This document provides a resume for C.H. Scott Goodwin including his contact information, training and certifications, employment history, and details of projects he has worked on in various roles such as Barge Superintendent, Barge Foreman, Anchor Foreman, and Control Tower Operator. His experience spans over 15 years working on offshore oil and gas projects in locations including Australia, Southeast Asia, the Middle East, and Africa. He has extensive experience overseeing operations related to pipe laying, jacket and topside installations, and subsea infrastructure projects.
1. C.H. Scott
Goodwin
26 Halswell Street,
Wanganui NZ
Home: +64 6 34 37723
Mobile: +64 21 038 9090
scott_good_win@yahoo.co.nz
Training and Certificates
Offshore Installation Manager Course
Advanced Rigging - Advanced Fire Fighting
Crane Operations
Sea Survival Training – BOSIET
McDermott In-house Safety Training
Confined Space Entry
Wire Rope inspection
Australian Import and export Cert.
Employment History
Barge Superintendent
June 2013 – Present
Duties: Operations of the DB27.DB 32 for McDermott’s
Middle East.
PROJECTS
Aramco: Kingdom Saudi Arabia
Pipelines and Jacket installations. Topside and Cable lay.
Water depth 10m-50m
Barge Superintendent
-
-
-
-
-
-
-
-
2. Barge Superintendent
January – March 2013
Duties:
Oversee the Norse Endeavor’s arrival from Singapore to
Dampier. Overall review and writing of project procedures.
Advise on training, and Australian Standards to the overseas
Marine Crew.
PROJECT
Chevron Gorgon LNG, Barrow Island, West Australia.
2.5 km LNG Load out Jetty.
Barge Superintendent
Supura Clough Australia Ply Ltd
November 2012 – January 2013
Duties:
Supervision of the Kulinder 8 point mooring system, shallow
water barge for the Jetting of the Domgas Pipeline.
Overseeing accommodation vessels, shallow water tugs and
supply vessels.
Barge Foreman
DB-30 McDermott Australia, Ply Ltd.
January 2011 – October, 2012
Duties:
Include: Supervision of all Boats / Anchor movements and
deck operations pertaining to a Derrick Barge in Pipe lay
mode; Jacket Installation and FPSO installations.
Rigging/Scaffolding/Diving/Sub-contractors Supervision
PROJECT
BHP BILLITON, Exmouth, West Australia. June 2012.
Macedon Gas Project
20” 84km pipe lay
I.L.S installation
Over the side - Sub Sea Manifold Installation.
•
•
•
•
•
3. I.L.S installation
Over the side - Sub Sea Manifold Installation.
PROJECT
ESSO: Kipper Tuna Turrum (KTT), BASS
STRAIT, Victoria, Australia.
Pipelines
18”, 14” 70km and 24km’s
Jacket Installation
Jacket launch, Marlin-B (MLB)
Riser Access Tower (RAT Jacket) Lift and upend
MLB, 8 skirt piles, P1Driven and Drilled. Inserts piles
grouted.
RAT ... P1 driven, drilled and grouted.
MLB Module Installation
MSF - 950MT
MLB Bridge – 440 MT
M2B – 1296 MT
M2A – 1759 MT
M1 – 1658 MT
M3 – 2095 MT
Flare – 403 MT
RAT Topside Installation
640 MT
Bridge – 240 MT
Barge Superintendent
QP 2000 Quippo Prakash Ltd, Singapore, March 2010 – Nov
2011
Duties:
Finish off commissioning works in Nan Tong, China.
Make vessel ready for sea trails Singapore.
Oversea operation on the following projects.
PROJECT
Pertronas Carigalli, West Malaysia
SUB CONTRACTED to TLO
(June- August 2010)
TBDR-A, Jacket Launch (2916mt)
installation.
TBFP-A, Tripod installation.
Shell, Sarawak SSB, MALAYSIA
(August-September 2010)
CPDR-A, Jacket launch (3430mt) installation- Skirt
piles.
•
•
•
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
••
•
o
o
••
o
4. Shell, Sarawak SSB, MALAYSIA
(August-September 2010)
CPDR-A, Jacket launch (3430mt) installation- Skirt
piles.
Topside (1645mt) in tire back mode.
Talisman Energy, Talisman field PM 3, West
Malaysia
(October -2010)
TML Mercury Removal Unit installation.
2x MRU Gas absorbers Vessels
2x MRU Condensate absorbers Vessels
380 Gas Skid
Condensate skid
Barge Foreman
DB-30 McDermott, Australia.
