries.
Installation and servicing will be done by the Manufacturers / Service providers.
4. NUCLEAR POWER :
All major equipment need to be imported.
However, Civil and Piping activities can be done by IK Vendors.
O&M can be done IK Engineers with proper training.
THANK YOU

More Related Content

What's hot

Wind power plant
Wind power plantWind power plant
Wind power plantshrey1993
 
Deserticbuildenergysolution 2015
Deserticbuildenergysolution 2015Deserticbuildenergysolution 2015
Deserticbuildenergysolution 2015Med Seghair
 
Israel building world’s tallest solar tower
Israel building world’s tallest solar towerIsrael building world’s tallest solar tower
Israel building world’s tallest solar towerBizLed
 
Scope of solar thermal power plants in India
Scope of solar thermal power plants in IndiaScope of solar thermal power plants in India
Scope of solar thermal power plants in IndiaRAJ BAIRWA
 
Secure Supplies Group Plan PDF ..ppsx
Secure Supplies Group Plan PDF ..ppsxSecure Supplies Group Plan PDF ..ppsx
Secure Supplies Group Plan PDF ..ppsxDaniel Donatelli
 
solar chimney power plant
solar chimney power plantsolar chimney power plant
solar chimney power plantRipal Maravia
 
CSPTower_Final_061214_MasterThesis
CSPTower_Final_061214_MasterThesisCSPTower_Final_061214_MasterThesis
CSPTower_Final_061214_MasterThesisMohamed Bahaa Noaman
 
50 Mwe Concentrated Solar Power Plant (1)
50 Mwe Concentrated Solar Power Plant (1)50 Mwe Concentrated Solar Power Plant (1)
50 Mwe Concentrated Solar Power Plant (1)VICTOR MANICKAM
 
Ess 116 Group Teaching Project Chapt 14
Ess 116 Group Teaching Project Chapt 14Ess 116 Group Teaching Project Chapt 14
Ess 116 Group Teaching Project Chapt 14Beth Theve
 
Chapter 2 solar energy 2021 part 2
Chapter 2 solar energy 2021 part 2Chapter 2 solar energy 2021 part 2
Chapter 2 solar energy 2021 part 2Prof . Ghada Amer
 
Solar chimney by chetan
Solar chimney by chetanSolar chimney by chetan
Solar chimney by chetanchetan more
 
concentrated solar powerplant
concentrated solar powerplant concentrated solar powerplant
concentrated solar powerplant Rasmin Sahoo
 
Concerntatini solar plant ppt
Concerntatini solar plant pptConcerntatini solar plant ppt
Concerntatini solar plant pptkarmbir saini
 
csp (concentrated solar power) technology
csp (concentrated solar power) technologycsp (concentrated solar power) technology
csp (concentrated solar power) technologyArvind Dautaniya
 

What's hot (20)

Wind power plant
Wind power plantWind power plant
Wind power plant
 
Deserticbuildenergysolution 2015
Deserticbuildenergysolution 2015Deserticbuildenergysolution 2015
Deserticbuildenergysolution 2015
 
Israel building world’s tallest solar tower
Israel building world’s tallest solar towerIsrael building world’s tallest solar tower
Israel building world’s tallest solar tower
 
Scope of solar thermal power plants in India
Scope of solar thermal power plants in IndiaScope of solar thermal power plants in India
Scope of solar thermal power plants in India
 
Secure Supplies Group Plan PDF ..ppsx
Secure Supplies Group Plan PDF ..ppsxSecure Supplies Group Plan PDF ..ppsx
Secure Supplies Group Plan PDF ..ppsx
 
NMRESGI_Concentrating Solar Power and Thermal Energy Storage_Ho
NMRESGI_Concentrating Solar Power and Thermal Energy Storage_HoNMRESGI_Concentrating Solar Power and Thermal Energy Storage_Ho
NMRESGI_Concentrating Solar Power and Thermal Energy Storage_Ho
 
Lunar abridged
Lunar abridgedLunar abridged
Lunar abridged
 
Arc reactor
Arc reactor Arc reactor
Arc reactor
 
solar chimney power plant
solar chimney power plantsolar chimney power plant
solar chimney power plant
 
CSPTower_Final_061214_MasterThesis
CSPTower_Final_061214_MasterThesisCSPTower_Final_061214_MasterThesis
CSPTower_Final_061214_MasterThesis
 
50 Mwe Concentrated Solar Power Plant (1)
50 Mwe Concentrated Solar Power Plant (1)50 Mwe Concentrated Solar Power Plant (1)
50 Mwe Concentrated Solar Power Plant (1)
 
Wind Farm design and Construction
Wind Farm design and ConstructionWind Farm design and Construction
Wind Farm design and Construction
 
013_20160726_Wind energy
013_20160726_Wind energy013_20160726_Wind energy
013_20160726_Wind energy
 
Ess 116 Group Teaching Project Chapt 14
Ess 116 Group Teaching Project Chapt 14Ess 116 Group Teaching Project Chapt 14
Ess 116 Group Teaching Project Chapt 14
 
