SlideShare a Scribd company logo
1 of 15
Download to read offline
   
 
 
 
1
MOHD NAZRUL ABRUL RAZAK
PERSONAL DATA
NATIONALITY : MALAYSIAN
RACE : MUSLIM
DATE OF BIRTH : 09TH
MARCH 1984
MARITAL STATUS : MARRIED
ADDRESS : E-2-12 BLOCK E CASUARINA APARTMENT, 41200 BANDAR BOTANIC KLANG
SELANGOR
PHONE : +6012 3736551
EMAIL : nazrulrazak@gmail.com
PROFESSIONAL PROFILE
 Involve in set-up floatover barge for topside loadout & installation.
 Involve in set-up launching barge for jacket launching operation
 Involve in topside floatover installation, jacket installation and pipeline pre-commissioning.
 Involve in performing pipeline pre-commissioning from pigging up to nitrogen packing
 Involve in performing Bolt Torque / Tensioning & Nitrogen/Helium Leak Testing
 Highly creative, analytical, multitasking and trainable.
HANDS-ON SKILL
 Ballasting launching barge for jacket launch operation
 Ballasting floatover barge for topside installation
 Capable to operate winches single drum & double drum
 Experienced on operating the internal lifting tool (ILT) to upend the 82 inch piles.
 Perform internal sling load test for jacket upending sling with 3rd
party approval
 Experience in operating pipeline pre-commissioning pumps
 Familiar to operate bolt tensioning pumps
ACADEMIC AND PROFESSIONAL QUALIFICATION
2001 : Malaysian Certificate Of Education
2014 :  Tropical Basic Offshore Safety Induction and Emergency Training (T-BOSIET) including
Travel Safely By Boat – OPITO Approved
Construction and Industrial Safety Training Centre Sdn. Bhd. (MSTS) – Malaysia.
 Authorized Gas Tester ( AGT ) – Construction and Industrial Safety Training Centre
Sdn. Bhd. (MSTS) – Malaysia
 Confine space - Construction and Industrial Safety Training Centre Sdn. Bhd. (MSTS) –
Malaysia
 Internal lifting tools ( ILT ) – in house training ( certified by IHC personnel )
   
 
 
 
2
MOHD NAZRUL ABRUL RAZAK
CAREER HISTORY
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
 Transportation And Installation Of Offshore Facilities For Garagol Deniz Oil Development Project
 Client – PETRONAS Carigali Turkmenistan Sdn Bhd
 Main Contractor – Sigur Ros Sdn Bhd
 Year – January 2015 – On Going
 Work Scope – Garagol Deniz Drilling Platform – A (GDDP-A) Topside Floatover Installation
 Job Scope & Responsibility:
1) Preparing the topside Loadout activities
2) Preparing the topside Floatover Installation
3) Preparing the topside floatover sequence
4) Perform function test for topside floatover barge equipment such as double drum & single drum
winches, diesel generator, ballast pump and etc.
5) Perform inspection at site on the equipment, topside tie down and topside arrangement positions
are as per drawing.
6) Perform ballast for the floatover barge upon complete topside loadout for towing purpose as per
provided ballast pattern
7) Perform function test on the equipment (ballast pump & winches) upon arrival of floatover barge at
site.
8) Coordinate with the barge superintendent & barge foreman during the floatover activity
9) Perform ballast on the floatover barge for topside mating activity as per ballast pattern
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
 Transportation And Installation Of Offshore Facilities For Garagol Deniz Oil Development Project
 Client – PETRONAS Carigali Turkmenistan Sdn Bhd
 Main Contractor – Sigur Ros Sdn Bhd
 Year – January 2015 – On Going
 Work Scope – Garagol Deniz Drilling Platform – A (GDDP-A) Jacket Launching & Installation
 Job Scope & Responsibility:
1) Perform ballast for the launch barge upon complete jacket loadout for towing purpose as per
provided ballast pattern
2) Perform ballast for jacket vertical launching operation
3) Perform jacket upending and flooding as per sequence
4) To operate internal lifting tool ( ILT ) for upending pile operations
   
 
 
 
3
MOHD NAZRUL ABRUL RAZAK
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
 Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project
 Client – PETRONAS Carigali Turkmenistan Sdn Bhd
 Main Contractor – Sigur Ros Sdn Bhd
 Year – July 2014 – Completed
 Work Scope – Central Diyarbekir Drilling Platform – A (CDDP-A) Topside Floatover Installation
 Job Scope & Responsibility:
1) Preparing the topside Loadout activities
2) Preparing the topside Floatover Installation
3) Preparing the topside floatover sequence
4) Perform function test for topside floatover barge equipment such as double drum & single drum
winches, diesel generator, ballast pump and etc.
5) Perform inspection at site on the equipment, topside tie down and topside arrangement positions
are as per drawing.
6) Perform ballast for the floatover barge upon complete topside loadout for towing purpose as per
provided ballast pattern
7) Perform function test on the equipment (ballast pump & winches) upon arrival of floatover barge at
site.
8) Coordinate with the barge superintendent & barge foreman during the floatover activity
9) Perform ballast on the floatover barge for topside mating activity as per ballast pattern
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
 Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project
 Client – PETRONAS Carigali Turkmenistan Sdn Bhd
 Main Contractor – Sigur Ros Sdn Bhd
 Year – July 2014 - Completed
 Work Scope – Pipeline Pre-Commissioning For 18 Inch From WDDP-A to MCR-A c/w 4 Inch Piggyback
 Job Scope & Responsibility:
1) Preparing the pipeline pre-commissioning material and equipment up to dewatering activity
2) Function test all the pumps & compressor prior pre-commissioning operation
3) Lead the rig up activity for pre commissioning vessel for launcher & receiver
4) Liaise with the pre-commissioning Engineer to ensure the pipeline pre-commissioning operation was
performed within the acceptance criteria.
   
