Ravinder Singh Verma has over 24 years of experience in project management, quantities, contracts, tendering, and construction management. He is currently working as a Project Manager for M/S Vibrant Sai Corporation, overseeing planning, surveying, execution, billing, and day-to-day site work. Previously, he has held roles such as Senior Manager for contracts and quantities, Manager for planning and business development, and Deputy Manager for a contracts and engineering division on various hydroelectric projects throughout India.
1. RavinderSinghVerma
H.No. 205, Sector-126,
Swaraj Enclave, Near ACHME Heights,
Greater Mohali, Punjab-140301.
Mob:08146739025
Email ID: rsingh_verma@yahoo.co.in
PROFESSIONAL EXPERIENCE
In a Nutshell…
24 plus years of Professional Experience in the field of Quantities, Contracts, Tendering, Project &
Construction Management.
Quantities, Tendering, Contracts and Execution
Preparation of Tender Documents from the input received from the user including complete project
estimate cost.
Participating in studies, pre-qualifications, evaluation, review, final bid recommendation and
approval from competent authorities.
Studying complete scope of work, B.O.Q., drawings and specifications in order to prepare technical
queries, interpretation of contract clauses, variations and price variations.
Co-ordination with different vendors / suppliers / sub contacts for scope distribution, collection of
information, preparation of complete offer after taking into the account the client requirements,
drawing and specifications, deviations etc. including bid-evaluation by projecting the advantage of
our bid vis-à-vis supplier / vendor /sub-contract offer.
Negotiations with the suppliers / vendors / sub-contractor / contractors of the contract for supply /
manufacture / construction etc.
Preparation of sub-contracts and agreements, technical specifications, documentation and
procedures including finalization of contractual terms and conditions, signing of contract agreement
with supplier vendor / sub-contract / manufactureretc.
Preparation and checking contractors / sub-contractor, vendors bills and processing for the
payments by the competent authority.
Construction of roads including blacktopping, construction of Tunnel by Drill & Blast Method
including required protection measures i.e. shotcreting, rock bolting and rib erections, forepoling,
grouting etc., construction of buildings (Commercial & Residential) including all layouts and final
handing over.
Dealing with client / contractor as per contract clauses for execution, billing, time extensions,
deviations, escalations etc.
2. July 2014 to till date:-
Working as Project Manager for M/S Vibrant Sai Corporation for the work of Constructiion of Building I
am looking after whole work i.e. Planning, Surveying, execution, billing and day to day work at site to
complete the job within the stipulated time perios.
Nov. 2012 to June 2014
Working as Sr.Manager ( Planning, Contracts and Quantity Survey) with M/S Rithwik Projects Private
Limited (For the work of Construction of Barrage and Desilting Works, Silt Flushing Tunnel, Control
Room Buildings, Office complex for Balance Works at Tapovan Vishnugad Hydro Power Project (4x130
MW, NTPC Limited) at Tapovan in District Chamoli in Utrakhand State. I am looking after the work of
Planning, Monitoring, Budgeting, billing work of Client and PRW’s, contractual correspondences and
reporting to Head Office on day to day basis.
March 2010 to October 2012
Worked as Manager (Planning, Monitoring and Business Development) with M/S P & R Infraprojects
Limited, Chandigarh.
I had worked with M/S P&R Infraprojects Limited, Quite Office No 7, 1st & 2nd Floor, Sector 35 A,
Chandigarh, UT.The Company is also engaged with road work with M/S SOMA ISOLUX JV for NH-
1(Supply, erection and construction of Foot Over Bridges on Paniput –Jallandhar Section, 6 lanning work).
The company is engaged in major fabrication, transportation and erection of bridges, satdiums, buildings,
Penstocks etc. Our company had worked for various Hydro Electric Projects.
January 2007 to Feb. 2010:-
Headed as Deputy Manager (Contracts and Engineering Division) in 192 MW Allain Duhangan Hydro
Electric Project in AD Hydro Power Limited, VPO Prini, Tehsil Manali, Distt. Kullu, H.P. (LNJ Bhilwara
Group & S N Power Norway JV).
Project Details: -
Allain Duhangan Hydro Electric Project 192 MW is being executing by AD Hydro Power Ltd., (The joint
venture of SN Power Norway and LNJ Bhilwara Group) VPO Prini, Distt. Kullu, H.P. This is a BOOT
(Build, Own, Operate & Transfer) project and ADHPL is a client for this project.