Chapter 2 solar energy 2021 part 2
Chapter 2 solar energy 2021 part 2Chapter 2 solar energy 2021 part 2
Chapter 2 solar energy 2021 part 2
 
Solar chimney by chetan
Solar chimney by chetanSolar chimney by chetan
Solar chimney by chetan
 
concentrated solar powerplant
concentrated solar powerplant concentrated solar powerplant
concentrated solar powerplant
 
Concerntatini solar plant ppt
Concerntatini solar plant pptConcerntatini solar plant ppt
Concerntatini solar plant ppt
 
csp (concentrated solar power) technology
csp (concentrated solar power) technologycsp (concentrated solar power) technology
csp (concentrated solar power) technology
 
Wind power
Wind powerWind power
Wind power
 

Viewers also liked

Arusha | Jun-14 | Technical Capacity Building in Solar PV Installation and Ma...
Arusha | Jun-14 | Technical Capacity Building in Solar PV Installation and Ma...Arusha | Jun-14 | Technical Capacity Building in Solar PV Installation and Ma...
Arusha | Jun-14 | Technical Capacity Building in Solar PV Installation and Ma...Smart Villages
 
Integrated Passive Solar Design: The Essence of a Green Building
Integrated Passive Solar Design: The Essence of a Green BuildingIntegrated Passive Solar Design: The Essence of a Green Building
Integrated Passive Solar Design: The Essence of a Green BuildingCenter for Sustainable Energy
 
Building integrated PV - technical issues - part 1
Building integrated PV - technical issues - part 1Building integrated PV - technical issues - part 1
Building integrated PV - technical issues - part 1ENBC
 
Il CSP di piccola taglia e il calore di processo: esempi pratici e casi studi...
Il CSP di piccola taglia e il calore di processo: esempi pratici e casi studi...Il CSP di piccola taglia e il calore di processo: esempi pratici e casi studi...
Il CSP di piccola taglia e il calore di processo: esempi pratici e casi studi...Sardegna Ricerche
 
Solar PV - Available Technologies and making it happen. Dr Dan Davies (Solarc...
Solar PV - Available Technologies and making it happen. Dr Dan Davies (Solarc...Solar PV - Available Technologies and making it happen. Dr Dan Davies (Solarc...
Solar PV - Available Technologies and making it happen. Dr Dan Davies (Solarc...Farming Futures
 
Indoor environmental quality of green building
Indoor environmental quality of green buildingIndoor environmental quality of green building
Indoor environmental quality of green buildingSai Bhaskar Reddy Nakka
 
Basic Introduction to solar PV System.
Basic Introduction to solar PV System.Basic Introduction to solar PV System.
Basic Introduction to solar PV System.Urval Chotalia
 
INDOOR ENVIRONMENTAL QUALITY FOR GREEN BUILDINGS
INDOOR ENVIRONMENTAL QUALITY FOR GREEN BUILDINGSINDOOR ENVIRONMENTAL QUALITY FOR GREEN BUILDINGS
INDOOR ENVIRONMENTAL QUALITY FOR GREEN BUILDINGSNischay N Gowda
 
Building Climatology - HEAT
Building Climatology - HEATBuilding Climatology - HEAT
Building Climatology - HEATAnsif Habib
 
Passive solar presentation 9.15
Passive solar presentation 9.15Passive solar presentation 9.15
Passive solar presentation 9.15keyalea
 
sunpath diagrams- different forms and their uses in functional design
sunpath diagrams- different forms and their uses in functional designsunpath diagrams- different forms and their uses in functional design
sunpath diagrams- different forms and their uses in functional designKOMPELLA KASYAPA SRIRAM
 
Climatology & Architecture
Climatology & ArchitectureClimatology & Architecture
Climatology & ArchitectureAr. Mukunda K.S
 
Climatology in architecture
Climatology in architectureClimatology in architecture
Climatology in architectureSadanand Kumar
 
Architecture for hot and humid climate
Architecture for hot and humid climateArchitecture for hot and humid climate
Architecture for hot and humid climateAsmita Rawool
 

Viewers also liked (20)

Saudi energy
Saudi energySaudi energy
Saudi energy
 
Arusha | Jun-14 | Technical Capacity Building in Solar PV Installation and Ma...
Arusha | Jun-14 | Technical Capacity Building in Solar PV Installation and Ma...Arusha | Jun-14 | Technical Capacity Building in Solar PV Installation and Ma...
Arusha | Jun-14 | Technical Capacity Building in Solar PV Installation and Ma...
 
Integrated Passive Solar Design: The Essence of a Green Building
Integrated Passive Solar Design: The Essence of a Green BuildingIntegrated Passive Solar Design: The Essence of a Green Building
Integrated Passive Solar Design: The Essence of a Green Building
 
Building integrated PV - technical issues - part 1
Building integrated PV - technical issues - part 1Building integrated PV - technical issues - part 1
Building integrated PV - technical issues - part 1
 
Il CSP di piccola taglia e il calore di processo: esempi pratici e casi studi...
Il CSP di piccola taglia e il calore di processo: esempi pratici e casi studi...Il CSP di piccola taglia e il calore di processo: esempi pratici e casi studi...
Il CSP di piccola taglia e il calore di processo: esempi pratici e casi studi...
 