 
 
 
4
MOHD NAZRUL ABRUL RAZAK
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
 Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project
 Client – PETRONAS Carigali Turkmenistan Sdn Bhd
 Main Contractor – Sigur Ros Sdn Bhd
 Year – Jun 2014 – Completed
 Work Scope – Central Diyarbekir Drilling Platform – A (CDDP-A) Jacket Installation
 Job Scope & Responsibility:
1) Perform ballast for the launch barge upon complete jacket loadout for towing purpose as per
provided ballast pattern
2) Perform ballast for jacket horizontal launching operation
3) Perform jacket upending and flooding as per sequence
4) To operate internal lifting tool ( ILT ) for upending pile operations
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
 Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project
 Client – PETRONAS Carigali Turkmenistan Sdn Bhd
 Main Contractor – Sigur Ros Sdn Bhd
 Year – May 2014 – Completed
 Work Scope – West Diyarbekir Drilling Platform – A (WDDP-A) Topside Floatover Installation
 Job Scope & Responsibility:
1) Preparing the topside Loadout
2) Preparing the topside Floatover Installation
3) Preparing the topside floatover sequence
4) Perform function test for topside floatover barge equipment such as double drum & single drum
winches, diesel generator, ballast pump and etc.
5) Perform inspection at site on the equipment, topside tie down and topside arrangement positions
are as per drawing.
6) Perform ballast for the floatover barge upon complete topside loadout for towing purpose as per
provided ballast pattern
7) Perform function test on the equipment (ballast pump & winches) upon arrival of floatover barge
at site.
8) Coordinate with the barge superintendent & barge foreman during the floatover activity
9) Perform ballast on the floatover barge for topside mating activity as per ballast pattern
   
 
 
 
5
MOHD NAZRUL ABRUL RAZAK
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
 Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project
 Client – PETRONAS Carigali Turkmenistan Sdn Bhd
 Main Contractor – Sigur Ros Sdn Bhd
 Year – April 2014 – Completed
 In House Work Scope – Sling Load Test For Central Diyarbekir Drilling Platform – A (CDDP-A) Jacket
Installation
 Job Scope & Responsibility:
1) To perform sling load test using single drum winch on launching barge .
2) Selecting rigging material and equipment to perform the sling load test
3) Liaise with the 3rd
Party for endorsement of the in-house sling load test certificate
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
 Pembangunan Saluran Pipa Minyak Bawah Laut 6” Sch.80 x 6000m Dari XB Platform Ke XA Platform Lapangan X-
Ray
 Client – PT Pertamina EP
 Main Contractor – PT Sigur Ros Indonesia
 Year – August 2013 - Completed
 Work Scope – Pipeline Pre-Commissioning For 6 Inch x 6000m From XB Platform to XA Platform
 Job Scope & Responsibility:
1) Preparing the pipeline pre-commissioning material and equipment up to dewatering activity
2) Function test all the pumps & compressor prior pre-commissioning operation
3) Lead the rig up activity for pre commissioning vessel for launcher & receiver
4) Liaise with the pre-commissioning Engineer to ensure the pipeline pre-commissioning operation
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
 Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project
 Client – PETRONAS Carigali Turkmenistan Sdn Bhd
 Main Contractor – Sigur Ros Sdn Bhd
 Year – Jun 2013 – Completed
 Work Scope – West Diyarbekir Drilling Platform – A (WDDP-A) Jacket Installation
 Job Scope & Responsibility:
1) Perform ballast for the launch barge upon complete jacket loadout for towing purpose as per
provided ballast pattern
2) Perform ballast for jacket horizontal launching operation
3) Perform jacket upending and flooding as per sequence
4) To operate internal lifting tool ( ILT ) for upending pile operations
   
 
 
 
6
MOHD NAZRUL ABRUL RAZAK
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
 Pipeline Replacement Project 2012
 Client – PT Pertamina Hulu Energi - ONWJ
 Main Contractor – PT Sigur Ros Indonesia
 Year – July 2012 - Completed
 Work Scope – Pipeline Pre-Commissioning For 10 Inch From ESA to EPRO and 6 Inch From EB to EPRO
 Job Scope & Responsibility:
1) Preparing the pipeline pre-commissioning material and equipment up to dewatering activity
2) Function test all the pumps & compressor prior pre-commissioning operation
3) Lead the rig up activity for pre commissioning vessel for launcher & receiver
4) Liaise with the pre-commissioning Engineer to ensure the pipeline pre-commissioning operation
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
 Turkmenistan Block 1 Gas Development Project Installation & Pre-Commissioning of Offshore Pipeline &
Associated Onshore Civil Works
 Client – PETRONAS Carigali Turkmenistan Sdn Bhd
 Main Contractor – Sigur Ros Sdn Bhd
 Year – March 2011 – Completed
 Work Scope – Pipeline Pre-Commissioning for Flooding, Cleaning, Gauging, Hydrotest and Dewatering
& Nitrogen Packing of 26” / 12” & 4” x 73KM Pipeline From OGT ( Onshore Gas Terminal) to MCR-A
Platform
 Job Scope & Responsibility:
1) Preparing the pipeline pre-commissioning material and equipment up to dewatering activity
2) Function test all the pumps & compressor prior pre-commissioning operation
3) Lead the rig up activity for pre commissioning vessel for launcher & receiver
4) Liaise with the Commissioning Engineer to ensure the pre-commissioning operation
   
 
 
 
7
MOHD NAZRUL ABRUL RAZAK
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
 Pre-Test Bolt Torque / Tensioning & Nitrogen/Helium Leak Testing Works At MCR-A, MDP-A And Interconnecting
Bridge.
 Client – PETRONAS Carigali Turkmenistan Sdn Bhd
 Main Contractor – MMHE JV TECHNIP
 Year – February 2011 – Completed
 Work Scope – Flange Management & Nitrogen + Helium Leak Testing for Several Package at MCR-A &
MDP-A Platform
 Job Scope & Responsibility:
1) Preparing the material and equipment
2) Manage all the works during execution (procure all the equipment & consumable, arrange all the
transport to mob/demob manpower and equipment, sourcing manpower, execute the job, and
liaise with Client during job execution
3) Liaise with Commissioning Engineer to ensure the commissioning operation
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
 Provision of Bolt Tightening & Leak Testing Services for TCOT & ANDR-A Platform
 Client – PETRONAS Carigali Sdn Bhd
 Main Contractor – Dayang Enterprise Sdn Bhd
 Year – October 2010 – Completed
 Work Scope – Flange Management & Nitrogen + Helium Leak Testing for Several Package at TCOT &
ANDR-A Platform
 Job Scope & Responsibility:
1) Preparing the material and equipment
2) Manage all the works during execution (procure all the equipment & consumable, arrange all
the transport to mob/demob manpower and equipment, sourcing manpower, execute the job,
and liaise with Client during job execution
3) Liaise with Commissioning Engineer to ensure the commissioning operation
   
 
 
