POST APPLIED FOR : Lifting & Rigging Supervisor
Seeking challenging assignments in Project Management Team / Erection &
installation and construction engineering with a growth oriented organization.
Professional Synopsis
 My Professionalism over 20 years of “hand on” experiences in Construction and
engineering in Oil & Gas.
 Presently employment:
 Penglai Jutal Offshore Engineering Heavy Industries Co.,[PJOE]
No.5 Harbin Road, Economic Development Zone, Penglai, Shandong, P, R. of
China-265607
Special Certifications
1. Safe Work Certification approved by RasGas co Ltd.
2. Personal commitment and outstanding effort rewarded by Ras Laffan onshore
expansion project.
3. Successful incident free erection of north pipe rack certificated by RasGas
4. Safe completion of RGX2 and AKG2.
5. Hazards identification training certified by Chiyoda Technip joint venture and
RasGas
Academic Qualification
ACADEMIC QUALIFICATION : 12 TH PASSED (1988 to1990)
TECHNICAL QUALIFICATION : Diploma in (Mechanical) 1990 to 1993)
LANGUAGE KNOWN : English / Hindi / Arabic / french
CERTIFICATES / TRAININGS :
•Scaffolding Inspector ( Velosi )
•Permit to Work Receiver ( Ras Gas / KBR and Chiyoda Technip Joint Venture)
•Safety Training for Task Instructions ( KBR)
Computer proficiency
 MS Word
 MS Excel
 MS PowerPoint
 MS outlook (internet knowledge)
WORK EXPERIENCES
 Name of Company : TECHNIP –FRANCE –ABU DHABI
 Project : YAMAL PROJECT – SARBETA - RUSSIA
 Position : Rigging and Lifting Supervisor
 Duration : 25 /01/ 2015 to 31 /12 / 2017
 Location : CHINA – SHANDONG - PENGLAI
JOB DESCRIPTION
In - charge of 33 LNG modules – installation and erection of complete modules ,
heavy lift ,spool and pipes spool and load test .
Heavy lift using 2 or 3 crane at 1 lift – such as deck erection & installation ,air cooler and
various machine and equipment’s erection and installation.
Supervision of contractor and sub - contractor – workforce 3000 manpower working on
modules and pipe rack etc.
Ensure all lifting are in proper and using of correct lifting gears and done safely
Loading and unloading barges and vessels and Assisting load out operation and heavy
and general transportation of big spool and pipes and decks and frames and modules .
Inspection and witness in inspection of various lifting gears , crane , gantry cranes and
mobile crane, total cranes in workshop and yard premises is about 67 crane – 50 tons to
1250 ton. and 37 gantry crane – 10 ton to 150 ton gantry on site and workshop.
Safe working condition and safe lifting operation – follow owner’s specification and
engineering drawing and take instruction from superior
Equipment’s under my control are 2 hyster forklift-36 T,16 forklift -3 ton to 10 ton, 6
units SPMT (belelli) 2 - trailers and 2-tractor joinders,6 - main lift( cherry picker) 3
crawler crane – 3 X Terex-CC6800.
Prefabrication of working platform ,platoon, flooding barge ,floating crane , various type
modules, top side, pipe rack .
Being working with multi - national organization and achieve company Targets - Zero LTI and
implementation in safe working operation and safe lifting operation ,within all departments as
per company requirements and company standard and safety policy.
I covered a lot of areas in the field of Rigging ,Heavy Lift ,Skidding - (loadout of modules and
jackets and offshore working platform ,heavy and huge transportation , Scaffolding work and
inspection ,daily routine for inspection and updating the scaffold tag on weekly basis,
all rigging studies and heavy lift ,method of statement , with the engineering team and lifting
plan and the type of cranes to be used for the job scope and for yard facilities ..
Including maintenances of heavy equipment’s ,cranes ,prime mover ,hyster 3 ton to 44 ton
,maintenances ,inspection ,load test of all equipment’s and machineries .
Including barges ,motor vessel. drilling rigs ,working rigs ,pipe laying barges ,
Prepare mooring and riggers for the alongside of vessels, after clearance ,Offloading ,and
transportation and Storage ,including working with all departments in construction &
engineering work and the marine base for all Rigs and Drilling vessel and barges materials