Solar PV - Available Technologies and making it happen. Dr Dan Davies (Solarc...
Solar PV - Available Technologies and making it happen. Dr Dan Davies (Solarc...Solar PV - Available Technologies and making it happen. Dr Dan Davies (Solarc...
Solar PV - Available Technologies and making it happen. Dr Dan Davies (Solarc...
 
Solar power in green building
Solar power in green buildingSolar power in green building
Solar power in green building
 
Indoor environmental quality of green building
Indoor environmental quality of green buildingIndoor environmental quality of green building
Indoor environmental quality of green building
 
Basic Introduction to solar PV System.
Basic Introduction to solar PV System.Basic Introduction to solar PV System.
Basic Introduction to solar PV System.
 
INDOOR ENVIRONMENTAL QUALITY FOR GREEN BUILDINGS
INDOOR ENVIRONMENTAL QUALITY FOR GREEN BUILDINGSINDOOR ENVIRONMENTAL QUALITY FOR GREEN BUILDINGS
INDOOR ENVIRONMENTAL QUALITY FOR GREEN BUILDINGS
 
Building Climatology - HEAT
Building Climatology - HEATBuilding Climatology - HEAT
Building Climatology - HEAT
 
Energy Efficient Architecture-Sustainable Habitat
Energy Efficient Architecture-Sustainable HabitatEnergy Efficient Architecture-Sustainable Habitat
Energy Efficient Architecture-Sustainable Habitat
 
Passive solar presentation 9.15
Passive solar presentation 9.15Passive solar presentation 9.15
Passive solar presentation 9.15
 
sunpath diagrams- different forms and their uses in functional design
sunpath diagrams- different forms and their uses in functional designsunpath diagrams- different forms and their uses in functional design
sunpath diagrams- different forms and their uses in functional design
 
Solar pv systems
Solar pv systemsSolar pv systems
Solar pv systems
 
Hot and dry climate
Hot and dry climateHot and dry climate
Hot and dry climate
 
Passive cooling
Passive coolingPassive cooling
Passive cooling
 
Climatology & Architecture
Climatology & ArchitectureClimatology & Architecture
Climatology & Architecture
 
Climatology in architecture
Climatology in architectureClimatology in architecture
Climatology in architecture
 
Architecture for hot and humid climate
Architecture for hot and humid climateArchitecture for hot and humid climate
Architecture for hot and humid climate
 

Similar to Saudi energy options

Renewable energy technologies and their potential
Renewable energy technologies and their potentialRenewable energy technologies and their potential
Renewable energy technologies and their potentialRahul Gupta
 
Power plant, an overview of power sector of Bangladesh
Power plant, an overview of power sector of BangladeshPower plant, an overview of power sector of Bangladesh
Power plant, an overview of power sector of BangladeshTarek Erin
 
Concentrated Solar Power Plant
Concentrated Solar Power PlantConcentrated Solar Power Plant
Concentrated Solar Power PlantIRJET Journal
 
Document--Different types of wind farms.
Document--Different types of wind farms.Document--Different types of wind farms.
Document--Different types of wind farms.sannuthi yaramapu
 
Final solar agro sprayer
Final solar agro sprayerFinal solar agro sprayer
Final solar agro sprayerMukesh Chitte
 
Irrigation water production1
Irrigation water production1Irrigation water production1
Irrigation water production1Orhan UTLU
 
Renewable Energy and conventional power integration
Renewable Energy and conventional power integrationRenewable Energy and conventional power integration
Renewable Energy and conventional power integrationManish Sah
 
DESIGNING OF HYBRID POWER GRID FOR REMOTE VILLAGE
DESIGNING OF HYBRID POWER GRID FOR REMOTE VILLAGEDESIGNING OF HYBRID POWER GRID FOR REMOTE VILLAGE
DESIGNING OF HYBRID POWER GRID FOR REMOTE VILLAGERAJBALA PURNIMA PRIYA
 
Applications of Solar Energy
Applications of Solar EnergyApplications of Solar Energy
Applications of Solar EnergyKartik Thakkar
 
Renewable energy considerations for the Bahamas
Renewable energy considerations for the BahamasRenewable energy considerations for the Bahamas
Renewable energy considerations for the BahamasCharvari Watson
 
Resource conserving architecture strategies for existing school
Resource conserving architecture   strategies for existing schoolResource conserving architecture   strategies for existing school
Resource conserving architecture strategies for existing schoolSoumitra Smart
 
Nuclear power plant kakarapar
Nuclear power plant kakaraparNuclear power plant kakarapar
Nuclear power plant kakaraparnaitik997
 
Renewable Energy Presentation
Renewable Energy PresentationRenewable Energy Presentation
Renewable Energy PresentationEvan Norman
 

Similar to Saudi energy options (20)

Concentrating Solar Power
Concentrating Solar PowerConcentrating Solar Power
Concentrating Solar Power
 
Solar thermal technologies
Solar thermal technologiesSolar thermal technologies
Solar thermal technologies
 
Renewable Energy.pptx
Renewable Energy.pptxRenewable Energy.pptx
Renewable Energy.pptx
 
Renewable energy technologies and their potential
Renewable energy technologies and their potentialRenewable energy technologies and their potential
Renewable energy technologies and their potential
 
Power plant, an overview of power sector of Bangladesh
Power plant, an overview of power sector of BangladeshPower plant, an overview of power sector of Bangladesh
Power plant, an overview of power sector of Bangladesh
 
Concentrated Solar Power Plant
Concentrated Solar Power PlantConcentrated Solar Power Plant
Concentrated Solar Power Plant
 
Document--Different types of wind farms.
Document--Different types of wind farms.Document--Different types of wind farms.
Document--Different types of wind farms.
 
