1.
1
MOHD NAZRUL ABRUL RAZAK
PERSONAL DATA
NATIONALITY : MALAYSIAN
RACE : MUSLIM
DATE OF BIRTH : 09TH
MARCH 1984
MARITAL STATUS : MARRIED
ADDRESS : E-2-12 BLOCK E CASUARINA APARTMENT, 41200 BANDAR BOTANIC KLANG
SELANGOR
PHONE : +6012 3736551
EMAIL : nazrulrazak@gmail.com
PROFESSIONAL PROFILE
Involve in set-up floatover barge for topside loadout & installation.
Involve in set-up launching barge for jacket launching operation
Involve in topside floatover installation, jacket installation and pipeline pre-commissioning.
Involve in performing pipeline pre-commissioning from pigging up to nitrogen packing
Involve in performing Bolt Torque / Tensioning & Nitrogen/Helium Leak Testing
Highly creative, analytical, multitasking and trainable.
HANDS-ON SKILL
Ballasting launching barge for jacket launch operation
Ballasting floatover barge for topside installation
Capable to operate winches single drum & double drum
Experienced on operating the internal lifting tool (ILT) to upend the 82 inch piles.
Perform internal sling load test for jacket upending sling with 3rd
party approval
Experience in operating pipeline pre-commissioning pumps
Familiar to operate bolt tensioning pumps
ACADEMIC AND PROFESSIONAL QUALIFICATION
2001 : Malaysian Certificate Of Education
2014 : Tropical Basic Offshore Safety Induction and Emergency Training (T-BOSIET) including
Travel Safely By Boat – OPITO Approved
Construction and Industrial Safety Training Centre Sdn. Bhd. (MSTS) – Malaysia.
Authorized Gas Tester ( AGT ) – Construction and Industrial Safety Training Centre
Sdn. Bhd. (MSTS) – Malaysia
Confine space - Construction and Industrial Safety Training Centre Sdn. Bhd. (MSTS) –
Malaysia
Internal lifting tools ( ILT ) – in house training ( certified by IHC personnel )
2.
2
MOHD NAZRUL ABRUL RAZAK
CAREER HISTORY
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
Transportation And Installation Of Offshore Facilities For Garagol Deniz Oil Development Project
Client – PETRONAS Carigali Turkmenistan Sdn Bhd
Main Contractor – Sigur Ros Sdn Bhd
Year – January 2015 – On Going
Work Scope – Garagol Deniz Drilling Platform – A (GDDP-A) Topside Floatover Installation
Job Scope & Responsibility:
1) Preparing the topside Loadout activities
2) Preparing the topside Floatover Installation
3) Preparing the topside floatover sequence
4) Perform function test for topside floatover barge equipment such as double drum & single drum
winches, diesel generator, ballast pump and etc.
5) Perform inspection at site on the equipment, topside tie down and topside arrangement positions
are as per drawing.
6) Perform ballast for the floatover barge upon complete topside loadout for towing purpose as per
provided ballast pattern
7) Perform function test on the equipment (ballast pump & winches) upon arrival of floatover barge at
site.
8) Coordinate with the barge superintendent & barge foreman during the floatover activity
9) Perform ballast on the floatover barge for topside mating activity as per ballast pattern
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
Transportation And Installation Of Offshore Facilities For Garagol Deniz Oil Development Project
Client – PETRONAS Carigali Turkmenistan Sdn Bhd
Main Contractor – Sigur Ros Sdn Bhd
Year – January 2015 – On Going
Work Scope – Garagol Deniz Drilling Platform – A (GDDP-A) Jacket Launching & Installation
Job Scope & Responsibility:
1) Perform ballast for the launch barge upon complete jacket loadout for towing purpose as per
provided ballast pattern
2) Perform ballast for jacket vertical launching operation
3) Perform jacket upending and flooding as per sequence
4) To operate internal lifting tool ( ILT ) for upending pile operations
3.