 
8
MOHD NAZRUL ABRUL RAZAK
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
 Nitrogen Helium Reinstatement Leak Test of Piping System for RUBY FPSO Project
 Client – MISC BERHAD
 Main Contractor – Malaysia Marine And Heavy Engineering Sdn Bhd (MMHE)
 Year – February 2010 – Completed
 Work Scope – Flange Management & Nitrogen + Helium Leak Testing for Several Package at RUBY FPSO
 Job Scope & Responsibility:
1) Preparing the material and equipment
2) Manage all the works during execution (procure all the equipment & consumable, arrange all
the transport to mob/demob manpower and equipment, sourcing manpower, execute the job,
and liaise with Client during job execution
3) Liaise with Commissioning Engineer to ensure the commissioning operation
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
 Provision of Bolt Tightening & Leak Testing For The RDP-A & RCPP Platform (RESAK)
 Client – PETRONAS Carigali Sdn Bhd
 Main Contractor – Dayang Enterprise Sdn Bhd
 Year – December 2010 – Completed
 Work Scope – Flange Management & Nitrogen + Helium Leak Testing for Several Package at RDP-A &
RCPP Platform
 Job Scope & Responsibility:
1) Preparing the material and equipment
2) Manage all the works during execution (procure all the equipment & consumable, arrange all
the transport to mob/demob manpower and equipment, sourcing manpower, execute the job,
and liaise with Client during job execution
3) Liaise with Commissioning Engineer to ensure the commissioning operation
   
 
 
 
9
MOHD NAZRUL ABRUL RAZAK
 Pembangunan Saluran Pipa Minyak Bawah Laut 6” Sch.80 x 6000m Dari XB Platform Ke XA Platform
Lapangan X-Ray
 Client – PT Pertamina EP
 Main Contractor – PT Sigur Ros Indonesia
 Year – February 2012
 Job Scope & Responsibility:
1) Preparing the pipeline pre-commissioning material and equipment up to
dewatering activity
2) Function test all the pumps & compressor prior pre-commissioning
operation
3) Lead the rig up activity for pre commissioning vessel for launcher &
receiver
4) Liaise with the Commissioning Engineer to ensure the pre-commissioning
operation
COMPANY PROJECT INVOLVED / CLIENT / COUNTRY BARGE YEAR
Sigur Ros Sdn Bhd
Garagol Deniz Drilling Platform – A (GDDP-A) Jacket
Launching & Installation
- Petronas Carigali Turkmenistan
- Turkmenistan
FOB Dagbasy +
DLB Armada
Installer
2015 – On
Going
Sigur Ros Sdn Bhd
Garagol Deniz Drilling Platform – A (GDDP-A) Topside
Floatover Installation
- Petronas Carigali Turkmenistan
- Turkmenistan
FOB Dagbasy +
DLB Armada
Installer
2015 – On
Going
Sigur Ros Sdn Bhd
Central Diyarbekir Drilling Platform – A (CDDP-A) Topside
Floatover Installation
- Petronas Carigali Turkmenistan
- Turkmenistan
FOB Dagbasy +
DLB Armada
Installer
2014 –
Completed
Sigur Ros Sdn Bhd 
Pipeline Pre-Commissioning For 18 Inch From WDDP-A to
MCR-A c/w 4 Inch Piggyback
- Petronas Carigali Turkmenistan Sdn Bhd
- Turkmenistan
DLB Armada
Installer
July 2014
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
   
 
 
 
10
MOHD NAZRUL ABRUL RAZAK
COMPANY PROJECT INVOLVED / CLIENT / COUNTRY BARGE YEAR
Sigur Ros Sdn Bhd 
Central Diyarbekir Drilling Platform – A (CDDP-A) Jacket
Installation
- Petronas Carigali Turkmenistan Sdn Bhd
- Turkmenistan
FOB Dagbasy +
DLB Armada
Installer
Jun 2014
Sigur Ros Sdn Bhd 
West Diyarbekir Drilling Platform – A (WDDP-A) Topside
Floatover Installation
- Petronas Carigali Turkmenistan Sdn Bhd
- Turkmenistan
FOB Dagbasy +
DLB Armada
Installer
May 2014
Sigur Ros Sdn Bhd 
Pembangunan Saluran Pipa Minyak Bawah Laut 6” Sch.80 x
6000m Dari XB Platform Ke XA Platform Lapangan X-Ray
- PT Pertamina EP Cirebon
- Indonesia
PLB Aussie 1 August 2013
Sigur Ros Sdn Bhd 
West Diyarbekir Drilling Platform – A (WDDP-A) Jacket
Installation
- Petronas Carigali Turkmenistan Sdn Bhd
- Turkmenistan
FOB Dagbasy +
DLB Armada
Installer
Jun 2013
Sigur Ros Sdn Bhd 
Pipeline Pre-Commissioning For 10 Inch From ESA to EPRO
and 6 Inch From EB to EPRO
- PT Pertamina Hulu Energi - ONWJ
- Indonesia
PLB Mas Mulia July 2012
Sigur Ros Sdn Bhd 
Pipeline Pre-Commissioning - Turkmenistan Block 1 Gas
Development Project Installation & Pre-Commissioning of
Offshore Pipeline & Associated Onshore Civil Works
- Petronas Carigali Turkmenistan Sdn Bhd
- Turkmenistan
DLB Armada
Installer
March 2011
COMPANY PROJECT INVOLVED / CLIENT / COUNTRY BARGE YEAR
Sigur Ros Sdn Bhd 
Pre-Test Bolt Torque / Tensioning & Nitrogen/Helium Leak
Testing Works At MCR-A, MDP-A And Interconnecting
Bridge.
- Petronas Carigali Turkmenistan Sdn Bhd
- Turkmenistan
Fabrication
yard + DLB
Armada
Installer
February 2011
Sigur Ros Sdn Bhd 
Provision of Bolt Tightening & Leak Testing For The RDP-A
& RCPP Platform (RESAK)
- Petronas Carigali Sdn Bhd
- Malaysia
WB Dayang
Berlian
December
2010
   
 
 
 
11
MOHD NAZRUL ABRUL RAZAK
COMPANY PROJECT INVOLVED / CLIENT / COUNTRY BARGE YEAR
Sigur Ros Sdn Bhd 
Provision of Bolt Tightening & Leak Testing Services for
TCOT & ANDR-A Platform
- Petronas Carigali Sdn Bhd
- Malaysia
WB Dayang
Berlian
October 2010
Sigur Ros Sdn Bhd 
Nitrogen Helium Reinstatement Leak Test of Piping System
for RUBY FPSO Project
- MISC Berhad
- Malaysia
RUBY FPSO February 2010
Project : Turkmenistan Block 1 Gas Development Project
Client : Petronas Carigali ( Turkmenistan )
Main Contractor : MMHE / Technip
Years : May 2010
Position : Assistance Supervisor
Project : Boltensionning & Leaktesting for TCOT
Client : Petronas Carigali Sdn. Bhd.
Main Contractor : Dayang Enterprise
Years : July 2009
Position : Assistance Supervisor
Project : Supply equipment for Kuantan Compressor Stations
Upgrading phase 1
Client : Petronas Carigali Sdn. Bhd.
Main Contractor : Sime Engineering ( Sime Darby )
Years : March 2009
Position : Assistance Supervisor
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
   