stored and transport to supply vessel that’s comes to our jetty and yard.
PJOE-China has constructed its own jetty approx. 1200 meters long ,for 4 to 5 vessels
and barges and rigs can alongside.
Project on going till July 2017
Reference: Mr. Sella +86 150 9852 9542
sellavianewyork@yahoo.com
sdsuppiah-yamal-external@external.technip.com
JOB DESCRIPTION
 Name of Company : TCJV –Technip Chiyoda Joint Venture
 Project : QG-PMP – Qatargas Plateau Maintenance Project
 Position : Supervisor - Rigging and Lifting
Duration : 01 April 2012 ~ 31st August 2013
Supervision of manpower onto production and maintenances of shut down. Safe working
operation , training riggers on erection and installation of pipe spool rigging ,supervision
riggers on lifting gears general inspection prior to commence work. Monitor riggers in
rigging work ,to ensure safe lifting and rigging work on the modules ,topside .
As a Lifting & Rigging Supervisor — Charge of all safe work operation of 26 operational
cranes on site, and 07 Grove Cranes -60 ton /
6 Manitou Forklift / 06 Hyster forklift- 3/5 ton & 6 Crawler Cranes-250 ton to 280 ton
(Kobelco /IHI)
4 nos Hyster 44 ton forklift / React Stacker- 44 ton, 03-Prime Movers - Trailer / 03 Truck
Crane & 8 hyster and 4 X tractor 1004 attached with trailer and heavy equipment’s.
.SPECIALIZED IN JETTY MOVEMENTS & LIFTING AND TRANSPORTATION OF
VARIOUS KIND OF PRODUCTS AND MATERIALS AND CONTAINERS INCLUDING
FROZEN CONTAINERS – FOOD. HEAVY LIFT & LOADOUT ACTITIVES & PRODUCTION
SUPPORT & COORDINATION.
Almost 20 years working full time at site as a lifting & Rigging Supervisor all the lifting
activities on site and modules and topside and working platform, all department job scope
and safe working operational at site.
LIFTING TEAM … we are 2 lifting Supervisor - 8 foremen for erection and lifting and
heavylift on all modules and engineering construction
Gain a lot of experiences in heavy lift and erection of heavy equipment’s and erection
and installation.
Handling 43 equipment’s of various job scope, barge loading & unloading, containers un-
stuffing loading of various kind of pipes and king piles, spun piles etc.
Installation of Overhead Crane approx. 10 to 40 ton each set / Assemble and Steel
Construction & erection & fabrications workshop.
Name of Company : Dodsal Engineering & Construction LLC
 3 Project : New Skikda LNG Project(client Sonatrach /KBR Algeria
: Qarn Alam Steam Project PDO ( Oman)
: Ras Gas-2 Expansion Project Doha ( Qatar)
 Position : Supervisor - Rigging and Lifting
 Duration : 07 July 2007 to 07 January 2012
JOB DESCRIPTION:
. Daily reporting to lifting – head of department Daily report to engineering department ,
daily meeting prior to commence work, all yard job scope and various department job
request.
Supervision of manpower – rigger and operators to various location of job.
Collect lifting gears from rigging store and transfer to various area on site.
Coordination job scope with various department supervisors and engineers.
Training and witness on 3rd party inspection of all lifting gears , load test.
 Name of Company : Nasar Al- Hajri Doha Qatar
 2 Project : Dolphin Onshore Facilities Project Doha Qatar.
Gas Liquid Project Qatar Ras-Laffan Industrial City
 Position : Foreman - Rigging and Lifting
 Duration : March -2005 to March 2007.
JOB DESCRIPTION:
Supervision of manpower – Riggers and crane operator and
equipment’s operator to various site.
Oversee and conduct daily Tool Box Meeting on site , contractors and sub-contractors.
High lighting job task and safely briefing and the risk in lifting and rigging operation.
Communicate with multi - national work force , organize load test and preparation of load
test material’s , coordinate various department regarding load test activities .
In charge of off - loading and loading of materials from barge and vessel,
Transportation to storage yard and off-loading , metering meter ,hammer ,levelling system,
generators, boilers , transformers, king piles ,plough and so on
VESSEL AND BARGES ARRIVE IN PJOE YARD – INSPECTION IS DONE WITH MANAGEMENT AND
SAFETY WITH A CHECKLIST .PERMIT TO WORK SYSTEM. (Shipping operation)
ALL SAFE LIFTING OPERATION & LIFTING ACTITIVES IN THE YARD, PRODUCTION,ALL SUPPLY