Duties Include: Supervision of all Boats / Anchor
movements and deck operations pertaining to a Derrick
Barge in Pipe lay mode; Jacket and FPSO installations
Rigging/Scaffolding/Diving/Sub-contractors
PROJECT:
Wood side Burrup Pty Ltd- Pluto LNG Project-NW
Australia
(November 09-January 2010)
Pluto Jacket Launch (10,000mt) Upend &
Drill for Skirt Piles, Grout.
Topside Lifts, lower (2190mt) upper (2160mt)
flare (585mt)
TLQ (700mt)
PROJECT: Malaysia
Sarawak Shell Berhad- B-11- A
Topsides Installation- (September
2009)
Module- A1- Module-1 B & 1C and Bridge
PROJECT: Vietnam
Cuulong Joint Operation Company. Su Tu
Development
Su Tu Den North East- July, 2009- Vietnam
(August 2009)
Wellhead Platform, Submarine Cable and Pipeline
W.H.P.-B Jacket- 4 Pile and Conducters
PROJECT: Malaysia
Sarawak Shell Berhad – B-11 PLATFORM (April,
2009 – May 2009 )
Miri, Sarawak
Eight Leg Jacket Installation
Removed B-11 LQ
Removed F-6 LQ and Installed New LQ
Removed M-1 Old Generator Set and Installed New
Generator Set
Installed B-11 New LQ
Sarawak Shell Berhad – F23 PLATFORM (Nov 8
2008 – Nov 18, 2008 )
o
o
••
••
o
o
o
o
o
•
o
o
o
••
o
••
o
o
o
••
o
o
o
o
o
o
••
5. Installed B-11 New LQ
Sarawak Shell Berhad – F23 PLATFORM (Nov 8
2008 – Nov 18, 2008 )
Miri, Sarawak
Installed F-23 Module
Barge Superintendent
March 08 – Nov 08 Aussie One - Trident Australasia Pty
Ltd, Perth Australia
Duties Include: Overall review and writing of project
procedures.
Supervision for the commissioning and project teams in
Singapore for mobilization of the AUSSIE ONE for Trident
Australasia - Kim Heng Marine.
PROJECT (Land based)
Nexus Energy – Bass Strait , Australia
20km 12” concrete coated gas line
13km Electro / hydraulic umbilical.
DP2 vessel – umbilical and ROV operations.
Barge Foreman
October 2005 – March 08 DB-30 McDermott, Singapore /
Australia.
Duties Include: Supervision of all Boats / Anchor
movements and deck operations pertaining to a
Derrick Barge in Pipe lay mode; Jacket and FPSO
installations
Rigging/Scaffolding/Diving/Sub-contractors Supervision
PROJECT HISTORY
Woodside Petroleum Ltd, Perth, Australia – Angel
Project
Oct 07 - March 08
Angel Jacket Launch Upend & Drill for Skirt Piles,
Grout
3x CRA 14inch Pipelines
1x 30 inch CS Angel-NRA 49KM
ONGC/Larsen & Toubro 4WPP-1 Project (Dec 06-
April-07)
Mumbai High. DB-30
N2A Tripod Installation
NEA Tripod Installation
NHA Tripod, Deck & NHA-NH Bridge
Installation
N2A Deck, N2 Boat Landing & N2A-N2 Bridge
Installation
NE-NEA Bridge Installation
BF Jacket & Deck Installation
NE-NH 6” Pipeline Installation
6” Riser Stalk-On @ NH+ NE Platform
JBBS 16” NH-NE Pipeline Installation
16” Riser Stalk-On Installation @ BF+BF
Platform
o
••
o
o
o
o
o
o
•
o
•
•
•
•
o
o
o
o
o
o
o
o
o
o
6. JBBS 16” NH-NE Pipeline Installation
16” Riser Stalk-On Installation @ BF+BF
Platform
CUEL / Chevron - Phase 29 (June 06
– Oct 06) DB-30
Plamuk, Kaphong, Satun, Funan, & Pailin Fields,
Thailand
PMWJ Jacket installation, Tie-ins @ PF end
KPWE 16” pipeline / jacket installation
SAPLN 10” pipeline
FUPLN 10”pipeline / jacket installation
8” water injection pipeline
BAWE jacket install, Tie-in @ PF end
SAWN 30/1 JACKET & TOPSIDE
FUNA-30/2 JACKET & TOPSIDE
ERMRP-JACKET 620 TON
ERMRP – TOPSIDE -1800 TON
ERMRP – BRIDGE – 500 TON
KPWE – 29/7 JACKET & TOPSIDE.