 
 
 
12
MOHD NAZRUL ABRUL RAZAK
Project : Pipeline Pre-commisionning ( CPOC )
Client : Petronas Carigali Sdn. Bhd.
Main Contractor : TL Offshore
Years : September 2008
Position : Assistance Supervisor
Project : Andra - TCOT Shore Approach Pipeline Installation ( Bolting and
Leaktesting division )
Client : Petronas Carigali Sdn. Bhd.
Main Contractor : Dayang Enterprise
Years : April 2008
Position : Senior Technician
Project :  Samarang Pipeline Replacement Project
Client :  Petronas Carigali Sdn. Bhd.
Main Contractor :  TL Offshore
Years :  Sept 2007
Position :  Senior Technician
Project EPCC Of The Natural Gas Pipeline And Metering & Regulating Station
Lion Group Plant, Banting Selangor.
Client :  Petronas Gas Sdn. Bhd./ Megasteel Lion Group Plant Sdn Bhd
Main Contractor :  MMC Engineering Sdn Bhd
Years :  Sept 2007
Position :  Senior Technician
   
 
 
 
13
MOHD NAZRUL ABRUL RAZAK
Project : Provision of Pipeline Pre-Commissioning Services for Leighton Melut
Basin, Bahsyer 2, Sudan Project – Bolt Torquing,Pre-
commisioning,hydrotesting
Client : PETRODAR, Sudan
Main Contractor : Leighton Contractor Malaysia/Oilfield Pipeline Inspection Sdn Bhd.
Years : Dec 2006 – March 2007
Position : Technician
Project : Bolt Torquing and Leak Testing of Kikeh SPAR DTU Topsides –
Nitrogen + Helium Leak Testing
Client : Murphy Oil Co. Ltd.
Main Contractor : Malaysia Marine & Heavy Engineering Sdn. Bhd.
Years : October 2006
Position : Technician
Project : Bolt Torquing and Leak Testing of South Angsi A (SAA) Naga Kecil
Project – Nitrogen + Helium Leak Testing
Client : Talisman Malaysia Limited
Main Contractor : EJ Joint Venture Sdn Bhd
Years : June 2006
Position : Technician
Project : Yadana Onshore Domestic Gas Upgrading Project – 12” X 0.63km &
24” X 2.652km Yadana Pipeline Pre-commissioning
Client : Total E&P Myanmar
Main Contractor : KNM Process Systems Sdn Bhd
Years : July 2006
Position : Technician
   
 
 
 
14
MOHD NAZRUL ABRUL RAZAK
Project : Offshore Transportation and Installation Work of EPCIC Ledang –
Anoa Development Project
Client : Petronas Carigali Sdn Bhd
Main Contractor : Malaysia Marine and Heavy Industries Sdn Bhd
Years : April 2006
Position : Technician
Project : Work in Ramunia Fabricators Sdn Bhd for Talisman Malaysia Limit in
hydrotesting and Nitrogen + Helium leak testing for new tie-in spool
at Bunga Raya – A & B platform.
Years : 2005 October - November
Position : Technician
Project : Work in Ramunia Fabricators Sdn. Bhd. For Petronas Carigali SdBhd
in bolting Controlled at Samarang Riser Platfo- A
Years : 2005 May
Position : Technician
Project : Pre-Commissioning and Hydro Testing for the Remedial Work of 8”
Damage Pipeline from Penara Platform to PLEM (FPSO)
Client : Petronas Carigali Sdn Bhd
Main Contractor : Malaysian Shipyard and Engineering Sdn Bhd
Years : 2004 (June-July)
Position : Technician
   
 
 
 
15
MOHD NAZRUL ABRUL RAZAK
EKHWAN HAKIM
Construction Manager
Sigur Ros Sdn Bhd
No.56 Jalan Seri Putra 1/4
Bandar Seri Putra
43000 Kajang Selangor
Mobile : +60 19 6641879
Email: ekhwan@sgrsb.com
ASRUL AZALI
OPERATION ENGINEER
Sigur Ros Sdn Bhd
No.56 Jalan Seri Putra 1/4
Bandar Seri Putra
43000 Kajang Selangor
Mobile : +60 12 9355149
Email: asrul.azali@sgrsb.com
REFERENCES

More Related Content

What's hot (16)

Kpr resume tunnel engineer
Kpr resume tunnel engineerKpr resume tunnel engineer
Kpr resume tunnel engineer
 
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
Ghufran Resume 2015 a
Ghufran Resume 2015 aGhufran Resume 2015 a
Ghufran Resume 2015 a
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)
 
Dnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CVDnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CV
 
CV 2016.doc
CV 2016.docCV 2016.doc
CV 2016.doc
 
cvPaoloAguzziNov16
cvPaoloAguzziNov16cvPaoloAguzziNov16
cvPaoloAguzziNov16
 
Ahmd Mahmoud c.v
Ahmd Mahmoud c.vAhmd Mahmoud c.v
Ahmd Mahmoud c.v
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 Final
 
Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)
 
Resume
ResumeResume
Resume
 
Resume Ajmel August 2016
Resume Ajmel August 2016Resume Ajmel August 2016
Resume Ajmel August 2016
 
Completed Projects PPI Deep Foundations
Completed Projects PPI Deep FoundationsCompleted Projects PPI Deep Foundations
Completed Projects PPI Deep Foundations
 
DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2
 

Similar to MOHD NAZRUL CV (20)

AMOD RESUME
AMOD RESUMEAMOD RESUME
AMOD RESUME
 
Robert CV
Robert CVRobert CV
Robert CV
 
AMOD CV CHINA 2017 - Copy
AMOD CV CHINA 2017 - CopyAMOD CV CHINA 2017 - Copy
AMOD CV CHINA 2017 - Copy
 
CV Farid
CV FaridCV Farid
CV Farid
 
Eswaran-CV
Eswaran-CVEswaran-CV
Eswaran-CV
 
Gagandeepgrover 21 dec 2019
Gagandeepgrover 21 dec 2019Gagandeepgrover 21 dec 2019
Gagandeepgrover 21 dec 2019
 