Green Engineering in Green Energy & Alternative Fuel
Green Engineering in Green Energy & Alternative Fuel Green Engineering in Green Energy & Alternative Fuel
Green Engineering in Green Energy & Alternative Fuel
 
Final solar agro sprayer
Final solar agro sprayerFinal solar agro sprayer
Final solar agro sprayer
 
Irrigation water production1
Irrigation water production1Irrigation water production1
Irrigation water production1
 
Renewable Energy and conventional power integration
Renewable Energy and conventional power integrationRenewable Energy and conventional power integration
Renewable Energy and conventional power integration
 
DESIGNING OF HYBRID POWER GRID FOR REMOTE VILLAGE
DESIGNING OF HYBRID POWER GRID FOR REMOTE VILLAGEDESIGNING OF HYBRID POWER GRID FOR REMOTE VILLAGE
DESIGNING OF HYBRID POWER GRID FOR REMOTE VILLAGE
 
Applications of Solar Energy
Applications of Solar EnergyApplications of Solar Energy
Applications of Solar Energy
 
Wind Energy | M-Azeem Jalbani |
Wind Energy | M-Azeem Jalbani | Wind Energy | M-Azeem Jalbani |
Wind Energy | M-Azeem Jalbani |
 
Renewable energy considerations for the Bahamas
Renewable energy considerations for the BahamasRenewable energy considerations for the Bahamas
Renewable energy considerations for the Bahamas
 
Resource conserving architecture strategies for existing school
Resource conserving architecture   strategies for existing schoolResource conserving architecture   strategies for existing school
Resource conserving architecture strategies for existing school
 
Nuclear power plant kakarapar
Nuclear power plant kakaraparNuclear power plant kakarapar
Nuclear power plant kakarapar
 
Arun
ArunArun
Arun
 
Renewable Energy Presentation
Renewable Energy PresentationRenewable Energy Presentation
Renewable Energy Presentation
 
Important issues for fossil power plants for the 21st Century - Robin Irons a...
Important issues for fossil power plants for the 21st Century - Robin Irons a...Important issues for fossil power plants for the 21st Century - Robin Irons a...
Important issues for fossil power plants for the 21st Century - Robin Irons a...
 

More from Periasamy K

1.top 10 agenda population control (1)
1.top 10 agenda   population control (1)1.top 10 agenda   population control (1)
1.top 10 agenda population control (1)Periasamy K
 
Nuclear energy how much bad it is
Nuclear energy   how much bad it isNuclear energy   how much bad it is
Nuclear energy how much bad it isPeriasamy K
 
Manifesto Parliament Elections - 2014
Manifesto Parliament Elections - 2014Manifesto Parliament Elections - 2014
Manifesto Parliament Elections - 2014Periasamy K
 
Per capita food production upa-nda-upa
Per capita food production   upa-nda-upaPer capita food production   upa-nda-upa
Per capita food production upa-nda-upaPeriasamy K
 
Inflation upa-nda-upa
Inflation      upa-nda-upaInflation      upa-nda-upa
Inflation upa-nda-upaPeriasamy K
 
Gdp growth rate upa-nda-upa
Gdp growth rate upa-nda-upaGdp growth rate upa-nda-upa
Gdp growth rate upa-nda-upaPeriasamy K
 
River inter linking is it really a mirage
River inter linking   is it really a mirageRiver inter linking   is it really a mirage
River inter linking is it really a miragePeriasamy K
 
Indian gdp growth story what to expect
Indian gdp growth story   what to expectIndian gdp growth story   what to expect
Indian gdp growth story what to expectPeriasamy K
 
Energy options for india
Energy options for indiaEnergy options for india
Energy options for indiaPeriasamy K
 
FDI in India - An Analysis
FDI in India - An AnalysisFDI in India - An Analysis
FDI in India - An AnalysisPeriasamy K
 
Germany india comparison
Germany   india comparisonGermany   india comparison
Germany india comparisonPeriasamy K
 
Germany : India - Energy Comparison
Germany : India - Energy ComparisonGermany : India - Energy Comparison
Germany : India - Energy ComparisonPeriasamy K
 
Indian gdp growth story what to expect
Indian gdp growth story   what to expectIndian gdp growth story   what to expect
Indian gdp growth story what to expectPeriasamy K
 
India Economic data
India Economic dataIndia Economic data
India Economic dataPeriasamy K
 
