Qatar Petroleum Procedure
DESIGN & CONSTRUCT
NEW ORBITAL HIGHWAY AND TRUCK ROUTE (P023)
Contract 3: Orbital Highway Mesaieed to Salwa Road
PROJECT ID: IA 12/13 C 062 ST
26 October 2015
Date: 25/10/2015 Page 1 of 37 QP Pipe Protection Procedures
Removal of QP Pipeline bund wall
Date: 25/10/2015 Page 2 of 37 QP Pipe Protection Procedures
Date: 25/10/2015 Page 3 of 37 QP Pipe Protection Procedures
Trench Excavation close to pipeline
Excavation of hard rock material
Date: 25/10/2015 Page 4 of 37 QP Pipe Protection Procedures
Date: 25/10/2015 Page 5 of 37 QP Pipe Protection Procedures
Excavation and installation of support pedestal
Date: 25/10/2015 Page 6 of 37 QP Pipe Protection Procedures
Trimming of excavation in preparation for foundation installation
Date: 25/10/2015 Page 7 of 37 QP Pipe Protection Procedures
Excavated formation/foundation level
Date: 25/10/2015 Page 8 of 37 QP Pipe Protection Procedures
Steel plates will be set prior to installation of arch segment
Date: 25/10/2015 Page 9 of 37 QP Pipe Protection Procedures
Restricted zone during element lifting
Date: 25/10/2015 Page 10 of 37 QP Pipe Protection Procedures
Arch Elements transported on flatbed trailer
Date: 25/10/2015 Page 11 of 37 QP Pipe Protection Procedures
Off-Loading Arch elements using Lifting beam
Date: 25/10/2015 Page 12 of 37 QP Pipe Protection Procedures
Storage of Arch Elements on Firm Ground and Proper Dunnage
Date: 25/10/2015 Page 13 of 37 QP Pipe Protection Procedures
Marks on footing keyway
Date: 25/10/2015 Page 14 of 37 QP Pipe Protection Procedures
Marks on unit side face for fast alignment
Date: 25/10/2015 Page 15 of 37 QP Pipe Protection Procedures
Turning of Arch element with Side Brackets
Date: 25/10/2015 Page 16 of 37 QP Pipe Protection Procedures
Installation of steel bracket on the segment
Date: 25/10/2015 Page 17 of 37 QP Pipe Protection Procedures
First arch unit staggered by half width
Date: 25/10/2015 Page 18 of 37 QP Pipe Protection Procedures
Total Station Survey Check of Crown Alignment
Date: 25/10/2015 Page 19 of 37 QP Pipe Protection Procedures
Element in Footing Keyway
(Unit position adjustment using hardwood wedges)
Date: 25/10/2015 Page 20 of 37 QP Pipe Protection Procedures
STEP 4
RELEASE CRANE B.
CRANE A CONTINUES PLACING UNIT
Erection Sequence of the Elements (units)
Date: 25/10/2015 Page 21 of 37 QP Pipe Protection Procedures
Grouting Foundation Keyway
Date: 25/10/2015 Page 22 of 37 QP Pipe Protection Procedures
Fig. A. Backfill Material zones
Fig. B. Backfill material grain size
Date: 25/10/2015 Page 23 of 37 QP Pipe Protection Procedures
Up to existing slope
or final grade
Or minimum one
span
Max
Backfill placement levels - Max. Differential height < 0.50 m
Date: 25/10/2015 Page 24 of 37 QP Pipe Protection Procedures
Crown Beam Reinforcement Prepared According to Approved Drawings
Date: 25/10/2015 Page 25 of 37 QP Pipe Protection Procedures
QP Pipe line protection structure - QP Arch Erection
Date: 25/10/2015 Page 26 of 37 QP Pipe Protection Procedures
QP Pipe line protection structure - QP Arch Erection
Date: 25/10/2015 Page 27 of 37 QP Pipe Protection Procedures
QP Pipe line protection structure - QP Arch Erection
Date: 25/10/2015 Page 28 of 37 QP Pipe Protection Procedures
QP Pipe line protection structure - QP Arch Erection
Date: 25/10/2015 Page 29 of 37 QP Pipe Protection Procedures
QP Pipe line protection structure - QP Arch Erection
Date: 25/10/2015 Page 30 of 37 QP Pipe Protection Procedures
QP Pipe line protection structure - QP Arch Erection
Date: 25/10/2015 Page 31 of 37 QP Pipe Protection Procedures
QP Pipe line protection structure - QP Arch Erection
Date: 25/10/2015 Page 32 of 37 QP Pipe Protection Procedures
QP Pipe line protection structure - QP Arch Erection
Date: 25/10/2015 Page 33 of 37 QP Pipe Protection Procedures
QP Pipe line protection structure - QP Arch Erection
Date: 25/10/2015 Page 34 of 37 QP Pipe Protection Procedures
QP Pipe line protection structure - QP Arch Erection
Date: 25/10/2015 Page 35 of 37 QP Pipe Protection Procedures
QP Pipe line protection structure - QP Arch Erection
Date: 25/10/2015 Page 36 of 37 QP Pipe Protection Procedures
Minimum fill cover before heavy plant can cross the arch
Date: 25/10/2015 Page 37 of 37 QP Pipe Protection Procedures
Table 1 — Earthworks Compaction criteria

