LARSEN & TOUBRO LIMITED – CONSTRUCTION DIVISION
Hyderabad, Mumbai, Bangalore - India
July 2001 to April 2015
Project Role: Assistant Quantity Surveyor (July 2001 to June 2006)
Quantity Surveyor (July 2006 to June 2012)
Senior Quantity Surveyor (July 2012 to April 2015)
Responsibilities:
Commercial Management of Terminal Building, Commercial & Residential High Rise Buildings including
infrastructure works for:
 RajivGandhi International Airport, Hyderabad, India (Circa US$ 90M)
 Chhatrapati Shivaji International Airport, Mumbai, India (Circa US$ 330M)
 Provident Sunworth Residential Gate Community, Bangalore, India (Circa US$ 30M) – 6500 Apartments
(18 Towers and 19 Floors per tower) Civil Works and external works like landscaping, irrigation, multilevel
carparking,undergroundtanks,waterfeatures,boundarywalls,internalroads,servicesandsecuritysystems.
Pre Contract/Tendering
 Collecting and verifying the Tender Documents for pricing
 Prepare Pre-Tender Report and Tender Clarification Letters
 Preparing Tender documentation including cost summary sheets, risk assessments and approval
documentation
 Cross checkingofBOQ quantitiesanddetailedquantitytake off for allTerminal Buildingsstructure& interior
works, Residential building & commercial buildings.
 Sending enquires for Suppliers and Sub Contractors; Maintain and update the database of quotations;
pricelists and cost libraries
 Rate analysis for structure – supplyof concrete,Shuttering, reinforcementtyingetc alongwith estimationof
quantities
 Rate Analysis of interiorworks : Flooring,Falseceiling,Cladding,Internalpartitionsetc alongwithestimation
of quantities
 Rate Analysis for external flexible pavements along with estimation of quantities
 Buildandmaintainpricing/estimatingdatabasesandensureoutturncostsarecapturedandfedbackthrough
the system
 Maintain a register of keyassumptions within estimates and pricing
 Preparation of RFP, RFI, bid documentation and bid comparison templates, Procurement Schedules
 Co-ordinationwithEngineer,ProjectManager&CostConsultantforsufficiencyofTenderPackage,togather,
analyze, summarize, and prepare recommendations on sourcing strategies, practices and procedures
 Assisting Business TenderingManagerinTenderingProcess;Identify opportunityandrisk duringthe tender
process
 Analysis of Project Information Document (PID) / Detailed project report (DPR) for bidding new projects
 Conducting Site Visits to understand Conditions and Constraints; Preparation of Site Investigation report
 Attend Pre-Bid Meeting; Negotiation / Post Tender Clarification Meeting
 Preparation & submission of Financial & Technical Bids; Tender Clarifications and Qualifications
 Assist with facilitating anyproject bonds, guarantees and insurances required bymain contract
 Preparereports for contractawardstatus, performanceanalysis,contracttermstracking,contractprovisions
and interpret reports/data for contract management
 Co-ordination for package award; Ensure proper handover of all relevant commercial and contractual
documents between departments
Post-ContractQuantitySurveying/ContractAdministration
 Prepared Interim Payment Application / progress payment claim against Value of Work done for measured
works, Variations/Change orders, Material On-Site/Off-Site, Fluctuations, Special payments in accordance
with contract
 Followedupcertificationtobeobtainedfrom theClientforpayment andcheckedthecorrectnessofthesame
as per contract provision.
 Prepared and compiled variation claims document with all relevant substantiation to the satisfaction of the
Engineer/Employer; followed up their submission to client for payments
 Maintained logs for claims and therebyagreeing variations/change orders
 Analysed and Recommended Subcontract payment application based on actual progress of S/C work.
Inspecting and then valuing the completed work.
 Performed, Monitored and Reviewed cost engineering functions, including Cost Estimating, Cost Control,
Financial Reporting Systems, and Cost Analysis
 Prepared Cost Report on a monthlybasis and monitored costs for the project
 Prepared Cash Flow Statements
 Handled Claims Management including Change Orders and variations for Main Contract and Sub contract
and assisted for strategyformulation for realizations of variations/ claims.
 Performed Quantity take-off from the approved Shop Drawings and developed a comprehensive list of
materials required for completion of project and for timelyprocurement.
 Studiedthedrawings,specificationandothercontractualdocumentsandprovidedtechnicalhelpforexecution
team.
 Managed subcontractor/material suppliers’ selection which included Identification, selection collection of
quotations, analysis, comparison, coordination and negotiation.
 ReviewedperformanceofSubcontractors,BondsandInsurancesincompliancewithcontractrequirements.
 Provided guidance and mentored subordinate staff in MonthlyPayments, Variations and Change Orders.
 Prepared Statement at Completion and Final Account and other Contract Close Out Documents.
 Preparedcontractualcorrespondence and processing of extension of time (EOT) of subcontractor / Client.
 Supported in the contract administration of multiple contracts to project & execution teams including
contractual communications, compliance requirements.
 FormulatedSubcontracttemplateonbacktobackterms,ProjectSubcontractingPlanthataddressescontract
format, content, subcontracting practices and procedures and subcontract administration requirements to
support of the project
 Assisted in recording of issues, communication and delays byclient for raising claims in future.
 Prepared & Compiled “Final Accounts Payment application” with relevant substantiation and documents as
per contract obligations.
 Escalation working for monthlybills based on indices, Oil prices etc.