Indian Agricultural Data Analysis
Indian Agricultural Data AnalysisIndian Agricultural Data Analysis
Indian Agricultural Data AnalysisPeriasamy K
 

More from Periasamy K (17)

1.top 10 agenda population control (1)
1.top 10 agenda   population control (1)1.top 10 agenda   population control (1)
1.top 10 agenda population control (1)
 
Nuclear energy how much bad it is
Nuclear energy   how much bad it isNuclear energy   how much bad it is
Nuclear energy how much bad it is
 
Manifesto Parliament Elections - 2014
Manifesto Parliament Elections - 2014Manifesto Parliament Elections - 2014
Manifesto Parliament Elections - 2014
 
Per capita food production upa-nda-upa
Per capita food production   upa-nda-upaPer capita food production   upa-nda-upa
Per capita food production upa-nda-upa
 
Inflation upa-nda-upa
Inflation      upa-nda-upaInflation      upa-nda-upa
Inflation upa-nda-upa
 
Gdp growth rate upa-nda-upa
Gdp growth rate upa-nda-upaGdp growth rate upa-nda-upa
Gdp growth rate upa-nda-upa
 
River inter linking is it really a mirage
River inter linking   is it really a mirageRiver inter linking   is it really a mirage
River inter linking is it really a mirage
 
Indian gdp growth story what to expect
Indian gdp growth story   what to expectIndian gdp growth story   what to expect
Indian gdp growth story what to expect
 
Organic farming
Organic farmingOrganic farming
Organic farming
 
Energy options for india
Energy options for indiaEnergy options for india
Energy options for india
 
FDI in India - An Analysis
FDI in India - An AnalysisFDI in India - An Analysis
FDI in India - An Analysis
 
Germany india comparison
Germany   india comparisonGermany   india comparison
Germany india comparison
 
Germany : India - Energy Comparison
Germany : India - Energy ComparisonGermany : India - Energy Comparison
Germany : India - Energy Comparison
 
Energy data
Energy dataEnergy data
Energy data
 
Indian gdp growth story what to expect
Indian gdp growth story   what to expectIndian gdp growth story   what to expect
Indian gdp growth story what to expect
 
India Economic data
India Economic dataIndia Economic data
India Economic data
 
Indian Agricultural Data Analysis
Indian Agricultural Data AnalysisIndian Agricultural Data Analysis
Indian Agricultural Data Analysis
 

Recently uploaded

Edukaciniai dropshipping via API with DroFx
Edukaciniai dropshipping via API with DroFxEdukaciniai dropshipping via API with DroFx
Edukaciniai dropshipping via API with DroFxolyaivanovalion
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service AmravatiVIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
BabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptxBabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptxolyaivanovalion
 
Week-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interactionWeek-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interactionfulawalesam
 
FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfMarinCaroMartnezBerg
 
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiLow Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiSuhani Kapoor
 
定制英国白金汉大学毕业证(UCB毕业证书) 成绩单原版一比一
定制英国白金汉大学毕业证(UCB毕业证书)																			成绩单原版一比一定制英国白金汉大学毕业证(UCB毕业证书)																			成绩单原版一比一
定制英国白金汉大学毕业证(UCB毕业证书) 成绩单原版一比一ffjhghh
 
Data-Analysis for Chicago Crime Data 2023
Data-Analysis for Chicago Crime Data  2023Data-Analysis for Chicago Crime Data  2023
Data-Analysis for Chicago Crime Data 2023ymrp368
 
Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfLars Albertsson
 
Halmar dropshipping via API with DroFx
Halmar  dropshipping  via API with DroFxHalmar  dropshipping  via API with DroFx
Halmar dropshipping via API with DroFxolyaivanovalion
 
Invezz.com - Grow your wealth with trading signals
Invezz.com - Grow your wealth with trading signalsInvezz.com - Grow your wealth with trading signals
Invezz.com - Grow your wealth with trading signalsInvezz1
 
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...Suhani Kapoor
 
Introduction-to-Machine-Learning (1).pptx
Introduction-to-Machine-Learning (1).pptxIntroduction-to-Machine-Learning (1).pptx
Introduction-to-Machine-Learning (1).pptxfirstjob4
 
04242024_CCC TUG_Joins and Relationships
04242024_CCC TUG_Joins and Relationships04242024_CCC TUG_Joins and Relationships
04242024_CCC TUG_Joins and Relationshipsccctableauusergroup
 
Brighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data StorytellingBrighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data StorytellingNeil Barnes
 

Recently uploaded (20)

Edukaciniai dropshipping via API with DroFx
Edukaciniai dropshipping via API with DroFxEdukaciniai dropshipping via API with DroFx
Edukaciniai dropshipping via API with DroFx
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
 
Sampling (random) method and Non random.ppt
Sampling (random) method and Non random.pptSampling (random) method and Non random.ppt
Sampling (random) method and Non random.ppt
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service AmravatiVIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
 
BabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptxBabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptx
 
Week-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interactionWeek-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interaction
 
FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdf
 
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiLow Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
 