More Related Content

What's hot

Marginal satellite study Noordzee
Marginal satellite study NoordzeeMarginal satellite study Noordzee
Marginal satellite study NoordzeeSander_van_oirschot
 
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...Torben Haagh
 
Harald Gilberg - resume this one is up to date
Harald Gilberg - resume this one is up to dateHarald Gilberg - resume this one is up to date
Harald Gilberg - resume this one is up to dateHarold Gilberg
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Association for Project Management
 
Method stm lean concrete
Method stm lean concreteMethod stm lean concrete
Method stm lean concreteMinh Bui Si
 
Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Fred Davidson
 
DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2Ian Kelly
 
Operator As Contractor Saves Offshore installation Costs (Pipeline & Gas Jour...
Operator As Contractor Saves Offshore installation Costs (Pipeline & Gas Jour...Operator As Contractor Saves Offshore installation Costs (Pipeline & Gas Jour...
Operator As Contractor Saves Offshore installation Costs (Pipeline & Gas Jour...Tahar Hajji
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1robinking277
 
CASING SOLUTIONS_OBEN_FIELD_
CASING SOLUTIONS_OBEN_FIELD_CASING SOLUTIONS_OBEN_FIELD_
CASING SOLUTIONS_OBEN_FIELD_Victor Momoh
 
Amit kala (Hydro Mechanical Professional Engineer)
Amit kala (Hydro Mechanical Professional Engineer)Amit kala (Hydro Mechanical Professional Engineer)
Amit kala (Hydro Mechanical Professional Engineer)AmiT```` ````KaLA``>>>
 
Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)petroEDGE
 
Master präsentation pal sys-offshore
Master präsentation pal sys-offshoreMaster präsentation pal sys-offshore
Master präsentation pal sys-offshoreBenji George
 
Master präsentation pal sys-ship
Master präsentation pal sys-shipMaster präsentation pal sys-ship
Master präsentation pal sys-shipBenji George
 

What's hot (18)

Marginal satellite study Noordzee
Marginal satellite study NoordzeeMarginal satellite study Noordzee
Marginal satellite study Noordzee
 
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
 
Harald Gilberg - resume this one is up to date
Harald Gilberg - resume this one is up to dateHarald Gilberg - resume this one is up to date
Harald Gilberg - resume this one is up to date
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
 
Method stm lean concrete
Method stm lean concreteMethod stm lean concrete
Method stm lean concrete
 
Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012
 
DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2
 
Operator As Contractor Saves Offshore installation Costs (Pipeline & Gas Jour...
Operator As Contractor Saves Offshore installation Costs (Pipeline & Gas Jour...Operator As Contractor Saves Offshore installation Costs (Pipeline & Gas Jour...
Operator As Contractor Saves Offshore installation Costs (Pipeline & Gas Jour...
 