Talisman Malaysia(May 06 – June 06) DB-30
Bunga Tulip Field, Terengganu, Malaysia
6” dia. Pipeline (BT- A to BR-C)
14” & 4½“ Piggyback
BR-C Riser Installation 14” / 6” / 4½” & Spool Tie-ins
BT – A Substructure installation
EMEPMI (April 06 – May 06) DB-30 Seligi – A Field,
Terengganu, Malaysia
18” SEA – TAP Pipe lay & Pipeline crossing
Riser Installation, Pigging, Hydro testing & De-
oiling
TL Offshore Charter (Oct 05 – April 06) DB-30,
TLO/PCSB – Baram Oilfield, Miri, East Malaysia,
Petronas Carigali/Shell Malaysia DB30
BAJT – H/ BAK - BP Baram installation project
MCOT 2005 Development project
Installed 16” diameter BAP – AA / MCOT
pipeline
Installed 6 pile jackets, in field pipe and
associated risers in Baram Field, Offshore
Miri, East Malaysia as per JRM / TL offshore
charter
Involving pipe lay various pipelines
Riser installation / Sub sea spools
Heavy lifts Jackets / Topsides /Bridges
Over the side pipeline tie in by means of Davit
lifts
Petronas Carigali (Oct 05) DB-30
Ruby Field development stage 1- phase 2
Installed RBDP – B topside installation.
Installed 10” riser & repair at RBDP - A
Anchor Foreman / Relief Foreman
o
o
••
o
o
o
o
o
o
o
o
o
o
o
o
•
o
o
o
o
••
o
o
••
o
o
o
o
o
o
o
o
••
o
o
7. Anchor Foreman / Relief Foreman
January 2003 – Oct 2005 McDermott Singapore
Duties Include: Supervision of all Anchor movements and
deck operations pertaining to a Derrick Barge in Pipe lay
mode; Jacket and FPSO installations
Exon Nestegas Limited (June - Sept 05) Sakhalin
export terminal, SPM and SSLL installation – Dekastri
Installed 12” WWOL Installation
Installed 12” WWOL / 48” SSLL
(onshore)
Installed 48” SSLL pipeline installation
and two submarine cables installation.
Installed SPM Substructure (2550 tons)
& Rotation head (1050 tons)
Loaded test on Templates (680 tons) &
(585 tons)
Talisman Malaysia / PTSC (May 05)
Launched and Installed 8 legged jacket (400
tons)
Installed bridge (250 tons) from BRE to BRD
platforms
Installed BRE Tripod Bridge (360 tons)
Installed BRE Bridge (400 tons) to flare
PTTP Bongkot Field Development PRJT Phase 3C
(Mar 05)
Installed SSP jacket and adjoining deck (North
deck - 2550 tons and South deck - 2700 tons)
Installed RP bridge (135 tons)
Installed SSP bridge (290 tons)
Installed Bridge support frame (112 tons), and
North Module Flare.
CUEL, Thailand (March, 2005)
Installed 4 legged jacket (380 tons) and
adjoining deck (450 tons) - PAWJ
Installed 4 legged jacket (402 tons) and
adjoining deck (450 tons) - ERWX
Installed 4 legged jacket (450 tons) and
adjoining deck (450 tons) - TRWC
Installed 4 legged jacket (415 tons) and
adjoining deck (590 tons) – Pearl (WHPA)
Installed PLOCP2 Production Deck (2450 tons)
and Utility deck (1400 tons)
Installed PLOCP2 Bridge (180 tons)
Installed subset tie-ins for all above
Oil & Natural Gas Corporation Ltd. (Dec 04 - Jan
2005) Hyundai Heavy Industries Co. Ltd.
Installation of 8 pie MSP jacket and flare tripod
Installation of MSP decks comprising of 7 modules
and bridge installation
L & T – QP (November 2004) DB30, Maydan Mahzam
Field, Qatar
Installed 4 legged jacket (PS3Q)
Installed tripod (PS2J)
••
o
o
o
o
o
••
o
o
o
o
••
o
o
o
o
o
o
o
o
o
o
o
o
••
o
o
••
o
o
8. L & T – QP (November 2004) DB30, Maydan Mahzam
Field, Qatar
Installed 4 legged jacket (PS3Q)
Installed tripod (PS2J)
Removed PS-2 old LQ module
Installed power module PS-2 LQ
Installed 4 legged PS-2Q jacket
Removed PS-3 old LQ module
Installed new PS-2 LQ module
Installed PS-2 helideck and bridge
Installed sub sea tie-ins 6", 10" and 16"
Qatar Petroleum – Qatar (September – November
2004) Larsen & Toubro Limited.