定制英国白金汉大学毕业证(UCB毕业证书) 成绩单原版一比一
定制英国白金汉大学毕业证(UCB毕业证书)																			成绩单原版一比一定制英国白金汉大学毕业证(UCB毕业证书)																			成绩单原版一比一
定制英国白金汉大学毕业证(UCB毕业证书) 成绩单原版一比一
 
Data-Analysis for Chicago Crime Data 2023
Data-Analysis for Chicago Crime Data  2023Data-Analysis for Chicago Crime Data  2023
Data-Analysis for Chicago Crime Data 2023
 
Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdf
 
Halmar dropshipping via API with DroFx
Halmar  dropshipping  via API with DroFxHalmar  dropshipping  via API with DroFx
Halmar dropshipping via API with DroFx
 
Invezz.com - Grow your wealth with trading signals
Invezz.com - Grow your wealth with trading signalsInvezz.com - Grow your wealth with trading signals
Invezz.com - Grow your wealth with trading signals
 
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
 
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
 
Introduction-to-Machine-Learning (1).pptx
Introduction-to-Machine-Learning (1).pptxIntroduction-to-Machine-Learning (1).pptx
Introduction-to-Machine-Learning (1).pptx
 
04242024_CCC TUG_Joins and Relationships
04242024_CCC TUG_Joins and Relationships04242024_CCC TUG_Joins and Relationships
04242024_CCC TUG_Joins and Relationships
 
Brighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data StorytellingBrighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data Storytelling
 
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Kishangarh
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in  KishangarhDelhi 99530 vip 56974 Genuine Escort Service Call Girls in  Kishangarh
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Kishangarh
 