Wpd Offshore Eow 2009 Final
Wpd Offshore Eow 2009 FinalWpd Offshore Eow 2009 Final
Wpd Offshore Eow 2009 Final
 
BMT VESSEL DESIGN PORTFOLIO
BMT VESSEL DESIGN PORTFOLIOBMT VESSEL DESIGN PORTFOLIO
BMT VESSEL DESIGN PORTFOLIO
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
 
Muller Mats Werner - CV May, 2016
Muller Mats Werner - CV May, 2016Muller Mats Werner - CV May, 2016
Muller Mats Werner - CV May, 2016
 
CASING SOLUTIONS_OBEN_FIELD_
CASING SOLUTIONS_OBEN_FIELD_CASING SOLUTIONS_OBEN_FIELD_
CASING SOLUTIONS_OBEN_FIELD_
 
Amit kala (Hydro Mechanical Professional Engineer)
Amit kala (Hydro Mechanical Professional Engineer)Amit kala (Hydro Mechanical Professional Engineer)
Amit kala (Hydro Mechanical Professional Engineer)
 
Steel Handling & Consolidation
Steel Handling & ConsolidationSteel Handling & Consolidation
Steel Handling & Consolidation
 
Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)
 
Master präsentation pal sys-offshore
Master präsentation pal sys-offshoreMaster präsentation pal sys-offshore
Master präsentation pal sys-offshore
 
Master präsentation pal sys-ship
Master präsentation pal sys-shipMaster präsentation pal sys-ship
Master präsentation pal sys-ship
 

Similar to QP_Presentation_20151027

CBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins PresentationCBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins PresentationDamian Coetzee
 
Single Family Gantt Chart-John Mueller
Single Family Gantt Chart-John MuellerSingle Family Gantt Chart-John Mueller
Single Family Gantt Chart-John MuellerJohn Mueller
 
Paper 43 - OPT 2015_BHI 9_2_15
Paper 43 - OPT 2015_BHI 9_2_15Paper 43 - OPT 2015_BHI 9_2_15
Paper 43 - OPT 2015_BHI 9_2_15John Grover
 
ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15Antonio Biasiolo
 
Clay Bricks - Start up Road map
Clay Bricks - Start up Road mapClay Bricks - Start up Road map
Clay Bricks - Start up Road mapKannan V.K
 
PCT Presentation 08.09.2020.pptx
PCT Presentation 08.09.2020.pptxPCT Presentation 08.09.2020.pptx
PCT Presentation 08.09.2020.pptxEngrMahmud3
 
KOM Presentation STN-N Conductor_rev 2
KOM Presentation STN-N Conductor_rev 2KOM Presentation STN-N Conductor_rev 2
KOM Presentation STN-N Conductor_rev 2Brian Quan (Minh)
 
Cryogenic facility project list rev1 may25,2015
Cryogenic facility project  list  rev1 may25,2015Cryogenic facility project  list  rev1 may25,2015
Cryogenic facility project list rev1 may25,2015Fanny guo
 
Water Treatment System Mf
Water Treatment System MfWater Treatment System Mf
Water Treatment System MfAyham Awad
 
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...Instituto del cemento y Hormigón de Chile
 
2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docx2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docxMohammedSalah424258
 
Gantt chart of Project schedule and management
Gantt chart of Project schedule and managementGantt chart of Project schedule and management
Gantt chart of Project schedule and managementadeel hamid
 
CICPA Updated Schedule Dtd 130816
CICPA Updated Schedule Dtd 130816CICPA Updated Schedule Dtd 130816
CICPA Updated Schedule Dtd 130816Manish Shah
 

Similar to QP_Presentation_20151027 (20)

CBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins PresentationCBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins Presentation
 
Single Family Gantt Chart-John Mueller
Single Family Gantt Chart-John MuellerSingle Family Gantt Chart-John Mueller
Single Family Gantt Chart-John Mueller
 