VESSEL LOADED WITH AIR COOLERS,GENERATORS,TRANFORMERS ,METERING MACHINE AND PIPE
SPPOL AND KING PLILES AND PLATES AND H-BEAMS AND SO ON.
WORRKING RIGS AND VESSELS-COORDINATE TO VESSEL MOVEMENTS AND ARRIVAL AND
SERVICES- ALL JOB TO BE DONE WITHIN TIME FRAME BY THE SHIP OWNER
Able to lead a team of deverse ideas and creative ideas and outlook toward a
pre planned goal. Able to work under stringent deadlines and time frame.
 Name of Company : ELCO Co. LLC ( Oman)
 2 Project : IHI Workshop Fabrication work for Sharjan Cement
Factory Kiln No. 2.
: Saffa, Yibal, Saihrawl, Salalah Port Pipe Line,
Storage Tank, Vessel, Structure Fab.& Erection
 Position : Foreman - Rigging and Lifting
Duration : Oct 1996 to Aug-2004
JOB DESCRIPTION:
The engineering department working very close with me regarding the lifting plan and
lifting study - all lifting gears records and given to the engineering department for lifting plan
and records. I will let them know which are the lifting gears to used , then the engineering
department ,will do the plan accordingly,
Very job scope in the yard , handling and lifting and un-stuffing and offloading and so on.
 Name of Company : Royal Engineering Ltd.
 Project : IOCL BXP Barauni ( Begusarai) India
 Position : Rigging tools inspector
 Duration : Jan 1995 to Aug-1996.
*Plan with Safety Managers
All safety matters and lifting activities, and inspection of crane and lifting gears..
*Job analyst/risk assessment/ JSA –permit to work/safe work practices.
*SHE Training & Hazard, Communication’s , Mass tool meeting , mass man hours
celebration preparation & promotion activities.
Safety Tool Box Meeting and Mass Tool Box briefing and Safety Orientation.
*1000 Manpower Canteen, mass, housekeeping, fire emergency Drill, Excavation Drill
*Liaise with relevant authorities, on regulatory compliance preparation KS
Good command and good in leadership for site improvement
DEAR SIR;
I have enoughworkingexperiencesinmyprofessionalasa working lifting&RiggingSupervisorgS
LIFTING & RIGGING SUPERVISOR- Handlingall bargesandwork andassistall productionof construction
engineeringmaterialsforjacketsandworkingplatform, pontoon ,riser,topside andmodules.
Includingpipe rackandvarioustype of pipe spool erectionandriggingandinstallationin safe working
manner,manykindandmethodof liftingandriggingandinstallationof equipment’sandpipes ,transferring
manykindsof pipe and spool fromdeckto deckslevel.
Includingof General LiftingActivities(production) Heavylift , andloadout activities ,transportation of decks
and modulesandvariousdepartmentmaterial’s.
Transportation of various modules and materials including marine base materials and
projects materials and equipment’s – Transportation of all kind of materials spool pipe’s,
fabricated materials and frame, flip over and load out
MOST OF THE EQUIPMENTS & MATERIALS ARE MORE THEN 30 TONS TO 600 TON EACH
USING - SPMT- multi wheels
Installation and erection of module decks and spool piles and transfer spool pile s to painting
cabin, load out and load in-loading & unloading of various fabricated materials to various
department.
CurrentlyI am Workingin China – Penglai –PJOE YARD for TECHNIP - As a lifting and riggingsupervisor,Iam
full time onsite because of the heavyliftandlifting activities anderectionandinstallationof pipesusingchain
blocksand soon. erectionof anymachineries andworkshop andfabricated materials etc.,The lifting man
power 285 riggers& operators.
In charge all liftingactivitiesandliftinggearsandliftingpermit’s inspectionof liftinggears&otherssafety
matters
HAVING ENOUGHEXPERIENCES AND SKILL AND COMPLYWITH ALL SAFETY PROCEDURES AND
SAFE WORKING CONDITION AND SAFE LIFTING OPERATION.
I Have excellentwrittenandspokencommunicationskillsinEnglish ,Arabic, Malayalam, Chinese, Hindi
,Urdu.Iam verymuch confidentand friendlyperson , able tocommunicate andinteractcomfortablywithall
level of peopleandtofunctioneffectivelyintime of stressfulsituationandfirmindecision.
I AMVERY MUCH INTERESTED ANDKEEN IN JOININGYOUR ESTEEMED ORGANIZATION.
THANKYOU VERY MUCH FOR YOUR KINDANTICIPATEDCOOPERATION.
AWAITFOR YOUR EARLIESTREPLY
YOURS FAITHFULLY.
Amod kumar
+86 138 1641 0836

