This document contains contact information and a resume for Amod Kumar Puri, who is seeking a position as a Lifting & Rigging Supervisor. He has over 20 years of experience in construction and engineering in the oil and gas industry. Currently he works as a Rigging and Lifting Supervisor for Technip in China, overseeing lifting activities and equipment installation. His experience includes roles in Qatar, Russia, India, and other locations supervising rigging, lifting, module installation, and heavy transportation tasks. He has the required certifications and seeks to join an organization where he can continue utilizing his skills in a safety-focused manner.
1. Amod Kumar Puri
Mobile: +91-9934277981
Mobail: +86-13816410836
village: Machhagar Jagadish
Post : Machhagar Lachhiram
Distt: Gopalganj
State: Bihar
INDIA - 841436
E-mail : amodkumarpuri@gmail.com
: amodpuri@yahho.com
: akumarpuri-yamal-external@external.technip.com
Skype-ID : amod.puri1
POST APPLIED FOR : Lifting & Rigging Supervisor
Seeking challenging assignments in Project Management Team / Erection &
installation and construction engineering with a growth oriented organization.
Professional Synopsis
My Professionalism over 20 years of “hand on” experiences in Construction and
engineering in Oil & Gas.
Presently employment:
Penglai Jutal Offshore Engineering Heavy Industries Co.,[PJOE]
No.5 Harbin Road, Economic Development Zone, Penglai, Shandong, P, R. of
China-265607
Special Certifications
1. Safe Work Certification approved by RasGas co Ltd.
2. Personal commitment and outstanding effort rewarded by Ras Laffan onshore
expansion project.
3. Successful incident free erection of north pipe rack certificated by RasGas
4. Safe completion of RGX2 and AKG2.
5. Hazards identification training certified by Chiyoda Technip joint venture and
RasGas
2. Academic Qualification
ACADEMIC QUALIFICATION : 12 TH PASSED (1988 to1990)
TECHNICAL QUALIFICATION : Diploma in (Mechanical) 1990 to 1993)
LANGUAGE KNOWN : English / Hindi / Arabic / french
CERTIFICATES / TRAININGS :
•Scaffolding Inspector ( Velosi )
•Permit to Work Receiver ( Ras Gas / KBR and Chiyoda Technip Joint Venture)
•Safety Training for Task Instructions ( KBR)
Computer proficiency
MS Word
MS Excel
MS PowerPoint
MS outlook (internet knowledge)
WORK EXPERIENCES
Name of Company : TECHNIP –FRANCE –ABU DHABI
Project : YAMAL PROJECT – SARBETA - RUSSIA
Position : Rigging and Lifting Supervisor
Duration : 25 /01/ 2015 to 31 /12 / 2017
Location : CHINA – SHANDONG - PENGLAI
JOB DESCRIPTION
In - charge of 33 LNG modules – installation and erection of complete modules ,
heavy lift ,spool and pipes spool and load test .
Heavy lift using 2 or 3 crane at 1 lift – such as deck erection & installation ,air cooler and
various machine and equipment’s erection and installation.
Supervision of contractor and sub - contractor – workforce 3000 manpower working on
modules and pipe rack etc.
Ensure all lifting are in proper and using of correct lifting gears and done safely
Loading and unloading barges and vessels and Assisting load out operation and heavy
and general transportation of big spool and pipes and decks and frames and modules .
Inspection and witness in inspection of various lifting gears , crane , gantry cranes and
mobile crane, total cranes in workshop and yard premises is about 67 crane – 50 tons to
1250 ton. and 37 gantry crane – 10 ton to 150 ton gantry on site and workshop.
Safe working condition and safe lifting operation – follow owner’s specification and
engineering drawing and take instruction from superior
Equipment’s under my control are 2 hyster forklift-36 T,16 forklift -3 ton to 10 ton, 6
units SPMT (belelli) 2 - trailers and 2-tractor joinders,6 - main lift( cherry picker) 3
crawler crane – 3 X Terex-CC6800.
Prefabrication of working platform ,platoon, flooding barge ,floating crane , various type
modules, top side, pipe rack .
3. Being working with multi - national organization and achieve company Targets - Zero LTI and
implementation in safe working operation and safe lifting operation ,within all departments as
per company requirements and company standard and safety policy.
I covered a lot of areas in the field of Rigging ,Heavy Lift ,Skidding - (loadout of modules and
jackets and offshore working platform ,heavy and huge transportation , Scaffolding work and
inspection ,daily routine for inspection and updating the scaffold tag on weekly basis,
all rigging studies and heavy lift ,method of statement , with the engineering team and lifting
plan and the type of cranes to be used for the job scope and for yard facilities ..
Including maintenances of heavy equipment’s ,cranes ,prime mover ,hyster 3 ton to 44 ton
,maintenances ,inspection ,load test of all equipment’s and machineries .