3
MOHD NAZRUL ABRUL RAZAK
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project
Client – PETRONAS Carigali Turkmenistan Sdn Bhd
Main Contractor – Sigur Ros Sdn Bhd
Year – July 2014 – Completed
Work Scope – Central Diyarbekir Drilling Platform – A (CDDP-A) Topside Floatover Installation
Job Scope & Responsibility:
1) Preparing the topside Loadout activities
2) Preparing the topside Floatover Installation
3) Preparing the topside floatover sequence
4) Perform function test for topside floatover barge equipment such as double drum & single drum
winches, diesel generator, ballast pump and etc.
5) Perform inspection at site on the equipment, topside tie down and topside arrangement positions
are as per drawing.
6) Perform ballast for the floatover barge upon complete topside loadout for towing purpose as per
provided ballast pattern
7) Perform function test on the equipment (ballast pump & winches) upon arrival of floatover barge at
site.
8) Coordinate with the barge superintendent & barge foreman during the floatover activity
9) Perform ballast on the floatover barge for topside mating activity as per ballast pattern
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project
Client – PETRONAS Carigali Turkmenistan Sdn Bhd
Main Contractor – Sigur Ros Sdn Bhd
Year – July 2014 - Completed
Work Scope – Pipeline Pre-Commissioning For 18 Inch From WDDP-A to MCR-A c/w 4 Inch Piggyback
Job Scope & Responsibility:
1) Preparing the pipeline pre-commissioning material and equipment up to dewatering activity
2) Function test all the pumps & compressor prior pre-commissioning operation
3) Lead the rig up activity for pre commissioning vessel for launcher & receiver
4) Liaise with the pre-commissioning Engineer to ensure the pipeline pre-commissioning operation was
performed within the acceptance criteria.
4.
4
MOHD NAZRUL ABRUL RAZAK
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project
Client – PETRONAS Carigali Turkmenistan Sdn Bhd
Main Contractor – Sigur Ros Sdn Bhd
Year – Jun 2014 – Completed
Work Scope – Central Diyarbekir Drilling Platform – A (CDDP-A) Jacket Installation
Job Scope & Responsibility:
1) Perform ballast for the launch barge upon complete jacket loadout for towing purpose as per
provided ballast pattern
2) Perform ballast for jacket horizontal launching operation
3) Perform jacket upending and flooding as per sequence
4) To operate internal lifting tool ( ILT ) for upending pile operations
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project
Client – PETRONAS Carigali Turkmenistan Sdn Bhd
Main Contractor – Sigur Ros Sdn Bhd
Year – May 2014 – Completed
Work Scope – West Diyarbekir Drilling Platform – A (WDDP-A) Topside Floatover Installation
Job Scope & Responsibility:
1) Preparing the topside Loadout
2) Preparing the topside Floatover Installation
3) Preparing the topside floatover sequence
4) Perform function test for topside floatover barge equipment such as double drum & single drum
winches, diesel generator, ballast pump and etc.
5) Perform inspection at site on the equipment, topside tie down and topside arrangement positions
are as per drawing.
6) Perform ballast for the floatover barge upon complete topside loadout for towing purpose as per
provided ballast pattern
7) Perform function test on the equipment (ballast pump & winches) upon arrival of floatover barge
at site.
8) Coordinate with the barge superintendent & barge foreman during the floatover activity
9) Perform ballast on the floatover barge for topside mating activity as per ballast pattern
5.
5
MOHD NAZRUL ABRUL RAZAK
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project
Client – PETRONAS Carigali Turkmenistan Sdn Bhd
Main Contractor – Sigur Ros Sdn Bhd
Year – April 2014 – Completed
In House Work Scope – Sling Load Test For Central Diyarbekir Drilling Platform – A (CDDP-A) Jacket
Installation
Job Scope & Responsibility:
1) To perform sling load test using single drum winch on launching barge .