More Related Content

What's hot (17)

L&t PARKCIRCUS
L&t PARKCIRCUSL&t PARKCIRCUS
L&t PARKCIRCUS
 
C V of Roopesh
C V of RoopeshC V of Roopesh
C V of Roopesh
 
MUHAMMAD CV (1)
MUHAMMAD CV (1)MUHAMMAD CV (1)
MUHAMMAD CV (1)
 
CV for ahmed(1)
CV for ahmed(1)CV for ahmed(1)
CV for ahmed(1)
 
Paul CV 2017-2
Paul CV  2017-2Paul CV  2017-2
Paul CV 2017-2
 
Majid Zahid Bhatti - CV
Majid Zahid Bhatti - CVMajid Zahid Bhatti - CV
Majid Zahid Bhatti - CV
 
Robert CV
Robert CVRobert CV
Robert CV
 
CV_Ramesh Chander
CV_Ramesh ChanderCV_Ramesh Chander
CV_Ramesh Chander
 
MUHAMMAD CV
MUHAMMAD CVMUHAMMAD CV
MUHAMMAD CV
 
Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...
 
Abdelraheim Mohamed-1
Abdelraheim Mohamed-1Abdelraheim Mohamed-1
Abdelraheim Mohamed-1
 
pratik shipper c.v (1) (1)
pratik shipper c.v (1) (1)pratik shipper c.v (1) (1)
pratik shipper c.v (1) (1)
 
CV C Pieroni Sept 2016 (3)
CV C Pieroni  Sept 2016 (3)CV C Pieroni  Sept 2016 (3)
CV C Pieroni Sept 2016 (3)
 
naveen resume
naveen resumenaveen resume
naveen resume
 
NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)
 
CV.Eng Ashraf Abdulsalam(2016)
CV.Eng Ashraf Abdulsalam(2016)CV.Eng Ashraf Abdulsalam(2016)
CV.Eng Ashraf Abdulsalam(2016)
 
RESUME - R 1
RESUME - R 1RESUME - R 1
RESUME - R 1
 

Viewers also liked

Jinglu ShipyardIntroduction_EN_Sep.2105_compressed
Jinglu ShipyardIntroduction_EN_Sep.2105_compressedJinglu ShipyardIntroduction_EN_Sep.2105_compressed
Jinglu ShipyardIntroduction_EN_Sep.2105_compressedLin Wang
 
M3 game download
M3 game downloadM3 game download
M3 game downloadMihai Pop
 
eng-ahmed-ali-CV
eng-ahmed-ali-CVeng-ahmed-ali-CV
eng-ahmed-ali-CVahmed ali
 
MediaEval 2016 - UNIFESP Predicting Media Interestingness Task
MediaEval 2016 - UNIFESP Predicting Media Interestingness TaskMediaEval 2016 - UNIFESP Predicting Media Interestingness Task
MediaEval 2016 - UNIFESP Predicting Media Interestingness Taskmultimediaeval
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSrinivas Sirigineedi
 
Curriculum Vitae – Gary Hubbard
Curriculum Vitae – Gary HubbardCurriculum Vitae – Gary Hubbard
Curriculum Vitae – Gary HubbardKarl-Erik Karlsson
 
MediaEval 2016 - UPMC at MediaEval2016 Retrieving Diverse Social Images Task
MediaEval 2016 - UPMC at MediaEval2016 Retrieving Diverse Social Images TaskMediaEval 2016 - UPMC at MediaEval2016 Retrieving Diverse Social Images Task
MediaEval 2016 - UPMC at MediaEval2016 Retrieving Diverse Social Images Taskmultimediaeval
 
MediaEval 2016 - ININ Submission to Zero Cost ASR Task
MediaEval 2016 - ININ Submission to Zero Cost ASR TaskMediaEval 2016 - ININ Submission to Zero Cost ASR Task
MediaEval 2016 - ININ Submission to Zero Cost ASR Taskmultimediaeval
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerSrivenkatesh Padmanaban
 

Viewers also liked (15)

Jinglu ShipyardIntroduction_EN_Sep.2105_compressed
Jinglu ShipyardIntroduction_EN_Sep.2105_compressedJinglu ShipyardIntroduction_EN_Sep.2105_compressed
Jinglu ShipyardIntroduction_EN_Sep.2105_compressed
 