Including barges ,motor vessel. drilling rigs ,working rigs ,pipe laying barges ,
Prepare mooring and riggers for the alongside of vessels, after clearance ,Offloading ,and
transportation and Storage ,including working with all departments in construction &
engineering work and the marine base for all Rigs and Drilling vessel and barges materials
stored and transport to supply vessel that’s comes to our jetty and yard.
PJOE-China has constructed its own jetty approx. 1200 meters long ,for 4 to 5 vessels
and barges and rigs can alongside.
Project on going till July 2017
Reference: Mr. Sella +86 150 9852 9542
sellavianewyork@yahoo.com
sdsuppiah-yamal-external@external.technip.com
JOB DESCRIPTION
Name of Company : TCJV –Technip Chiyoda Joint Venture
Project : QG-PMP – Qatargas Plateau Maintenance Project
Position : Supervisor - Rigging and Lifting
Duration : 01 April 2012 ~ 31st August 2013
Supervision of manpower onto production and maintenances of shut down. Safe working
operation , training riggers on erection and installation of pipe spool rigging ,supervision
riggers on lifting gears general inspection prior to commence work. Monitor riggers in
rigging work ,to ensure safe lifting and rigging work on the modules ,topside .
As a Lifting & Rigging Supervisor — Charge of all safe work operation of 26 operational
cranes on site, and 07 Grove Cranes -60 ton /
6 Manitou Forklift / 06 Hyster forklift- 3/5 ton & 6 Crawler Cranes-250 ton to 280 ton
(Kobelco /IHI)
4 nos Hyster 44 ton forklift / React Stacker- 44 ton, 03-Prime Movers - Trailer / 03 Truck
Crane & 8 hyster and 4 X tractor 1004 attached with trailer and heavy equipment’s.
.SPECIALIZED IN JETTY MOVEMENTS & LIFTING AND TRANSPORTATION OF
VARIOUS KIND OF PRODUCTS AND MATERIALS AND CONTAINERS INCLUDING
4. FROZEN CONTAINERS – FOOD. HEAVY LIFT & LOADOUT ACTITIVES & PRODUCTION
SUPPORT & COORDINATION.
Almost 20 years working full time at site as a lifting & Rigging Supervisor all the lifting
activities on site and modules and topside and working platform, all department job scope
and safe working operational at site.
LIFTING TEAM … we are 2 lifting Supervisor - 8 foremen for erection and lifting and
heavylift on all modules and engineering construction
Gain a lot of experiences in heavy lift and erection of heavy equipment’s and erection
and installation.
Handling 43 equipment’s of various job scope, barge loading & unloading, containers un-
stuffing loading of various kind of pipes and king piles, spun piles etc.
Installation of Overhead Crane approx. 10 to 40 ton each set / Assemble and Steel
Construction & erection & fabrications workshop.
Name of Company : Dodsal Engineering & Construction LLC
3 Project : New Skikda LNG Project(client Sonatrach /KBR Algeria
: Qarn Alam Steam Project PDO ( Oman)
: Ras Gas-2 Expansion Project Doha ( Qatar)
Position : Supervisor - Rigging and Lifting
Duration : 07 July 2007 to 07 January 2012
JOB DESCRIPTION:
. Daily reporting to lifting – head of department Daily report to engineering department ,
daily meeting prior to commence work, all yard job scope and various department job
request.
Supervision of manpower – rigger and operators to various location of job.
Collect lifting gears from rigging store and transfer to various area on site.
Coordination job scope with various department supervisors and engineers.
Training and witness on 3rd party inspection of all lifting gears , load test.
Name of Company : Nasar Al- Hajri Doha Qatar
2 Project : Dolphin Onshore Facilities Project Doha Qatar.
Gas Liquid Project Qatar Ras-Laffan Industrial City
Position : Foreman - Rigging and Lifting
Duration : March -2005 to March 2007.
JOB DESCRIPTION:
Supervision of manpower – Riggers and crane operator and
equipment’s operator to various site.
Oversee and conduct daily Tool Box Meeting on site , contractors and sub-contractors.
High lighting job task and safely briefing and the risk in lifting and rigging operation.
5. Communicate with multi - national work force , organize load test and preparation of load
test material’s , coordinate various department regarding load test activities .
In charge of off - loading and loading of materials from barge and vessel,
Transportation to storage yard and off-loading , metering meter ,hammer ,levelling system,
generators, boilers , transformers, king piles ,plough and so on
VESSEL AND BARGES ARRIVE IN PJOE YARD – INSPECTION IS DONE WITH MANAGEMENT AND
SAFETY WITH A CHECKLIST .PERMIT TO WORK SYSTEM. (Shipping operation)
ALL SAFE LIFTING OPERATION & LIFTING ACTITIVES IN THE YARD, PRODUCTION,ALL SUPPLY
VESSEL LOADED WITH AIR COOLERS,GENERATORS,TRANFORMERS ,METERING MACHINE AND PIPE
SPPOL AND KING PLILES AND PLATES AND H-BEAMS AND SO ON.