CV_Ramesh Chander
CV_Ramesh ChanderCV_Ramesh Chander
CV_Ramesh Chander
 
Keith Youngs Resume 2015
Keith Youngs Resume 2015Keith Youngs Resume 2015
Keith Youngs Resume 2015
 
Andrew-CV Crane Operator
Andrew-CV Crane OperatorAndrew-CV Crane Operator
Andrew-CV Crane Operator
 
subhash__cv
subhash__cvsubhash__cv
subhash__cv
 
pame cv
pame cvpame cv
pame cv
 
Resume jeyakkumar.CRANE OPERATION
Resume jeyakkumar.CRANE OPERATIONResume jeyakkumar.CRANE OPERATION
Resume jeyakkumar.CRANE OPERATION
 
Sanjeev Barwal
Sanjeev BarwalSanjeev Barwal
Sanjeev Barwal
 
Resume Mazen December 9, 15
Resume Mazen  December 9, 15Resume Mazen  December 9, 15
Resume Mazen December 9, 15
 
ROV Pilot Tech
ROV Pilot TechROV Pilot Tech
ROV Pilot Tech
 
Amir Shuaib CV
Amir Shuaib CVAmir Shuaib CV
Amir Shuaib CV
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017
 
Austin Okwordu CV PDF
Austin Okwordu CV PDFAustin Okwordu CV PDF
Austin Okwordu CV PDF
 