M3 game download
M3 game downloadM3 game download
M3 game download
 
eng-ahmed-ali-CV
eng-ahmed-ali-CVeng-ahmed-ali-CV
eng-ahmed-ali-CV
 
MediaEval 2016 - UNIFESP Predicting Media Interestingness Task
MediaEval 2016 - UNIFESP Predicting Media Interestingness TaskMediaEval 2016 - UNIFESP Predicting Media Interestingness Task
MediaEval 2016 - UNIFESP Predicting Media Interestingness Task
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
Kalle Mallikarjuna
Kalle MallikarjunaKalle Mallikarjuna
Kalle Mallikarjuna
 
Curriculum Vitae – Gary Hubbard
Curriculum Vitae – Gary HubbardCurriculum Vitae – Gary Hubbard
Curriculum Vitae – Gary Hubbard
 
Rizwan CV
Rizwan CV  Rizwan CV
Rizwan CV
 
MediaEval 2016 - UPMC at MediaEval2016 Retrieving Diverse Social Images Task
MediaEval 2016 - UPMC at MediaEval2016 Retrieving Diverse Social Images TaskMediaEval 2016 - UPMC at MediaEval2016 Retrieving Diverse Social Images Task
MediaEval 2016 - UPMC at MediaEval2016 Retrieving Diverse Social Images Task
 
MediaEval 2016 - ININ Submission to Zero Cost ASR Task
MediaEval 2016 - ININ Submission to Zero Cost ASR TaskMediaEval 2016 - ININ Submission to Zero Cost ASR Task
MediaEval 2016 - ININ Submission to Zero Cost ASR Task
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineer
 
Master Sportwissenschaft studieren | HG Hochschule
Master Sportwissenschaft studieren | HG HochschuleMaster Sportwissenschaft studieren | HG Hochschule
Master Sportwissenschaft studieren | HG Hochschule
 
Bachelor Creative Media berufsbegleitend studieren an der H:G Hochschule
Bachelor Creative Media berufsbegleitend studieren an der H:G HochschuleBachelor Creative Media berufsbegleitend studieren an der H:G Hochschule
Bachelor Creative Media berufsbegleitend studieren an der H:G Hochschule
 
Psychologie studieren (Bachelor of Science)
Psychologie studieren (Bachelor of Science)Psychologie studieren (Bachelor of Science)
Psychologie studieren (Bachelor of Science)
 
Saroj CVV
Saroj CVVSaroj CVV
Saroj CVV
 

Similar to Mobile: +91-9934277981

Similar to Mobile: +91-9934277981 (20)

vikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioningvikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioning
 
AMOD CV CHINA 2017 - Copy
AMOD CV CHINA 2017 - CopyAMOD CV CHINA 2017 - Copy
AMOD CV CHINA 2017 - Copy
 
wilfredo guila resume crane operator
wilfredo guila resume crane operatorwilfredo guila resume crane operator
wilfredo guila resume crane operator
 
JA_Swanepoel CV updated 16 Sep 2015
JA_Swanepoel CV updated 16 Sep 2015 JA_Swanepoel CV updated 16 Sep 2015
JA_Swanepoel CV updated 16 Sep 2015
 
Anton Occhiuto Resume 2015
Anton Occhiuto Resume 2015Anton Occhiuto Resume 2015
Anton Occhiuto Resume 2015
 
Darren Johnson CV
Darren Johnson CVDarren Johnson CV
Darren Johnson CV
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
Geoff Day Mechanical CV
Geoff Day Mechanical CVGeoff Day Mechanical CV
Geoff Day Mechanical CV
 
scooby cv4
scooby cv4scooby cv4
scooby cv4
 
Asif Mahmood Resume
Asif Mahmood ResumeAsif Mahmood Resume
Asif Mahmood Resume
 
Resume Samuel Gleeson
Resume Samuel GleesonResume Samuel Gleeson
Resume Samuel Gleeson
 
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
 
Liffting supervisor
Liffting supervisorLiffting supervisor
Liffting supervisor
 
Moh.Ramadan-CV
Moh.Ramadan-CVMoh.Ramadan-CV
Moh.Ramadan-CV
 
Muller Mats Werner - CV May, 2016
Muller Mats Werner - CV May, 2016Muller Mats Werner - CV May, 2016
Muller Mats Werner - CV May, 2016
 
Rajnish_Yadav_-_Curriculum_Vitae
Rajnish_Yadav_-_Curriculum_VitaeRajnish_Yadav_-_Curriculum_Vitae
Rajnish_Yadav_-_Curriculum_Vitae
 
Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)
 
Engr,imran cv.cement.
Engr,imran cv.cement.Engr,imran cv.cement.
Engr,imran cv.cement.
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
 