More Related Content

What's hot

Tendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessTendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessPrateek Kashyap
 
Construction industry and estimating
Construction industry and estimatingConstruction industry and estimating
Construction industry and estimatingalanchong88
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - siteAbdulaziz Kaya
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
Construction Documents
Construction DocumentsConstruction Documents
Construction DocumentsAllan Berry
 
PP Seminar Tutorial 7
PP Seminar Tutorial 7PP Seminar Tutorial 7
PP Seminar Tutorial 7Farah Sham
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBESahl Buhary
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeepSandeep Yadav
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides마 이환
 
Cp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qCp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qumes manandhar
 

What's hot (20)

Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 
PP Seminar
PP SeminarPP Seminar
PP Seminar
 
Chapter 2- Contract Management
Chapter 2- Contract ManagementChapter 2- Contract Management
Chapter 2- Contract Management
 
Tendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessTendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award Process
 
Construction industry and estimating
Construction industry and estimatingConstruction industry and estimating
Construction industry and estimating
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Construction Documents
Construction DocumentsConstruction Documents
Construction Documents
 
Module 4 lecture 1
Module  4 lecture 1Module  4 lecture 1
Module 4 lecture 1
 
PP Seminar Tutorial 7
PP Seminar Tutorial 7PP Seminar Tutorial 7
PP Seminar Tutorial 7
 
Design-Build Procurement Approaches
Design-Build Procurement ApproachesDesign-Build Procurement Approaches
Design-Build Procurement Approaches
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBE
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeep
 
Tendering presenation
Tendering presenationTendering presenation
Tendering presenation
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
 
ACH 216 Lecture 04b (Bidding) Part 1
ACH 216 Lecture 04b (Bidding) Part 1ACH 216 Lecture 04b (Bidding) Part 1
ACH 216 Lecture 04b (Bidding) Part 1
 
CV_Saifullah Khalid-
CV_Saifullah Khalid-CV_Saifullah Khalid-
CV_Saifullah Khalid-
 
Cp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qCp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post q
 
COMPANY PORTFOLIO
COMPANY PORTFOLIOCOMPANY PORTFOLIO
COMPANY PORTFOLIO
 

Similar to sp - Copy (20)

Unnikrishnan_CV-
Unnikrishnan_CV-Unnikrishnan_CV-
Unnikrishnan_CV-
 
Eng's Nisar CV for Sr QS & Contract Engineer
Eng's Nisar CV for Sr QS & Contract EngineerEng's Nisar CV for Sr QS & Contract Engineer
Eng's Nisar CV for Sr QS & Contract Engineer
 
111
111111
111
 
Jitender_Sharma
Jitender_SharmaJitender_Sharma
Jitender_Sharma
 
Moph 7 5-13 (sa path)
Moph   7 5-13 (sa path)Moph   7 5-13 (sa path)
Moph 7 5-13 (sa path)
 
Moph 7 5-13 (sa path)
Moph   7 5-13 (sa path)Moph   7 5-13 (sa path)
Moph 7 5-13 (sa path)
 
CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef sam
 
Frances L. Vessell Resume 01.26.2017
Frances L. Vessell Resume 01.26.2017Frances L. Vessell Resume 01.26.2017
Frances L. Vessell Resume 01.26.2017
 
Van herrera cv
Van herrera   cvVan herrera   cv
Van herrera cv
 
Anand resume scm
Anand resume scmAnand resume scm
Anand resume scm
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
 
Procurement management-plan template
Procurement management-plan templateProcurement management-plan template
Procurement management-plan template
 
CV Shehzad SQS
CV Shehzad SQSCV Shehzad SQS
CV Shehzad SQS
 
Homer CV - CA2
Homer CV - CA2Homer CV - CA2
Homer CV - CA2
 
Resume
ResumeResume
Resume
 
CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub Contract
 
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERRESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
 
Thangaraj Chandrasekaran Commercial Contract Manager - Available Immediate
Thangaraj Chandrasekaran Commercial Contract Manager - Available ImmediateThangaraj Chandrasekaran Commercial Contract Manager - Available Immediate
Thangaraj Chandrasekaran Commercial Contract Manager - Available Immediate
 