Manish Ray - CV
Manish Ray - CVManish Ray - CV
Manish Ray - CV
 

MOHD NAZRUL CV

  • 1.           1 MOHD NAZRUL ABRUL RAZAK PERSONAL DATA NATIONALITY : MALAYSIAN RACE : MUSLIM DATE OF BIRTH : 09TH MARCH 1984 MARITAL STATUS : MARRIED ADDRESS : E-2-12 BLOCK E CASUARINA APARTMENT, 41200 BANDAR BOTANIC KLANG SELANGOR PHONE : +6012 3736551 EMAIL : nazrulrazak@gmail.com PROFESSIONAL PROFILE  Involve in set-up floatover barge for topside loadout & installation.  Involve in set-up launching barge for jacket launching operation  Involve in topside floatover installation, jacket installation and pipeline pre-commissioning.  Involve in performing pipeline pre-commissioning from pigging up to nitrogen packing  Involve in performing Bolt Torque / Tensioning & Nitrogen/Helium Leak Testing  Highly creative, analytical, multitasking and trainable. HANDS-ON SKILL  Ballasting launching barge for jacket launch operation  Ballasting floatover barge for topside installation  Capable to operate winches single drum & double drum  Experienced on operating the internal lifting tool (ILT) to upend the 82 inch piles.  Perform internal sling load test for jacket upending sling with 3rd party approval  Experience in operating pipeline pre-commissioning pumps  Familiar to operate bolt tensioning pumps ACADEMIC AND PROFESSIONAL QUALIFICATION 2001 : Malaysian Certificate Of Education 2014 :  Tropical Basic Offshore Safety Induction and Emergency Training (T-BOSIET) including Travel Safely By Boat – OPITO Approved Construction and Industrial Safety Training Centre Sdn. Bhd. (MSTS) – Malaysia.  Authorized Gas Tester ( AGT ) – Construction and Industrial Safety Training Centre Sdn. Bhd. (MSTS) – Malaysia  Confine space - Construction and Industrial Safety Training Centre Sdn. Bhd. (MSTS) – Malaysia  Internal lifting tools ( ILT ) – in house training ( certified by IHC personnel )
  • 2.           2 MOHD NAZRUL ABRUL RAZAK CAREER HISTORY SIGUR ROS SDN. BHD. JUN 2004 - PRESENT POSITION : SUPERVISOR  Transportation And Installation Of Offshore Facilities For Garagol Deniz Oil Development Project  Client – PETRONAS Carigali Turkmenistan Sdn Bhd  Main Contractor – Sigur Ros Sdn Bhd  Year – January 2015 – On Going  Work Scope – Garagol Deniz Drilling Platform – A (GDDP-A) Topside Floatover Installation  Job Scope & Responsibility: 1) Preparing the topside Loadout activities 2) Preparing the topside Floatover Installation 3) Preparing the topside floatover sequence 4) Perform function test for topside floatover barge equipment such as double drum & single drum winches, diesel generator, ballast pump and etc. 5) Perform inspection at site on the equipment, topside tie down and topside arrangement positions are as per drawing. 6) Perform ballast for the floatover barge upon complete topside loadout for towing purpose as per provided ballast pattern 7) Perform function test on the equipment (ballast pump & winches) upon arrival of floatover barge at site. 8) Coordinate with the barge superintendent & barge foreman during the floatover activity 9) Perform ballast on the floatover barge for topside mating activity as per ballast pattern SIGUR ROS SDN. BHD. JUN 2004 - PRESENT POSITION : SUPERVISOR  Transportation And Installation Of Offshore Facilities For Garagol Deniz Oil Development Project  Client – PETRONAS Carigali Turkmenistan Sdn Bhd  Main Contractor – Sigur Ros Sdn Bhd  Year – January 2015 – On Going  Work Scope – Garagol Deniz Drilling Platform – A (GDDP-A) Jacket Launching & Installation  Job Scope & Responsibility: 1) Perform ballast for the launch barge upon complete jacket loadout for towing purpose as per provided ballast pattern 2) Perform ballast for jacket vertical launching operation 3) Perform jacket upending and flooding as per sequence 4) To operate internal lifting tool ( ILT ) for upending pile operations
  • 3.           3 MOHD NAZRUL ABRUL RAZAK SIGUR ROS SDN. BHD. JUN 2004 - PRESENT POSITION : SUPERVISOR  Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project  Client – PETRONAS Carigali Turkmenistan Sdn Bhd  Main Contractor – Sigur Ros Sdn Bhd  Year – July 2014 – Completed  Work Scope – Central Diyarbekir Drilling Platform – A (CDDP-A) Topside Floatover Installation  Job Scope & Responsibility: 1) Preparing the topside Loadout activities 2) Preparing the topside Floatover Installation 3) Preparing the topside floatover sequence 4) Perform function test for topside floatover barge equipment such as double drum & single drum winches, diesel generator, ballast pump and etc. 5) Perform inspection at site on the equipment, topside tie down and topside arrangement positions are as per drawing. 6) Perform ballast for the floatover barge upon complete topside loadout for towing purpose as per provided ballast pattern 7) Perform function test on the equipment (ballast pump & winches) upon arrival of floatover barge at site. 8) Coordinate with the barge superintendent & barge foreman during the floatover activity 9) Perform ballast on the floatover barge for topside mating activity as per ballast pattern SIGUR ROS SDN. BHD. JUN 2004 - PRESENT POSITION : SUPERVISOR  Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project  Client – PETRONAS Carigali Turkmenistan Sdn Bhd  Main Contractor – Sigur Ros Sdn Bhd  Year – July 2014 - Completed  Work Scope – Pipeline Pre-Commissioning For 18 Inch From WDDP-A to MCR-A c/w 4 Inch Piggyback  Job Scope & Responsibility: 1) Preparing the pipeline pre-commissioning material and equipment up to dewatering activity 2) Function test all the pumps & compressor prior pre-commissioning operation 3) Lead the rig up activity for pre commissioning vessel for launcher & receiver 4) Liaise with the pre-commissioning Engineer to ensure the pipeline pre-commissioning operation was performed within the acceptance criteria.
  • 4.           4 MOHD NAZRUL ABRUL RAZAK SIGUR ROS SDN. BHD. JUN 2004 - PRESENT POSITION : SUPERVISOR  Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project  Client – PETRONAS Carigali Turkmenistan Sdn Bhd  Main Contractor – Sigur Ros Sdn Bhd  Year – Jun 2014 – Completed  Work Scope – Central Diyarbekir Drilling Platform – A (CDDP-A) Jacket Installation  Job Scope & Responsibility: 1) Perform ballast for the launch barge upon complete jacket loadout for towing purpose as per provided ballast pattern 2) Perform ballast for jacket horizontal launching operation 3) Perform jacket upending and flooding as per sequence 4) To operate internal lifting tool ( ILT ) for upending pile operations SIGUR ROS SDN. BHD. JUN 2004 - PRESENT POSITION : SUPERVISOR  Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project  Client – PETRONAS Carigali Turkmenistan Sdn Bhd  Main Contractor – Sigur Ros Sdn Bhd  Year – May 2014 – Completed  Work Scope – West Diyarbekir Drilling Platform – A (WDDP-A) Topside Floatover Installation  Job Scope & Responsibility: 1) Preparing the topside Loadout 2) Preparing the topside Floatover Installation 3) Preparing the topside floatover sequence 4) Perform function test for topside floatover barge equipment such as double drum & single drum winches, diesel generator, ballast pump and etc. 5) Perform inspection at site on the equipment, topside tie down and topside arrangement positions are as per drawing. 6) Perform ballast for the floatover barge upon complete topside loadout for towing purpose as per provided ballast pattern 7) Perform function test on the equipment (ballast pump & winches) upon arrival of floatover barge at site. 8) Coordinate with the barge superintendent & barge foreman during the floatover activity 9) Perform ballast on the floatover barge for topside mating activity as per ballast pattern