Crawler Mounted crane
Crawler Mounted craneCrawler Mounted crane
Crawler Mounted crane
 

Mobile: +91-9934277981

  • 1. Amod Kumar Puri Mobile: +91-9934277981 Mobail: +86-13816410836 village: Machhagar Jagadish Post : Machhagar Lachhiram Distt: Gopalganj State: Bihar INDIA - 841436 E-mail : amodkumarpuri@gmail.com : amodpuri@yahho.com : akumarpuri-yamal-external@external.technip.com Skype-ID : amod.puri1  POST APPLIED FOR : Lifting & Rigging Supervisor Seeking challenging assignments in Project Management Team / Erection & installation and construction engineering with a growth oriented organization. Professional Synopsis  My Professionalism over 20 years of “hand on” experiences in Construction and engineering in Oil & Gas.  Presently employment:  Penglai Jutal Offshore Engineering Heavy Industries Co.,[PJOE] No.5 Harbin Road, Economic Development Zone, Penglai, Shandong, P, R. of China-265607 Special Certifications 1. Safe Work Certification approved by RasGas co Ltd. 2. Personal commitment and outstanding effort rewarded by Ras Laffan onshore expansion project. 3. Successful incident free erection of north pipe rack certificated by RasGas 4. Safe completion of RGX2 and AKG2. 5. Hazards identification training certified by Chiyoda Technip joint venture and RasGas
  • 2. Academic Qualification ACADEMIC QUALIFICATION : 12 TH PASSED (1988 to1990) TECHNICAL QUALIFICATION : Diploma in (Mechanical) 1990 to 1993) LANGUAGE KNOWN : English / Hindi / Arabic / french CERTIFICATES / TRAININGS : •Scaffolding Inspector ( Velosi ) •Permit to Work Receiver ( Ras Gas / KBR and Chiyoda Technip Joint Venture) •Safety Training for Task Instructions ( KBR) Computer proficiency  MS Word  MS Excel  MS PowerPoint  MS outlook (internet knowledge) WORK EXPERIENCES  Name of Company : TECHNIP –FRANCE –ABU DHABI  Project : YAMAL PROJECT – SARBETA - RUSSIA  Position : Rigging and Lifting Supervisor  Duration : 25 /01/ 2015 to 31 /12 / 2017  Location : CHINA – SHANDONG - PENGLAI JOB DESCRIPTION In - charge of 33 LNG modules – installation and erection of complete modules , heavy lift ,spool and pipes spool and load test . Heavy lift using 2 or 3 crane at 1 lift – such as deck erection & installation ,air cooler and various machine and equipment’s erection and installation. Supervision of contractor and sub - contractor – workforce 3000 manpower working on modules and pipe rack etc. Ensure all lifting are in proper and using of correct lifting gears and done safely Loading and unloading barges and vessels and Assisting load out operation and heavy and general transportation of big spool and pipes and decks and frames and modules . Inspection and witness in inspection of various lifting gears , crane , gantry cranes and mobile crane, total cranes in workshop and yard premises is about 67 crane – 50 tons to 1250 ton. and 37 gantry crane – 10 ton to 150 ton gantry on site and workshop. Safe working condition and safe lifting operation – follow owner’s specification and engineering drawing and take instruction from superior Equipment’s under my control are 2 hyster forklift-36 T,16 forklift -3 ton to 10 ton, 6 units SPMT (belelli) 2 - trailers and 2-tractor joinders,6 - main lift( cherry picker) 3 crawler crane – 3 X Terex-CC6800. Prefabrication of working platform ,platoon, flooding barge ,floating crane , various type modules, top side, pipe rack .
  • 3. Being working with multi - national organization and achieve company Targets - Zero LTI and implementation in safe working operation and safe lifting operation ,within all departments as per company requirements and company standard and safety policy. I covered a lot of areas in the field of Rigging ,Heavy Lift ,Skidding - (loadout of modules and jackets and offshore working platform ,heavy and huge transportation , Scaffolding work and inspection ,daily routine for inspection and updating the scaffold tag on weekly basis, all rigging studies and heavy lift ,method of statement , with the engineering team and lifting plan and the type of cranes to be used for the job scope and for yard facilities .. Including maintenances of heavy equipment’s ,cranes ,prime mover ,hyster 3 ton to 44 ton ,maintenances ,inspection ,load test of all equipment’s and machineries . Including barges ,motor vessel. drilling rigs ,working rigs ,pipe laying barges , Prepare mooring and riggers for the alongside of vessels, after clearance ,Offloading ,and transportation and Storage ,including working with all departments in construction & engineering work and the marine base for all Rigs and Drilling vessel and barges materials stored and transport to supply vessel that’s comes to our jetty and yard. PJOE-China has constructed its own jetty approx. 