Resume 082516
Resume 082516Resume 082516
Resume 082516
 

sp - Copy

  • 1. LARSEN & TOUBRO LIMITED – CONSTRUCTION DIVISION Hyderabad, Mumbai, Bangalore - India July 2001 to April 2015 Project Role: Assistant Quantity Surveyor (July 2001 to June 2006) Quantity Surveyor (July 2006 to June 2012) Senior Quantity Surveyor (July 2012 to April 2015) Responsibilities: Commercial Management of Terminal Building, Commercial & Residential High Rise Buildings including infrastructure works for:  RajivGandhi International Airport, Hyderabad, India (Circa US$ 90M)  Chhatrapati Shivaji International Airport, Mumbai, India (Circa US$ 330M)  Provident Sunworth Residential Gate Community, Bangalore, India (Circa US$ 30M) – 6500 Apartments (18 Towers and 19 Floors per tower) Civil Works and external works like landscaping, irrigation, multilevel carparking,undergroundtanks,waterfeatures,boundarywalls,internalroads,servicesandsecuritysystems. Pre Contract/Tendering  Collecting and verifying the Tender Documents for pricing  Prepare Pre-Tender Report and Tender Clarification Letters  Preparing Tender documentation including cost summary sheets, risk assessments and approval documentation  Cross checkingofBOQ quantitiesanddetailedquantitytake off for allTerminal Buildingsstructure& interior works, Residential building & commercial buildings.  Sending enquires for Suppliers and Sub Contractors; Maintain and update the database of quotations; pricelists and cost libraries  Rate analysis for structure – supplyof concrete,Shuttering, reinforcementtyingetc alongwith estimationof quantities  Rate Analysis of interiorworks : Flooring,Falseceiling,Cladding,Internalpartitionsetc alongwithestimation of quantities  Rate Analysis for external flexible pavements along with estimation of quantities  Buildandmaintainpricing/estimatingdatabasesandensureoutturncostsarecapturedandfedbackthrough the system  Maintain a register of keyassumptions within estimates and pricing  Preparation of RFP, RFI, bid documentation and bid comparison templates, Procurement Schedules  Co-ordinationwithEngineer,ProjectManager&CostConsultantforsufficiencyofTenderPackage,togather, analyze, summarize, and prepare recommendations on sourcing strategies, practices and procedures  Assisting Business TenderingManagerinTenderingProcess;Identify opportunityandrisk duringthe tender process  Analysis of Project Information Document (PID) / Detailed project report (DPR) for bidding new projects  Conducting Site Visits to understand Conditions and Constraints; Preparation of Site Investigation report  Attend Pre-Bid Meeting; Negotiation / Post Tender Clarification Meeting
  • 2.  Preparation & submission of Financial & Technical Bids; Tender Clarifications and Qualifications  Assist with facilitating anyproject bonds, guarantees and insurances required bymain contract  Preparereports for contractawardstatus, performanceanalysis,contracttermstracking,contractprovisions and interpret reports/data for contract management  Co-ordination for package award; Ensure proper handover of all relevant commercial and contractual documents between departments Post-ContractQuantitySurveying/ContractAdministration  Prepared Interim Payment Application / progress payment claim against Value of Work done for measured works, Variations/Change orders, Material On-Site/Off-Site, Fluctuations, Special payments in accordance with contract  Followedupcertificationtobeobtainedfrom theClientforpayment andcheckedthecorrectnessofthesame as per contract provision.  Prepared and compiled variation claims document with all relevant substantiation to the satisfaction of the Engineer/Employer; followed up their submission to client for payments  Maintained logs for claims and therebyagreeing variations/change orders  Analysed and Recommended Subcontract payment application based on actual progress of S/C work. Inspecting and then valuing the completed work.  Performed, Monitored and Reviewed cost engineering functions, including Cost Estimating, Cost Control, Financial Reporting Systems, and Cost Analysis  Prepared Cost Report on a monthlybasis and monitored costs for the project  Prepared Cash Flow Statements  Handled Claims Management including Change Orders and variations for Main Contract and Sub contract and assisted for strategyformulation for realizations of variations/ claims.  Performed Quantity take-off from the approved Shop Drawings and developed a comprehensive list of materials required for completion of project and for timelyprocurement.  Studiedthedrawings,specificationandothercontractualdocumentsandprovidedtechnicalhelpforexecution team.  Managed subcontractor/material suppliers’ selection which included Identification, selection collection of quotations, analysis, comparison, coordination and negotiation.  ReviewedperformanceofSubcontractors,BondsandInsurancesincompliancewithcontractrequirements.  Provided guidance and mentored subordinate staff in MonthlyPayments, Variations and Change Orders.  Prepared Statement at Completion and Final Account and other Contract Close Out Documents.  Preparedcontractualcorrespondence and processing of extension of time (EOT) of subcontractor / Client.  Supported in the contract administration of multiple contracts to project & execution teams including contractual communications, compliance requirements.  FormulatedSubcontracttemplateonbacktobackterms,ProjectSubcontractingPlanthataddressescontract format, content, subcontracting practices and procedures and subcontract administration requirements to support of the project  Assisted in recording of issues, communication and delays byclient for raising claims in future.  Prepared & Compiled “Final Accounts Payment application” with relevant substantiation and documents as per contract obligations.
  • 3.  Escalation working for monthlybills based on indices, Oil prices etc.