PS2/PS3 Living Quarters and power upgrade project
Installations of 4 pile jacket(s) and tripod(s)
Installation of topsides (power package/regeneration
skid, living quarters and associated bridges.
Belanak FPSO Batam Yard Installation (2004)
Installation of 5 x deck sections / Crane towers / Flare
Tower
Used Asian Hercules as lift crane
Average lift 1500 to 2300 tones
ALOC PLBG (April 2004 – June 2004) Baku,
Azerbaijan.
Trenching (pipeline burial)
Mcdermott DB30 (February-April 2004)
Dry and wet docking of McDermott DB30 and
associated heavy cargo material barges at Keppel
Shipyard in Singapore.
Control Tower Operator/ Leader man
2001-2003Mcdermott Singapore DB30
Duties Include: Anchor hoist operations, Supervisor for deck
operations ie: Crane operations, rigging, and scaffolding.
DB30, Rang Dong Field, Vietnam (2003) /Japan
Vietnam Petroleum Corp. (JVPC)
Installed 16" 7km pipeline and associated hydro test.
Installed 2 jackets, NCW1 and LQ.
DB30, Belanak Field Development (2003),
Natuna Field Indonesia.
CONOCO Phillips Indonesia Inc.
Heavy lift of WHPA deck 2917 ST
Peciko (2003)
Ibis-West Kalimantan
Total Elf
Jetting
EMEPMI (October 2002) DB30, Terengganu, West
Malaysia. Exxon Mobil
Jackets and adjoining decks Tapis-F, Bintang-A and
Bintang-B
PM3 (September 2002) DB30, Terengganu, West
Malaysia. Clough
••
o
o
o
o
o
o
o
o
o
••
o
o
o
••
o
o
o
••
o
••
o
••
o
o
••
o
••
o
o
o
••
o
••
9. Bintang-B
PM3 (September 2002) DB30, Terengganu, West
Malaysia. Clough
2 jackets
Bayu Undan Gas Recycle Project (2002) DB30, Timor
Sea, Timor Leste.
Phillip 66
Launched and installed 2ea 8-legged jackets
Underwater drilling, piling and grouting
Installed flare bridge
Installed 1ea 4 legged jacket with adjoining deck
Installed 2 ea 12" dia pipelines
FSO SBM installation and flexible riser installation
Batam Marine Base (Dec 2001 - Feb 2002) Batam,
Indonesia
Upgrading of KP1, DB26 and DB30 in preparation for
upcoming projects
Cable change outs, load test and E-mag of crane
cables
MODEC Bongkot (November 2001) DB30,
Thailand. MODEC
Launched and installed an 8-legged jacket and
adjoining topside
EPMI Larut-A (August 2001) DB30, Terengganu,
Malaysia. Esso Production Malaysia Inc
MSF Heavy Lift of 2500 ST
Heavy Lift and installation of 4 Modules
Angsi
Project
(2001)
DB30,
Terengganu,
Malaysia.
Carigali -
TLO
Crane Operator
October 1999 – March 2001 Three Foot Six Ltd. “Lord of the
Rings” Construction Company, Wellington, New Zealand.
Duties Include: Operation of 40-ton mobile crane and
associated rigging requirements.
Machinery Operator
May 1996 – October 1999 Henry Walker Ltd (Mining
Contractors) Western Australia
Duties Include: Operation of Dozers and dump trucks
for the recovery of gold in an open pit mine.
Control Tower Operator/ Leader Man
DB27, DB14 and DBL801
1991 – 1996 McDermott ETPM Dubai United Arab
Emirates
••
o
••
o
o
o
o
o
o
••
o
o
••
o
••
o
o
••
10. DB27, DB14 and DBL801
1991 – 1996 McDermott ETPM Dubai United Arab
Emirates
Duties Include: Anchor hoist operation; all aspects of
rigging, scaffolding and working with cranes on these
barges. Foreman: pigging, hydro testing and grouting.
Free span work with divers on four point mooring
vessels. Crane Operation on these vessels involved 10
to 40 ton hydraulic units.
Referees
1.) John Nicholson
Sapura General Superintendant
KL , Malaysia
Telephone: 60 19 620 6074
2.) Stuart Wright
DB30 Superintendant
Singapore
Email: SWright@mcdermott.com
3.) Wayne Bingham
Superintendant
Telephone: 61 3 9862 5590