2) Selecting rigging material and equipment to perform the sling load test
3) Liaise with the 3rd
Party for endorsement of the in-house sling load test certificate
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
Pembangunan Saluran Pipa Minyak Bawah Laut 6” Sch.80 x 6000m Dari XB Platform Ke XA Platform Lapangan X-
Ray
Client – PT Pertamina EP
Main Contractor – PT Sigur Ros Indonesia
Year – August 2013 - Completed
Work Scope – Pipeline Pre-Commissioning For 6 Inch x 6000m From XB Platform to XA Platform
Job Scope & Responsibility:
1) Preparing the pipeline pre-commissioning material and equipment up to dewatering activity
2) Function test all the pumps & compressor prior pre-commissioning operation
3) Lead the rig up activity for pre commissioning vessel for launcher & receiver
4) Liaise with the pre-commissioning Engineer to ensure the pipeline pre-commissioning operation
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
Transportation And Installation Of Offshore Facilities For Diyarbekir Oil Development Project
Client – PETRONAS Carigali Turkmenistan Sdn Bhd
Main Contractor – Sigur Ros Sdn Bhd
Year – Jun 2013 – Completed
Work Scope – West Diyarbekir Drilling Platform – A (WDDP-A) Jacket Installation
Job Scope & Responsibility:
1) Perform ballast for the launch barge upon complete jacket loadout for towing purpose as per
provided ballast pattern
2) Perform ballast for jacket horizontal launching operation
3) Perform jacket upending and flooding as per sequence
4) To operate internal lifting tool ( ILT ) for upending pile operations
6.
6
MOHD NAZRUL ABRUL RAZAK
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
Pipeline Replacement Project 2012
Client – PT Pertamina Hulu Energi - ONWJ
Main Contractor – PT Sigur Ros Indonesia
Year – July 2012 - Completed
Work Scope – Pipeline Pre-Commissioning For 10 Inch From ESA to EPRO and 6 Inch From EB to EPRO
Job Scope & Responsibility:
1) Preparing the pipeline pre-commissioning material and equipment up to dewatering activity
2) Function test all the pumps & compressor prior pre-commissioning operation
3) Lead the rig up activity for pre commissioning vessel for launcher & receiver
4) Liaise with the pre-commissioning Engineer to ensure the pipeline pre-commissioning operation
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
Turkmenistan Block 1 Gas Development Project Installation & Pre-Commissioning of Offshore Pipeline &
Associated Onshore Civil Works
Client – PETRONAS Carigali Turkmenistan Sdn Bhd
Main Contractor – Sigur Ros Sdn Bhd
Year – March 2011 – Completed
Work Scope – Pipeline Pre-Commissioning for Flooding, Cleaning, Gauging, Hydrotest and Dewatering
& Nitrogen Packing of 26” / 12” & 4” x 73KM Pipeline From OGT ( Onshore Gas Terminal) to MCR-A
Platform
Job Scope & Responsibility:
1) Preparing the pipeline pre-commissioning material and equipment up to dewatering activity
2) Function test all the pumps & compressor prior pre-commissioning operation
3) Lead the rig up activity for pre commissioning vessel for launcher & receiver
4) Liaise with the Commissioning Engineer to ensure the pre-commissioning operation
7.
7
MOHD NAZRUL ABRUL RAZAK
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
Pre-Test Bolt Torque / Tensioning & Nitrogen/Helium Leak Testing Works At MCR-A, MDP-A And Interconnecting
Bridge.
Client – PETRONAS Carigali Turkmenistan Sdn Bhd
Main Contractor – MMHE JV TECHNIP
Year – February 2011 – Completed
Work Scope – Flange Management & Nitrogen + Helium Leak Testing for Several Package at MCR-A &
MDP-A Platform
Job Scope & Responsibility:
1) Preparing the material and equipment
2) Manage all the works during execution (procure all the equipment & consumable, arrange all the
transport to mob/demob manpower and equipment, sourcing manpower, execute the job, and
liaise with Client during job execution
3) Liaise with Commissioning Engineer to ensure the commissioning operation
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
Provision of Bolt Tightening & Leak Testing Services for TCOT & ANDR-A Platform
Client – PETRONAS Carigali Sdn Bhd
Main Contractor – Dayang Enterprise Sdn Bhd
Year – October 2010 – Completed
Work Scope – Flange Management & Nitrogen + Helium Leak Testing for Several Package at TCOT &
ANDR-A Platform
Job Scope & Responsibility:
1) Preparing the material and equipment
2) Manage all the works during execution (procure all the equipment & consumable, arrange all
the transport to mob/demob manpower and equipment, sourcing manpower, execute the job,
and liaise with Client during job execution
3) Liaise with Commissioning Engineer to ensure the commissioning operation
8.