1200 meters long ,for 4 to 5 vessels and barges and rigs can alongside. Project on going till July 2017 Reference: Mr. Sella +86 150 9852 9542 sellavianewyork@yahoo.com sdsuppiah-yamal-external@external.technip.com JOB DESCRIPTION  Name of Company : TCJV –Technip Chiyoda Joint Venture  Project : QG-PMP – Qatargas Plateau Maintenance Project  Position : Supervisor - Rigging and Lifting Duration : 01 April 2012 ~ 31st August 2013 Supervision of manpower onto production and maintenances of shut down. Safe working operation , training riggers on erection and installation of pipe spool rigging ,supervision riggers on lifting gears general inspection prior to commence work. Monitor riggers in rigging work ,to ensure safe lifting and rigging work on the modules ,topside . As a Lifting & Rigging Supervisor — Charge of all safe work operation of 26 operational cranes on site, and 07 Grove Cranes -60 ton / 6 Manitou Forklift / 06 Hyster forklift- 3/5 ton & 6 Crawler Cranes-250 ton to 280 ton (Kobelco /IHI) 4 nos Hyster 44 ton forklift / React Stacker- 44 ton, 03-Prime Movers - Trailer / 03 Truck Crane & 8 hyster and 4 X tractor 1004 attached with trailer and heavy equipment’s. .SPECIALIZED IN JETTY MOVEMENTS & LIFTING AND TRANSPORTATION OF VARIOUS KIND OF PRODUCTS AND MATERIALS AND CONTAINERS INCLUDING
  • 4. FROZEN CONTAINERS – FOOD. HEAVY LIFT & LOADOUT ACTITIVES & PRODUCTION SUPPORT & COORDINATION. Almost 20 years working full time at site as a lifting & Rigging Supervisor all the lifting activities on site and modules and topside and working platform, all department job scope and safe working operational at site. LIFTING TEAM … we are 2 lifting Supervisor - 8 foremen for erection and lifting and heavylift on all modules and engineering construction Gain a lot of experiences in heavy lift and erection of heavy equipment’s and erection and installation. Handling 43 equipment’s of various job scope, barge loading & unloading, containers un- stuffing loading of various kind of pipes and king piles, spun piles etc. Installation of Overhead Crane approx. 10 to 40 ton each set / Assemble and Steel Construction & erection & fabrications workshop. Name of Company : Dodsal Engineering & Construction LLC  3 Project : New Skikda LNG Project(client Sonatrach /KBR Algeria : Qarn Alam Steam Project PDO ( Oman) : Ras Gas-2 Expansion Project Doha ( Qatar)  Position : Supervisor - Rigging and Lifting  Duration : 07 July 2007 to 07 January 2012 JOB DESCRIPTION: . Daily reporting to lifting – head of department Daily report to engineering department , daily meeting prior to commence work, all yard job scope and various department job request. Supervision of manpower – rigger and operators to various location of job. Collect lifting gears from rigging store and transfer to various area on site. Coordination job scope with various department supervisors and engineers. Training and witness on 3rd party inspection of all lifting gears , load test.  Name of Company : Nasar Al- Hajri Doha Qatar  2 Project : Dolphin Onshore Facilities Project Doha Qatar. Gas Liquid Project Qatar Ras-Laffan Industrial City  Position : Foreman - Rigging and Lifting  Duration : March -2005 to March 2007. JOB DESCRIPTION: Supervision of manpower – Riggers and crane operator and equipment’s operator to various site. Oversee and conduct daily Tool Box Meeting on site , contractors and sub-contractors. High lighting job task and safely briefing and the risk in lifting and rigging operation.