Saudi energy options

  • 1. ENERGY OPTIONS FOR SAUDI ARABIA BY K.PERIASAMY
  • 2. REF : KA CARE
  • 3.
  • 5. TOTAL HEAT ENERGY SPENT ON POWER GENERATION = 604 TWh TOTAL ELECTRICITY (UNITS) PRODUCED = 204 TWh EFFICIENCY = 34% OUT OF THIS TOTAL ELECTRICITY PRODCUED, A) 40% IS USED FOR HEATING IN WINTER 4 MONTHS & B) 70% IS USED FOR COOLING IN SUMMER 8 MONTHS Note : 1 KWHr = 860 KCal WHAT IS BEING DONE NOW ?
  • 6. 1. GENERATING ELECTRICITY FROM HEAT @ 34% EFFICIENCY AND USING IT BACK FOR HEATING IS NOT THE RIGHT WAY. 2. IN COOLING ALSO, ELECTRICITY USAGE IS VERY POOR. THERE ARE OTHER MEANS OF COOLING. (HEAT ITSELF CAN BE USED FOR COOLING). IS THIS THE RIGHT WAY OF ENERGY USAGE?
  • 7. WHAT IS THE RIGHT ENERGY GENERATION & USAGE COMBINATION FOR SAUDI ARABIA ?
  • 9. PEAK DEMAND IN SUMMER (WORKING DAY) = 120 GW PEAK DEMAND IN WINTER (HOLIDAY) = 70 GW WE NEED TO PLAN FOR MEETING THE PEAK DEMAND IN SUMMER ( WORKING DAY ) i.e 120 GW HENCE, WE NEED TO ADD A CAPACITY OF 60 GW TO THE EXISTING CAPACITY OF 60 GW. 2032 : DEMAND PATERN
  • 10. 1. TOTAL INCREASE FROM 2014 = 60 GW 2. INCREASE FROM HVAC ALONE = 40 to 50 GW 3. DIFF BETWEEN DAY & NIGHT PEAK DEMAND ( SUMMER) = 10 GW ( EXCEPTING THE MORNING OFF PEAK PERIOD ) THIS DAY & NIGHT DIFFERENCE IS LOWER COMPARED TO THE PRESENT LEVEL OF ABOUT 20 GW DUE TO EXPECTED INCREASE IN OTHER LOADS DURING NIGHT TIME, IN THE NEXT 20 YEARS. 2032 : DEMAND INCREASE
  • 11. WHAT SHOULD BE THE PLAN ? 1. HVAC DEMAND IS HIGH IN SUMMER MONTHS 2. HVAC DEMAND IS HIGH IN DAY TIME ( BOTH IN SUMMER AND WINTER ) HENCE, IT IS BETTER TO USE SOLAR ENERGY FOR HVAC. SOLAR PERFECTLY COINCIDES WITH THE HVAC DEMAND, EXCEPT FOR ABOUT 8 HOURS IN THE NIGHT. DO NOT USE OIL / GAS TO PRODUCE ELECTRICITY FOR HVAC PURPOSE.
  • 12. USE OF SOLAR ENERGY FOR HVAC THERE ARE TWO WAYS OF USING SOLAR ENERGY FOR HVAC : 1. USE SOLAR ENERGY TO GENERATE ELECTRICITY THROUGH PHOTOVOLTOIC (PV) CELLS or CONCENTRATED SOLAR THERMAL POWER PLANT ( CSP) AND USE IT IN CONVENTIONAL AC MACHINES. 2. USE THE SOLAR HEAT DIRECTLY IN VACUUM ABSORPTION CHILLER(VAC) BASED AC MACHINES.
  • 13. COMPARISON OF CONVENTIONAL AC & VAC MACHINES 1. INVESTMENTS REQUIRED CONVENTIONAL AC MACHINES a) POWER PLANT b) TRANSMISSION c) AC MACHINES VAC MACHINES a) VAC MACHINE ONLY
  • 14. COMPARISON OF CONVENTIONAL AC & VAC MACHINES 2. UTILISATION OF INVESTMENT CONVENTIONAL AC MACHINES a) ONLY IN SUMMER b) MOST WINDOW AC MACHINES HAVE NO HEATING PROVISION. HENCE SEPARATE HEATER IS REQUIRED. VAC MACHINES a) VAC CAN BE USED AS A HEATER ALSO WITH HOT WATER FLOWING IN THE SAME COIL.
  • 15. COMPARISON OF CONVENTIONAL AC & VAC MACHINES 3. ENERGY STORAGE CONVENTIONAL AC MACHINES a) PV BASED SOLAR – NOT POSSIBLE b) CSP BASED SOLAR - ADDITIONAL INVESTMENT REQUIRED (MOLTEN SALT) VAC MACHINES a) VAC CAN BE USED WITH LOCAL STORAGE OPTION ( SIMPLE HOT / COLD WATER STORAGE)
  • 16. COMPARISON OF CONVENTIONAL AC & VAC MACHINES 4. ENERGY EFFICIENCY CONVENTIONAL AC MACHINES a) ABOUT 1470 Kcal OF HEAT ENERGY IS USED FOR EVERY 1000 Kcal COOLING ( COP = 2 & ELECTRICITY GENERATION EFF = 34%) b) 2940 Kcal HEAT ENERGY IS USED FOR EVERY 1000 Kcal OF HEATING c) THERE IS 12% TRANSMISSION LOSS VAC MACHINES a) 1450 Kcal HEAT IS USED FOR EVERY 1000 Kcal COOLING ( COP= 0.7 ) b) 1000 Kcal HEAT ENERGY IS USED FOR EVERY 1000 Kcal OF HEATING
  • 17. VACUUM ABSORPTION CHILLERS ARE BETTER FOR HVAC ! 1. SO, IT IS BETTER TO GO FOR VAPOUR ABSORPTION CHILLER(VAC) BASED AC MACHINES. PRODUCING ELECTRICITY WITH PV or CSP SOLAR POWER PLANTS AND THEN USING IT IN CONVENTIONAL AC MACHINES IS NOT A RIGHT CHOICE. 2. VAC MACHINES CAN BE INSTALLED IN ALL BUILDINGS WHERE TOTAL AC LOAD IS MORE THAN 50 Tons. TERRACE AND CAR PARK AREAS CAN BE USED FOR INSTALLING SOLAR REFLECTORS. 3. OUT OF ABOUT 40 GW OF ADDITIONAL LOAD FROM HVAC IN 2032, WE CAN INSTALL VAC FOR ABOUT 15 GW. OLD BUILDINGS : 5 GW, NEW BUILDINGS : 10 GW. 4. THE BALANCE 25 GW CAN BE MET BY SOLAR CSP / PV & NUCLEAR.
  • 18. SOLAR CSP or PV ? 1. SOLAR CSP WITH MOLTEN SALT STORAGE SHALL BE PREFERED OVER SOLAR PV. THIS IS BECAUSE, THE DIFFERENCE BETWEEN DAY AND NIGHT LOADS IS GETTING NARROWED TO 10 GW ONLY, AND WE NEED TO STORE THE SOLAR ENERGY FOR NIGHT USAGE, IF WE HAVE TO EFFECTIVLEY USE SOLAR ENERGY. 2. FOR STORING LARGE QUANTITIES OF ENERGY, MOLTEN SALT IS THE SECOND BEST OPTION AFTER PUMPED STORAGE HYDEL POWER PLANTS. 3. HENCE, OUT OF 25 GW OF SOLAR PV / CSP & NUCLEAR, 10 GW SHALL BE FROM CSP, 5 GW FROM PV. BALANCE SHALL BE FROM NUCLEAR, ALONG WITH OTHER BASE LOAD REQUIREMENTS.