8
MOHD NAZRUL ABRUL RAZAK
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
Nitrogen Helium Reinstatement Leak Test of Piping System for RUBY FPSO Project
Client – MISC BERHAD
Main Contractor – Malaysia Marine And Heavy Engineering Sdn Bhd (MMHE)
Year – February 2010 – Completed
Work Scope – Flange Management & Nitrogen + Helium Leak Testing for Several Package at RUBY FPSO
Job Scope & Responsibility:
1) Preparing the material and equipment
2) Manage all the works during execution (procure all the equipment & consumable, arrange all
the transport to mob/demob manpower and equipment, sourcing manpower, execute the job,
and liaise with Client during job execution
3) Liaise with Commissioning Engineer to ensure the commissioning operation
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
Provision of Bolt Tightening & Leak Testing For The RDP-A & RCPP Platform (RESAK)
Client – PETRONAS Carigali Sdn Bhd
Main Contractor – Dayang Enterprise Sdn Bhd
Year – December 2010 – Completed
Work Scope – Flange Management & Nitrogen + Helium Leak Testing for Several Package at RDP-A &
RCPP Platform
Job Scope & Responsibility:
1) Preparing the material and equipment
2) Manage all the works during execution (procure all the equipment & consumable, arrange all
the transport to mob/demob manpower and equipment, sourcing manpower, execute the job,
and liaise with Client during job execution
3) Liaise with Commissioning Engineer to ensure the commissioning operation
9.
9
MOHD NAZRUL ABRUL RAZAK
Pembangunan Saluran Pipa Minyak Bawah Laut 6” Sch.80 x 6000m Dari XB Platform Ke XA Platform
Lapangan X-Ray
Client – PT Pertamina EP
Main Contractor – PT Sigur Ros Indonesia
Year – February 2012
Job Scope & Responsibility:
1) Preparing the pipeline pre-commissioning material and equipment up to
dewatering activity
2) Function test all the pumps & compressor prior pre-commissioning
operation
3) Lead the rig up activity for pre commissioning vessel for launcher &
receiver
4) Liaise with the Commissioning Engineer to ensure the pre-commissioning
operation
COMPANY PROJECT INVOLVED / CLIENT / COUNTRY BARGE YEAR
Sigur Ros Sdn Bhd
Garagol Deniz Drilling Platform – A (GDDP-A) Jacket
Launching & Installation
- Petronas Carigali Turkmenistan
- Turkmenistan
FOB Dagbasy +
DLB Armada
Installer
2015 – On
Going
Sigur Ros Sdn Bhd
Garagol Deniz Drilling Platform – A (GDDP-A) Topside
Floatover Installation
- Petronas Carigali Turkmenistan
- Turkmenistan
FOB Dagbasy +
DLB Armada
Installer
2015 – On
Going
Sigur Ros Sdn Bhd
Central Diyarbekir Drilling Platform – A (CDDP-A) Topside
Floatover Installation
- Petronas Carigali Turkmenistan
- Turkmenistan
FOB Dagbasy +
DLB Armada
Installer
2014 –
Completed
Sigur Ros Sdn Bhd
Pipeline Pre-Commissioning For 18 Inch From WDDP-A to
MCR-A c/w 4 Inch Piggyback
- Petronas Carigali Turkmenistan Sdn Bhd
- Turkmenistan
DLB Armada
Installer
July 2014
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
POSITION : SUPERVISOR
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
10.