  • 5. Communicate with multi - national work force , organize load test and preparation of load test material’s , coordinate various department regarding load test activities . In charge of off - loading and loading of materials from barge and vessel, Transportation to storage yard and off-loading , metering meter ,hammer ,levelling system, generators, boilers , transformers, king piles ,plough and so on VESSEL AND BARGES ARRIVE IN PJOE YARD – INSPECTION IS DONE WITH MANAGEMENT AND SAFETY WITH A CHECKLIST .PERMIT TO WORK SYSTEM. (Shipping operation) ALL SAFE LIFTING OPERATION & LIFTING ACTITIVES IN THE YARD, PRODUCTION,ALL SUPPLY VESSEL LOADED WITH AIR COOLERS,GENERATORS,TRANFORMERS ,METERING MACHINE AND PIPE SPPOL AND KING PLILES AND PLATES AND H-BEAMS AND SO ON. WORRKING RIGS AND VESSELS-COORDINATE TO VESSEL MOVEMENTS AND ARRIVAL AND SERVICES- ALL JOB TO BE DONE WITHIN TIME FRAME BY THE SHIP OWNER Able to lead a team of deverse ideas and creative ideas and outlook toward a pre planned goal. Able to work under stringent deadlines and time frame.  Name of Company : ELCO Co. LLC ( Oman)  2 Project : IHI Workshop Fabrication work for Sharjan Cement Factory Kiln No. 2. : Saffa, Yibal, Saihrawl, Salalah Port Pipe Line, Storage Tank, Vessel, Structure Fab.& Erection  Position : Foreman - Rigging and Lifting Duration : Oct 1996 to Aug-2004 JOB DESCRIPTION: The engineering department working very close with me regarding the lifting plan and lifting study - all lifting gears records and given to the engineering department for lifting plan and records. I will let them know which are the lifting gears to used , then the engineering department ,will do the plan accordingly, Very job scope in the yard , handling and lifting and un-stuffing and offloading and so on.  Name of Company : Royal Engineering Ltd.  Project : IOCL BXP Barauni ( Begusarai) India  Position : Rigging tools inspector  Duration : Jan 1995 to Aug-1996. *Plan with Safety Managers All safety matters and lifting activities, and inspection of crane and lifting gears.. *Job analyst/risk assessment/ JSA –permit to work/safe work practices. *SHE Training & Hazard, Communication’s , Mass tool meeting , mass man hours celebration preparation & promotion activities. Safety Tool Box Meeting and Mass Tool Box briefing and Safety Orientation. *1000 Manpower Canteen, mass, housekeeping, fire emergency Drill, Excavation Drill *Liaise with relevant authorities, on regulatory compliance preparation KS
  • 6. Good command and good in leadership for site improvement DEAR SIR; I have enoughworkingexperiencesinmyprofessionalasa working lifting&RiggingSupervisorgS LIFTING & RIGGING SUPERVISOR- Handlingall bargesandwork andassistall productionof construction engineeringmaterialsforjacketsandworkingplatform, pontoon ,riser,topside andmodules. Includingpipe rackandvarioustype of pipe spool erectionandriggingandinstallationin safe working manner,manykindandmethodof liftingandriggingandinstallationof equipment’sandpipes ,transferring manykindsof pipe and spool fromdeckto deckslevel. Includingof General LiftingActivities(production) Heavylift , andloadout activities ,transportation of decks and modulesandvariousdepartmentmaterial’s. Transportation of various modules and materials including marine base materials and projects materials and equipment’s – Transportation of all kind of materials spool pipe’s, fabricated materials and frame, flip over and load out MOST OF THE EQUIPMENTS & MATERIALS ARE MORE THEN 30 TONS TO 600 TON EACH USING - SPMT- multi wheels Installation and erection of module decks and spool piles and transfer spool pile s to painting cabin, load out and load in-loading & unloading of various fabricated materials to various department. CurrentlyI am Workingin China – Penglai –PJOE YARD for TECHNIP - As a lifting and riggingsupervisor,Iam full time onsite because of the heavyliftandlifting activities anderectionandinstallationof pipesusingchain blocksand soon. erectionof anymachineries andworkshop andfabricated materials etc.,The lifting man power 285 riggers& operators. In charge all liftingactivitiesandliftinggearsandliftingpermit’s inspectionof liftinggears&otherssafety matters HAVING ENOUGHEXPERIENCES AND SKILL AND COMPLYWITH ALL SAFETY PROCEDURES AND SAFE WORKING CONDITION AND SAFE LIFTING OPERATION. I Have excellentwrittenandspokencommunicationskillsinEnglish ,Arabic, Malayalam, Chinese, Hindi ,Urdu.Iam verymuch confidentand friendlyperson , able tocommunicate andinteractcomfortablywithall level of peopleandtofunctioneffectivelyintime of stressfulsituationandfirmindecision. I AMVERY MUCH INTERESTED ANDKEEN IN JOININGYOUR ESTEEMED ORGANIZATION. THANKYOU VERY MUCH FOR YOUR KINDANTICIPATEDCOOPERATION. AWAITFOR YOUR EARLIESTREPLY YOURS FAITHFULLY. Amod kumar