WORRKING RIGS AND VESSELS-COORDINATE TO VESSEL MOVEMENTS AND ARRIVAL AND
SERVICES- ALL JOB TO BE DONE WITHIN TIME FRAME BY THE SHIP OWNER
Able to lead a team of deverse ideas and creative ideas and outlook toward a
pre planned goal. Able to work under stringent deadlines and time frame.
Name of Company : ELCO Co. LLC ( Oman)
2 Project : IHI Workshop Fabrication work for Sharjan Cement
Factory Kiln No. 2.
: Saffa, Yibal, Saihrawl, Salalah Port Pipe Line,
Storage Tank, Vessel, Structure Fab.& Erection
Position : Foreman - Rigging and Lifting
Duration : Oct 1996 to Aug-2004
JOB DESCRIPTION:
The engineering department working very close with me regarding the lifting plan and
lifting study - all lifting gears records and given to the engineering department for lifting plan
and records. I will let them know which are the lifting gears to used , then the engineering
department ,will do the plan accordingly,
Very job scope in the yard , handling and lifting and un-stuffing and offloading and so on.
Name of Company : Royal Engineering Ltd.
Project : IOCL BXP Barauni ( Begusarai) India
Position : Rigging tools inspector
Duration : Jan 1995 to Aug-1996.
*Plan with Safety Managers
All safety matters and lifting activities, and inspection of crane and lifting gears..
*Job analyst/risk assessment/ JSA –permit to work/safe work practices.
*SHE Training & Hazard, Communication’s , Mass tool meeting , mass man hours
celebration preparation & promotion activities.
Safety Tool Box Meeting and Mass Tool Box briefing and Safety Orientation.
*1000 Manpower Canteen, mass, housekeeping, fire emergency Drill, Excavation Drill
*Liaise with relevant authorities, on regulatory compliance preparation KS
6. Good command and good in leadership for site improvement
DEAR SIR;
I have enoughworkingexperiencesinmyprofessionalasa working lifting&RiggingSupervisorgS
LIFTING & RIGGING SUPERVISOR- Handlingall bargesandwork andassistall productionof construction
engineeringmaterialsforjacketsandworkingplatform, pontoon ,riser,topside andmodules.
Includingpipe rackandvarioustype of pipe spool erectionandriggingandinstallationin safe working
manner,manykindandmethodof liftingandriggingandinstallationof equipment’sandpipes ,transferring
manykindsof pipe and spool fromdeckto deckslevel.
Includingof General LiftingActivities(production) Heavylift , andloadout activities ,transportation of decks
and modulesandvariousdepartmentmaterial’s.
Transportation of various modules and materials including marine base materials and
projects materials and equipment’s – Transportation of all kind of materials spool pipe’s,
fabricated materials and frame, flip over and load out
MOST OF THE EQUIPMENTS & MATERIALS ARE MORE THEN 30 TONS TO 600 TON EACH
USING - SPMT- multi wheels
Installation and erection of module decks and spool piles and transfer spool pile s to painting
cabin, load out and load in-loading & unloading of various fabricated materials to various
department.
CurrentlyI am Workingin China – Penglai –PJOE YARD for TECHNIP - As a lifting and riggingsupervisor,Iam
full time onsite because of the heavyliftandlifting activities anderectionandinstallationof pipesusingchain
blocksand soon. erectionof anymachineries andworkshop andfabricated materials etc.,The lifting man
power 285 riggers& operators.
In charge all liftingactivitiesandliftinggearsandliftingpermit’s inspectionof liftinggears&otherssafety
matters
HAVING ENOUGHEXPERIENCES AND SKILL AND COMPLYWITH ALL SAFETY PROCEDURES AND
SAFE WORKING CONDITION AND SAFE LIFTING OPERATION.
I Have excellentwrittenandspokencommunicationskillsinEnglish ,Arabic, Malayalam, Chinese, Hindi
,Urdu.Iam verymuch confidentand friendlyperson , able tocommunicate andinteractcomfortablywithall
level of peopleandtofunctioneffectivelyintime of stressfulsituationandfirmindecision.
I AMVERY MUCH INTERESTED ANDKEEN IN JOININGYOUR ESTEEMED ORGANIZATION.
THANKYOU VERY MUCH FOR YOUR KINDANTICIPATEDCOOPERATION.
AWAITFOR YOUR EARLIESTREPLY
YOURS FAITHFULLY.
Amod kumar