10
MOHD NAZRUL ABRUL RAZAK
COMPANY PROJECT INVOLVED / CLIENT / COUNTRY BARGE YEAR
Sigur Ros Sdn Bhd
Central Diyarbekir Drilling Platform – A (CDDP-A) Jacket
Installation
- Petronas Carigali Turkmenistan Sdn Bhd
- Turkmenistan
FOB Dagbasy +
DLB Armada
Installer
Jun 2014
Sigur Ros Sdn Bhd
West Diyarbekir Drilling Platform – A (WDDP-A) Topside
Floatover Installation
- Petronas Carigali Turkmenistan Sdn Bhd
- Turkmenistan
FOB Dagbasy +
DLB Armada
Installer
May 2014
Sigur Ros Sdn Bhd
Pembangunan Saluran Pipa Minyak Bawah Laut 6” Sch.80 x
6000m Dari XB Platform Ke XA Platform Lapangan X-Ray
- PT Pertamina EP Cirebon
- Indonesia
PLB Aussie 1 August 2013
Sigur Ros Sdn Bhd
West Diyarbekir Drilling Platform – A (WDDP-A) Jacket
Installation
- Petronas Carigali Turkmenistan Sdn Bhd
- Turkmenistan
FOB Dagbasy +
DLB Armada
Installer
Jun 2013
Sigur Ros Sdn Bhd
Pipeline Pre-Commissioning For 10 Inch From ESA to EPRO
and 6 Inch From EB to EPRO
- PT Pertamina Hulu Energi - ONWJ
- Indonesia
PLB Mas Mulia July 2012
Sigur Ros Sdn Bhd
Pipeline Pre-Commissioning - Turkmenistan Block 1 Gas
Development Project Installation & Pre-Commissioning of
Offshore Pipeline & Associated Onshore Civil Works
- Petronas Carigali Turkmenistan Sdn Bhd
- Turkmenistan
DLB Armada
Installer
March 2011
COMPANY PROJECT INVOLVED / CLIENT / COUNTRY BARGE YEAR
Sigur Ros Sdn Bhd
Pre-Test Bolt Torque / Tensioning & Nitrogen/Helium Leak
Testing Works At MCR-A, MDP-A And Interconnecting
Bridge.
- Petronas Carigali Turkmenistan Sdn Bhd
- Turkmenistan
Fabrication
yard + DLB
Armada
Installer
February 2011
Sigur Ros Sdn Bhd
Provision of Bolt Tightening & Leak Testing For The RDP-A
& RCPP Platform (RESAK)
- Petronas Carigali Sdn Bhd
- Malaysia
WB Dayang
Berlian
December
2010
11.
11
MOHD NAZRUL ABRUL RAZAK
COMPANY PROJECT INVOLVED / CLIENT / COUNTRY BARGE YEAR
Sigur Ros Sdn Bhd
Provision of Bolt Tightening & Leak Testing Services for
TCOT & ANDR-A Platform
- Petronas Carigali Sdn Bhd
- Malaysia
WB Dayang
Berlian
October 2010
Sigur Ros Sdn Bhd
Nitrogen Helium Reinstatement Leak Test of Piping System
for RUBY FPSO Project
- MISC Berhad
- Malaysia
RUBY FPSO February 2010
Project : Turkmenistan Block 1 Gas Development Project
Client : Petronas Carigali ( Turkmenistan )
Main Contractor : MMHE / Technip
Years : May 2010
Position : Assistance Supervisor
Project : Boltensionning & Leaktesting for TCOT
Client : Petronas Carigali Sdn. Bhd.
Main Contractor : Dayang Enterprise
Years : July 2009
Position : Assistance Supervisor
Project : Supply equipment for Kuantan Compressor Stations
Upgrading phase 1
Client : Petronas Carigali Sdn. Bhd.
Main Contractor : Sime Engineering ( Sime Darby )
Years : March 2009
Position : Assistance Supervisor
SIGUR ROS SDN. BHD. JUN 2004 - PRESENT
12.
12
MOHD NAZRUL ABRUL RAZAK
Project : Pipeline Pre-commisionning ( CPOC )
Client : Petronas Carigali Sdn. Bhd.