  • 5.           5 MOHD NAZRUL ABRUL RAZAK SIGUR ROS SDN. BHD. JUN 2004 - PRESENT POSITION : SUPERVISOR  Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project  Client – PETRONAS Carigali Turkmenistan Sdn Bhd  Main Contractor – Sigur Ros Sdn Bhd  Year – April 2014 – Completed  In House Work Scope – Sling Load Test For Central Diyarbekir Drilling Platform – A (CDDP-A) Jacket Installation  Job Scope & Responsibility: 1) To perform sling load test using single drum winch on launching barge . 2) Selecting rigging material and equipment to perform the sling load test 3) Liaise with the 3rd Party for endorsement of the in-house sling load test certificate SIGUR ROS SDN. BHD. JUN 2004 - PRESENT POSITION : SUPERVISOR  Pembangunan Saluran Pipa Minyak Bawah Laut 6” Sch.80 x 6000m Dari XB Platform Ke XA Platform Lapangan X- Ray  Client – PT Pertamina EP  Main Contractor – PT Sigur Ros Indonesia  Year – August 2013 - Completed  Work Scope – Pipeline Pre-Commissioning For 6 Inch x 6000m From XB Platform to XA Platform  Job Scope & Responsibility: 1) Preparing the pipeline pre-commissioning material and equipment up to dewatering activity 2) Function test all the pumps & compressor prior pre-commissioning operation 3) Lead the rig up activity for pre commissioning vessel for launcher & receiver 4) Liaise with the pre-commissioning Engineer to ensure the pipeline pre-commissioning operation SIGUR ROS SDN. BHD. JUN 2004 - PRESENT POSITION : SUPERVISOR  Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project  Client – PETRONAS Carigali Turkmenistan Sdn Bhd  Main Contractor – Sigur Ros Sdn Bhd  Year – Jun 2013 – Completed  Work Scope – West Diyarbekir Drilling Platform – A (WDDP-A) Jacket Installation  Job Scope & Responsibility: 1) Perform ballast for the launch barge upon complete jacket loadout for towing purpose as per provided ballast pattern 2) Perform ballast for jacket horizontal launching operation 3) Perform jacket upending and flooding as per sequence 4) To operate internal lifting tool ( ILT ) for upending pile operations
  • 6.           6 MOHD NAZRUL ABRUL RAZAK SIGUR ROS SDN. BHD. JUN 2004 - PRESENT POSITION : SUPERVISOR  Pipeline Replacement Project 2012  Client – PT Pertamina Hulu Energi - ONWJ  Main Contractor – PT Sigur Ros Indonesia  Year – July 2012 - Completed  Work Scope – Pipeline Pre-Commissioning For 10 Inch From ESA to EPRO and 6 Inch From EB to EPRO  Job Scope & Responsibility: 1) Preparing the pipeline pre-commissioning material and equipment up to dewatering activity 2) Function test all the pumps & compressor prior pre-commissioning operation 3) Lead the rig up activity for pre commissioning vessel for launcher & receiver 4) Liaise with the pre-commissioning Engineer to ensure the pipeline pre-commissioning operation SIGUR ROS SDN. BHD. JUN 2004 - PRESENT POSITION : SUPERVISOR  Turkmenistan Block 1 Gas Development Project Installation & Pre-Commissioning of Offshore Pipeline & Associated Onshore Civil Works  Client – PETRONAS Carigali Turkmenistan Sdn Bhd  Main Contractor – Sigur Ros Sdn Bhd  Year – March 2011 – Completed  Work Scope – Pipeline Pre-Commissioning for Flooding, Cleaning, Gauging, Hydrotest and Dewatering & Nitrogen Packing of 26” / 12” & 4” x 73KM Pipeline From OGT ( Onshore Gas Terminal) to MCR-A Platform  Job Scope & Responsibility: 1) Preparing the pipeline pre-commissioning material and equipment up to dewatering activity 2) Function test all the pumps & compressor prior pre-commissioning operation 3) Lead the rig up activity for pre commissioning vessel for launcher & receiver 4) Liaise with the Commissioning Engineer to ensure the pre-commissioning operation
  • 7.           7 MOHD NAZRUL ABRUL RAZAK SIGUR ROS SDN. BHD. JUN 2004 - PRESENT POSITION : SUPERVISOR  Pre-Test Bolt Torque / Tensioning & Nitrogen/Helium Leak Testing Works At MCR-A, MDP-A And Interconnecting Bridge.  Client – PETRONAS Carigali Turkmenistan Sdn Bhd  Main Contractor – MMHE JV TECHNIP  Year – February 2011 – Completed  Work Scope – Flange Management & Nitrogen + Helium Leak Testing for Several Package at MCR-A & MDP-A Platform  Job Scope & Responsibility: 1) Preparing the material and equipment 2) Manage all the works during execution (procure all the equipment & consumable, arrange all the transport to mob/demob manpower and equipment, sourcing manpower, execute the job, and liaise with Client during job execution 3) Liaise with Commissioning Engineer to ensure the commissioning operation SIGUR ROS SDN. BHD. JUN 2004 - PRESENT POSITION : SUPERVISOR  Provision of Bolt Tightening & Leak Testing Services for TCOT & ANDR-A Platform  Client – PETRONAS Carigali Sdn Bhd  Main Contractor – Dayang Enterprise Sdn Bhd  Year – October 2010 – Completed  Work Scope – Flange Management & Nitrogen + Helium Leak Testing for Several Package at TCOT & ANDR-A Platform  Job Scope & Responsibility: 1) Preparing the material and equipment 2) Manage all the works during execution (procure all the equipment & consumable, arrange all the transport to mob/demob manpower and equipment, sourcing manpower, execute the job, and liaise with Client during job execution 3) Liaise with Commissioning Engineer to ensure the commissioning operation
  • 8.           8 MOHD NAZRUL ABRUL RAZAK SIGUR ROS SDN. BHD. JUN 2004 - PRESENT POSITION : SUPERVISOR  Nitrogen Helium Reinstatement Leak Test of Piping System for RUBY FPSO Project  Client – MISC BERHAD  Main Contractor – Malaysia Marine And Heavy Engineering Sdn Bhd (MMHE)  Year – February 2010 – Completed  Work Scope – Flange Management & Nitrogen + Helium Leak Testing for Several Package at RUBY FPSO  Job Scope & Responsibility: 1) Preparing the material and equipment 2) Manage all the works during execution (procure all the equipment & consumable, arrange all the transport to mob/demob manpower and equipment, sourcing manpower, execute the job, and liaise with Client during job execution 3) Liaise with Commissioning Engineer to ensure the commissioning operation SIGUR ROS SDN. BHD. JUN 2004 - PRESENT POSITION : SUPERVISOR  Provision of Bolt Tightening & Leak Testing For The RDP-A & RCPP Platform (RESAK)  Client – PETRONAS Carigali Sdn Bhd  Main Contractor – Dayang Enterprise Sdn Bhd  Year – December 2010 – Completed  Work Scope – Flange Management & Nitrogen + Helium Leak Testing for Several Package at RDP-A & RCPP Platform  Job Scope & Responsibility: 1) Preparing the material and equipment 2) Manage all the works during execution (procure all the equipment & consumable, arrange all the transport to mob/demob manpower and equipment, sourcing manpower, execute the job, and liaise with Client during job execution 3) Liaise with Commissioning Engineer to ensure the commissioning operation