Paper 43 - OPT 2015_BHI 9_2_15
Paper 43 - OPT 2015_BHI 9_2_15Paper 43 - OPT 2015_BHI 9_2_15
Paper 43 - OPT 2015_BHI 9_2_15
 
jahangir
jahangirjahangir
jahangir
 
ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15
 
Lyes boudiaf
Lyes boudiafLyes boudiaf
Lyes boudiaf
 
Clay Bricks - Start up Road map
Clay Bricks - Start up Road mapClay Bricks - Start up Road map
Clay Bricks - Start up Road map
 
Case study
Case studyCase study
Case study
 
PCT Presentation 08.09.2020.pptx
PCT Presentation 08.09.2020.pptxPCT Presentation 08.09.2020.pptx
PCT Presentation 08.09.2020.pptx
 
KOM Presentation STN-N Conductor_rev 2
KOM Presentation STN-N Conductor_rev 2KOM Presentation STN-N Conductor_rev 2
KOM Presentation STN-N Conductor_rev 2
 
ScheduleRev- 6
ScheduleRev- 6ScheduleRev- 6
ScheduleRev- 6
 
Cryogenic facility project list rev1 may25,2015
Cryogenic facility project  list  rev1 may25,2015Cryogenic facility project  list  rev1 may25,2015
Cryogenic facility project list rev1 may25,2015
 
Water Treatment System Mf
Water Treatment System MfWater Treatment System Mf
Water Treatment System Mf
 
10. Overall Implementation Programme
10. Overall Implementation Programme10. Overall Implementation Programme
10. Overall Implementation Programme
 
Orbital arc welding
Orbital arc weldingOrbital arc welding
Orbital arc welding
 
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
 
2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docx2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docx
 
Gantt chart of Project schedule and management
Gantt chart of Project schedule and managementGantt chart of Project schedule and management
Gantt chart of Project schedule and management
 
CICPA Updated Schedule Dtd 130816
CICPA Updated Schedule Dtd 130816CICPA Updated Schedule Dtd 130816
CICPA Updated Schedule Dtd 130816
 