Job Responsibilities:-
I was heading the Contracts and Engineering Division of ADHPL. My job includes the overall working of
the Contract & Engineering Division (CED). The works being executed in CED were as: minor designs,
preparation of Tender specifications, Finalization of Tender after negotiations, Awarding of works to
contractors, Estimation of various works, Checking of Bills of contractors(like L&T, NCC, AMC Projects,
DKS Contractors Ltd., SEW – Coastal JV, P&R Engg. Services, BHEL, ABB and others), Finalization of
Deviations / extra items rates w.r.t. contract agreement and finalization of rates, preparation of flow chart
and monitoring of contractor’s progress w.r.t. planned / scheduled progress and to do scheduling. Further I
had also to report our Head Office about all type of delays and forecast about the planned progress w.r.t
actual progress achieved etc. Close liaison with contractor’s progress. ADHPL had 35KM roads duly black
carpeted and maintained by itself. All billing, execution and preparation of bar chart and operation of roads
were directly under control of CED.
3. March 2006 to January 2007:
Worked as Manager (Contracts) with M/S Hindustan Construction Company Limited for Chamera Hydro
Electric Project (Stage –III) at Chamba,Distt. Chamba, H.P.
Job Responsibilities:-
Contracts Branch: - My job includes the daily Liaisoning with client (NHPC Ltd.) for smooth functioning of
the work at site. To look after the work of billing with client and subcontractors.
Specialized training in SAP at our H.O. Hincon House, LBS Marg, East Vikhroli, Mumbai with IBM
team.
August 1998 to March 2006:
Worked as Engineer (Civil) at 192 MW Allain Duhangan Hydro Electric Project. (LNJBhilwara Group)
Project Details: -
Allain Duhangan Hydro Electric Project 192 MW) is being executing by AD Hydro Power Ltd., VPO Prini,
Distt. Kullu, H.P. This is a BOOT (Build, Own, Operate & Transfer) project and ADHPL is a client for this
project.
Job Responsibilities:-
My job includes minor designs at site office and preparation of Tender specifications, Finalization of Tender
after negotiations, Awarding of works to contractors, Estimation of various works, Checking of Bills of
contractors, Finalization of Deviations/ extra items, escalations, preparation of flow & bar charts etc.,
planning and monitoring of contractor’s progress and to do scheduling.
Computer Literacy: Well working knowledge of MS Office.
Worked as Asstt. Engineer (Civil) at Malana Hydro Electric Project. (LNJ Bhilwara Group)
Project Details: -
Malana Hydro Electric Project (86 MW) is executed and commissioned by Malana Power Company Ltd.,
VPO Jari, Distt. Kullu, H.P. This is a BOOT (Build, Own, Operate & Transfer) project and MPCL is a client
for this project. This project was commissioned in a record time of 30 months instead of scheduled 36
months.
Job Responsibilities:-
My job includes minor designs at site and preparation of Tender specifications, Finalization of Tender after
negotiations, Awarding of works to contractors, Estimation of various works, Checking of Bills of
contractors, Finalization of Deviations/ extra items, escalations, preparation of flow & bar charts etc.,
planning and monitoring of contractor’s progress and to do scheduling. Further I have also to report Head
Office about all type of delays and forecast about the progress etc. Close liaison with contractor’s progress.
January 1991 to August 1998:
4. Worked as Engineer Civil with M/s Sohan Singh & Company.
Company Profile:
The company was dealing with HPPWD & various misc works of Nathpa Jhakri Power Corporation Ltd.
contract works with NJJV, CFJV and JPI Ltd. The company had executed the work of Widening and black
topping of existing road to 6-10 m from Rampur to Solding section NH22.
Job Responsibilities:
My job includes rate analysis for tendering works for HPPWD and NJPC Ltd. works. I had executed the
work of Widening of NH-22 This work includes widening of existing road to 10 meter with excavation of
Hard rock by drilling and blasting, construction of Retaining / Breast walls of RR Stone masonry and RCC
work, C/O Culverts, C/O Bridges (RCC Bridges), Metalling and tarring of road as per MOST specifications
as per guidance of N.H.A.I.
Personal Particulars:
Father’s name Shri Lal Singh Verma
Permanent address Village Sandehra, PO Khouda,
Tehsil Sarkaghat, Distt. Mandi, H.P.
PIN 175024
DOB 25/06/1968
Marital Status Married
Qualification:
A) Academic Matric in First Division from H.P.School Education Board.
(March 1983-1984)
10 + 2 (Intermediate) from H.P.School Education Board.
(Private March 2002)
B) Technical National Trade Certificate in D. Man Civil from Haryana
Technical Education Board in First Division in August 1987.
Three years Diploma in Civil Engineering from H.P.Technical
Education Board in First Division in January 1991.
Curricular Activity NCC “C” certificate.
Notice Period One month or as per mutual understanding.
Salary Drawn Rs 14,20,000/- per annum with free accommodation, conveyance.
Salary Expected Rs 16,00,000/- (Negotiable)
Place : Greater Mohali, Punjab.
Date : Jan 2016
(Ravinder Singh Verma)