  • 9.           9 MOHD NAZRUL ABRUL RAZAK  Pembangunan Saluran Pipa Minyak Bawah Laut 6” Sch.80 x 6000m Dari XB Platform Ke XA Platform Lapangan X-Ray  Client – PT Pertamina EP  Main Contractor – PT Sigur Ros Indonesia  Year – February 2012  Job Scope & Responsibility: 1) Preparing the pipeline pre-commissioning material and equipment up to dewatering activity 2) Function test all the pumps & compressor prior pre-commissioning operation 3) Lead the rig up activity for pre commissioning vessel for launcher & receiver 4) Liaise with the Commissioning Engineer to ensure the pre-commissioning operation COMPANY PROJECT INVOLVED / CLIENT / COUNTRY BARGE YEAR Sigur Ros Sdn Bhd Garagol Deniz Drilling Platform – A (GDDP-A) Jacket Launching & Installation - Petronas Carigali Turkmenistan - Turkmenistan FOB Dagbasy + DLB Armada Installer 2015 – On Going Sigur Ros Sdn Bhd Garagol Deniz Drilling Platform – A (GDDP-A) Topside Floatover Installation - Petronas Carigali Turkmenistan - Turkmenistan FOB Dagbasy + DLB Armada Installer 2015 – On Going Sigur Ros Sdn Bhd Central Diyarbekir Drilling Platform – A (CDDP-A) Topside Floatover Installation - Petronas Carigali Turkmenistan - Turkmenistan FOB Dagbasy + DLB Armada Installer 2014 – Completed Sigur Ros Sdn Bhd  Pipeline Pre-Commissioning For 18 Inch From WDDP-A to MCR-A c/w 4 Inch Piggyback - Petronas Carigali Turkmenistan Sdn Bhd - Turkmenistan DLB Armada Installer July 2014 SIGUR ROS SDN. BHD. JUN 2004 - PRESENT POSITION : SUPERVISOR SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
  • 10.           10 MOHD NAZRUL ABRUL RAZAK COMPANY PROJECT INVOLVED / CLIENT / COUNTRY BARGE YEAR Sigur Ros Sdn Bhd  Central Diyarbekir Drilling Platform – A (CDDP-A) Jacket Installation - Petronas Carigali Turkmenistan Sdn Bhd - Turkmenistan FOB Dagbasy + DLB Armada Installer Jun 2014 Sigur Ros Sdn Bhd  West Diyarbekir Drilling Platform – A (WDDP-A) Topside Floatover Installation - Petronas Carigali Turkmenistan Sdn Bhd - Turkmenistan FOB Dagbasy + DLB Armada Installer May 2014 Sigur Ros Sdn Bhd  Pembangunan Saluran Pipa Minyak Bawah Laut 6” Sch.80 x 6000m Dari XB Platform Ke XA Platform Lapangan X-Ray - PT Pertamina EP Cirebon - Indonesia PLB Aussie 1 August 2013 Sigur Ros Sdn Bhd  West Diyarbekir Drilling Platform – A (WDDP-A) Jacket Installation - Petronas Carigali Turkmenistan Sdn Bhd - Turkmenistan FOB Dagbasy + DLB Armada Installer Jun 2013 Sigur Ros Sdn Bhd  Pipeline Pre-Commissioning For 10 Inch From ESA to EPRO and 6 Inch From EB to EPRO - PT Pertamina Hulu Energi - ONWJ - Indonesia PLB Mas Mulia July 2012 Sigur Ros Sdn Bhd  Pipeline Pre-Commissioning - Turkmenistan Block 1 Gas Development Project Installation & Pre-Commissioning of Offshore Pipeline & Associated Onshore Civil Works - Petronas Carigali Turkmenistan Sdn Bhd - Turkmenistan DLB Armada Installer March 2011 COMPANY PROJECT INVOLVED / CLIENT / COUNTRY BARGE YEAR Sigur Ros Sdn Bhd  Pre-Test Bolt Torque / Tensioning & Nitrogen/Helium Leak Testing Works At MCR-A, MDP-A And Interconnecting Bridge. - Petronas Carigali Turkmenistan Sdn Bhd - Turkmenistan Fabrication yard + DLB Armada Installer February 2011 Sigur Ros Sdn Bhd  Provision of Bolt Tightening & Leak Testing For The RDP-A & RCPP Platform (RESAK) - Petronas Carigali Sdn Bhd - Malaysia WB Dayang Berlian December 2010
  • 11.           11 MOHD NAZRUL ABRUL RAZAK COMPANY PROJECT INVOLVED / CLIENT / COUNTRY BARGE YEAR Sigur Ros Sdn Bhd  Provision of Bolt Tightening & Leak Testing Services for TCOT & ANDR-A Platform - Petronas Carigali Sdn Bhd - Malaysia WB Dayang Berlian October 2010 Sigur Ros Sdn Bhd  Nitrogen Helium Reinstatement Leak Test of Piping System for RUBY FPSO Project - MISC Berhad - Malaysia RUBY FPSO February 2010 Project : Turkmenistan Block 1 Gas Development Project Client : Petronas Carigali ( Turkmenistan ) Main Contractor : MMHE / Technip Years : May 2010 Position : Assistance Supervisor Project : Boltensionning & Leaktesting for TCOT Client : Petronas Carigali Sdn. Bhd. Main Contractor : Dayang Enterprise Years : July 2009 Position : Assistance Supervisor Project : Supply equipment for Kuantan Compressor Stations Upgrading phase 1 Client : Petronas Carigali Sdn. Bhd. Main Contractor : Sime Engineering ( Sime Darby ) Years : March 2009 Position : Assistance Supervisor SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
  • 12.           12 MOHD NAZRUL ABRUL RAZAK Project : Pipeline Pre-commisionning ( CPOC ) Client : Petronas Carigali Sdn. Bhd. Main Contractor : TL Offshore Years : September 2008 Position : Assistance Supervisor Project : Andra - TCOT Shore Approach Pipeline Installation ( Bolting and Leaktesting division ) Client : Petronas Carigali Sdn. Bhd. Main Contractor : Dayang Enterprise Years : April 2008 Position : Senior Technician Project :  Samarang Pipeline Replacement Project Client :  Petronas Carigali Sdn. Bhd. Main Contractor :  TL Offshore Years :  Sept 2007 Position :  Senior Technician Project EPCC Of The Natural Gas Pipeline And Metering & Regulating Station Lion Group Plant, Banting Selangor. Client :  Petronas Gas Sdn. Bhd./ Megasteel Lion Group Plant Sdn Bhd Main Contractor :  MMC Engineering Sdn Bhd Years :  Sept 2007 Position :  Senior Technician
  • 13.           13 MOHD NAZRUL ABRUL RAZAK Project : Provision of Pipeline Pre-Commissioning Services for Leighton Melut Basin, Bahsyer 2, Sudan Project – Bolt Torquing,Pre- commisioning,hydrotesting Client : PETRODAR, Sudan Main Contractor : Leighton Contractor Malaysia/Oilfield Pipeline Inspection Sdn Bhd. Years : Dec 2006 – March 2007 Position : Technician Project : Bolt Torquing and Leak Testing of Kikeh SPAR DTU Topsides – Nitrogen + Helium Leak Testing Client : Murphy Oil Co. Ltd. Main Contractor : Malaysia Marine & Heavy Engineering Sdn. Bhd. Years : October 2006 Position : Technician Project : Bolt Torquing and Leak Testing of South Angsi A (SAA) Naga Kecil Project – Nitrogen + Helium Leak Testing Client : Talisman Malaysia Limited Main Contractor : EJ Joint Venture Sdn Bhd Years : June 2006 Position : Technician Project : Yadana Onshore Domestic Gas Upgrading Project – 12” X 0.63km & 24” X 2.652km Yadana Pipeline Pre-commissioning Client : Total E&P Myanmar Main Contractor : KNM Process Systems Sdn Bhd Years : July 2006 Position : Technician
  • 14.           14 MOHD NAZRUL ABRUL RAZAK Project : Offshore Transportation and Installation Work of EPCIC Ledang – Anoa Development Project Client : Petronas Carigali Sdn Bhd Main Contractor : Malaysia Marine and Heavy Industries Sdn Bhd Years : April 2006 Position : Technician Project : Work in Ramunia Fabricators Sdn Bhd for Talisman Malaysia Limit in hydrotesting and Nitrogen + Helium leak testing for new tie-in spool at Bunga Raya – A & B platform. Years : 2005 October - November Position : Technician Project : Work in Ramunia Fabricators Sdn. Bhd. For Petronas Carigali SdBhd in bolting Controlled at Samarang Riser Platfo- A Years : 2005 May Position : Technician Project : Pre-Commissioning and Hydro Testing for the Remedial Work of 8” Damage Pipeline from Penara Platform to PLEM (FPSO) Client : Petronas Carigali Sdn Bhd Main Contractor : Malaysian Shipyard and Engineering Sdn Bhd Years : 2004 (June-July) Position : Technician
  • 15.           15 MOHD NAZRUL ABRUL RAZAK EKHWAN HAKIM Construction Manager Sigur Ros Sdn Bhd No.56 Jalan Seri Putra 1/4 Bandar Seri Putra 43000 Kajang Selangor Mobile : +60 19 6641879 Email: ekhwan@sgrsb.com ASRUL AZALI OPERATION ENGINEER Sigur Ros Sdn Bhd No.56 Jalan Seri Putra 1/4 Bandar Seri Putra 43000 Kajang Selangor Mobile : +60 12 9355149 Email: asrul.azali@sgrsb.com REFERENCES