Oct 2009 acp
Oct 2009 acpOct 2009 acp
Oct 2009 acp
 

QP_Presentation_20151027

  • 1. Qatar Petroleum Procedure DESIGN & CONSTRUCT NEW ORBITAL HIGHWAY AND TRUCK ROUTE (P023) Contract 3: Orbital Highway Mesaieed to Salwa Road PROJECT ID: IA 12/13 C 062 ST 26 October 2015
  • 2. Date: 25/10/2015 Page 1 of 37 QP Pipe Protection Procedures Removal of QP Pipeline bund wall
  • 3. Date: 25/10/2015 Page 2 of 37 QP Pipe Protection Procedures
  • 4. Date: 25/10/2015 Page 3 of 37 QP Pipe Protection Procedures Trench Excavation close to pipeline Excavation of hard rock material
  • 5. Date: 25/10/2015 Page 4 of 37 QP Pipe Protection Procedures
  • 6. Date: 25/10/2015 Page 5 of 37 QP Pipe Protection Procedures Excavation and installation of support pedestal
  • 7. Date: 25/10/2015 Page 6 of 37 QP Pipe Protection Procedures Trimming of excavation in preparation for foundation installation
  • 8. Date: 25/10/2015 Page 7 of 37 QP Pipe Protection Procedures Excavated formation/foundation level
  • 9. Date: 25/10/2015 Page 8 of 37 QP Pipe Protection Procedures Steel plates will be set prior to installation of arch segment
  • 10. Date: 25/10/2015 Page 9 of 37 QP Pipe Protection Procedures Restricted zone during element lifting
  • 11. Date: 25/10/2015 Page 10 of 37 QP Pipe Protection Procedures Arch Elements transported on flatbed trailer
  • 12. Date: 25/10/2015 Page 11 of 37 QP Pipe Protection Procedures Off-Loading Arch elements using Lifting beam
  • 13. Date: 25/10/2015 Page 12 of 37 QP Pipe Protection Procedures Storage of Arch Elements on Firm Ground and Proper Dunnage
  • 14. Date: 25/10/2015 Page 13 of 37 QP Pipe Protection Procedures Marks on footing keyway
  • 15. Date: 25/10/2015 Page 14 of 37 QP Pipe Protection Procedures Marks on unit side face for fast alignment
  • 16. Date: 25/10/2015 Page 15 of 37 QP Pipe Protection Procedures Turning of Arch element with Side Brackets
  • 17. Date: 25/10/2015 Page 16 of 37 QP Pipe Protection Procedures Installation of steel bracket on the segment
  • 18. Date: 25/10/2015 Page 17 of 37 QP Pipe Protection Procedures First arch unit staggered by half width
  • 19. Date: 25/10/2015 Page 18 of 37 QP Pipe Protection Procedures Total Station Survey Check of Crown Alignment
  • 20. Date: 25/10/2015 Page 19 of 37 QP Pipe Protection Procedures Element in Footing Keyway (Unit position adjustment using hardwood wedges)
  • 21. Date: 25/10/2015 Page 20 of 37 QP Pipe Protection Procedures STEP 4 RELEASE CRANE B. CRANE A CONTINUES PLACING UNIT Erection Sequence of the Elements (units)
  • 22. Date: 25/10/2015 Page 21 of 37 QP Pipe Protection Procedures Grouting Foundation Keyway
  • 23. Date: 25/10/2015 Page 22 of 37 QP Pipe Protection Procedures Fig. A. Backfill Material zones Fig. B. Backfill material grain size
  • 24. Date: 25/10/2015 Page 23 of 37 QP Pipe Protection Procedures Up to existing slope or final grade Or minimum one span Max Backfill placement levels - Max. Differential height < 0.50 m
  • 25. Date: 25/10/2015 Page 24 of 37 QP Pipe Protection Procedures Crown Beam Reinforcement Prepared According to Approved Drawings
  • 26. Date: 25/10/2015 Page 25 of 37 QP Pipe Protection Procedures QP Pipe line protection structure - QP Arch Erection
  • 27. Date: 25/10/2015 Page 26 of 37 QP Pipe Protection Procedures QP Pipe line protection structure - QP Arch Erection
  • 28. Date: 25/10/2015 Page 27 of 37 QP Pipe Protection Procedures QP Pipe line protection structure - QP Arch Erection
  • 29. Date: 25/10/2015 Page 28 of 37 QP Pipe Protection Procedures QP Pipe line protection structure - QP Arch Erection
  • 30. Date: 25/10/2015 Page 29 of 37 QP Pipe Protection Procedures QP Pipe line protection structure - QP Arch Erection
  • 31. Date: 25/10/2015 Page 30 of 37 QP Pipe Protection Procedures QP Pipe line protection structure - QP Arch Erection
  • 32. Date: 25/10/2015 Page 31 of 37 QP Pipe Protection Procedures QP Pipe line protection structure - QP Arch Erection
  • 33. Date: 25/10/2015 Page 32 of 37 QP Pipe Protection Procedures QP Pipe line protection structure - QP Arch Erection
  • 34. Date: 25/10/2015 Page 33 of 37 QP Pipe Protection Procedures QP Pipe line protection structure - QP Arch Erection
  • 35. Date: 25/10/2015 Page 34 of 37 QP Pipe Protection Procedures QP Pipe line protection structure - QP Arch Erection
  • 36. Date: 25/10/2015 Page 35 of 37 QP Pipe Protection Procedures QP Pipe line protection structure - QP Arch Erection
  • 37. Date: 25/10/2015 Page 36 of 37 QP Pipe Protection Procedures Minimum fill cover before heavy plant can cross the arch
  • 38. Date: 25/10/2015 Page 37 of 37 QP Pipe Protection Procedures Table 1 — Earthworks Compaction criteria