  • 19. WHAT ABOUT DESALINATION ? PRESENT DESALINATION REQUIREMENT = 3 Mn M^3/ Day PROJECTED DEMAND BY 2032 = 9 Mn M^3/ Day ADDITIONAL DEMAND BY 2032 = 6 Mn M^3/ Day ENERGY REQUIREMENT IN RO DESALINAITON = 4 KWh/ M^3 TOTAL ENERGY REQUIRED / Day = 24 Mn KWh DESALINATION CAN BE PLANNED DURING 6 HOURS OF OFF PEAK DEMAND PERIOD ( 04.00 to 10.00 AM ) WITH THIS, THE ELECTRICITY LOAD(GW) FOR DESALINATION = 4 GW THIS IS NOT MUCH. THIS CAN BE MANAGED FROM BASE LOAD POWER PLANTS ( NUCLEAR) AND SOLAR CSP DURING OFF PEAK PERIODS.
  • 20. 2032 : MEETING THE DEMAND NUCLEAR : 30 GW SOLAR BASED VAC : 15 GW SOLAR PV : 5 GW SOLAR CSP : 10 GW TOTAL : 60 GW
  • 21. MEETING THE DEMAND SOLAR PV SOLAR CSP SOLAR VAC NUCLEAR NEW COMMITTED EXISTING DIESEL EXISTING HFO EXISTING CRUDE / GAS
  • 22. 2032 : OPTIONS TO EXPLORE 1. NUCLEAR SHARE CAN BE INCREASED BEYOND 30 GW, IF PART OF THE COMMITTED ( OIL / GAS BASED ) POWER PLANTS CAN BE REVERSED. - NUCLEAR IS CLEAN, SAFE AND CHEAPER. - SPENT FUEL REPROCESSING AND WASTE MANAGEMENT ARE SIMPLE TECHNOLOGIES ALREADY AVAILABLE IN MANY COUNTRIES. - SPENT FUEL REPROCESSING AND RECOVERY OF PLUTONIUM FOR RECYCLE BACK INTO THE REACTORS PROVIDES LONG TERM ENERGY SECURITY. 2. NUCLEAR POWER PLANTS CAN BE EASILY BUILT IN UNDER DEVELOPED COASTAL REGIONS. PROXIMITY OF FUEL AVAILABILITY IS NOT APPLICABLE FOR NUCLEAR, LIKE IN OIL / GAS. - INLAND NUCLEAR POWER PLANTS MAY BE AVOIDED IN KSA DUE TO LIMITED COOLING WATER AVAILABILITY. 3. ALL NEW DESALINATION PLANTS CAN BE MADE PART OF NUCLEAR POWER PLANTS FOR, - EFFECTIVE UTILISATION OF NUCLEAR POWER PLANTS DURING OFF PEAK PERIODS. - EFFECTIVE UTILISATION OF SEA WATER INTAKE / DISCHANRGE INFRASTRUCTURE CREATED FOR COOLING WATER. - UTILIZING PART OF THE HOT WATER DISCHARGED FROM POWER PLANT FOR DESALINATION.
  • 23. WHAT ABOUT WIND MILLS ? 1. IT IS INFIRM ( UNPREDICTABLE ) 2. SAUDI WIND SITES HAVE JUST ABOUT 4 M/Sec to 6 M/Sec WIND VELOCITY AS AGAINST THE RATED WIND SPEEDS OF 14 TO 15 M/Sec FOR THE WIND MILLS. 3. THE RESULT : PLANT LOAD FACTOR IS HARDLY 10-20% ( COMPARE IT WITH 80 TO 90% FOR NUCLEAR POWER !) 4. O&M MANPOWER REQUIREMENT IS HIGH. HENCE, IT IS NOT ADVISABLE TO GO FOR WIND MILLS IN SAUDI ARABIA.
  • 24. REGION WISE DEMAND FORECAST
  • 25.
  • 26. REGIONWSIE PLAN 1. EASTERN OPERATING AREA ( EOA) & CENTRAL OEPARATING AREA ( COA) ACCOUNT FOR 50% LOAD INCREASE. - SHARE OF HVAC LOAD IS LESSER. SOLAR IRRADIATION IS ALSO LOWER. - HENCE, NUCLEAR POWER PLANTS CAN BE BUILT IN THE EASTERN REGION ALONG THE GULF COAST. 2. SOUTHERN OPERATING AREA ( SOA) CAN HAVE NUCLEAR POWER PLANT WITH DESALINATION ALONG RED SEA COAST, AS PART OF AREA DEVELOPEMNT PLAN. 3. WESTERN OPERATING AREA ( WOA) CAN HAVE HIGHER PROPORTION OF SOLAR SINCE, - IT HAS GOOD SOLAR IRRADIANCE. - HVAC LOAD IS ALSO HIGHER.
  • 27. WHAT ABOUT IK PROCUREMENT & EMPLOYMENT ? 1. VACUUM ABSORPTION CHILLERS : These can be completely manufactured in Saudi Arabia, excepting a few special pumps. Existing Market leaders will be more than willing to set up In-Kingdom facilities if KSA announces a firm policy on VAC. The Saudi Facilities will become a manufacturing hub for other Middle East Countries. Installation and servicing will be done by the Manufacturers / Service providers. 2. PV SOLAR : The Solar Cells can be imported and all other structural steel fabrication and installation can be done by IK Vendors.
  • 28. WHAT ABOUT IK PROCUREMENT & EMPLOYMENT ? 3. CONCENTRATED SOLAR THERMAL POWER PLANTS : These can be completely manufactured in Saudi Arabia, except the Turbines & Generators. Existing Market leaders will be more than willing to set up In-Kingdom facilities if KSA announces a firm policy on CSP. The Saudi Facilities will become a manufacturing hub for other Middle East Countries. Installation and servicing will be done by the Manufacturers / Service providers. 4. NUCLEAR POWER : All major equipment need to be imported. However, Civil and Piping activities can be done by IK Vendors. O&M can be done IK Engineers with proper training.