Main Contractor : TL Offshore
Years : September 2008
Position : Assistance Supervisor
Project : Andra - TCOT Shore Approach Pipeline Installation ( Bolting and
Leaktesting division )
Client : Petronas Carigali Sdn. Bhd.
Main Contractor : Dayang Enterprise
Years : April 2008
Position : Senior Technician
Project : Samarang Pipeline Replacement Project
Client : Petronas Carigali Sdn. Bhd.
Main Contractor : TL Offshore
Years : Sept 2007
Position : Senior Technician
Project EPCC Of The Natural Gas Pipeline And Metering & Regulating Station
Lion Group Plant, Banting Selangor.
Client : Petronas Gas Sdn. Bhd./ Megasteel Lion Group Plant Sdn Bhd
Main Contractor : MMC Engineering Sdn Bhd
Years : Sept 2007
Position : Senior Technician
13.
13
MOHD NAZRUL ABRUL RAZAK
Project : Provision of Pipeline Pre-Commissioning Services for Leighton Melut
Basin, Bahsyer 2, Sudan Project – Bolt Torquing,Pre-
commisioning,hydrotesting
Client : PETRODAR, Sudan
Main Contractor : Leighton Contractor Malaysia/Oilfield Pipeline Inspection Sdn Bhd.
Years : Dec 2006 – March 2007
Position : Technician
Project : Bolt Torquing and Leak Testing of Kikeh SPAR DTU Topsides –
Nitrogen + Helium Leak Testing
Client : Murphy Oil Co. Ltd.
Main Contractor : Malaysia Marine & Heavy Engineering Sdn. Bhd.
Years : October 2006
Position : Technician
Project : Bolt Torquing and Leak Testing of South Angsi A (SAA) Naga Kecil
Project – Nitrogen + Helium Leak Testing
Client : Talisman Malaysia Limited
Main Contractor : EJ Joint Venture Sdn Bhd
Years : June 2006
Position : Technician
Project : Yadana Onshore Domestic Gas Upgrading Project – 12” X 0.63km &
24” X 2.652km Yadana Pipeline Pre-commissioning
Client : Total E&P Myanmar
Main Contractor : KNM Process Systems Sdn Bhd
Years : July 2006
Position : Technician
14.
14
MOHD NAZRUL ABRUL RAZAK
Project : Offshore Transportation and Installation Work of EPCIC Ledang –
Anoa Development Project
Client : Petronas Carigali Sdn Bhd
Main Contractor : Malaysia Marine and Heavy Industries Sdn Bhd
Years : April 2006
Position : Technician
Project : Work in Ramunia Fabricators Sdn Bhd for Talisman Malaysia Limit in
hydrotesting and Nitrogen + Helium leak testing for new tie-in spool
at Bunga Raya – A & B platform.
Years : 2005 October - November
Position : Technician
Project : Work in Ramunia Fabricators Sdn. Bhd. For Petronas Carigali SdBhd
in bolting Controlled at Samarang Riser Platfo- A
Years : 2005 May
Position : Technician
Project : Pre-Commissioning and Hydro Testing for the Remedial Work of 8”
Damage Pipeline from Penara Platform to PLEM (FPSO)
Client : Petronas Carigali Sdn Bhd
Main Contractor : Malaysian Shipyard and Engineering Sdn Bhd
Years : 2004 (June-July)
Position : Technician
15.
15
MOHD NAZRUL ABRUL RAZAK
EKHWAN HAKIM
Construction Manager
Sigur Ros Sdn Bhd
No.56 Jalan Seri Putra 1/4
Bandar Seri Putra
43000 Kajang Selangor
Mobile : +60 19 6641879
Email: ekhwan@sgrsb.com
ASRUL AZALI
OPERATION ENGINEER
Sigur Ros Sdn Bhd
No.56 Jalan Seri Putra 1/4
Bandar Seri Putra
43000 Kajang Selangor
Mobile : +60 12 9355149
Email: asrul.azali@sgrsb.com
REFERENCES